point defiance bypass project...jul 26, 2010  · technical advisory team . july 15, 2010. larry...

14
Point Defiance Bypass Project Technical Advisory Team July 15, 2010 Larry Mattson Environmental Manager Chris Dunster Business Manager Cascades High Speed Rail Program

Upload: others

Post on 02-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Point Defiance Bypass Project...Jul 26, 2010  · Technical Advisory Team . July 15, 2010. Larry Mattson. Environmental Manager. Chris Dunster. Business Manager Cascades High Speed

Point Defiance Bypass ProjectTechnical Advisory Team

July 15, 2010

Larry MattsonEnvironmental Manager

Chris DunsterBusiness Manager

Cascades High Speed Rail Program

Page 2: Point Defiance Bypass Project...Jul 26, 2010  · Technical Advisory Team . July 15, 2010. Larry Mattson. Environmental Manager. Chris Dunster. Business Manager Cascades High Speed

History of Rail Lines in the Point Defiance Bypass Project

The proposed project traces three rail lines built at different times.

• The Prairie Line - 1873

• American Lake Line -1891

• Point Defiance Line - 1914

2

Page 3: Point Defiance Bypass Project...Jul 26, 2010  · Technical Advisory Team . July 15, 2010. Larry Mattson. Environmental Manager. Chris Dunster. Business Manager Cascades High Speed

The “Prairie Line”

• Built in 1873 from Tenino to Tacoma

• The only rail route between Tacoma and Portland for 40 years

• In 1914, 28 daily passenger trains used the line to Lakewood

• Used as a passenger route until 1956

• In 1973 through-freights (i.e. Seattle to Portland) were removed.

• In 1986 the line from Yelm to Tenino was abandoned.

• In 2003 the line through downtown Tacoma was closed

3

Page 4: Point Defiance Bypass Project...Jul 26, 2010  · Technical Advisory Team . July 15, 2010. Larry Mattson. Environmental Manager. Chris Dunster. Business Manager Cascades High Speed

Present Day Steilacoom Boulevard SW circa 1927Looking South along “Prairie Line”

(NP Joint Facilities Book #2, Photo No. 11-191)

4

Page 5: Point Defiance Bypass Project...Jul 26, 2010  · Technical Advisory Team . July 15, 2010. Larry Mattson. Environmental Manager. Chris Dunster. Business Manager Cascades High Speed

Present Day 100th Avenue SW circa 1927 Looking South along “Prairie Line”

(NP Joint Facilities Book #2, Photo No. 11-194)5

Page 6: Point Defiance Bypass Project...Jul 26, 2010  · Technical Advisory Team . July 15, 2010. Larry Mattson. Environmental Manager. Chris Dunster. Business Manager Cascades High Speed

Lakeview Station circa 1927 Looking north along “Prairie Line” at about present day 108th St. SW

6

Page 7: Point Defiance Bypass Project...Jul 26, 2010  · Technical Advisory Team . July 15, 2010. Larry Mattson. Environmental Manager. Chris Dunster. Business Manager Cascades High Speed

The “American Lake” Line

7

• Built in about 1891 as part of the Grays Harbor Line running through Olympia

• The only rail route between Tacoma and Portland for 40 years

• In 1914, six daily passenger trains used the line

• Used as a secondary passenger route until 1956

• In 1973 through-freights (i.e. Seattle to Portland) were removed.

• In 1986 the line from Yelm to Tenino was abandoned.

• In 2003 the line became the only rail route to JBLM and South Tacoma

Page 8: Point Defiance Bypass Project...Jul 26, 2010  · Technical Advisory Team . July 15, 2010. Larry Mattson. Environmental Manager. Chris Dunster. Business Manager Cascades High Speed

Camp Murray Station circa 1928 American Lake Line looking northeast at Barksdale Avenue SW crossing

(NP Joint Facilities Book #7, Photo No. 11-813)8

Page 9: Point Defiance Bypass Project...Jul 26, 2010  · Technical Advisory Team . July 15, 2010. Larry Mattson. Environmental Manager. Chris Dunster. Business Manager Cascades High Speed

Original Mounts Road Bridge circa 1927 Looking northeast along American Lake Line

(NP Joint Facilities Book #7, Photo No. 11-768)

9

Page 10: Point Defiance Bypass Project...Jul 26, 2010  · Technical Advisory Team . July 15, 2010. Larry Mattson. Environmental Manager. Chris Dunster. Business Manager Cascades High Speed

The “Point Defiance Line”• Built between 1912 and 1914 • Most of the freight and passenger trains were re-routed over the

line when it opened for service• The line avoided the steep grades of the “Prairie Line” but was

4.5 miles longer• Nelson Bennett Tunnel is more than ¾ of a mile long under

Ruston and shorter Ruston Tunnel• Originally double track throughout, a single track installed

through the tunnels in 1988 for double-stack container, auto rack, and Boeing airplane parts cars over 20 feet tall

• Mud slides and unstable slopes on this water-level route were documented as early as 1921

• Line is used by BNSF, Union Pacific Railroad, and Amtrak trains• In 2006 the line averaged 41 through-freight trains and eight daily

Amtrak trains

10

Page 11: Point Defiance Bypass Project...Jul 26, 2010  · Technical Advisory Team . July 15, 2010. Larry Mattson. Environmental Manager. Chris Dunster. Business Manager Cascades High Speed

North portal of Nelson Bennett Tunnel circa 1927 Looking West with the town of Ruston above

(NP Joint Facilities Book #2, Photo No. 11-110)

11

Page 12: Point Defiance Bypass Project...Jul 26, 2010  · Technical Advisory Team . July 15, 2010. Larry Mattson. Environmental Manager. Chris Dunster. Business Manager Cascades High Speed

1992 2000199819971995 2003 2005

Project Concept Identified

Project Alignment Options Analyzed

Draft Intercity Passenger Rail Plan includes project

Final Intercity Passenger Rail Plan includes project

Amtrak CascadesPlan Update includes project

Legislative Transportation Budget includes project for ‘05 design start

Legislative Transportation Budget includes project for ‘05 design and ‘09 construction

April 2006

August 2006

Fall 2006

October 2007

August 2007

July 2007

Nov. 2006

May 2008

June 2008

August 2008

May 2010

April 2010

February 2010

July 2009

FHWA / FRA NEPA EA procedure is begun

Pre-scoping letters to cities, military & tribes

“Public Scoping Meeting/Open House” held; Elected officials briefed; TNT article published

Draft EA sent to FHWA and FRA

FHWA determines a DCE is appropriate NEPA document

Notices mailed to 440 parcel owners

DCE signed by FHWA

Scoping meetings with cities, military & tribes

Open House held; Environmental Summary & tech reports sent to cities, military & tribes and made available on web

Limited construction begins in Lakewood & Tacoma with FHWA DCE

FRA announces HSIPR funding

An FRA NEPA EA is required to fund project

FHWA NEPA DCE adopted as SEPA DNS

Open House held; Scoping letters for FRA NEPA sent to cities, military & tribes

Point Defiance Bypass Project History

12

Page 13: Point Defiance Bypass Project...Jul 26, 2010  · Technical Advisory Team . July 15, 2010. Larry Mattson. Environmental Manager. Chris Dunster. Business Manager Cascades High Speed

Future meetings

• Review schedule (handout in binder)

• General agenda for first technical meeting – Review Concerns– Build Base Screening Criteria– Determine analysis priorities– Align data– Identify additional data needs

13

Page 14: Point Defiance Bypass Project...Jul 26, 2010  · Technical Advisory Team . July 15, 2010. Larry Mattson. Environmental Manager. Chris Dunster. Business Manager Cascades High Speed

For more information

Please contact:

Larry Mattson509-577-1922

[email protected]

14