Executive Profile

A well respected architect in my profession, an outstanding, hard-working individual who can be counted on to “get the job done.”

Experience Brief

• Project Architect with 13 years total experience covering all phases of the design process and the construction implementation.

• Hand-On BIM & energy modeling skills using Revit, Rhino/Grasshopper.

• Project experience includes Mixed-Use (Mall + Offices + Hotel 5 stars), healthcare facilities, educational facilities and office building.

• The work experience I possessed has prepared me as a distinguished participant in architectural design that integrates highly into the digital

era of the profession.

Academic Qualifications:-

• B.sc Architecture (Honors, 5years Degree)- University of Khartoum, Faculty of Engineering & Architecture – 2003, number one ranking university

in Sudan

• EESA-NAAB Accreditation granted

• Eligible for ARE Testing in Illinois

Ahmed M AbubakerAssoc. AIA, LEED AP BD+C, PMP

Visa Status: Permanent Resident (validity 2025)

Ability to join any employer in USA

[email protected]

US: (224)814-8219

3

Page 4: Portfolio, Ahmed Mahgoub Abubaker

Experience

Project Architect July 2014– Oct. 2016

Arcadis, Incorporating Hyder Consulting - Riyadh, Saudi Arabia

Project: Alrajhi Operational Buildings & Data Center Project

• Reviewed contractor’s material, shop drawing and method statement submissions for conformance with contract documents

• Ensured that works are constructed in accordance with the design and contract documentation

• Liaison with the client, contractor and design consultant representatives

• Assisted in preparation of daily, weekly and monthly progress reports

• Attended inspections to ensure that works are constructed in accordance with the contract documentation and method statements

• Liaison with the contractor on all construction related matters

• Maintained photo and written diaries to record daily works

• Reviewed of As-Built documents

Senior Architect/Technical OfficeActing Technical Manager | February 2013–June 2014

Youssef Marroun Contracting Company (YMCO) - Riyadh, Saudi Arabia

• Studied contract’s document prior to starting shop drawings preparation and planning for the design of related shop drawings.

• Interpreted contractual agreements for buildings into blueprints covering all design aspects pertaining required designs and projects.

• Managed the preparation of sketch drawings, architectural drawings and detailed drawings by hand or using computer-aided design (CAD).

• Participated in preparing specifications and contract documents, specified building materials, construction equipment and required staff.

• Participated in solving discrepancies related to the contract and discussed ways to resolve conflicts in a professional manner and provided

assistance on all engineering matters such as design and specifications clarifications and changes, field engineering and scheduling.

Senior Architect | March 2012–December 2012

S.E.I.G spa Italy - Sudan Branch

Project :Al Qasswa Factory for Veterinary Production

Contract Value :15.7 Million USD

• Studied contract’s document prior to starting shop drawings preparation and planning for the design of related shop drawings according to GMP

requirements.

• Interpreted contractual agreements for buildings into blueprints covering all design aspects pertaining required designs and projects.

4

Professional Registration:-

•Specialist Engineer, Sudanese

Engineering Council.

• Full Member, Sudanese Associ-

ation of Architects.

•Member, Saudi Engineering

Counci l .

Professional Associations:-

• Assoc. AIA,38492453,

1 2 / 3 1 / 2 0 1 5

•Certified PMP, PMI, 1702583,

03/26/2017

•LEED AP BD+C, US Green

Building Council, 10923145-AP-

BD+C, 08/27/2017

Certification under Process:-

•CM-BIM, Association of General

Contractor, attended and

completed 2 of the 4 workshops

required for certification at the

BIMforum April 2016 held in

Minneapolis, USA

Page 5: Portfolio, Ahmed Mahgoub Abubaker

• Prepared sketch drawings, architectural drawings and detailed drawings by hand or using computer-aided design (CAD) equipment.

• Participated in preparing specifications and contract documents, specifying building materials, construction equipment and required staff.

• Observed, inspected and monitored building work, to make sure that the progress is according to the predetermined specification and contractual

agreements.

• Negotiated with builders and planning engineers, administered building activities and inspected the work carried out on sites.

• Facilitated site work execution and communicated with projects staff to clarify drawings details and discussed modifications when required.

• Participated in solving discrepancies related to the contract and discussed ways to resolve conflicts in a professional manner and provided

assistance on all engineering matters such as design and specifications clarifications and changes, field engineering and scheduling.

• Provided value engineering for tender reports and found better ways to design shop drawings and reduced costs.

• Prepared periodic reports with respect to the Architectural Section activities and achievements to be submitted to the Project Manager.

Tenant Coordinator / Asst. Chief Engineer | October 2011 –February 2012

AlWaha Khartoum - Khartoum, Sudan

• Maintained tenant design criteria manuals for each mall, to be used by tenants to design and build stores that will enhance the overall look and

feel of the shopping center.

• Coordinated with departments such as Leasing, Legal Leasing and Mall Management to facilitate Tenant Openings.

• Provided guidance to Leasing in regard to all design and construction activities to enhance Landlord’s opportunity for earlier rent commencements.

Architect | September 2008 – September 2011

Noon Consultancy Co. Ltd – Khartoum, Sudan

Projects:

• Retail Buildings (New Corporate image for Bank of Khartoum) Branding old branches, new branches and ATMs.

• Mix Use Buildings (WahatAlkhartoum Urban Development)

• Hotel Arjaan by Rotana Khartoum – Sudan site coordination.

• High End Residential complex (Al Manshieh Gardens)

• Commercial Buildings (Al Nour Convention & International Trading Center)

Responsibilities:

• Developed architectural design for concepts presented by concept architect.

• Prepared detailed design drawings.

5

Skills

• AutoCAD 2D/3D

• Revit Architecture

• Naviswork Manage

• Rhino/Grasshopper – Ladybug/

Honeybee for Energy Modeling

• 3d Max

• Photoshop CS

•InDesign

•Effective Project Management

applications (MS-Excel, MS-

Project, Primavera).

Page 6: Portfolio, Ahmed Mahgoub Abubaker

• Coordinated with MEP engineers to develop services design for the building.

• Evaluated design and material specifications for tender.

• Prepared material data sheets and coordinated with the procurement engineer.

• Incorporated feedback from customers for design clarification and modifications

Architect (PMO) | September 2004 – March 2008

Al-Amal National Hospital – Khartoum North, Sudan

Al-Amal National Hospital (200beds) general hospital, multi-story building over 25,000m² Built area, high quality standards finishing and services

Hospital Planner: AL–Mashora for Healthcare Technologies, Amman-Jordan

MEP Design:Universal Consultancy Services, Amman-Jordan

• Followed-up the process of re-design made by the hospital planner in order to prepare and present design proposals for the other proposed

hospitals for Al-Amal National Hospital ;

• Managed the preparation of the as-built drawings for existing buildings to enable the re-design process.

• Followed-up and documented the recommendation made by the consultant to the client on the practicality of the project;

• Followed-up and monitored the preparation and handling of the detailed drawings from which quantities were made;

• Followed-up the preparation and handling of the MEP detailed drawings to assure its applicability for the architectural design, and tender

documents;

• Followed-up negotiating with contractors and other professionals;

• Designed 70beds hospital as filtering (at suburbs) hospitals for Al-Amal National Hospital.

• Re-designed & supervised the construction of Emergency ,CCU,ICU units in the temporary location for Al-Amal National Hospital – Kobar

Junior Designer | December 2003 - August 2004

Perfection Engineering Consultancy – Khartoum North, Sudan

• Work with firm Principals on project phases including planning, design development, exploring new design directions, and furniture design,

selection and specification.

• Interact with clients through various project phases.

• Explore new and innovative materials and applications while interacting with vendors and manufacturers.

6

Short Courses:-

•FIDIC contract, claims and

arbi t rat ions.

Page 7: Portfolio, Ahmed Mahgoub Abubaker

7

Portfolio Directory

Page 8: Portfolio, Ahmed Mahgoub Abubaker

Wahat Alkhartoum Urban Development Noon Consultancy ............................................ 09

Commercial Buildings Projects Noon Consultancy ..................................................... 13

Bank of Khartoum - New Corporate Image Noon Consultancy ........................................ 14

Healthcare Projects | Multiple ....................................................................................... 21

Residential Projects | Multiple ...................................................................................... 22

Construction Administration & Contracting Projects | Multiple ...................................... 23

Page 9: Portfolio, Ahmed Mahgoub Abubaker

9

Wahat Alkhartoum Urban DevelopmentNoon Consultancy

Page 10: Portfolio, Ahmed Mahgoub Abubaker

10

Wahat Alkhartoum Urban DevelopmentNoon Consultancy 2009 | 2011

The project is built on 26,000m2 of

prime land located in down town

Khartoum the capital city of Sudan.

Noon was appointed as the PMC & Lead

Architect, to implement the new Owner’s

requirements regarding the complex, the

super structure and the exterior envelope

for the 4 towers were already constructed.

The new Owner’s objective was to create

a one stop business facility that would attract the investors by

providing a 5 star hotel with a high-tech business center, premium

office spaces, a luxurious shopping center and a city center

landscaped area.

The project team included me as a project architect, in charge of the

in house engineering department, the building operation firm, and

the nominated interior designer firm.

The first challenge was to accommodate the 5 star hotel

requirements in the existing two office towers buildings connected

to a central core services area. This required the adapting of 14 new

shafts in each of the existing floors to provide services to the wet

areas in each room.

Providing a swimming pool was the second challenge, utilizing the

malls main foyer roof to locate an open air swimming pool in between

the towers by using a new steel structure. The pool was accessible

from the second floor terrace. A separation feature wall was added

to divide the terrace, provide privacy and form seating areas for both

the pool area and the food court out door seating area.

01 Main alwaha

Page 11: Portfolio, Ahmed Mahgoub Abubaker

11

02 Elevations Design & Construction Adminstration

The scope was to re-design elevations for the two floors podium out of the 14 floor complex to reflect the new Owner’s vision and the function change of the complex. The old elevation

solution with massive glazing curtain walls with unjustified cost.

The new concept was to distinguish the lower floors and create a horizontal solid mass bounding the entire complex and forming a base for the upper towers. A combination of granite

and marble were used as finishing cladding. Vertical thin decoritive aluminum columns were used to divide the horizontal mass and create a visual connection with the vertical parts of

the towers. In between these columns, staggered dummy horizontal windows were engraved in the solid granite mass. A frame-less tempered glass system was used for these windows

to consolidate the concept.

A Transparent hand-railing system was used for the terrace to be the visual transition from the solid base mass to the towers light finishing.

This design has provided a modern architectural solution that unified the complex facades while addressing the environmental requirements and significant cost reduction & energy sav-

ings for both initial and building operation costs.

Wahat Alkhartoum Urban DevelopmentNoon Consultancy 2009 | 2011

Page 12: Portfolio, Ahmed Mahgoub Abubaker

12

03 Landscape Design & Construction Adminstration

The scope was to re-design a 13,000m2 landmark & a public

entertainment hub above the under ground parking area that

would serve both the complex and surrounding areas and reducing

the cost in the previous design.

Leasing with the landscape architect, structural and MEP designers,

I was leading the design process.

A simple yet coordinated & efficient layout was selected to

accommodate the different functional requirements and to reflect

diversified landscaping techniques.

The main challenge was to provide enough depth for different

planting requirements, without exceeding the allowable structural

loading that was considdered in the previous design. Accordingly,

a crater shape was implemented on a stamped concrete finish to

simulate the natural stone effect.

The second challenge was to conceal the concrete structure below

and create a natural landscape effect. Limiting the expansion joints

in the green areas under planting soil and applying a cost effective

water proofing system for the massive wet area were some of the

techniques used.

Water features took the same crater shape for design unity, with a

special designed fountain on the hotel side to reflect the function

change and identify the area.

The colonnade was selected to define the main plaza and to present a historical theme in the complex. To

minimize the dead loads on the lower structure, a light weight steel structure was used that presented a

challenge in achieving the required ancient finish. A mixed technique of both painting and stamping was used for

that purpose.

Out-door lighting LED luminaires were used in the entire landscaped area to reduce the complex operational cost.

Wahat Alkhartoum Urban DevelopmentNoon Consultancy 2009 | 2011

Page 13: Portfolio, Ahmed Mahgoub Abubaker

13

Major changes had to be implemented internally to the previous design as well to fulfill the new functional requirements, mainly re-designing

the horizontal circulation, adding new vertical circulation elements and adopting new shafts to the existing slabs.

Transforming the existing twin office building structure with a central core area to a 5 star hotel, where the existing core was used as guests

lifts, required two additional service lifts to serve all 14 floors. Two of the four U-shape fire escape stairs were used to add the lifts using a steel

structure. From the drop point and parking area in basement one, another new lift was added to provide access for the business center, health

club and out door swimming pool on the second floor .

The mall area in the previous design extended through out the entire built-up area in basement one, ground and first floors. %20 of the existing

mall layout had to be used for the hotel and the remaining %80 had to be rearranged to accommodate the new tenants layout.

A new food-court area was added on the second floor of the twin tower office building to benefit from the large terrace area. Two new escalators on a steel structure were added to enable

smooth access from the mall area on the first floor.

The main skylight in the mall central foyer was replaced by the new swimming pool structure. Therefore, an artificial sky painted ceiling was used for simulation.

04 Interior Architecture & Design and Construction Adminstration

Wahat Alkhartoum Urban DevelopmentNoon Consultancy 2009 | 2011

Page 14: Portfolio, Ahmed Mahgoub Abubaker

14

Commercial Buildings ProjectsNoon Consultancy

Page 15: Portfolio, Ahmed Mahgoub Abubaker

15

Al Nour Convention & International Trading Center

Having a prime location at Aljamaa street in Khartoum, just one block from Nile river and the magnificent view

of Toti island, the client was looking for a building that Would fulfill the market demands.

Our response was converting the marketing research data that resulted in to a modern conventional and inter-

national trade center.

The form addressed reflecting smooth visual transition from the three floors podium conventional center, to

a twin tower high-rise international trade center. Special steel mesh was selected for that purpose to form

semi-enclosed spaces for the terrace.

The terrace space was used as a landscaped area with marvilous views, mainly because %100 of the site was

to be developed due to the high value of land.

The podium architecture was restricted by the historical nature of the area and the local regulations, therefore

block techniques with void corners were implemented to allow integration with the modern designed twin tower.

SSD Bank Commercial Building

In response to the client program of

constructing a commercial building with

two different functions, one being high end

office space the other being luxurious show

rooms.

The concept was to create a transparent

form with solid mass at one edge to identify

the vertical circulation and provide the

maximum rent-able areas, connected with

a horizontal mass that separated the show

room areas from the office spaces.

Horizontal shading devices were used,

parallel with the building form and to reduce

direct sun rays.

Commercial Buildings ProjectsNoon Consultancy 2008 | 2011

Page 16: Portfolio, Ahmed Mahgoub Abubaker

16

Bank of Khartoum - Aldmazine Commercial Building

Commercial Buildings ProjectsNoon Consultancy 2008 | 2011

Upgrading the city center of Aldamazine city in the eastern south of Sudan was the aim of the project, by providing a mixed-use complex of hotel space, shopping center, bank branch

and a semi-shaded food-court area to enhance the social interaction and separate the bank branch from the complex.

An in depth environmental study was carried out to minimize the energy consumption, due to high temperature from the direct sun and the strong seasonal winds. As a result, a triangular

shape was selected for the building plan with reduced glazing surfaces.

Page 17: Portfolio, Ahmed Mahgoub Abubaker

17

Being the biggest bank in Sudan, bank of Khartoum had hundreds of branches scattered all over the country. The majority of these

branches were built decades ago and where not designed to support the leading edge banking systems and technology were not

up to modern aesthetical standards. Another problem was that each branch was designed separately by a different designer.

Noon was hired to prepare and implement a standardized architectural image to reflect the bank’s long history and support future

technology growth.

Accordingly, the concept was to identify the main elevation by two solid stone finished walls representing the bank’s long history. In

between the entrance is formed as a modern designed steel and glazing facade. The steel plate elements concept was inspired by the

sugar cane plantations in the country, as the bank had a leading role in supporting and enhancing this sector.

Internally, a combination of high technology and local materials were used together with modern furniture.

The remodeling project for the main branch in Portsudan the contry’s gate to the Red sea and the biggest city in the eastern region.

My task was to prepare the as built-drawings for the existing branch and implement the new theme.

The old facades were completely replaced and a complete remodling for the interior space. The challange was to solve deficincies In the existing layout, where %70 of the spaces were

not utalized, 10 of the space was customer waiting hall and scattered not functioning back of house offices.

As a result one new floor was created from the wasted space as a rentable office spaces.

Bank of Khartoum - New Corporate ImageNoon Consultancy

Page 18: Portfolio, Ahmed Mahgoub Abubaker

18

Bank of Khartoum - New Corporate ImageNoon Consultancy

Aljamhoria Branch 2010

Remodeling the branch in a historical building limited the facade area and solutions, even though a complete representation of the new theme was developed with minimum effect to

the building.

Internally a complete new layout was implemented, utilizing the double volume hall for the customer service and waiting area. Adding 8 teller stations with a compacted back of house

offices with a newly constructed safe room and all the required services.

Page 19: Portfolio, Ahmed Mahgoub Abubaker

19

To lead the competition, Bank of Khartoum initiated the Cash Office project.

The concept was to provide teller services coverage for all the prospective customers.

Working with the client I developed the minimum spaces required to accommodate their

functional requirements, according to with the new theme.

The client rented two floor spaces in the center of Khartoum. 77m2 of

ground floor and 105m2 of mezzanine floor.

Accommodating all the functional requirements was accomplished.

To provide spacious visual effects different techniques were

implemented, such as an open layout, transparent staircase and

feature elements.

Almshtal Branch 2009

This was the first branch to implement a new theme. The existing two floor building was selected by the

bank and a total remodeling took place.

The requirements were to provide complete banking facilities in the ground floor with two main areas. One

was the customer hall and the other a tellers area with compacted back office facilities. A luxurious elite

banking area with private teller facilities was located on the first floor.

A new steel structure extension for both the ground and firsts floor was implemented. The entrance modern

steel and glazing designed facade allowed flexibility to cover the slab edges of the structure, by utilizing the main sign board and canopy for that purpose.

The solid stone walls formed the location for both the ATM and deposit boxes, that are accessed 24 hours out-side the main entrance to minimize the operational power consumption.

Transparent partitions were used internally, together with simple modern designed furniture, that would reflect the bank’s vision towards its customers and to create a spacious atmosphere.

Cash Office 2010

National Exchane Company 2008

Drive Thru ATM 2009

Bank of Khartoum - New Corporate ImageNoon Consultancy

Page 20: Portfolio, Ahmed Mahgoub Abubaker

20

Bank of Khartoum - New Corporate ImageNoon Consultancy

Healthcare ProjectsMultiple

Residential Projects Multiple

Construction Administrationand Contracting Projects

Multiple

Page 21: Portfolio, Ahmed Mahgoub Abubaker

21Healthcare ProjectsMultiple

Massa Private Hospital 2008 Alamal National Hospital 2008-2004

Alsalam Hospital 2007

I was hired as a free lancer to provide programming and conceptual

design for a 100 bedprivate hospital.

The cultural aspect was a major factor in the facility planning. Long

visiting habits mandated separating the visitors access from the in-

patient area without affecting the hospital operation.

1- Facades Design & 3D visualization Services - Perfection Engineering Consultancy:

The scope was to design the facades for a 200 bed general hospital, located on the Nile river side in Khartoum

Bahry.

The complex was developed through different stages from a single building to four buildings with a separate

power plant facility.

Working with the project architect, I used diversified visualization techniques to achieve the final architectural

solution that was approved by the client.

2- Project Management Services - Alamal National Hospital:

Working as part of the client’s team, my task was to liaise with all the consultants engaged, collect and

communicate the client’s requirements at different design stages.

Monitor the design schedule and deliverables, finalize the bidding and negotiation process.

Working as part of the clients team, I provided the programming and conceptual design services for the 3 new

proposed filtering hospitals to be located at the far end of Khartoum, Khartoum Bahry and Ummdurman.

The proposal was based on a minimum site area to accommodate the functional requirements for a 70 bed

hospital, providing ER, Obstetrics & gynecology, surgical services with all supporting facilities. As well as sep-

arately accessed outpatient facility.

Page 22: Portfolio, Ahmed Mahgoub Abubaker

22

Residential Projects Multiple

Private Resort

Private Residential Palace

English Language Training Center

Single Family Home

Multi-Family Home

Privet Residential Palace Noon Consultancy

Client owned a farm in Khartoum country side on the bank of the Nile

river. The client was fascinated by the ancient Nobian architecture

theme, therefore he hired me to provide a luxurious resort.

A courtyard layout was selected to provide the required privacy by the

client and inline with the Nobian theme.

Separate blocks, small windows, decorated parapets, higher

dominating main entrance building defined by columns were the main

elements defining this architecture.

As a free lancer my job was to provide

facade solutions for an existing

concrete structure of 5 typical slabs.

The structure was 1600m2 with

central enclosed spaces surrounded

by terraces and many columns were

exposed to the facades. The slab layout

at the edges had many sides and it was a very complicated structure.

Differently colored light weight surfaces were used to create modern

cost effective solutions addressing all the deficiencies.

The client had major changes required to transform

his already designed residential building into a

luxurious palace.

As the project’s design architect I performed the

schematic design phase including complete facades

redesign and 3D visualization services.

The concept was to implement the Andalusian

architecture theme. A new open sky garden was

introduced in the basement to provide natural lighting and viewing opportunities for the indoor swimming pool

located there.

New materials were introduced to the building including natural stone and GRC decorated panels.

The stair case as part of a

feature wall was utilized as

the dominating architectural

element shaped to represent

the center’s helping hand

policy.

Natural lighting was provided

for all the center spaces.

The client required maximum usage for the land.

He needed to locate his family residence on the

ground floor with completely separate entrances

from 6 rentable apartments in the upper floors

and 2 rentable commercial shops.

Feature walls were used to identify the building architecture.

A Simple architectural form was selected with maximum viewing opportunities from the family halls in both the ground and first floors.

Sustainability techniques were considered in the early design stages, 35cm wide load bearing clay brick walls were used to provide maximum thermal insulation, glazing openings were reduced.

Page 23: Portfolio, Ahmed Mahgoub Abubaker

23

Alrajhi Bank Operational and Data Center BuildingsArcadis - Incorporating Hyder Consulting 2014Client: Alrajhi BankValue: 500 Million SAR

National Training Institute Project - Ahsa, KSAYMCO Contracting 2014-2015Client: Technical & Vocational Training CorporationValue: 465 Million SAR

Al Qasswa Factory for Veterinary ProductionS.E.I.G spa Italy - Sudan Branch 2012Client: Arab Company for Veterinary Medicine Production Value: 33 Million USD

Arcadis scope was to provide project management and construction

administration services for the complex built on 24,000m2 .

The building includes a tier 4 data center building, cash center

building, utilities building and an operations building with 39,000m2

under ground car parking.

My responsibilities were to:

Review of contractor’s material, shop drawing and method statement

submissions for compliance with contract documents.

Ensure that works were constructed in accordance with the design

and contract documentation.

Liaise with the client, contractor and design consultant representatives.

Aramco and Technical & Vocational Training Corporation (TVTC)

agreed to construct an Industrial Institute for training TVTC students.

They are to be trained through real life experience case studies in

different fields.

Working from the central technical office for a grade one main

contractor. Interpreted contractual agreements for buildings into

blueprints covering all design aspects pertaining to required designs

and projects.

Working from the project site technical office for specialized industrial

main contractor, I Provided value engineering for tender reports and

found improved ways to design shop drawings that reduce costs.

Construction Administration & Contracting ProjectsMultiple

Page 24: Portfolio, Ahmed Mahgoub Abubaker

Commercial Buildings ProjectsNoon Consultancy 2009 | 2011