PLANT-NET CY LIFE+08 NAT/CY/000453
Third Meeting of the Scientific Committee 26/04/2012
Assoc. Prof. Costas Kadis
Project’s Scientific Coordinator
1
![Page 2: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/2.jpg)
PLANT-NET CY LIFE+08 NAT/CY/000453
2
CONTENTS 1. The PLANT-NET CY project : General characteristics 2. Progress achieved in each Action 3. Additional activities (Outside LIFE) 4. Discussion 5. Evaluation of “Project Monitoring Protocol”
![Page 3: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/3.jpg)
PLANT-NET CY LIFE+08 NAT/CY/000453
3
CONTENTS 1. The PLANT-NET CY project : General characteristics 2. Progress achieved in each Action 3. Additional activities (Outside LIFE) 4. Discussion 5. Evaluation of “Project Monitoring Protocol”
![Page 4: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/4.jpg)
PLANT-NET CY LIFE+08 NAT/CY/000453
4
Budget: € 1.547.297,00
PROJECT IMPLEMENTORS:
Coordinating Beneficiary:
Duration: 01/01/10 - 30/06/13
Department of Environment (MANRE)
Associated Beneficiaries:
EC Co-funding: 69,17 %
Frederick University University of Athens
Department of Forests (MANRE) UNDP - ACT FEEO
![Page 5: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/5.jpg)
PMR 3: Koilada Kedron - Kampos
PMR 2: Koilada Kedron - Kampos
PMR 4: Chersonisos Akama
PMR 5: Periochi Asgatas
5
PMR 1: Periochi Mitserou
![Page 6: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/6.jpg)
PLANT-NET CY LIFE+08 NAT/CY/000453
6
PRESENTATION’S CONTENTS 1. The PLANT-NET CY project : General characteristics 2. Progress achieved in each Action 3. Additional activities (Outside LIFE) 4. Discussion 5. Evaluation of “Project Monitoring Protocol”
![Page 7: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/7.jpg)
7
Project’s Timetable
Project’s Deliverables and Milestones
![Page 8: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/8.jpg)
8
Action A.1: Inventory of the localities of the targeted species/habitats and determination of the boundaries of the PMRs COMPLETED – Deliverables: i. Database; ii. Five 1:5000 scale maps. Action A.2: Detailed mapping of the PMRs COMPLETED – Deliverables: i. Five 1:500 scale maps.
Action A.3: Preparation of Monitoring Plans for each PMR COMPLETED – Deliverables: i. Five Monitoring Plans. Action A.4: Preparation of Management Plans for each PMR COMPLETED – Deliverables: i. Five Management Plans [Accepted]
![Page 9: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/9.jpg)
9
Action A.5: Assessment of the genetic diversity and population structure for each of the 4 targeted priority species and Cedrus brevifolia (05/2012) In progress – Deliverables: i. Report on the necessity and feasibility of reinforcement of existing populations, ii. Report on the genetic diversity and population structure of each of the 4 targeted priority species and Cedrus brevifolia.
This action is delayed due to the huge accident in Mari - Limassol (11/07/2011), which resulted in nationwide electricity cut offs; two machines from our lab were affected.
![Page 10: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/10.jpg)
10
Action A.6: Learning from the experiences of other EU countries that adopted the PMR approach COMPLETED – EU countries visited: Greece (Crete), Spain (Minorca, Valencia), Bulgaria (Sofia, Rhodope).
@ T. Papachristophorou
![Page 11: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/11.jpg)
11
Action C.1: Establishment of the PMRs in the field (1/2) COMPLETED i. Placement of borderline signs ii. Installation of notice boards
![Page 12: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/12.jpg)
12
Action C.1: Establishment of the PMRs in the field (2/2) >> COMPLETED iii. Fencing & iv. Pathway construction
![Page 13: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/13.jpg)
13
Action C.2: Installation of permanent monitoring plots COMPLETED
Action C.3: Monitoring of the PMRs In progress – Deliverables: i. Operational and maintenance protocol of the Monitoring Stations (Completed); ii. Five monitoring reports for 2012 >> 07/2012; iii. Five monitoring reports for 2013 >> 06/2013; iv. Monitoring Database/Diagrammatic summaries (models) >>07/2013.
An overview of the establishment of a PMR in the field >>
![Page 14: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/14.jpg)
14
Action C.4: Application of conservation measures within the PMR (1/4) In progress (06/2013) a. Moderate provision of water in extreme drought conditions. b. Moderate provision of fertilizer/manure in order to increase reproductive success in
Astragalus macrocarpus subsp. lefkarensis. c. Small-scale relief modifications to reduce erosion and enhance plant protection.
![Page 15: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/15.jpg)
15
Action C.4: Application of conservation measures within the PMR (2/4) In progress (06/2013)
d. Dispersal of seeds from the local populations to appropriately prepared areas. e. Course modification of human and animal pathways to minimize the impacts.
![Page 16: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/16.jpg)
16
Action C.4: Application of conservation measures within the PMR (3/4) In progress (06/2013) f. Fencing of A. macrocarpus subsp. lefkarensis individuals for preventing flower/fruit
predation g. Removal of flammable biomass
![Page 17: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/17.jpg)
17
Action C.4: Application of conservation measures within the PMR (4/4) In progress (06/2013) h. Following conducts with an entomologist, new measures were implemented for
preventing fruit predation such as spraying with a specific insecticide on the ovary just after pollination or the beginning of fruit setting. And also covering the sprayed inflorescences/infructescences.
i. Self - & Cross - hand pollination took place and this measure was combined with spraying with the specific insecticide.
![Page 18: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/18.jpg)
18
Action C.5: Enrichment of the populations of the targeted species In progress (06/2013) At least 200 plantlets from each targeted species will be planted in the respective PMR (except from Ophrys kotschyi). Deliverable: i. Report on the enrichment of the populations of the targeted species. 20 plantlets of Astragalus macrocarpus subsp. lefkarensis and 20 plantlets of Centaurea akamantis were planted and the action is still in progress
![Page 19: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/19.jpg)
19
Action C.6: Utilization of existing Botanical Gardens of the FD to achieve the ex-situ conservation of the targeted plant species In progress (06/2013)
![Page 20: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/20.jpg)
20
Action C.7: Collection and storage of seeds of the targeted species at the seed bank of the Agricultural Research Institute to achieve ex-situ conservation of the targeted taxa In progress (06/2013)
Action C.8: Safekeeping of the PMRs In progress (06/2013) Frequent patrolling of trained staff of the Department of Forests.
![Page 21: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/21.jpg)
21
Action D.1: Information campaign, organization of workshops, seminars and conferences, production of information material (1/3) In progress (06/2013) Deliverables: i. Rural appraisals and local workshops
![Page 22: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/22.jpg)
22
Action D.1: Information campaign, organization of workshops, seminars and conferences, production of information material (2/3) In progress (06/2013)
Deliverables:
ii. Media coverage: 2/3 press releases (IR, FPR), 2/3 TV (FPR) and 2/2 radio broadcasts (IR, FPR), 3/3 articles in newspapers/magazines(FPR, new1, new2) >> 11/2010, 11/2011, 06/2013
IR: Inception Report; FPR: First Progress Report, MTR: Middle Term Report
iii. Information material: Three Newsletters (1000 copies, 8pp each, colored, in A5 size) >> 06/2010, 06/2011, 06/2012 Leaflet (in Greek, English, Turkish, 600 copies, colored, A5 size) Colored poster (500 copies, A2 size) DVD (500 copies) >> 06/2013
![Page 23: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/23.jpg)
23
Action D.1: Information campaign, organization of workshops, seminars and conferences, production of information material (3/3) In progress (06/2013) iv. Workshops : Tourism workshop Bi-communal workshop v. Final info day >> 06/2013
![Page 24: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/24.jpg)
24
Action D.2: Technical publications, website development, CD-ROM production, Layman’s report In progress (06/2013) Deliverables: i. Technical/Scientific publication (100 copies, A4 size) >> 06/2013 ii. Website development iii. CD-ROM with reports and documents of the Project >> 06/2013 iv. Layman’s Report >> 06/2013 v. Three presentations in international conferences >>11/2010, 11/2011, 06/2013
www.plantnet.org.cy
![Page 25: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/25.jpg)
25
Action D.3: Operation of Information Centres within three Botanical Gardens In progress (06/2013) The Information Centres will utilize the deliverables of Actions D.1 (Information material) and C.6 (section within the Botanical Gardens for the ex-situ conservation of the targeted taxa).
Action D.4: Preparation and publication of a book on PMR experiences In progress (06/2013) Contacts have been made with the experts who will contribute in the preparation of the book. Deliverable: i. Book presenting the knowledge and experience accumulated over the last 15 years from successful PMR projects.
![Page 26: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/26.jpg)
26
Action E.1: Project Management In progress (06/2013) Changes in Project Management Team (PMT) which have already been reported to External Monitoring Team and European Commission These changes have not affected the project implementation. Deliverables: i. Inception Report (09/2010) ii. 1st Progress Report (09/2011) iii. Mid-Term Report with payment request (01/2012) iv. 2nd Progress Report >> 11/2012 v. Final Report with payment request >> 12/2013
![Page 27: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/27.jpg)
27
Action E.2: Project Monitoring In progress (06/2013) The “Monitoring Protocol” was evaluated and accepted by the Scientific Committee . The progress achieve by each action is monitored and evaluated by the Scientific Committee.
![Page 28: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/28.jpg)
28
Action E.3: Operation of the Scientific Committee In progress (06/2013) Four meetings of the Scientific Committee >> 04/2010, 04/2011, 04/2012, 04/2013
![Page 29: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/29.jpg)
29
Action E.4: Operation of the Stakeholders Board In progress (06/2013) Four meetings of the Stakeholders Board >> 03/2010, 01/2011, 01/2012, 06/2013
![Page 30: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/30.jpg)
30
Action E.5: Networking with other projects (1/2) In progress (06/2013) The project provides a platform for networking of all LIFE projects with a focus on the establishment of PMRs in Europe
![Page 31: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/31.jpg)
31
Action E.5: Networking with other projects (2/2) In progress (06/2013) Deliverable: A two-day Experts’ Workshop Experts from 7 European countries participated. Prospects of creating a European Plant Micro-Reserves Network The Commission’s response
![Page 32: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/32.jpg)
32
Action E.6: After-LIFE Conservation Plan (06/2013) Deliverable: i. An After-LIFE Conservation Plan in Greek and English, in paper and electronic format >> 09/2013. The After-LIFE will : Secure the management of the PMRs and the targeted priority species/habitats in long term Give details on the actions that will be carried out in the future Contribute to the sustainability of the project
![Page 33: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/33.jpg)
PLANT-NET CY LIFE+08 NAT/CY/000453
33
PRESENTATION’S CONTENTS 1. The PLANT-NET CY project : General characteristics 2. Progress achieved in each Action 3. Additional activities (Outside LIFE) 4. Discussion 5. Evaluation of “Project Monitoring Protocol”
![Page 34: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/34.jpg)
34
PUBLIC AWARENESS Creation of a group on “Facebook” for further dissemination of the project’s actions . Creation of a “PLANT-NET CY” page on YouTube-Channels for the screening of videos showing actions of the project and TV broadcasts of the project.
![Page 35: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/35.jpg)
35
Presentation at the elementary school of Mitsero. Presentation of the project and the PMRs approach to the students of the MSc program “Education for the Environment and Sustainable Development”.
![Page 36: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/36.jpg)
36
Implementation of four MSc theses within the MSc Programme in Education for the Environment and Sustainable Development Voluntary cleaning of the PMR with *Ophrys kotschyi in Mitsero by members of “Environmental Group of Mitsero”. Presentation of the project at the 1st Festival on Environment and Recycling organized by Green Dot Cy. Support the initiative of Mitsero community to publish an annual calendar presenting the flora of the area.
![Page 37: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/37.jpg)
37
Contribution to the knowledge on the insect fauna of Cyprus. Presentation of the project in 7 international conferences.
PLANT-NET CY was selected as one of the best case studies by a USAID project entitled “Future Together: Participatory Development in Cyprus” for the conservation of cultural and natural heritage. The European Landowner’s Organization selected the project as possible best case study and approached the Coordinating Beneficiary to complete a questionnaire about the project’s objectives and actions.
![Page 38: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/38.jpg)
38
Presentation of the project at the Grundtvig workshop entitled “Creating Bridges – Education for Sustainable Development ESD in MAB BRs and Designated Areas” [Greece, 30/03 - 05/04/2012].
Visit of the students of Mitsero school at the PMR neighboring their village (PMR1 - *Ophrys kotschyi).
![Page 39: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/39.jpg)
39
POLICY MAKING The legal status of the PMRs is defined by the New Forest Law since March 2012 [Article 16: Declaration of Forest Monuments and Plant Micro-Reserves]. The Ministry of Education and Culture introduced the PMR approach in the official “Guide for the Application of Environmental Education – Education for Sustainable Development in the Curriculum of Primary Education”.
![Page 40: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/40.jpg)
40
29th May 2012 The celebration ceremony of the Youth Competition will be combined
with an event for LIFE’s 20th anniversary.
![Page 41: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/41.jpg)
PLANT-NET CY LIFE+08 NAT/CY/000453
41
PRESENTATION’S CONTENTS 1. The PLANT-NET CY project : General characteristics 2. Progress achieved in each Action 3. Additional activities (Outside LIFE) 4. Discussion 5. Evaluation of “Project Monitoring Protocol”
![Page 42: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/42.jpg)
42
PMR1 - *Ophrys kotschyi • Abnormal development of the flowers of the orchid. • Despite these observations the hand pollinations were carried out with no problems and visits on a regular basis take place to assess fruit setting. • Seed germination was successfully implemented in NKUA labs; what is the next step?
![Page 43: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/43.jpg)
43
PMR2 - Scrub and low forest vegetation of Quercus alnifolia, *9390 • Counting of the male inflorescences in 30-40 individuals of Q. alnifolia is impossible. • There was a very limited production of female flowers and consequently a very limited fruit production, within the PMR. • 75% of the fruits collected, were insect infected.
PMR3 - *Arabis kennedyae and Cedrus brevifolia forests, *9590 • No evidence yet, of A. kennedyae plantlets at the new positions where seed dispersal took place. • Regeneration of A. kennedyae is evident only within the monitoring plots.
![Page 44: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/44.jpg)
44
PMR4 - *Centaurea akamantis • Last year, seeding directly into the crevices showed relatively low success (7-10%); should it be repeated? PMR5 - *Astragalus macrocarpus subsp. lefkarensis • Limited seed output of the species because of the high levels of predation.
![Page 45: PLANT-NET CY LIFE+08 NAT/CY/000453](https://reader031.vdocuments.net/reader031/viewer/2022022121/6212b046d105825b930d1a82/html5/thumbnails/45.jpg)
PLANT-NET CY LIFE+08 NAT/CY/000453
45
PRESENTATION’S CONTENTS 1. The PLANT-NET CY project : General characteristics 2. Progress achieved in each Action 3. Additional activities (Outside LIFE) 4. Discussion 5. Evaluation of “Project Monitoring Protocol”