Drawings (2D, 3D)
• Details………..
• Arch itectura l drawing: This type of drawing gives a complete view of building. It describes thelocation of a building and where to place every parts of building etc. It holds many other drawingsheets of different names. Such as plan, elevation, section etc.
Structural drawing: Its name describes about it. It explains everything about structure such as
strength of different part of structure, structural material, placement, grade and size ofreinforcement etc. It also contains many other different named drawing sheets inside it.
• Plumbin g and sanitary drawing : This type of drawings show the location of sanitary and watersupply piping and fixture and how to connect every fixture etc.
Electr ical drawing : This kind of drawings describe the location and details of electrical wiring,fixtures and sub-station etc. It also shows the electrical load calculation.
Fin ish ing drawing: It includes all drawing about finishes and out looking of building such as tiles,marble granite etc. Sometimes this type of drawing included with architectural drawing
• Missing drawing ?????
• EW……..
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 3/48
Flow conditions (Refer to detail calculation)
Depth of flow Hydraulic
mean depth
Full or ½ full
bore
Diameter X
0.25
¾ depth of
flow
Diameter X
0.30
2 /3 depth of
flow
Diameter X
0.29
1/3 depth offollow
Diameter X0.19
¼ depth of
flow
Diameter X
0.15
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 4/48
End products
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 5/48
Check
• Sewage is mainly a liquid waste containing
some solids, produced by humans. It
typically consists of washing water, feces,
urine, laundry waste and other materialwhich goes down drains and toilets from
households and industry. Sewage sludge
is an end product of the wastewatertreatment process. This material can be a
wonderful source of nutrients for the soil
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 6/48
Hydraulic mean depth; m or R
• The hydraulic mean depth of a
liquid flowing through a pipe is
equal to the sectional area ofliquid divided by the wetted
perimeter
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 7/48
Sewage and population equivalent
• It can be defined as; ‘The equivalent,in terms of a fixed population, of avarying or transient population (e.g.Restaurant or Airport) based upon afigure of x xx grams/BOD/hd/day and 225 litres /hd/day .
• This means in practise that 1 person
resident in a normal house is expectedto produce 225 l of sewage flowcontaining xxx g o f BOD per day . Inother words 225 l of flow containing
xxx g of BOD is equivalent to 1Population Equivalent or 1 PE. Sotherefore a house with five peopleliving in it would have a PE of 5 andwould produce:5 x 225 l = 1125 l of flow & 5 x (xxx) g= 5xxx g of BOD .
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 8/48
BOD
• Biochemical oxygen demand or B.O.D is the amountof dissolved oxygen needed by aerobic biologicalorganisms in a body of water to break down organicmaterial present in a given water sample at certain
temperature over a specific time period. The BOD valueis most commonly expressed in milligrams of oxygenconsumed per litre of sample during 5 days of incubationat 20 °C and is often used as a robust surrogate of thedegree of organic pollution of water .
• BOD can be used as a gauge of the effectiveness ofwastewater treatment plants
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 9/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 10/48
Effect of gradient
• Gradient = f (v…..)
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 11/48
Check>>>>>V, Q
Based on the following equations,
calculate the velocity of flow (m/sec)
in a 40 cm diameter sanitary sewer
pipe flowing at a depth equal to three-
quarters of the diameter when the
gradient is 1 in 100. Also, calculatethe flow rate (m3/sec) in the pipe.
Assume the pipe were made from ast
iron or DI
(i) Manning
(ii) Hazen-William(iii) Others
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 12/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 13/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 14/48
Effect of steeper gradient, I
• If a gradient is too steep i.e. steeper than 1 in
40, the liquid may run faster than the solids in
the sloping foul water pipe thus leaving the
solids stranded, which could then block the pipe.
• If the gradient is not steep enough, i.e. less than
1 in 110, then the pipe could still block if the
solids slow down and become stranded.
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 15/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 16/48
Sewerage system
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 17/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 18/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 19/48
Force mains
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 20/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 21/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 22/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 23/48
Size
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 24/48
Joint
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 25/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 26/48
Manning etc
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 27/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 28/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 29/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 30/48
Embedment (continued)
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 31/48
Embedment (Continued)
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 32/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 33/48
Sewer Pipelines testing
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 34/48
Straightness are important to
achieve the design velocity
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 35/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 36/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 37/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 38/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 39/48
Hydraulic design of gravity sewers
• The hydraulic design of four sewers shall be based on a sewageproduction value of 225 litres/head/day at a peak flow factor of 4.7x p-0.11 where p is the estimated population equivalent in thousands.
• The minimum design at full flow shall be 0.8m/s to allow selfcleansing
• The determination of discharge capacity of gravity pipelines iscommonly made by using the ……whereby hydraulic resistance isexpressed by various roughness coefficient which depend on the
type material and operational conditions. Tables giving velocitiesand pipe capacities at various gradients and roughness coefficient
are commonly available.
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 40/48
1.PE calculation (example)
• Site A, B, C and D
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 41/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 42/48
3.Peak flow factor, p
• =4.7 x (PE/1000) -0.11
• =……..litre/sec
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 43/48
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 44/48
5.Selection of pipe, gradient etc
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 45/48
6.Self cleansing velocity
• Using Manning eq (Alternative 1, 2)
• Hazen-Willians (Next week), diff %
• Based on min hidraul, ¾ full etc
8/13/2019 Power Sewerage
http://slidepdf.com/reader/full/power-sewerage 46/48
Construction
• Layout (GL, RL, SIL etc.) >>>Longitudinal section
• MH no., GL, Prop. IL, Prop depth, Prop distance