Page 1: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

PLI Project DI Khan (Pakistan)

3.7

Page 2: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Project for Livelihood Improvement

• Overall Goal: Socio-Economic status of Disadvantaged communities enhanced.

• Objectives: Coping strategies of poor communities strengthened to improve their livelihood with special reference to women..

Page 3: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Two extreme conditions of the area

Condition when there is no rain/ flood water.

Condition when there is rain/ flood water

Area becomes inaccessibleand difficult to get out evenin case of emergency

Page 4: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Issues of Rodh Kohi area

• Seasonal Droughts. (12 droughts in last 50 years)

• Low and erratic rainfall. (135mm to 250mm)

Page 5: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Continued……….

• Soil erosion due to high intensity of flood.

• High maintenance cost of the flood irrigation system (Earthen Bund).

Page 6: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Continued…….

• Unavailability of drinking water for human & livestock.

• Under ground water is saline

• Rules (Kuliyat & Riwajat-e- Abapashi) are not followed.

Page 7: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Water management issues

• Distribution and control system of flood water.

• Depth of water application/ No. of irrigation/ season.

Page 8: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Continued……

• Uneven land leveling status.

• High sediments in flood irrigation channels (Rodh).

Page 9: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Potential to address water issues.

A. Efficient use of water for crop production and drinking purpose (Improvement in conveyance system).

B. Strengthening of water users association for equitable distribution.

C. Introduction of dry land farming technologies (incl. rain water harvesting etc) that improve production.

Page 10: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Project interventions

• Water Ponds Rehabilitation for Human & Livestock drinking purposes.

• Introduction of low cost sand filter at house hold level.

Page 11: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Improvement in distribution and control of flood water

• Improvement in water convenience system in collaboration with spate irrigation system project. (Diversion structure)

• Improvement in control of water at field in collaboration with spate irrigation system project. (field inlet)

Page 12: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Continued……..

• Rain Water Harvesting for trees/ crops production through artificial slopes.

• Homestead vegetable production and plantation through Pitcher irrigation techniques.

Page 13: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Project other interventions

• Conducted a Study to review the Social aspect of the Rodh Kohi Irrigation system

• Conducted a study to evaluate water status in the system

• Study in progress to determine appropriate depth of water applied during the flood

• Testing the ponds storage capacity in relation to population and time

Page 14: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Objectives Technical study

• To determine discharges of perennial and flood water of the selected Zam and Rodhs during flood season (July-September, 2004).

• To find the depth of irrigation water applied to each selected fields.

• To determine the depth of deposited sediment in the selected fields.

Page 15: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Study Area

Chaudhwan Zam

Daraban Zam

Gud

Terkhoba

Lohra

Gud

Velehri

Page 16: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Depth of Sediment deposited in selected bundras of both zams

0.001.002.003.004.005.006.00

H M T H M T

Draban Chawdwan

Location HMT of zams

Dept

h of

sed

imen

t de

posi

ted

in c

ms

Maximum

Minimum

Average

Page 17: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Depth of water Applied in selected bundras of Both Zams

0.00

50.00

100.00

150.00

200.00

250.00

H M T H M T

Draban Chawdwan

Location HMT of Zams

Dep

th o

f Wat

er A

pplie

d in

cm

s

Maximum

Minimum

Average

Page 18: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Conclusions

Flood water availability decreases from upstream to down stream in both Zam, farmers at downstream gets water twice out of ten years.

About 84% of the respondents mentioned that the amount of flood water availability has decreased during the past ten years.

In project area 67 percent of the total respondents received Rodh-Kohi water last year(2003), while that year(2004) 79% got flood water.

Page 19: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Due to limited water supply the cropping intensity is very low (single crop).

The yield of crops at downstream of the Rodh is relatively low as compared to the upstream due to limited water availability.

For perennial (Kala Pani) stream water management the organization set up is strong as compared to flood water management.

In general there exists an informal Water User’s Association for management of flood water but has weaken with time especially at the downstream of the Rodh due to unreliable flood water availability

Page 20: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Average depth of flood water applied by farmers ranges from 40 to 80 cm, due to large and unleveled fields the depth of water is relatively more than required.

Average depth of deposited sediment in the field ranges from about 2 to 3.5 cm per flood.

Infiltration rate of water in fields ranges from 0.2 to 1.2 mm /hr, which is relatively low and water stands in the fields for longer period and significant amount of water lost in evaporates.

Page 21: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

About two-third of the respondents reported that water distribution laws are followed.

Most of the respondents mentioned that the Rodh-Kohi system should be improved by improving the conveyance system.

Sixty-one percent of total respondents replied that they attend regular WUAs meetings which shows that people in this part of project area are more keen to involve themselves in the system improvement and important decision-making regarding efficient use of water.

Page 22: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

RECOMMENDATIONS

Mobilizations and Capacity Building of Communities for Management of irrigation system should be encouraged.

Integrated approach for the identification, planning, and implementation of interventions should be explored bu involving different stakeholders.

Water harvesting through catchments improvements, ponds and other structures at cost effective way for solving drinking water problems in Rodh Kohi area should be explored.

Low cost water management structures for control of flood water should be developed at field as well as Gundi/Sod level.

Page 23: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Community participation, mobilization and their capacity building should be ensured for equitable water distribution.

Old ponds at tail of Rodhs should be rehabilitated and their capacity should be enhanced for steady water supply.

Communities should be mobilized and organized first at village then to gundi / sod level and later should be extended to Rodh as well as Zam level for overall equitable water distribution.

For increasing crops yield and moisture conservation some agronomic interventions like deep tillage, improved seed etc be tested through farmer centered approaches.

Page 24: PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:

Lessons learnt

• People centered & demand driven approaches work successfully.

• Poor Peoples are a potential to work with, not a problem.