3.0

take a tour of our Data Centers

2014

This presentation contains proprietary financial information about Sify

For limited circulation only © Sify Technologies Limited 2014

3.0 • Over 14 years experience providing Data Center and related services in India:

Sify built India’s 1st Tier III Data Center (Vashi)

• Sify understands DC and ICT – not just Telco with a DC as a sideline business – Sify has Dedicated COE on Datacenter Engineering

• Sify has hands-on experience -- DCs are Designed, Built and Operated in-house by Sify

• Proven track record of meeting guaranteed uptime:

• 100 % in Mumbai Airoli till date (2007)

• 99.982%+ in Vashi(2000), Bangalore (2006) and Chennai (2001)

• Mature operational processes & vendor relationships

• Sify has Managed Services resources, capable of handling all IT support functions

• Design based on 4th generation SDA (Sify Datacenter Architecture) for better Availability

Sify has 300 Enterprise-level Sales and Professional Services; can distribute Amazon services to customers requiring greater support

Sify is the only non-Telco that can also provide access to local Fiber, IP Peering, Submarine cable, and Cable Landing Station

So how are we the right partner?

3.0

Vashi Mumbai

TIER III

TIDEL Park Chennai

Electronic city Bangalore Airoli Mumbai

Noida Delhi

Rabale Mumbai

data centre presence

6 Owned

Multilayer, Multi-point

6 SDC BOT

Thrice awarded

1.9 L sq.ft

20 MW

3.0

Spread across different seismic zones

data centre specs

• NOIDA, DELHI • 54,000 Sq.ft.* •Tier III specifications

• RABALE, MUMBAI • 59,400 Sq.ft * • Tier III specifications

• TIDEL Park, CHENNAI • 7,300 Sq.ft * • Tier III specifications • AIROLI, MUMBAI

• 44,562 Sq.ft * • Tier III specifications

• ELECTRONIC CITY, B’LORE • 13,450 Sq.ft * • Tier III specifications

• VASHI, MUMBAI • 11,125 Sq.ft * • Tier III specifications

Total capacity 20 MW *white space

3.0 vashi, mumbai

• Since 2000

• Term - Long Lease

• Period - 60 Years

• Whitespace:11,125 Sq ft

• CAPEX : $ 4.4 mln

• Design IT Power capacity: 720 KW

1 $= 50

3.0 electronics city, bangalore

• Since 2004

• Term - Long Lease

• Period - 66 Years

• Whitespace:13,450 Sq ft

• CAPEX : $ 8.0 mln

• Design IT Power capacity: 1080 KW

1 $= 50

3.0 TIDEL park , chennai

• Since 2000

• Term - Own premise – Office cum DC

• Whitespace:7,300 Sq ft

• CAPEX: $ 2.0 mln

• Design IT Power capacity: 320 KW

1 $= 50

3.0 airoli , mumbai

• Since 2009

• Term - Long Lease

• Period – 29 Years

• Whitespace:44,562 Sq ft

• CAPEX: $ 22.0 mln

• Design IT Power capacity: 4300 KW

1 $= 50

3.0 noida, delhi

• Since 2013

• Term - Own building

• Whitespace : 54,000 Sq ft

• CAPEX : $ 48 mln

including Land & Building

• Design IT Power capacity: 5760 KW

1 $= 50

3.0 rabale, mumbai (under implementation)

• Coming up – Dec 2013

• Term - Own building

• Whitespace : 59,400 Sq ft

• CAPEX : $ 59 mln

including Land & Building

• Design IT Power capacity: 8640 KW

1 $= 50

3.0 compliance & certifications

Data Center Services are certified in

Quality Management

ISO 9001:2008

SIFY TECHNOLOGIES LIMITED CERTIFIED TO ISO 9001:2008

CERTIFIED FROM: 16 Nov 2001 VALID TILL: 15 Nov 2016

SIFY TECHNOLOGIES LIMITED CERTIFIED TO ISO 27001:2005

CERTIFIED FROM: 08 June 2005 VALID TILL: 08 June 2014

Information Security

ISO 27001:2005

SIFY TECHNOLOGIES LIMITED CERTIFIED TO ISO 20000:2011 CERTIFIED FROM: 19 Feb 2009

VALID TILL: 16 June 2014

Service Management

ISO 20000:2011

Our hosting services are also

3.0 More than a decade of operations experience

DC Operations

Vashi - 13 Years (Sep 2000) Chennai Tidel - 12 Years (March 2001) Bangalore - 7 Years (July 2006) Mumbai Airoli - 5 years (July 2008) Delhi Noida - Launched (June 2013)

Higher Utilization

100 % occupancy at Mumbai and Tidel and 80% at Bangalore

Efficiency – PUE (Power usage Effectiveness) is maintained under 1.9 – Equipment selection, right sizing and loading pattern – Optimum Cooling – Mature operational processes

operational excellence

3.0

Multiple STM termination from Major Telecom and Connectivity providers

a true carrier neutral data centre

3.0 Business Requirements Right Solution Justify Technology Investment

Innovation and Efficiency Site selection Risk analysis Design Drawings Specifications Solution Document

Manage Project Cost Performance Schedule Performance Change Management Risk Management Vendor Management Procurement Quality Assurance

Integrated Testing Exception Management Factory Tests Documentation Training Knowledge base

Evaluate Infrastructure Audit Gap Analysis Risk Analysis Alternate Solutions Alternate Technology

Improvements Operational efficiency Energy Efficiency Process improvement Training Continuous monitoring Datacenter

Lifecycle

Budgeting Future Planning

DC build - framework

3.0 Green Grid – The international organization that defines data center energy efficiency matrices. Sify is a member of Greengrid

Uptime Institute, the owner of datacenter tier topologies. Sify has certified professionals from the UI

ASHRAE, the international organization that sets the cooling standards and specifications. Sify is a member of ASHRAE

Sify works closely with the organizations that defines standards and frameworks. Equipped to quickly adapt and practice the latest recommendations and standards

process framework

3.0 DC build experience – government

Customer Area (Sq ft) SFA

National Informatics Centre through CPWD, Pune 10,000 5,500

IMD through CPWD, Pune 3,000 1,000

DIMTS, Delhi 2,500 400

Tripura State Data Center, Agartala 2,220 904

Sikkim State Data Center, Gangtok 1,600 620

Meghalaya State Data Center, Shillong 1,368 728

Kerala State Data Center, Thiruvananthapuram 2,900 900

Jharkhand State Data Center, Ranchi 3,600 934

Chhattisgarh State Data Centre 5850 1921

AMTRON, Assam Electronics, Guwahati 1,000 460

NISCAIR, Delhi 2000 400

As a standard practise,

orders were for…

Supply, Installation,

Commissioning and

Maintenance of UPS,

Civil, BMS, Electrical,

Racks, Cabling, PAC,

and CAC

3.0 Customer DC Area

(Sq ft) SFA Racks Remarks

HPCL, Hyderabad 40,000 10,000 280 Design and consultancy of 40,000 Sq. Ft. of DC facility

Trimax DC, ITI Bangalore 40,000 11,337 301 Design, Consultancy & Vendor Selection

RAK Bank, UAE 10,000 2,000 65 Design, Consultancy and Project Management

RAK FTZ, UAE 20,000 8,000 270 Design, Consultancy and Project Management

Bank of Dofar, Oman (through E&Y) 4,500 2,200 70 IT & NON-IT audit, redesign consultancy, vendor selection

Vodafone 3,000 1,850 50 Supply, installation and commissioning of UPS, Civil, BMS, Electrical, Racks, Cabling, PAC & CAC

MSEDCL – Maharashtra State Electricity Board (both Primary & DR sites)

DC: 3600 DC: 1600 DC: 44 Primary Data Center is at Mumbai & DR site is at Nagpur.

DR: 4000 DR: 1200 DR: 44 Deliverables includes Supply, installation and commissioning of UPS,

Civil, BMS, Electrical, Racks, Cabling, PAC & CAC for 5 years.

Other recent DC Projects include Indian Institute of Astro Physics (IIAP), Shell, Exon Mobile in Bangalore

DC build experience – private sector