Powering Seattle through the 21st Century Denny Substation Program WHAT’S NEXT? In the fourth quarter of 2018, crews will work to complete the remaining duct bank installation and roadway restoration in the South Lake Union area. Other upcoming visible work in and around the substation includes completing project art works, community spaces, and landscaping. In the new year, we’ll host a celebration event to commemorate the public opening of the substation. Stay tuned for more details in the fourth quarter report. CONSTRUCTION SCHEDULE 2016 2017 2018 2019 2020 Denny Substation Substation Energized Denny Network VISIT OUR WEBSITE: www.seattle.gov/light/dennysub SEND US AN EMAIL: [email protected] CALL OUR HOTLINE: (206) 257-2142 Denny Substation and Denny Network Construction Map 5 8TH AVE 9TH AVE BOREN AVE TERRY AVE 7TH AVE 7TH AVE 6TH AVE 9TH AVE BOREN AVE 8TH AVE 7TH AVE 6TH AVE 5TH AVE PINE ST PIKE ST STEWART ST VIRGINIA ST BLANCHARD ST BELL ST OLIVE WAY MERCER ST MERCER ST REPUBLICAN ST HARRISON ST DENNY WAY THOMAS ST FAIRVIEW AVE N ROY ST ROY ST WESTLAKE AVE N 9TH AVE N 8TH AVE N TERRY AVE N BOREN AVE N YALE AVE N MINOR AVE YALE AVE DENNY PARK MINOR AVE N MELROSE AVE E PONTIUS AVE N CASCADE PLAYGROUND CASCADE P-PATCH HOWELL ST JOHN ST DENNY SUBSTATION WESTLAKE AVE LENORA ST STEWART ST Ramps to and fro m I-5 Key Planned Duct Bank Completed Duct Bank Completed Duct Bank and Roadway Restoration Completed Duct Bank, Roadway Restoration, and Final Driving Surface Vault DV-08 DV-09 DV-10 DV-11 DV-05 DV-06 DV-07 DV-12 HV-02 HV-01 DV-13 DV-21 DV-22 DV-23 DV-40 DV-31 DV-20 DV-33 DV-27 DV-28 DV-29 DV-30 DV-34 DV-35 DV-36 DV-37 DV-39 DV-26 DV-24 DV-25 DV-32 DV-38 DV-41 HV-03 Veer Lofts Via 6 Larned Apts. Westlake Hotel Westin North Westin South Stewart Court Hotel Max Cosmopolitan Dekko Apts. Aspira Apts. Balfour Apts. Harbor House Julie Apts. 502 Minor Cascade Apts. AMLI Stack House Alcyone Apts. Mirabella Casa Pacifca Lakeview Apts. Brewster Colwell Apts. Alley 24 Apts. Alley 24 North SCCA 215 Pontius 219 Pontius Minor Ave Children’s Metropolitan Project map showing progress of work for Denny Substation and Denny Network Powering Seattle through the 21st Century Denny Substation Program QUARTERLY REPORT 3RD QUARTER | 2018 MAKIN’ MOVES IN THE THIRD QUARTER Hammering it home: It wasn’t long ago, during the third quarter of 2017, that we received the first delivery of our 125,000-pound transformers, began installing metal siding for the “Switchwall” art project, and began construction of the elevated walkway. Just one year later, we’ve energized the transformers, installed all siding, and completed the elevated walkway. Other recent accomplishments include final paving of Minor Avenue N, installation of architectural concrete along John Street, and begnning installation of new pedestrian signals on Denny Way at Minor Avenue N. Looking ahead to the fourth quarter, we’ll be continuing work on the community spaces, prepping for landscaping and tree planting, and getting ready for the materials delivery for the “Transforest” art piece (see more inside). With completion projected for early 2019, the substation is well on its way to becoming a unique community feature for the public and providing efficient energy for the Denny Triangle and South Lake Union neighborhoods. A crew member building forms in preparation for concrete pouring.

Upload: others

Post on 07-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Powering Seattle through the 21st Century WHAT’S NEXT? Denny …€¦ · Community features include two indoor meetings ... AWESOME ART We partnered with the Seattle Office of Arts

Powering Seattle through the 21st Century

Denny Substation Program

WHAT’S NEXT? In the fourth quarter of 2018, crews will work to complete the remaining duct bank installation and roadway restoration in the South Lake Union area. Other upcoming visible work in and around the substation includes completing project art works, community spaces, and landscaping.

In the new year, we’ll host a celebration event to commemorate the public opening of the substation. Stay tuned for more details in the fourth quarter report.

CONSTRUCTION SCHEDULE

2016 2017 2018 2019 2020

Denny Substation

Substation Energized

Denny Network

VISIT OUR WEBSITE:www.seattle.gov/light/dennysub

SEND US AN EMAIL:[email protected]

CALL OUR HOTLINE:(206) 257-2142

Denny Substation and Denny Network Construction Map

5

8TH AVE

9TH AVE

BOREN AVE

TERRY AVE

7TH AVE

7TH AVE

6TH AVE

9TH AVE

BOREN AVE

8TH AVE 7TH AVE

6TH AVE 5TH AVE

PINE ST

PIKE ST

STEW

ART ST

VIRGIN

IA ST

BLANCHARD ST

BELL ST

OLIVE WAY

MERCER ST

MERCER ST

REPUBLICAN ST

HARRISON ST

DENNY WAY

THOMAS ST

FAIRVIEW

AVE N

ROY ST

ROY ST

WESTLA

KE AVE N

9TH AVE N

8TH AVE N

TERRY AVE N

BOREN

AVE N

YALE AVE N

MINOR AVE

YALE AVE

DENNY PARK

MIN

OR AVE N

MELRO

SE AVE E

PON

TIUS AVE N

CASCADEPLAYGROUND

CASCADEP-PATCH

HOWELL

ST

JOHN ST

DENNYSUBSTATION

WESTLA

KE AVE

LENORA ST

STEWART ST

Ramps to and from I-5

Key

Planned Duct Bank

Completed Duct Bank

Completed Duct Bank and Roadway Restoration

Completed Duct Bank, Roadway Restoration, and Final Driving Surface

Vault

DENNY NETWORK ONGOING CONSTRUCTION

DV-08

DV-09

DV-10

DV-11

DV-05

DV-06

DV-07

DV-12

HV-02

HV-01

DV-13

DV-21 DV-22 DV-23

DV-40

DV-31

DV-20

DV-33

DV-27 DV-28 DV-29 DV-30

DV-34 DV-35 DV-36

DV-37 DV-39 DV-26

DV-24

DV-25

DV-32

DV-38

DV-41

HV-03

Veer Lofts

Via 6

Larned Apts. Westlake

Hotel

WestinNorth

WestinSouth

StewartCourtHotel

Max

Cosmopolitan

DekkoApts.

Aspira Apts.

BalfourApts.

HarborHouse

JulieApts.

502Minor

CascadeApts.

AMLI

Stack House

AlcyoneApts.

Mirabella

CasaPacifca

LakeviewApts.

Brewster Co

lwell A

pts.

Alley 24 Apts.

Alley 24North

SCCA

215Pontius

219PontiusMinor

AveChildren’s

Metropolitan

Project map showing progress of work for Denny Substation and Denny Network

Powering Seattle through the 21st Century

Denny Substation Program

QUARTERLY REPORT 3 R D Q UA R T E R | 2 0 1 8

MAKIN’ MOVES IN THE THIRD QUARTERHammering it home: It wasn’t long ago, during the third quarter of 2017, that we received the first delivery of our 125,000-pound transformers, began installing metal siding for the “Switchwall” art project, and began construction of the elevated walkway. Just one year later, we’ve energized the transformers, installed all siding, and completed the elevated walkway. Other recent

accomplishments include final paving of Minor Avenue N, installation of architectural concrete along John Street, and begnning installation of new pedestrian signals on Denny Way at Minor Avenue N.

Looking ahead to the fourth quarter, we’ll be continuing work on the community spaces, prepping for landscaping and

tree planting, and getting ready for the materials delivery for the “Transforest” art piece (see more inside).

With completion projected for early 2019, the substation is well on its way to becoming a unique community feature for the public and providing efficient energy for the Denny Triangle and South Lake Union neighborhoods.

A crew member building forms in preparation for concrete pouring.

Page 2: Powering Seattle through the 21st Century WHAT’S NEXT? Denny …€¦ · Community features include two indoor meetings ... AWESOME ART We partnered with the Seattle Office of Arts

Denny Substation ProgramPowering Seattle through the 21st Century

AROUND THE SUBSTATION:

OUT WITH THE OLD, IN WITH THE NEW…

The name of the network’s game this year has been duct bank installation and roadway restoration. Earlier this quarter, we needed to remove an existing duct bank before installing a new one. Below is a photo of what was discovered. Who knew underground conduits could be so artful?

Other network construction activities include planting new trees in Denny Triangle and new landscaping in the Cascade neighborhood.

New tiles and trees on the corner of 6th Avenue N and Lenora Street.

Duct bank removed prior to a new duct bank installation near the intersection of 9th Avenue N and Mercer Street.

INSIDE THE SUBSTATION: HANG OUT AT THE SUBSTATION

We’re continuing to make progress on the community rooms, open space area, and landscaping. When the substation is open to the public, there will be opportunities for people to gather and learn about how it works. Community features include two indoor meetings spaces, an off-leash area designated for the neighborhood’s furry friends, and educational portals that display infographics.

AWESOME ARTWe partnered with the Seattle Office of Arts & Culture to integrate both permanent and temporary art into the Denny Substation Project. This art program is administered by the Office of Arts & Culture 1% for Art Fund. Seattle artists Annie Han and Daniel Mihalyo of Lead Pencil Studio are members of the substation design team and the creators of “Transforest,” an art installation on the substation site that communicates the natural beauty of the Pacific Northwest and the history of power generation and transmission.

In July, the base for the “Transforest” art piece was installed on the southwest side of the substation site.

Rendering of the “Transforest” illuminated at night.

SOUTH LAKE UNION SNAPSHOT

LINEAR FEET OF DUCT BANK CONSTRUCTED:

2017: 4,349

2018: 11,300 an increase of nearly 7,000 feet

ROADWAY RESTORATION COMPLETED:

2017: 5%

2018: 40% up by 35%

ABOUT SILVA CELLSThe Silva Cell is an underground bioretention system that creates forest-like conditions to support tree growth and provide healthy storm water management through absorption. Silva Cells are designed specifically for urban spaces and are a perfect fit for the substation and its surrounding areas. Offering benefits such as waterflow and pollutant control and maintenance of water quality, Silva Cells are also low maintenance, work in any type of soil, and best of all, help grow big trees. Who doesn’t love more greenery?

A line of Silva Cells on the south side of the substation on Denny Way set to receive a row of trees later this year.

Silva Cells being laid down outside of the Brewster Apartment, just west of the substation site.

Open space area on the west side of the substation. Dogs and their people will soon be able to run free and enjoy this unique community amenity.