ppsd comprehensive maint. 2009-12

53
PLAINFIELD BOARD OF EDUCATION Comprehensive Maintenance Plan Report 2009 - 2012

Upload: mariapellum

Post on 08-Apr-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 1/53

PLAINFIELD BOARD OF EDUCATION

Comprehensive Maintenance Plan Report

2009 - 2012

Page 2: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 2/53

BARLOW SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

(Check indicates requiredmaintenance addressed.)

(Check indicates requiredmaintenance addressed.)

(Check indicates requiredmaintenance to be addressed.)

(Only required to list schools thatare eligible for future aid.)

(Description) (Amts. in this column come from theaudit and are actual or simply basedupon a square foot allocation.)

(Amts. In this column arebudgeted in function 261 -total of all objects for each facility. Thiscolumn will be reviewed by theauditor at years end for compliance. )

(Amts. In this column are what isplanned to be budgeted next year.This column should equal or exceedthe required maintenance calculatedfrom M-1.)

1 S truc tura l Foundations Loca li zed repai r o f c racks and spell ing w ithcement caulk, grout or epoxy sealant, water proofing. parging. X X X

2 Superstructure Repair damaged fireproofing, rust removal andrepaint

3 Exterior C losures-Wall s Loca li zed repa irs, point ing, waterproof ing.painting, replacement of individual lintels.

X4 Exterior Closures Windows &Glazed Walls

Repairs/localized replacements of frames,sash, caulk, balancing individual replacements,etc. X

5 Exterior C losures-Doom Repai r/ replace individua l hardware, doom,frames; recaulking, leveling, adjustments,general operations X X X

6 Exterior Closures-Roofs Clear clogged drains, inspect ions and repairs of roofing/flashing materials to maintain warranty

X X X7 Interior Construction Partitions Painting walls, patching of plaster, tape &

speckle, lubricate portable partitions. X X8 Interior Construction Interior Doors Repair/replace hardware, leveling adjustments,

general operations. X X X9 Interior Construction stair 

ConstructionCheck and replace individual worn treads, tightenloose railings end floorboards.

X X10 Interior Construction Stair Finishes Clean, seal and wax, replace misc. vinyl andrepair terrazzo. X X X

11 Interior Construction Wall Finishes Preparation/painting, repair or ceramic tilesections; vinyl base/trim X

Page 2 of 53

Page 3: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 3/53

BARLOW SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

12 Interior Construction Floor 

FinishesRepair/replace floor tiles, boards,Strip/wax/varnish. Localized repaid/replacementand annual refurbishing. X X X

13 Inferior Construction CeilingFinishes

Paint, replace damaged grid, hangers, patchplaster and textured finish (localizedrepair/replacement).

X

14 Vertical Movement Elevators, Lif t Inspect/adjust/repair motor, door operation,relays, flooring, lights. Usually under contract. X X X

15 Domestic cold water distribution-piping materials

Inspect/repair/replace/service valves, seats, joints, water softener, filters, booster, pumps,etc. X X X

16 Domestic hat water supply-Water Heater, Tank Storage or Convertor 

Drain/flush tanks, healer, repair thermostats,gauges, valves, controls, etc. X X X

17 Plumbing Fixtures Repair/replace seals, valves, fixtures andpiping, water fountains/coolers, lab and cooking

gas piping/fixtures/controls, etc. X X X18 Sanitary Piping.materials and equipment

Chemical treatment of disposal fields,repair/replace sanitary piping, sewage ejectionor other pumps, clean grease traps, pumpseptic tanks, etc. X X

19 Storm Water Riser Piping Replace broken or missing gutter. downspouts,leaf guards, maintenance of detention/retentionbasin, etc. (Clear clogged risers) X X X

20 Heating System-Boiler (Electric,Gas, Oil)

Repair piping or insulation. Repair or replaceboiler components including thermostats,valves, seals, burner, etc. Perform annualservice, inspection. X X X

21 Cooling System Types. chiller withcooling tower, fan coil unit, roof topunit, split system, window air 

conditioner 

Chemical water treatment, clean supply returnductwork, coils, repair/replace thermostats,valves, fans and motors, etc. Perform annual

service/inspection. X X X22 Heating/Cooling Systems-Multi

zone roof top unit, heat exchanger,air handier,

Clean supply/return ductwork, repair/replacethermostats, valves, fans and motors, etc.Perform annual service/inspection. X X X

23 Exhaust Ventilation-toilet exhaustfans, kitchen exhaust fans/hoodslab exhaust

Replace grills, louvers, fan covers, Servicesystem-motors, belts, blades, lubrication. etc.Annual certification of hoods. X X X

Page 3 of 53

Page 4: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 4/53

BARLOW SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

24 Control System-

Pneumatic, Electronic, DDC

Annual service/inspection. Repair or replace

components, piping. Controllers, wiring. X X X25 Fire Sprinkler System-Wet or Dry Annual service and inspection. Test flow andtamper switches, replace broken sprinkler heads, repair or replace valves, fire departmentconnection, gauges, etc. X X X

26 Standpipe & Hose Systems-Wet or Dry

Exercise zone valves, Repair or replacedefective valves, hoses, etc.

27 Building Service (400-4000) ampsHigh Voltage Main to Low VoltageDistribution Panel

Replace defective breakers in high or lowvoltage side of transformer. Annual testing. Runnew ground.

28 Branch Panels Replace individual breakers or panels. Wiredevices from panel or panel to point of service. X X

29 Interior Lighting Replace/rewire switches, install individual lights,replace lights, replace fixtures, etc. X

30 Exterior LightingReplace fixtures, day/night individual sensors,damaged light pole, etc. X X X

31 Exit Signs Repairs due to breakage/vandalism or replacement. X X X

32 Power & Outlets New convenience use power outlets. newmiscellaneous power outlets, repair or replacement of interior parts (wall switches, walloutlets, exclusive of covers). X X X

33 Communication & Security Annual testing, service and inspection, replacebroken components-control panel, motioncontrol, other security device, speaker systemor video. X X X

34 Special Systems/HardwiredCentral Systems such as FireAlarms,Fire Control, Clock, Closed CircuitTV, Data Ports, Central Video,Telephone

Annual testing, service and inspection, replacebroken components of or hard-wiring for non-security devices.

X X X35 Emergency Power/Generators &

Fuel Tanks & LinesAnnual testing, service and inspection,Replacement of broken components, new or replaced fuel lines, tank containment or wiring.

Page 4 of 53

Page 5: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 5/53

BARLOW SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Descr ipt ion Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

Site Improvement such as: Parking,

Driveways, Walkways, - DirectionalSignage, landscaping bicycle racks,site signage, irrigation systems or other site Improvements,

Repair, replacement or painting of any security or 

safety-related fencing/gates; repair or replacement of uneven or cracked walkways,driveways and/or parking areas, including"potholes', addition of or improvement to surfacecourse, base or sub-base of any walkway,driveway or parking area; addition of repair to or replacement of curbs or concrete bumpers. X X X

37 Athletic Facilities Replacement or repair of localized equipmentrequired to implement the Core CurriculumContent Standards. X X

38Fixed Furnishings (Subject to $2000capitalization threshold per Item)

Page 5 of 53

Page 6: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 6/53

CEDARBROOK SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORTCOUNTY 39 STATE

CODE 4160

System # System Descript ion Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

(Check indicates required maintenance

addressed.)

(Check indicates required

maintenance addressed.)

(Check indicates required

maintenance to be addressed.)(Only required to list schools thatare eligible for future aid.)

(Description) (Amts. in this column come from theaudit and are actual or simply basedupon a square foot allocation.)

(Amts. In this column arebudgeted in function 261 -total of all objects for each facility. Thiscolumn will be reviewed by theauditor at years end for compliance.)

(Amts. In this column are what isplanned to be budgeted next year.This column should equal or exceedthe required maintenance calculatedfrom M-1.)

1 Structural Foundations Localized repair of cracks and spelling withcement caulk, grout or epoxy sealant, water proofing. parging. X X X

2 Superstructure Repair damaged fireproofing, rust removal andrepaint

3 Exterior Closures-Walls Localized repairs, pointing, waterproofing.painting replacement of individual lintels.

4 Exterior Closures Windows &Glazed Walls

Repairs/localized replacements of frames,sash, caulk, balancing individual replacements,etc.

5 Exterior Closures-Doors Repair/replace individual hardware, doors,frames; recaulking, leveling, adjustments,general operations X X

6 Exterior Closures-Roofs Clear clogged drains, inspections and repairs of Roofing/flashing materials to maintain warranty X X X

7 Interior Construction Partitions Painting walls, patching of piaster, tape & ,speckle, lubricate portable partitions. X X X

8 Interior Construction Interior Doors Repair/replace hardware, leveling adjustments,general operations. X X X

9 Interior Construction stair Construction

Check and replace individual worn treads,tighten loose railings end floorboards. X X X

10 Interior Construction Stair Finishes Clean, seal and wax, replace misc. vinyl andrepair terrazzo. X X X

11 Interior Construction Wall Finishes Preparation/painting, repair or ceramic tilesections; vinyl base/trim

Page 6 of 53

Page 7: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 7/53

CEDARBROOK SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

12 Interior Construction Floor Finishes

Repair/replace floor tiles, boards,Strip/wax/varnish. Localized repair/replacement

and annual refurbishing. X X X13 Interior Construction CeilingFinishes

Paint, replace damaged grid, hangers, patchplaster and textured finish (localizedrepair/replacement). X

14 Vertical Movement Elevators, Lifts Inspect/adjust/repair motor, door operation, relays,flooring. lights. Usually under contract.

15 Domestic cold water distribution-piping materials

Inspect/repair/replace/service valves, seats, joints, water softener, filters, booster, pumps,etc. X X

16 Domestic hot water supply-Water Heater, Tank Storage or Convertor 

Drain/flush tanks, healer, repair thermostats,gauges, valves, controls, etc. X X X

17 Plumbing Fixtures Repair/replace seals, valves, fixtures andpiping, water fountains/coolers, lab and cookinggas piping/fixtures/controls, etc. X X

18 Sanitary Piping.materials and equipment

Chemical treatment of disposal fields,Repair/replace sanitary piping, sewage ejectionor other pumps, clean grease traps, pumpseptic tanks, etc. X X X

19 Storm Water Riser Piping Replace broken or missing gutter. downspouts,leaf guards, maintenance of detention/retentionbasin, etc. (Clear clogged risers) X X

20 Heating System-Boiler (Electric,Gas, Oil)

Repair piping or insulation. Repair or replaceboiler components including thermostats,valves, seals, burner, etc. Perform annualservice, inspection. X X X

21 Cooling System Types. chiller withcooling tower, fan coil unit, roof topunit, split system, window air conditioner 

Chemical water treatment, clean supply returnductwork, coils, repair/replace thermostats,valves, fans and motors, etc. Perform annualservice/inspection. X X

22 Heating/Cooling Systems-Multi zoneroof top unit, heat exchanger, air handier,

Clean supply/return ductwork, repair/replacethermostats, valves, fans and motors, etc.Perform annual service/inspection. X X X

23 Exhaust Ventilation-toilet exhaustfans, kitchen exhaust fans/hoodslab exhaust

Replace grills, louvers, fan covers, Servicesystem-motors, belts, blades, lubrication. etc.Annual certification of hoods. X X X

Page 7 of 53

Page 8: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 8/53

Page 9: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 9/53

CEDARBROOK SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

36 Site Improvement such as: Parking,Driveways, Walkways, - DirectionalSignage, landscaping bicycle racks,site signage, irrigation systems or 

other site Improvements,

Repair, replacement or painting of any security or safety-related fencing/gates; repair or replacementof uneven or cracked walkways, driveways and/or parking areas, including "potholes', addition of or 

improvement to surface course, base or sub-baseof any walkway, driveway or parking area; additionof repair to or replacement of curbs or concretebumpers.

X X X37 Athletic Faci lities Rep lacement or repa ir of localized eq uipmen t

required to implement the Core CurriculumContent Standards. X

38Fixed Furnishings (Subject to $2000capitalization threshold per Item)

Page 9 of 53

Page 10: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 10/53

CLINTON SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

(Check indicates required

maintenance addressed.)

(Cheek indicates required

maintenance addressed.)

(Check indicates required

maintenance to be addressed.)(Only required to list schools thatare eligible for future aid.)

(Description) (Amts. In this column come from theaudit and are actual or simply basedupon a square foot allocation.)

(Amts. In this column arebudgeted in function 261 -total of all objects for each facility. Thiscolumn will be reviewed by theauditor at years end for compliance.)

(Amts. In this column are what isplanned to be budgeted next year.This column should equal or exceedthe required maintenance calculatedfrom M-1.)

I Structural Foundations Localized repair of cracks and spelling withcement caulk, grout or epoxy sealant, water proofing. parging, X

2 Superstructure Repair damaged fireproofing, rust removal andrepaint

3 Exterior Closures-Walls Localized repairs, pointing, waterproofing.painting, replacement of individual lintels.

4 Exterior Closures Windows &Glazed Walls

Repairs/localized replacements of frames,sash, caulk, balancing individual replacements,etc.

5 Exterior Closures-Doors Repair/replace individual hardware, doors,frames; recaulking, leveling, adjustments,general operations X

6 Exterior Closures-Roofs ' Clear clogged drains, inspections and repairs of Roofing/flashing. materials to maintain warrant X X X

7 Interior Construction Partitions Painting walls, patching of piaster, tape &speckle, lubricate portable partitions. X X

8 Interior Construction Interior Doors Repair/replace hardware, leveling adjustments,general operations. X X

9 Interior Construction stair Construction

Check and replace Individual worn treads,tighten loose railings end floorboards. X X X

10 Interior Construction Stair Finishes Clean, seal and wax, replace misc. vinyl andrepair terrazzo. X X X

11 Interior Construction Wall Finishes Preparation/painting, repair or ceramic tilesections; vinyl base/trim X

Page 10 of 53

Page 11: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 11/53

CLINTON SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Descript ion Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

12Interior Construction Floor Finishes

Repair/replace floor tiles, boards,Strip/wax/varnish. Localized repair/replacement

and annual refurbishing. X13Interior Construct/on Ceiling

FinishesPaint, replace damaged grid, hangers, patchplaster and textured finish (localizedrepair/replacement). X

14Vertical Movement Elevators, Lifts Inspect/adjust/repair motor, door operation,relays, flooring, lights. Usually under contract. X X X

15Domestic cold water distribution-piping materials

Inspect/repair/replace/service valves, seats, joints, water softener, filters, booster, pumps,etc. X X

16Domestic hot water supply-Water Heater, Tank Storage or Convertor 

Drain/flush tanks, healer, repair thermostats,gauges, valves, controls, etc. X X X

1 7P lu mb ing Fix tu res R epai r/r epl ace sea ls , v al ves , fi xt ur es a nd p ip ing ,water fountains/coolers, lab and cooking gaspiping/fixtures/controls, etc. X

18Sanitary Piping.materials and equipment Chemical treatment of disposal fields,repair/replace sanitary piping, sewage ejection or other pumps, clean grease traps, pump septictanks, etc. X X

19Storm Water Riser Piping Replace broken or missing gutter. downspouts,leaf guards, maintenance of detention/retentionbasin, etc. (Clear clogged risers) X X

20Heating System-Boiler (Electric,Gas, Oil)

Repair piping or insulation. Repair or replaceboiler components including thermostats, valves,seals, burner, etc. Perform annual service,inspection. X X X

21Cooling System Types. chiller withcooling tower, fan coil unit, roof topunit, split system, window air conditioner 

Chemical water treatment, clean supply returnductwork, coils, repair/replace thermostats,valves, fans and motors, etc. Perform annualservice/inspection. X X X

22Heating/Cooling Systems-Multizone roof top unit, heat exchanger,air handier,

Clean supply/return ductwork repair/replacethermostats, valves, fans and motors, etc.Perform annual service/inspection. X X X

23Exhaust Ventilation-toilet exhaustfans, kitchen exhaust fans/hoodslab exhaust

Replace grills, louvers, fan covers, Servicesystem-motors, belts, blades, lubrication. etc.Annual certification of hoods.

X X X

Page 11 of 53

Page 12: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 12/53

CLINTON SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

24 Control System - Pneumatic,Electronic, DDC

Annual service/inspection. Repair or replacecomponents, piping. Controllers, wiring. X X X

25 Fire Sprinkler System-Wet or Dry Annual service and inspection. Test flow andtamper switches, replace broken sprinkler heads, repair or replace valves, fire departmentconnection, gauges, etc. X X X

26 Standpipe & Hose Systems-Wet or Dry

Exercise zone valves, Repair or replacedefective valves, hoses, etc. X X

27 Building Service (400-4000) ampsHigh Voltage Main to Low VoltageDistribution Panel

Replace defective breakers in high or lowvoltage side of transformer. Annual testing. Runnew ground.

28 Branch Panels Replace individual breakers or panels. Wiredevices from panel or panel to point of service. X

29 Interior Lighting Replace/rewire switches, install individual lights,replace lights, replace fixtures, etc. X X X

30 Exterior Lighting Replace fixtures, day/night individual sensors,. damaged light pole, etc. X X X

31 Exit Signs Repairs due to breakage/vandalism or  replacement. X X32 Power & Outlets New convenience use power outlets. new

miscellaneous power outlets, repair or replacement of interior pans (wall switches, walloutlets, exclusive of cavern).

33 Communication & Securi ty Annual test ing, service and inspection, replacebroken components-control panel, motioncontrol, other security device, speaker systemor video. X X

34 Special Systems/HardwiredCentral Systems such as FireAlarms,Fire Control, Clock, Closed CircuitTV, Data Pons, Central Video,Telephone

Annual testing, service and inspection, replacebroken components of or hard-wiring for non-security devices.

X X35 Emergency Power/Generators &

Fuel Tanks & LinesAnnual testing, service and inspection,Replacement of broken components, new or replaced fuel lines, tank containment or wiring..

Page 12 of 53

Page 13: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 13/53

CLINTON SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

36 Site Improvement such as:Parking, Driveways, Walkways, -

Directional Signage, landscapingbicycle racks, site signage, irrigationsystems or other siteImprovements,

Repair, replacement or painting of any securityor safety-related fencing/gates; repair or 

replacement of uneven or cracked walkways,driveways and/or parking areas, including"potholes', addition of or improvement tosurface course, base or sub-base of anywalkway, driveway or parking area; addition of repair to or replacement of curbs or concrete X X

37 Athletic Facilities Replacement or repair of localized equipmentrequired to implement the Core CurriculumContent Standards.

38 Fixed Furnishings (Subject to$2000 capitalization threshold per Item)

Page 13 of 53

Page 14: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 14/53

COOK SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

(Check indicates required

maintenance addressed.)

(Check indicates required

maintenance addressed.)

(Check indicates required

maintenance to be addressed.)(Only required to list schools thatare eligible for future aid.)

(Description) (Amts. In this column come from theaudit and are actual or simply basedupon a square fool allocation.)

(Amts. In this column arebudgeted in function 261 -total of all objects for each facility. Thiscolumn will be reviewed by theauditor at years end for compliance.)

(Amts. In this column are what isplanned to be budgeted next year.This column should equal or exceedthe required maintenance calculatedfrom M-1.)

1 Structural Foundations Localized repair of cracks and spelling withcement caulk, grout or epoxy sealant, water proofing. parging. X X X

2 Superstructure Repair damaged fireproofing, rust removal andrepaint

3 Exterior Closures-Walls Localized repairs, pointing, waterproofing.painting, replacement of individual lintels. X

4 Exterior Closures Windows &Glazed Walls

Repairs/localized replacements of frames,sash, caulk, balancing individual replacements,etc. X

5 Exterior Closures-Doors Repair/replace individual hardware, doors,frames; recaulking, leveling, adjustments,general operations X X X

6 Exterior Closures-Roofs Clear clogged drains, inspections and repairs of roofing/flashing materials to maintain warranty X X X

7 Interior Construction Partitions Painting walls, patching of plaster, tape &speckle, lubricate portable partitions. X X X

8 Interior Construction Interior Doors Repair/replace hardware, leveling adjustments,general operations. X X X

9 Interior Construction stair Construction

Check and replace individual worn treads,tighten loose railings end floorboards. X

10 Interior Construction Stair Finishes Clean, seal and wax, replace misc. vinyl andrepair terrazzo. X X X

11 Interior Construction Wall Finishes Preparation/painting, repair or ceramic tilesections; vinyl base/trim X X

-

Page 14 of 53

Page 15: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 15/53

COOK SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39 STATECODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

12 Interior Construction Floor Finishes

Repair/replace floor tiles, boards,strip/wax/varnish. Localized repair/replacement

and annual refurbishing. X X X13 Interior Construction Ceiling

FinishesPaint, replace damaged grid, hangers, patchplaster and textured finish (localizedrepair/replacement). X X X

14 Vertical Movement Elevators, Lifts Inspect/adjust/repair motor, door operation,relays, flooring, lights. Usually under contract.

15 Domestic cold water distribution-piping/ materials

Inspect/repair/replace/service valves, seats, joints, water softener, filters, booster, pumps,etc. X X X

16 Domestic hot water supply-Water Heater, Tank Storage or Convertor 

Drain/flush tanks, healer, repair thermostats,gauges, valves, controls, etc. X X

17 Plumbing Fixtures Repair/replace seals, valves, fixtures andpiping, water fountains/coolers, lab and cookinggas piping/fixtures/controls, etc. X X X

18 Sanitary Piping.materials and equipment Chemical treatment of disposal fields,repair/replace sanitary piping, sewage electionor other pumps, clean grease traps, pumpseptic tanks, etc. X

19 Storm Water  Riser Piping Replace broken or miss ing gut ter. downspouts,leaf guards, maintenance of detention/detentionbasin, etc. (Clear clogged risers) X X

20 Heating System-Boiler (Electric,Gas, Oil)

Repair piping or insulation. Repair or replaceboiler components including thermostats,valves, seals, burner, etc. Perform annualservice, inspection. X X X

^ 21 Coo ling System Types. chiller wi thcoaling tower, fan coil unit, roof topunit, split system, window air conditioner 

Chemical water treatment, clean supply returnductwork, coils, repair/replace thermostats,valves, fans and motors, etc. Perform annualservice/inspection. X X X

22 Heating/Cooling Systems-Multizone roof top unit, heat exchanger,air handier,

Clean supply/return ductwork, repair/replacethermostats, valves, fans and motors, etc.Perform annual service/inspection. X X X

23 Exhaust Ventilation-toilet exhaustfans, kitchen exhaust fans/hoodslab exhaust

Replace grills, louvers, fan covers, Servicesystem-motors, belts, blades. lubrication. etc.Annual certification of hoods. X X

Page 15 of 53

Page 16: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 16/53

COOK SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Descript ion Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

24 Control System-Pneumatic, Electronic, DDC

Annual service/inspection. Repair or replacecomponents, piping. Controllers, wiring. X X

25 Fire Sprinkler System-Wet or Dry Annual service and inspection. Test flow andtamper switches, replace broken sprinkler heads, repair or replace valves, fire departmentconnection, gauges, etc. X X X

26 Standpipe & Hose Systems-Wet or Dry

Exercise zone valves, Repair or replacedefective valves, hoses, etc.

27 Building Service (400-4000) ampsHigh Voltage Main to Low VoltageDistribution Panel

Replace defective breakers in high or lowvoltage side of transformer. Annual testing. Runnew ground.

28 Branch Panels Replace individual breakers or panels. Wiredevices from panel or panel to point of service. X

29 Interior Lighting Replace/rewire switches, install individual lights,replace lights, replace fixtures, etc. X X X

30 Exterior Lighting Replace fixtures, day/night individual sensors,

damaged light pole, etc. X X X31 Exi t Signs Repairs due to breakage/vandalism or replacement. X X X

32 Power & Outlets New convenience use power outlets. Newmiscellaneous power outlets, repair or replacement of interior parts (wall switches, walloutlets, exclusive of covers). X

33 Communication & Security Annual testing, service and inspect ion, replacebroken components-control panel, motion control,other security device, speaker system or video.

X X X34 Special Systems/Hardwired

Central Systems such as Fire

Fire Control, Clock, Closed CircuitTV, Data Ports, Central Video,Telephone

Annual testing, service and inspection, replacebroken components of or hard-wiring for non-security devices.

X X X35 Emergency Power/Generators &

Fuel Tanks & LinesAnnual testing, service and inspection,Replacement of broken components, new or ,replaced fuel lines, tank containment or wiring.

Page 16 of 53

Page 17: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 17/53

COOK SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORTCOUNTY 39

STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

36 Site Improvement such as:Parking, Driveways, Walkways, -Directional Signage, landscapingbicycle racks, site signage,irrigation systems or other siteImprovements,

Repair, replacement or painting of any securityor safety-related fencing gates; repair or replacement of uneven or cracked walkways,driveways and/or parking areas, including'potholes', addition of or improvement tosurface course, base or sub-base of anywalkway, driveway or parking area; addition of repair to or replacement of curbs or concretebumpers.

X X X37 Athletic Facilities Replacement or repair of localized equipment

required to implement the Core CurriculumContent Standards.

 _ 

38 Fixed Furnishings (Subject to$2000 capitalization threshold per Item)

Page 17 of 53

Page 18: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 18/53

EMERSON SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

(Check indicates requiredmaintenance addressed.)

{Check indicates requiredmaintenance addressed.)

(Check indicates requiredmaintenance to be addressed.)

(Only required to list schools thatare eligible for future aid.)

(Description) (Amts. In this column come from theaudit and are actual or simply basedupon a square foot allocation.)

(Amts. In this column arebudgeted In function 261 -total of all objects for each facility. Thiscolumn will be reviewed by theauditor at years end for compliance.)

(Amts. In this column are what isplanned to be budgeted next year.This column should equal or exceedthe required maintenance calculatedfrom M-1.)

1 St ructural Foundations Locali zed repai r o f c racks and spell ing w ithcement caulk, grout or epoxy sealant, water proofing. parging.

2 Superstructure Repair damaged fireproofing, rust removal andRepaint

3 Exterior Closures-Walls Local ized repairs, point ing, waterproofing.painting, replacement of individual lintels.

4 Exterior Closures Windows &Glazed Walls

Repairs/localized replacements of frames,sash, caulk, balancing individual replacements,etc.

5 Exterior Closures-Doors Repair/replace individual hardware, doors,frames; recaulking, Leveling, adjustments,general operations X X

6 Exterior Closures-Roofs Clear clogged drains, inspections and repairs of roofing/flashing materials to maintain warranty X

7 Interior Construction Partitions Painting walls, patching of plaster, tape &speckle, lubricate portable partitions. X X

8 Interior Construction Interior Doors Repair/replace hardware, leveling adjustments,, general operations. X X X

9 Interior Construction stair Construction

Check and replace individual worn treads,lighten loose railings end floorboards.

10 Interior Construction Stair Finishes Clean, seal and wax, replace misc. vinyl andrepair terrazzo. X X X11 Interior Construction Wall Finishes Preparation/painting, repair or ceramic tile

sections; vinyl base/trim X X

Page 18 of 53

Page 19: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 19/53

EMERSON SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

12 Interior Construction Floor Finishes

Repair/replace floor tiles, boards,strip/wax/varnish. Localized repair/replacementand annual refurbishing.

X X X13 Interior Construction CeilingFinishes

Paint, replace damaged grid, hangers, patchplaster and textured finish (localizedrepair/replacement).

14 Vertical Movement Elevators, Lifts Inspect/adjust/repair motor, door operation,relays, flooring, lights. Usually under contract. X X X

15 Domestic cold water distribution-piping! materials

Inspect/repair/replace/service valves, seats, joints, water softener, filters, booster, pumps,etc. X X

16 Domestic hot water supply-Water Heater, Tank Storage or Convertor 

Drain/flush tanks, healer, repair thermostats,gauges, valves, controls, etc. X X X

17 Plumbing Fixtures Repair/replace seals, valves, fixtures andpiping, water fountains/coolers, lab and cookinggas piping/fixtures/controls, etc. X X

18 Sanitary Piping.

materials and equipment

Chemical treatment of disposal fields,

repair/rapine sanitary piping, sewage ejectionor other pumps, clean grease traps, pumpseptic tanks, etc. X X X

19 Storm Water Riser Piping Replace broken or missing gutter. downspouts,leaf guards, maintenance of detention/retentionbasin. etc. (Clear clogged risers) X X

20 Heating System-Boiler (Electric,Gas, Oil)

Repair piping or insulation. Repair or replaceboiler components including thermostats,valves, seals, burner, etc. Perform annualservice, inspection. X X X

21 Cooling System Types. chiller withcooling tower, fan coil unit, roof topunit, split system, window air conditioner 

Chemical water treatment, clean supply returnductwork, coils, repair/replace thermostats,valves, fans and motors, etc. Perform annualservice/inspection. X X X

22 Heating/Cooling Systems-Multizone roof top unit, heat exchanger,air handier,

Clean supply/return ductwork, repair/replacethermostats, valves, fans and motors, etc.Perform annual service/inspection. X X X

23 Exhaust Ventilation-toilet exhaustfans, kitchen exhaust fans/hoodslab exhaust

Replace grills, louvers, fan covers, Servicesystem-motors, belts, blades, lubrication. etc.Annual certification of hoods. X X

Page 19 of 53

Page 20: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 20/53

EMERSON SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39 STATECODE 4160

System # ̀ System Descript ion Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

24 Control System-Pneumatic, Electronic, DDC

Annual service/inspection. Repair or replacecomponents, piping. Controllers, wiring. X X X

25 Fire Sprinkler System-Wet or Dry Annual service and inspection. Test flow andtamper switches, replace broken sprinkler heads, repair or replace valves, fire departmentconnection, gauges, etc. X X X

26 Standpipe & Hose Systems-Wet or D

Exercise zone valves, Repair or replacedefective valves, hoses, etc. X X X

27 Building Service (400-4000) ampsHigh Vol age Main to Low VoltageDistribution Panel

Replace defective breakers in high or lowvoltage side of transformer. Annual testing. Runnew ground. X X

28 Branch Panels Replace individual breakers or panels, Wiredevices from panel or panel to point of service.

29 Interior Lighting Replace/rewire switches, install Individual lights,replace lights, replace fixtures, etc.

30 Exterior Lighting Replace fixtures, day/night individual sensors,damaged light pole, etc.

31 Exit Signs Repairs due to breakage/vandalism or  replacement.

32 Power & Outlets New convenience use power outlets. newmiscellaneous power outlets, repair or replacement of interior parts (wail switches, walloutlets, exclusive of covers).

33 Communication & Securi ty Annual test ing, service and inspect ion, replacebroken components-control panel, motioncontrol, other security device, speaker systemor video. X X X

Special Systems/Hardwired CentralSystems such as Fire Alarms, FireControl, Clock, Closed Circuit TV,Data Ports, Central Video, Telephone

Annual testing, service and inspection, replacebroken components of or hard-wiring for non-

X X X35 Emergency Power/Generators &

Fuel Tanks & LinesAnnual testing, service and inspection,Replacement of broken components, new or replaced fuel lines, tank containment or wiring.

X

Page 20 of 53

Page 21: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 21/53

EMERSON SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Descript ion Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

36 Site Improvement such as:Parking. Driveways, Walkways, -Directional Signage, landscaping

bicycle racks, site signage,irrigation systems or other siteImprovements,

Repair, replacement or painting of any securityor safety-related fencing/gates; repair or replacement of uneven or cracked walkways,

driveways and/or parking areas, including'potholes', addition of or improvement tosurface course, base or sub-base of anywalkway, driveway or parking area: addition of repair to or replacement of curbs or concretebumpers.

37 Athletic Facilities Replacement or repair of localized equipmentrequired to implement the Core CurriculumContent Standards.

38 Fixed Furnishings (Subject to$2000 capitalization threshold per Item)

Page 21 of 53

Page 22: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 22/53

Page 23: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 23/53

EVERGREEN SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Descript ion Required Maintenance 09-10 Actual 10-11 Budgete d 11-12 Planned

12 Interior Construction Floor Finishes

Repair/replace floor tiles, boards,Strip/wax/varnish. Localized repair/replacementand annual refurbishing

X X X13 Interior Construction CeilingFinishes

Paint, replace damaged grid, hangers, patchplaster and textured finish (localizedrepair/replacement). X X X

14 Vertical Movement Elevators, Lifts Inspect/adjust/repair motor, door operation,relays, flooring, tights. Usually under contract. X X X

15 Domestic cold water distribution-Piping materials

Inspect/repair/replace/service valves, seats, joints, water softener, filters, booster, pumps,etc. X X X

16 Domestic hot water supply-Water heater, Tank Storage or Convertor 

Drain/flush tanks, healer, repair thermostatsvalves, controls, etc., X X X

17 Plumbing Fixtures Repair/replace seals, valves, fixtures andpiping, water fountains/coolers, tab and cookinggas piping/fixtures/controls, etc. X X

18 Sanitary Piping.materials and equipment

Chemical treatment of disposal fields,Repair/replace sanitary piping, sewage ejectionor other pumps, clean grease traps, pumpseptic tanks, etc. X X X

19 Storm Water Riser Piping Replace broken or missing gutter. downspouts,leaf guards, maintenance of detention/retentionbasin, etc. (Clear clogged risers) X X X

20 Heating System-Boiler (Electric,Gas, Oil)

Repair piping or insulation. Repair or replaceboiler components including thermostats,valves, seals, burner, etc. Perform annualservice, inspection. X X X

21 Cooling System Types. chiller withcooling tower, fan coil unit, roof topunit, split system, window air conditioner 

Chemical water treatment, clean supply returnductwork, coils, repair/replace thermostats,valves, fans and motors, etc. Perform annualservice/inspection. X X X

22 Heating/Cooling Systems-Multizone roof top unit, heat exchanger,air handier,

Clean supply/return ductwork, repair/replacethermostats, valves, fans and motors, etc.Perform annual service/inspection. X X

23 Exhaust Ventilation-toilet exhaustfans, kitchen exhaust fanslhoodslab exhaust

Replace grills, louvers, fan covers, Servicesystem-motors, belts, blades, lubrication. etc.Annual certification of hoods. X X X

Page23

of 53

Page 24: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 24/53

EVERGREEN SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

24 Control System-Pneumatic, Electronic, DDC

Annual service/inspection. Repair or replacecomponents, piping. Controllers, wiring. X X

25 Fire Sprinkler System-Wet or Dry Annual service and inspection. Test flow andtamper switches, replace broken sprinkler heads, repair or replace valves, fire departmentconnection, gauges, etc. X X X

26 Standpipe & Hose Systems-Wet or Dry

Exercise zone valves, Repair or replacedefective valves, hoses, etc.

27 Building Service (4004000) ampsHigh Voltage Main to Low VoltageDistribution Panel

Replace defective breakers in high or lowvoltage side of transformer. Annual testing. Runnew ground.

28 Branch Panels Replace individual breakers or panels. Wiredevices from panel or panel to point of service.

29 Interior Lighting Replace/rewire switches, install individual lights,Replace lights, replace fixtures, etc. X X

30 Exterior Lighting Replace fixtures, day/night individual sensors,damaged light pole, etc.

X X X31 Ex it Signs Repairs due to breakage/vandalism or replacement X X X

32 Power & Outlets New convenience use power outlets. newmiscellaneous power outlets, repair or replacement of interior parts (wall switches, wailoutlets, exclusive of covers). X X X

33 Communication & Security Annual testing, service and inspection, replacebroken components-control panel, motioncontrol, other security device, speaker systemor video. X X X

34 Special Systems/HardwiredCentral Systems such as FireAlarms,Fire Control, Clock, Closed CircuitTV, Data Pons, Central Video,

Telephone

Annual testing, service and inspection, replacebroken components of or hard-wiring for non-security devices.

X X X35 Emergency Power/Generators &

Fuel Tanks & LinesAnnual testing, service and inspection,Replacement of broken components, new or replaced fuel lines, tank containment or wiring. X X X

Page24

of 53

Page 25: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 25/53

EVERGREEN SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Descript ion Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

36 Site Improvement such as:Parking, Driveways, Walkways, -Directional Signage, landscapingbicycle racks, site signage,

irrigation systems or other siteImprovements,

Repair, replacement or painting of any securityor safety-related fencing/gates; repair or replacement of uneven or cracked walkways,driveways and/or parking areas, including

"potholes', addition of or improvement tosurface course, base or sub-base of anywalkway, driveway or parking area; addition of repair to or replacement of curbs or concretebumpers.

X X37 Athletic Facilities Replacement or repair of localized equipment

required to implement the Core CurriculumContent Standards.

38 Fixed Furnishings (Subject to$2000 capitalization threshold per Item)

Page25

of 53

Page 26: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 26/53

HUBBARD MIDDLE SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

(Check indicates requiredmaintenance addressed.)

(Check indicates requiredmaintenance addressed.)

(Check indicates requiredmaintenance to be addressed.)

(Only required to list schools thatare eligible for future aid.)

(Description} (Amts. In this column come from theaudit and are actual or simply basedupon a square foot allocation.)

{Amts. In this column arebudgeted in function 261 .total of all objects for each facility. Thiscolumn will be reviewed by theauditor at years end for compliance.)

(Amts. In this column are what isplanned to be budgeted next year.This column should equal or exceedthe required maintenance calculatedfrom M-1.)

ISt ructural Foundations Local ized repa ir of cracks and spe ll ing wi thcement caulk, grout or epoxy sealant, water proofing. parging.

2Superstructure Repair damaged fireproofing, rust removal andrepaint

3Exterior Closures-Walls Local ized repairs, point ing, waterproofing.painting, replacement of individual lintels.

4Exterior Closures Windows &Glazed Walls

Repairs/localized replacements of frames,sash, caulk, balancing individual replacements,etc. X

5Exterior Closures-Doors Repair/replace individual hardware, doors,frames; recaulking, leveling, adjustments,general operations X X X

6Exterior Closures-Roofs Clear clogged drains, inspections and repairs of Roofing/flashing materials to maintain warranty X X X

Interior Construction Partitions Painting walls, patching of plaster, tape &lubricate portable partitions. X X X

8Interior Construction Interior Doors Repair/replace hardware, leveling adjustments,general operations. X X X

9Interior Construction stair Construction

Check and replace individual worn treads,tighten loose railings end floorboards. X X

10Interior Construction Stair Finishes Clean, seat and wax, replace misc. vinyl andrepair terrazzo. X X X

11Interior Construction Walt Finishes Preparation/painting, repair or ceramic tile, sections; vinyl base/trim X X X

Page26

of 53

Page 27: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 27/53

HUBBARD MIDDLE SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Descr ipt ion Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

12 Interior Construction Floor Finishes

Repair/replace floor tiles, boards,strip/wax/varnish. Localized repair/replacementand annual refurbishing.

X X X13 Interior Construction CeilingFinishes

Paint, replace damaged grid, hangers, patchplaster and textured finish (localizedrepair/replacement). X X

14 Vertical Movement Elevators, Lifts Inspect/adjust/repair molar, door operation,relays, flooring, lights. Usually under contract. X X X

15 Domestic cold water distribution-piping/ materials

Inspect/repair/replace/service valves, seats, joints, water softener, filters, booster, pumps,etc. X X X

16 Domestic hot water supply-Water Heater, Tank Storage or Convertor 

Drain/flush tanks, healer, repair thermostats,gauges, valves, controls, etc. X X

17 P lumbing Fixtures Repair/replace seals, valves, fixtures andpiping, water fountains/coolers, lab and cookinggas piping/fixtures/controls, etc. X X X

18 Sanitary Piping.materials and equipment

Chemical treatment of disposal fields,Repair/replace sanitary piping, sewage ejectionor other pumps, clean grease traps, pumpseptic tanks, etc. X X X

19Storm Water Riser Piping Replace broken or missing gutter. downspouts,leaf guards, maintenance of detention/retentionbasin, etc. (Clear clogged risers) X X X

20 Heating System-Boiler (Electric,Gas, Oil)

Repair piping or insulation. Repair or replaceboiler components including thermostats,valves, seals, burner, etc. Perform annualservice, inspection. X X X

21 Cooling System Types. chiller withcooling tower, fan coil unit, roof topunit, split system, window air conditioner 

Chemical water treatment, clean supply returnductwork, coils, repair/replace thermostats,valves, fans and motors, etc. Perform annualservice/inspection. X X X

22 Heating/Cooling Systems-Multizone roof top unit, heat exchanger,air handier,

Clean supply/return ductwork, repair/replacethermostats, valves, fans and motors, etc.Perform annual service/inspection. X X X

23 Exhaust Ventilation-toilet exhaustfans, kitchen exhaust fans/hoodslab exhaust

Replace grills, louvers, fan covers, Servicesystem-motors, belts, blades, lubrication. etc.Annual certification of hoods. X X X

Page27

of 53

Page 28: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 28/53

HUBBARD MIDDLE SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Descr ipt ion Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

24 Control System-Pneumatic, Electronic, DDC

Annual service/inspection. Repair or replacecomponents, piping. Controllers, wiring. X X X

25 Fire Sprinkler System-Wet or Dry Annual service and inspection. Test now andtamper switches, replace broken sprinkler heads, repair or replace valves, fire departmentconnection, gauges, etc. X X X

26 Standpipe & Hose Systems-Wet or Dry

Exercise zone valves, Repair or replacedefective valves, hoses, etc. X X X

27 Building Service (400-4000) ampsHigh Voltage Main to Low VoltageDistribution Panel

Replace defective breakers in high or towvoltage side of transformer. Annual testing. Runnew ground. X X X

28 Branch Panels Replace individual breakers or panels. Wiredevices from panel or panel to point of service. X X

29 Interior Lighting Replace/rewire switches, install individual lights,replace lights, replace fixtures, etc. X X X

30 Exterior Lighting Replace fixtures, day/night individual sensors,damaged tight pole, etc.

X X X31 Exit Signs Repairs due to breakage/vandalism or replacement X X X

32 Power & Outlets New convenience use power outlets. newmiscellaneous power outlets, repair or replacement of interior parts (wall switches, walloutlets, exclusive of cavern). X X X

33 Commun icat ion & Securi ty Annual testing, service and inspection, replacebroken components-control panel, motioncontrol, other security device, speaker systemor video. X X X

34 Special Systems/HardwiredCentral Systems such as FireAlarms,Fire Control, Clock, Closed CircuitTV, Data Ports, Central Video,

Telephone

Annual testing, service and inspection, replacebroken components of or hard-wiring for non-security devices.

X X X35 Emergency Power/Generators &

Fuel Tanks & LinesAnnual testing, service and inspection,Replacement of broken components, new or replaced fuel lines, tank containment or wiring.

Page28

of 53

Page 29: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 29/53

HUBBARD MIDDLE SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Descript ion ' Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

36Site Improvement such as:Parking, Driveways, Walkways, -Directional Signage, landscapingbicycle racks, site signage,irrigation systems or other siteImprovements,

Repair, replacement or painting of any securityor safety-related fencing/gates; repair or replacement of uneven or cracked walkways,driveways and/or parking areas, including"potholes', addition of or improvement tosurface course, base or sub-base of anywalkway, driveway or parking area; addition of repair to or replacement of curbs or concretebumpers.

X X37Athletic Facilities Replacement or repair of localized equipment

required to implement the Core CurriculumContent Standards. X X

38Fixed Furnishings (Subject to82000 capitalization threshold per Item)

Page29

of 53

Page 30: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 30/53

JEFFERSON SWING SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

(Check indicates required

maintenance addressed.)

(Check indicates required

maintenance addressed.)

(Check indicates required

maintenance to be addressed.)(Only required to list schools thatare eligible for future aid.)

(Description) (Amts. In this column come from theaudit and are actual or simply basedupon a square fool allocation.)

(Amte. In this column arebudgeted in function 261 . total of all objects for each facility. Thiscolumn will be reviewed by theauditor at years end for compliance.)

(Amts. In this column are what isplanned to be budgeted next year.This column should equal or exceedthe required maintenance calculatedfrom M-1.)

1 Structural Foundations Localized repair of cracks and spelling withcement caulk, grout or epoxy sealant, water proofing. parging. X X

2 Superstructure Repair damaged fireproofing, rust removal andrepaint

3 Exterior Closures-Walls Localized repairs, pining, waterproofing.painting, replacement of individual lintels.

4 Exterior Closures Windows &Glazed Walls

Repairs/localized replacements of frames,sash, caulk, balancing individual replacements,etc.

5 Exterior Closures-Doors Repair/replace individual hardware, doors,frames; recaulking, leveling, adjustments,general operations X X X

6 Exterior Closures-Roofs Clear clogged drains, inspections and repairs of roofing. flashing• materials to maintain warrant X X X

7 Interior Construction Partitions Painting walls, patching of plaster, tape &speckle, lubricate portable partitions. X X X

8 Interior Construction Interior Doors Repair/replace hardware, leveling adjustments,general operations. X X X

9 Interior Construction stair Construction

Check and replace individual worn treads,tighten loose railings end floorboards. X X

10 Interior Construction Stair Finishes Clean, seal and wax, replace misc. vinyl andrepair terrazzo. X X X

11 Interior Construction Wall Finishes Preparation/painting, repair or ceramic tilesections; vinyl base/trim X X X

Page30

of 53

Page 31: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 31/53

JEFFERSON SWING SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # Sys te m Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

12 Interior Construction Floor Finishes

Repair/replace floor tiles, boards,Strip/wax/varnish. Localized repair/replacement

and annual refurbishing. X X X13 Interior Construction CeilingFinishes

Paint, replace damaged grid, hangers, patchplaster and textured finish (localizedrepair/replacement). X

14 Vertical Movement Elevators, Lifts Inspect/adjust/repair motor, door operation,relays, flooring, lights. Usually under contract. X X X

15 Domestic cold water distribution-piping/ materials

Inspect/repair/replace/service valves, seats, joints, water softener, filters, booster, pumps,etc. X X X

16 Domestic hot water supply-Water Heater, Tank Storage or Conveyor 

Drain/flush tanks, healer, repair thermostats., gauges, valves, controls, etc. X X X

17 Plumbing Fixtures Repaid/replace seals, valves, fixtures andpiping, water fountains/coolers, lab and cooking

gas piping/fixtures/controls, etc. X X X18 Sanitary Piping.

materials and equipment Chemical treatment of disposal fields,repair/replace sanitary piping, sewage ejectionor other pumps, clean grease traps, pumpseptic tanks, etc. X

19 Storm Water Riser Piping Replace broken or missing gutter. downspouts,leaf guards, maintenance of detention/retentionbasin, etc. (Clear clogged risers) X X X

20 Heating System-Boiler (Electric,Gas, Oil)

Repair piping or insulation. Repair or replaceboiler components including thermostats,valves, seals, burner, etc. Perform annualservice, inspection. X X X

21 Cooling System Types. chiller withcooling tower, fan coil unit, roof topunit, split system, window air conditioner 

Chemical water treatment, clean supply returnductwork, coils, repair/replace thermostats,valves, fans and motors, etc. Perform annualservice/inspection. X X X

22 Heating/Cooling Systems-Multizone roof top unit, heat exchanger,air handier,

Clean supply/return ductwork, repair/replacethermostats, valves, fans and motors, etc.Perform annual service/inspection. X X X

23 Exhaust Ventilation-toilet exhaustfans, kitchen exhaust fans/hoodslab exhaust

Replace grills, louvers, fan covers, Servicesystem-motors, belts, blades, lubrication. etc.Annual certification of hoods. X X X

Page31

of 53

Page 32: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 32/53

JEFFERSON SWING SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Descript ion Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

24 Control System-Pneumatic, Electronic. DDC

Annual service/inspection. Repair or replacecomponents, piping. Controllers, wiring. X X

25 Fire Sprinkler System-Wet or Dry Annual service and inspection. Test flow andtamper switches, replace broken sprinkler heads, repair or replace valves, fire departmentconnection, gauges, etc. X X X

26 Standpipe & Hose Systems-Wet or Dry

Exercise zone valves, Repair or replacedefective valves, hoses, etc.

27 Building Service (400-4000) ampsHigh Voltage Main to Low VoltageDistribution Panel

Replace defective breakers in high or lowvoltage side of transformer. Annual testing. Runnew ground.

28 Branch Panels Replace individual breakers or panels. Wiredevices from panel or panel to point of service. X X X

29 Interior Light ing Replace/rewire switches, install individual lights,replace lights, replace fixtures, etc. X X X

30 Exterior Lighting Replace fixtures, day/night individual sensors,damaged light pole, etc. X X X

31 Exi t Signs Repairs due to breakage/vandalism or replacement. X X X

32 Power & Outlets New convenience use power outlets. newmiscellaneous power outlets, repair or replacement of interior parts (wall switches, walloutlets, exclusive of cavern). X X X

33 Communication & Security Annual testing, service and inspection, replacebroken components-control panel, motioncontrol, other security device, speaker systemor video. X X X

34 Special Systems/Hardwired CentralSystems such as Fire Alarms, FireControl, Clock, Closed Circuit TV,Data Ports, Central Video,Telephone

Annual testing, service and inspection, replacebroken components of or hard-wiring for non-security devices.

X X X35 Emergency Power/Generators &

Fuel Tanks & LinesAnnual testing, service and inspection,Replacement of broken components, new or replaced fuel lines, tank containment or wiring.

Page32

of 53

Page 33: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 33/53

JEFFERSON SWING SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

36 Site Improvement such as:Parking, Driveways, Walkways, -Directional Signage, landscapingbicycle racks, site signage,irrigation systems or other siteImprovements,

Repair, replacement or painting of any securityor safety-related fencing/gates; repair or 

replacement of uneven or cracked walkways,driveways and/or parking areas, including"potholes', addition of or improvement tosurface course, base or sub-base of anywalkway, driveway or parking area; addition of repair to or replacement of curbs or concretebumpers.

X X X37 Athletic Facilities Replacement or repair of localized equipment

required to implement the Core CurriculumContent Standards. X

38 Fixed Furnishings (Subject to$2000 capitalization threshold per Item)

Page33

of 53

Page 34: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 34/53

MAXSON MIDDLE SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39 STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

(Check indicates required

maintenance addressed.)

(Check indicates required

maintenance addressed.)

(Check indicates required

maintenance to be addressed.)(Only required to list schools thatare eligible for future aid.)

(Description) (Amts. In this column come from theaudit and are actual or simply basedupon a square foot allocation.)

(Amts. in this column are r  budgeted in function 261 total of all objects for each facility. Thiscolumn will be reviewed by theauditor at years end for compliance.)

(Amts. In this column are what isplanned to be budgeted next year.This column should equal or exceedthe required maintenance calculatedfrom M-1.)

1Structural Foundations Localized repair of cracks and spelling withcement caulk, grout or epoxy sealant, water proofing. parging X X

2Superstructure Repair damaged fireproofing, rust removal andRepaint _ 

3Exterior Closures-Walls Localized repairs, pointing, waterproofing.painting, replacement of individual lintels. X X

4Exterior Closures Windows &Glazed Walls

Repairs/localized replacements of frames,sash, caulk, balancing individual replacements,etc.

5 Exterior Closures-Doors Repair/replace individual hardware, doors,frames; recaulking, leveling, adjustments,general operations X X X

6 Exterior Closures-Roofs Clear clogged drains. inspections and repairs of Roofing/flashing materials to maintain warranty X X X

7 Interior Construction Partitions Painting walls, patching of plaster, tape &speckle, lubricate portable partitions. X X X

8 Interior Construction Interior Doors Repair/replace hardware, leveling adjustments,general operations. X X X

9 Interior Construction stair , Construction

Check and replace individual worn treads,tighten loose railings end floorboards. X X

10 Interior Construction Stair Finishes Clean, seal and wax, replace misc. vinyl andrepair terrazzo. X X X

11 Interior Construction Wall Finishes Preparation/painting, repair or ceramic tilesections; vinyl base/trim X X X

Page34

of 53

Page 35: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 35/53

MAXSON MIDDLE SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Descript ion Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

12 interior Construction Floor Finishes

Repair/replace floor tiles, boards,strip/wax/varnish. Localized repair/replacementand annual refurbishing.

X X X13 Interior Construction CeilingFinishes

Paint, replace damaged grid, hangers, patchplaster and textured finish (localizedrepair/replacement). X X X

14 Vertical Movement Elevators, Lifts Inspect/adjust/repair motor, door operation,relays, flooring, lights. Usually under contract. X X X

15 Domestic cold water distribution-piping/ materials

Inspect/repair/replace/service valves, seats, joints, water softener, filters, booster, pumps,etc. X X X

16 Domestic hot water-supply-Water Heater, Tank Storage or Convertor 

Drain/flush tanks, healer, repair thermostats,gauges, valves, controls, etc. X X X

17 Plumbing Fixtures Repair/replace seals, valves, fixtures andpiping, water fountains/coolers, lab and cookinggas piping/Fixtures/controls, etc. X X X

18 Sanitary Piping.

materials and equipmentChemical treatment of disposal fields,repair/replace sanitary piping, sewage ejectionor other pumps, clean grease traps, pumpseptic tanks, etc. X X X

19 Storm Water Riser Piping Replace broken or missing gutter. downspouts,leaf guards, maintenance of detention/retentionbasin, etc. (Clear clogged risers) X X X

20 Heating System-Boiler (Electric,Gas, Oil)

Repair piping or insulation. Repair or replaceboiler components including thermostats,valves, seals, burner, etc. Perform annualservice, inspection. X X X

21 Cooling System Types. chiller withcooling tower, fan coil unit, roof topunit, split system, window air conditioner 

Chemical water treatment, clean supply returnductwork, coils, repair/replace thermostats,valves, fans and motors, etc. Perform annualservice/inspection. X X X

22 Heating/Cooling Systems-Multizone roof top unit, heat exchanger,air handier,

Clean supply/return ductwork, repair/replacethermostats, valves, fans and motors, etc.Perform annual service/inspection. X X X

23 Exhaust Ventilation-toilet exhaustfans, kitchen exhaust fans/hoodslab exhaust

Replace grills, louvers, fan covers, Servicesystem-motors, belts, blades, lubrication. etc.Annual certification of hoods. X X X

Page35

of 53

Page 36: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 36/53

MAXSON MIDDLE SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Descript ion Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

24 Control System-Pneumatic, Electronic, DDC

Annual service/inspection. Repair or replacecomponents, piping. Controllers, wiring. X X X

25 Fire Sprinkler System-Wet or DryAnnual service and inspection. Test flow andtamper switches, replace broken sprinkler heads, repair or replace valves, fire departmentconnection, gauges, etc. X X X

26 Standpipe & Hose Systems-Wet or Dry

Exercise zone valves, Repair or replacedefective valves, hoses, etc. X

27 Building Service (4004000) ampsHigh Voltage Main to Low VoltageDistribution Panel

Replace defective breakers in high or lowvoltage side of transformer. Annual testing. Runnew ground. X X X

28 Branch Panels Replace individual breakers or panels. Wiredevices from panel or panel to point of service. X X

29 Interior Lighting Replace/rewire switches, install Individual lights,replace lights, replace fixtures, etc. X X X

30 Exterior Lighting Replace fixtures, day/night individual sensors,damaged light pole, etc. X X

31 Exi t S igns Repairs due to breakage/vandalism or replacement. X X X

32 Power & Outlets New convenience use power outlets. newmiscellaneous power outlets, repair or replacement of interior parts (wall switches, walloutlets, exclusive of covers). X X X

33 Communication & Security Annual testing, service and inspection, replacebroken components-control panel, motioncontrol, other security device, speaker systemor video. X X X

34 Special Systems/HardwiredCentral Systems such as FireAlarms, Fire Control, Clock, ClosedCircuit TV, Data Ports, CentralVideo, Telephone

Annual testing, service and inspection, replacebroken components of or hard-wiring for non-security devices.

X X X35 Emergency Power/Generators &

Fuel Tanks & LinesAnnual testing, service and inspection,Replacement of broken components, new or replaced fuel lines, tank containment or wiring.

Page36

of 53

Page 37: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 37/53

MAXSON MIDDLE SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

36 Site Improvement such as:Parking, Driveways, Walkways, -Directional Signage, landscaping

bicycle racks, site signage,irrigation systems or other siteImprovements,

Repair, replacement or painting of any securityor safety-related fencing/gates; repair or replacement of uneven or cracked walkways,

driveways and/or parking areas, including"potholes', addition of or improvement tosurface course, base or sub-base of anywalkway, driveway or parking area; addition of repair to or replacement of curbs or concretebumpers.

X X X37 Athletic Facilities Replacement or repair of localized equipment

required to implement the Core CurriculumContent Standards. X X

38 Fixed Furnishings (Subject to$2000 capitalization threshold per item)

Page 37 of 53

Page 38: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 38/53

STILLMAN SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

(Check indicates requiredmaintenance addressed.)

(Check indicates requiredmaintenance addressed.)

(Check indicates requiredmaintenance to be addressed.)

(Only required to list schools thatare eligible for future aid.)

(Description) (Amts. In this column come from theaudit and are actual or simply basedupon a square foot allocation.)

(Amts. In this column arebudgeted in function 261 -total of all objects for each facility. Thiscolumn will be reviewed by theauditor at years end for compliance.)

(Amts. In this column are what isplanned to be budgeted next year.This column should equal or exceedthe required maintenance calculatedfrom M-1.)

I Structural Foundations Localized repair of cracks and spelling withcement caulk, grout or epoxy sealant, water proofing. parging. X X

2 Superstructure Repair damaged fireproofing, rust removal andrepaint

3 Exterior Closures-Walls Localized repairs, pointing, waterproofing.painting, replacement of individual lintels. X X

4 Exterior Closures Windows &Glazed Walls Repairs/localized replacements of frames,sash, caulk, balancing individual replacements,etc. X X

5 Exterior Closures-Doors Repair/replace individual hardware, doors,frames; recaulking, leveling, adjustments,general operations X X

6 Exterior Closures-Roofs Clear clogged drains, inspections and repairs of roofing/flashing materials to maintain warranty X X

7 Interior Construction Partitions Painting walls, patching of plaster, tape &speckle, lubricate portable partitions. X X X

8 Interior Construction Interior Doors Repair/replace hardware, leveling adjustments,general operations. X X X

9 Interior Construction stair Construction

Check and replace individual worn treads,lighten loose railings end floorboards.

10 Interior Construction Stair Finishes Clean, seal and wax, replace misc. vinyl andrepair terrazzo. X X X

11 Interior Construction Wall Finishes Preparation/painting, repair or ceramic tilesections; vinyl base/trim X X X

Page 38 of 53

Page 39: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 39/53

STILLMAN SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Descript ion Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

12 Interior Construction Floor Finishes

Repair/replace floor tiles, boards,strip/wax/varnish. Localized repair/replacementand annual refurbishing.

X X X13 ' Interior Construction CeilingFinishes

Paint, replace damaged grid, hangers, patchplaster and textured finish (localizedrepair/replacement). X X

14 Vertical Movement Elevators, Lifts Inspect/adjust/repair motor, door operation,relays, flooring, lights, Usually under contract.

15 Domestic cold water distribution-piping/ materials

Inspect/repair/replace/service valves, seats, joints, water softener, filters, booster, pumps,etc. X X X

16 Domestic hot water supply-Water Heater, Tank Storage or Convertor 

Drain/flush tanks, healer, repair thermostats,gauges, valves, controls, etc. X X X

17 Plumbing Fixtures Repair/replace seals, valves, fixtures andpiping, water fountains/coolers, lab and cooking

gas piping/fixtures/controls, etc. X X X18 Sanitary Piping.

materials and equipment

Chemical treatment of disposal fields,

repair/replace sanitary piping, sewage ejectionor other pumps, clean grease traps, pumpseptic tanks, etc. X X X

19 Storm Water Riser Piping Replace broken or missing gutter. downspouts,leaf guards, maintenance of detention/retentionbasin, etc. (Clear clogged risers) X X X

20 Heating System-Boiler (Electric,Gas, Oil)

Repair piping or insulation. Repair or replaceboiler components including thermostats,valves, seals, burner, etc. Perform annual

, service, inspection. X X X21 Cooling System Types. chiller with

cooling tower, fan coil unit, roof topunit, split system, window air conditioner 

Chemical water treatment, clean supply returnductwork, coils, repair/replace thermostats,valves, fans and motors, etc. Perform annualservice/inspection. X X X

22Heating/Cooling Systems-Multizone roof top unit, heat exchanger,air handier,

Clean supply/return ductwork, repair/replacethermostats, valves, fans and motors, etc.Perform annual service/inspection. X X X

23 Exhaust Ventilation-toilet exhaustfans, kitchen exhaust fans/hoodslab exhaust

Replace grills, louvers, fan covers, Servicesystem-motors, belts, blades, lubrication. etc.Annual certification of hoods. X X X

Page 39 of 53

Page 40: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 40/53

STILLMAN SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

24 Control System-Pneumatic, Electronic, DOC

Annual service/inspection. Repair or replacecomponents, piping. Controllers, wiring. X X X

25 Fire Sprinkler System-Wet or DryAnnual service and inspection. Test flow andtamper switches, replace broken sprinkler heads, repair or replace valves, fire departmentconnection, gauges, etc.

26 Standpipe & Hose Systems-Wet or Dry

Exercise zone valves, Repair or replacedefective valves, hoses, etc.

27 Building Service (400-4000) ampsHigh Voltage Main to Low VoltageDistribution Panel

Replace defective breakers in high or lowvoltage side of transformer. Annual testing. Runnew ground.

25 Branch Panels Replace individual breakers or panels. Wiredevices from panel or panel to point of service. X

29 Interior Lighting Replace/rewire switches, install individual lights,replace lights, replace fixtures, etc. X X X

30 Exterior Lighting Replace fixtures, day/night individual sensors,damaged light pole, etc. X X X

31 Exit Signs Repairs due to breakage/vandalism or replacement. X X X

32 Power & Outlets New convenience use power outlets. newmiscellaneous power outlets, repair or replacement of interior parts (wall switches, walloutlets, exclusive of covers). X X X

33 Communication & Security Annual testing, service and inspection, replacebroken components-control panel, motioncentral, other security device, speaker systemor video. X X X

34Special Systems/HardwiredCentral Systems such as FireAlarms,Fire Control, Clock, Closed CircuitTV, Oat Ports, Central Video,Telephone

Annual testing, service and inspection, replacebroken components of or hard-wiring for non-security devices.

X X X35 Emergency Power/Generators &

Fuel Tanks & LinesAnnual testing, service and inspection,Replacement of broken components, new or replaced fuel lines, tank containment or wiring.

Page 40 of 53

Page 41: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 41/53

STILLMAN SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39

STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

36 Site Improvement such as:Parking, Driveways, Walkways, -Directional Signage, landscapingbicycle racks, site signage,irrigation systems or other siteImprovements,

Repair, replacement or painting of any securityor safety-related fencing/gates; repair or replacement of uneven or cracked walkways,driveways and/or parking areas, including"potholes', addition of or improvement tosurface course, base or sub-base of anywalkway, driveway or parking area; addition of repair to or replacement of curbs or concretebumpers.

X X X37 Athletic Facilities Replacement or repair of localized equipment

required to implement the Core CurriculumContent Standards.

38 Fixed Furnishings (Subject to$2000 capitalization threshold per Item)

Page 41 of 53

Page 42: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 42/53

WASHINGTON SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNT ' 39STATE CODE 4160

System # ' System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

(Check indicates requiredmaintenance addressed.)

(Check indicates requiredmaintenance addressed.)

(Check indicates requiredmaintenance to be addressed.)

(Only required to list schools thatare eligible for future aid.)

(Description) (Amts. in this column come from theaudit and are actual or simply basedupon a square foot allocation.)

(Amts. In this column arebudgeted in function 261 -total of all objects for each facility. Thiscolumn will be reviewed by theauditor at years end for compliance

(Amts. ln this column are what isplanned to be budgeted next year.This column should equal or exceedthe required maintenance calculatedfrom M-1.)

1 Structural Foundations Localized repair of cracks and spelling withcement caulk, grout or epoxy sealant, water proofing. parging,

2 Superstructure Repair damaged fireproofing, rust removal andrepaint

3 Exterior Closures-Walls Localized repairs, pointing, waterproofing.painting, replacement of individual lintels.

4 Exterior Closures Windows &Glazed Walls

Repairs/localized replacements of frames,sash, caulk, balancing individual replacements,

etc. X X X5 Exterior Closures-Doors Repair/replace individual hardware, doors,

frames; recaulking, leveling, adjustments,general operations X X X

6 Exterior Closures-Roofs Clear clogged drains, inspections and repairs of roofing/flashing materials to maintain warranty X X X

7 Interior Construction Partitions Painting walls, patching of plaster, tape &speckle, lubricate portable partitions. X X

8 Interior Construction Interior Doors Repair/replace hardware, leveling adjustments,general operations. X X X

9 Interior Construction Stair Construction

Check and replace individual worn treads,tighten loose railings end floorboards. X X X

10 Interior Construction Stair Finishes Clean, seal and wax, replace misc. vinyl andrepair terrazzo. X X X

11 Interior Construction Wail Finishes Preparation/painting, repair or ceramic tilesections; vinyl base/trim X X X

Page 42 of 53

Page 43: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 43/53

WASHINGTON SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Descript ion Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

12 Interior Construction Floor Finishes

Repair/replace floor tiles, boards,strip/wax/varnish. Localized repair/replacementand annual refurbishing. X X X

13 Interior Construction CeilingFinishes

Paint, replace damaged grid, hangers, patchplaster and textured finish (localizedrepair/replacement). X

14 Vertical Movement Elevators, Lifts Inspect/adjust/repair motor, door operation,relays, flooring, lights, Usually under contract. X X X

15 Domestic cold water distribution-piping/ materials

Inspect/repair/replace/service valves, seats, joints, water softener, filters, booster, pumps,etc. X X X

16 Domestic hot water supply-Water Heater, Tank Storage or Convertor 

Drain/flush tanks, healer, repair thermostats,gauges, valves, controls, etc. X X X

17 Plumbing Fixtures Repair/replace seals, valves, fixtures andpiping, water fountains/coolers, lab and cookinggas piping/fixtures/controls, etc.

X X X

18 Sanitary Piping.

materials and equipment

Chemical treatment of disposal fields,

Repair/replace sanitary piping, sewage ejectionor other pumps, clean grease traps, pumpseptic tanks, etc. X X X

19 Storm Water Riser Piping Replace broken or missing gutter. downspouts,leaf guards, maintenance of detention/retentionbasin, etc. (Clear clogged risers) X X X

20 Heating System-Boiler (Electric,Gas, Oil)

Repair piping or insulation. Repair or replaceboiler components including thermostats,valves, seals, burner, etc. Perform annualservice, inspection. X X X

21 Cooling System Types. chiller withcooling tower, fan coil unit, roof topunit, split system, window air conditioner 

Chemical water treatment, clean supply returnductwork, coils, repair/replace thermostats,valves, fans and motors, etc. Perform annualservice/inspection. X X X

22 Heating/Cooling Systems-Multizone roof top unit, heat exchanger,air handier,

Clean supply/return ductwork, repair/replacethermostats, valves, fans and motors, etc.Perform annual service/inspection. X X X

23 Exhaust Ventilation-toilet exhaustfans, kitchen exhaust fans/hoodslab exhaust

Replace grills, louvers, fan covers, Servicesystem-motors, belts, blades, lubrication. etc.Annual certification of hoods. X X X

Page 43 of 53

Page 44: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 44/53

WASHINGTON SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

24 Control System-Pneumatic, Electronic, DOC

Annual service/inspection. Repair or replacecomponents, piping. Controllers, wiring, X X X

25 Fire Sprinkler System-Wet or Dry

Annual service and inspection_ Test flow andtamper switches, replace broken sprinkler heads, repair or replace valves, fire departmentconnection, gauges, etc. X X X

26 Standpipe & Hose Systems-Wet or Dry

Exercise zone valves, Repair or replacedefective valves, hoses, etc. X X X

27 Building Service (400-4000) ampsHigh Voltage Main to Low VoltageDistribution Panel

Replace defective breakers in high or lowvoltage side of transformer. Annual testing. Runnew ground. X

28 Branch Panels Replace individual breakers or panels. Wiredevices from panel or panel to point of service.

29 Interior Light ing Replace/rewire switches, install individual lights,replace lights, replace fixtures, etc. X X X

30 Exterior Light ing Replace fixtures, day/night individual sensors,damaged light pole, etc. X X X

3 1 E xi t Si gn s Repairs due to breakage/vandalism or replacement. X X X

32 ' Power & Outlets New convenience use power outlets. newmiscellaneous power outlets, repair or replacement of interior parts (wall switches, walloutlets, exclusive of cavern). X X X

33 Communication & Security Annual testing, service and inspection, replacebroken components-control panel, motioncontrol, other security device, speaker systemor video- X X X

34 Special Systems/HardwiredCentral Systems such as FireAlarms,Fire Control, Clock, Closed CircuitTV, Data Ports, Central Video,

Telephone

Annual testing, service and inspection, replacebroken components of or hard-wiring for non-security devices.

X X X35 Emergency Power/Generators &

Fuel Tanks & LinesAnnual testing, service and inspection,Replacement of broken components, new or replaced fuel lines, tank containment or wiring.

Page 44 of 53

Page 45: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 45/53

WASHINGTON SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 41 60

System # System Descr ipt ion Required Maintenance 09-10 Actual 10-11 Budgete d 11-12 Planned

36 Site Improvement such as:Parking, Driveways, Walkways, -Directional Signage, landscaping

bicycle racks, site signage,irrigation systems or other siteImprovements,

Repair, replacement or painting of any securityor safety-related fencing/gates; repair or replacement of uneven or cracked walkways,

driveways and/or parking areas, including"potholes', addition of or improvement tosurface course, base or sub-base of anywalkway, driveway or parking area; addition of repair to or replacement of curbs or concretebumpers.

X X37 Athletic Facilities Replacement or repair of localized equipment

required to implement the Core CurriculumContent Standards.

38 Fixed Furnishings (Subject to$2000 capitalization threshold per Item)

Page 45 of 53

Page 46: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 46/53

WOODLAND SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

(Check indicates requiredmaintenance addressed.)

(Check indicates requiredmaintenance addressed.)

(Check indicates requiredmaintenance to be addressed)

(Only required to list schoolsthat are eligible for future aid.)

(Description) (Amts. In this column come fromthe audit and are actual or simplybased upon a square footallocation.)

(Amts. In this column arebudgeted in function 261, total of all objects for each facility. Thiscolumn will be reviewed by theauditor at years end for compliance.)

(Amts. In this column are what isplanned to be budgeted next year.This column should equal or exceed the required maintenancecalculated from M-1.)

1 Structured Foundations. Local ized repair of cracks and spell ing withcement caulk, grout or epoxy sealant, water proofing parging. X X

2 Superstructure Repair damaged fireproofing, rust removaland repaint.

3 Exterior Closures-Walls Local ized repairs, point ing, waterproofing,painting, replacement of individual lintels.

4 Exterior Closures Windows &glazed Walls

Repairs/localized replacements of frames,sash, caulk, balancing individualreplacements, etc. X X

5 Exterior Closures-Doors Repair/replace individual hardware, doors,frames; recaulking, leveling, adjustments,general operations. X X X

6 Exterior C losures-Roofs Clear clogged dra ins, inspect ions andrepairs of roofing/flashing materials tomaintain warranty X X X

7 Interior Construction Partitions Painting walls, patching of plaster, tape &speckle, lubricate portable partitions. X X X

8 Interior Construction Interior Doors

Repair/replace hardware, levelingadjustments general operations. X X X

9 Interior Construction Stair Construction

Check and replace individual worn treadstighten loose railings end floorboards.

10 Interior Construction Stair Finishes

Clean, seal and wax, replace misc. vinyland repair terrazzo. X X X

11 Interior Construction WallFinishes

Preparation/painting, repair or ceramic titlesections; vinyl base/trim X X X

Page 46 of 53

Page 47: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 47/53

WOODLAND SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

12 inferior Construction Floor Finishes

Repair/replace floor tiles, boards,strip/wax/varnish. Localized repair/replacement

and annual refurbishing. X X X13 Interior Construction Ceiling

FinishesPaint, replace damaged grid, hangers, patchplaster and textured Finish (localizedrepair/replacement). X X X

14 Vertical Movement Elevators, Lifts Inspect/adjust/repair motor, door operation,relays, flooring, lights. Usually under contract.

15 Domestic cold water distribution-piping/ materials

Inspect/repair/replace/service valves, seats, joints, water softener, filters, booster, pumps,etc. X X X

16 Domestic hot water supply-Water Heater, Tank Storage or Convertor 

Drain/flush tanks, healer, repair thermostats,, gauges, valves, controls, etc. X X X

17 Plumbing Fixtures Repair/replace seals, valves, fixtures andpiping, water fountains/coolers, lab and cookinggas piping/fixtures/controls, etc. X X X

18 Sanitary Piping.materials and equipment Chemical treatment of disposal fields,repair/replace sanitary piping, sewage ejection

or other pumps, clean grease traps, pumpseptic tanks, etc. X X

19 Storm Water Riser Piping Replace broken or missing gutter. downspouts,leaf guards, maintenance of detention/retentionbasin, etc. (Clear clogged risers) X X

20 Heating System-Boiler (Electric,Gas, Oil)

Repair piping or insulation. Repair or replaceboiler components including thermostats,valves, seals, burner, etc, Perform annualservice, inspection. X X X

21 Cooling System Types. chiller withcooling tower, fan coil unit, roof topunit, split system, window air 

 _ conditioner 

Chemical water treatment, clean supply returnductwork, coils, repair/replace thermostats,valves, fans and motors, etc. Perform annualservice/inspection. X X X

22 Heating/Cooling Systems-Multizone roof top unit, heat exchanger,air handier,

Clean supply/return ductwork, repair/replacethermostats, valves, fans and motors, etc.Perform annual service/Inspection. X X

23 Exhaust Ventilation-toilet exhaustfans, kitchen exhaust fans/hoodslab exhaust

Replace grills, louvers, fan covers, Servicesystem-motors, belts, blades, lubrication. etc.Annual codification of hoods. X X X

Page 47 of 53

Page 48: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 48/53

WOODLAND SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

24 Control System-Pneumatic, Electronic, DDC

Annual service/inspection. Repair or replacecomponents, piping. Controllers, wiring. X X X

25 Fire Sprinkler System-Wet or Dry Annual service and inspection. Test flow andtamper switches, replace broken sprinkler heads, repair or replace valves, fire departmentconnection, gauges, etc.

26 Standpipe & Hose Systems-Wet or 'Dry

Exercise zone valves, Repair or replacedefective valves, hoses. etc.

27 Building Service (400-4000) ampsHigh Voltage Main to Low VoltageDistribution Panel

Replace defective breakers in high or lowvoltage side of transformer. Annual testing. Runnew ground. X X

28 Branch Panels Replace individual breakers or panels. Wiredevices from panel or panel to point of service. X X

29 Interior Lighting Replace/rewire switches, install individual lights,

replace lights, replace fixtures, etc. X X X30 Exterior Lighting Replace fixtures, day/night individual sensors,damaged light pole, etc. X

31 Exit Signs Repairs due to breakage/vandalism or replacement. X X X

32 Power & Outlets New convenience use power outlets. newmiscellaneous power outlets, repair or replacement of interior parts (wall switches, walloutlets, exclusive of covers). X X X

33 Communication & Security Annual testing, service and inspection, replacebroken components-control panel, motioncontrol, other security device, speaker systemor video. X X X

34 Special Systems/HardwiredCentral Systems such as Fire

Alarms,Fire Control, Clock, Closed CircuitTV, Data Ports, Central Video,Telephone

Annual testing, service and inspection, replacebroken components of or hard-wiring for non-

security devices.

X X X35

 _ 

Emergency Power/Generators &Fuel Tanks & Lines

Annual testing, service and inspection,Replacement of broken components, new or replaced fuel lines, tank containment or wiring.

Page 48 of 53

Page 49: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 49/53

WOODLAND SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

36 Site Improvement such as:Parking, Driveways, Walkways, -Directional Signage, landscapingbicycle racks, site signage,irrigation systems or other siteImprovements,

Repair, replacement or painting of any securityor safety-related fencing/gates; repair or replacement of uneven or cracked walkways,driveways and/or parking areas, including"potholes', addition of or improvement tosurface course, base or sub-base of anywalkway, driveway or parking area; addition of repair to or replacement of curbs or concretebumpers.

X X X37 Athletic Facilities Replace ment or repair of localized e qui pment

required to implement the Core CurriculumContent Standards.

F

38 Fixed Furnishings (Subject to$2000 capitalization threshold per Item)

Page 49 of 53

Page 50: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 50/53

PLAINFIELD HIGH SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

(Check indicates requiredmaintenance addressed.)

Check indicates requiredmaintenance addressed.)

Check indicates requiredmaintenance addressed.)

1 (Only required to list schools thatare eligible for future aid.)

(Description) (Amts. In this column come fromthe audit and are actual or simplybased upon a square foot

allocation.)

(Amts. In this column arebudgeted in function 261 total of all objects for each facility. This

column will be reviewed by theauditor at years end for compliance.)

(Amts. In the column are what isplanned to be budgeted next year.This column should equal or 

exceed the required maintenancecalculated from M-1.)

2 Structural Foundations Localized repair of cracks andspelling with cement caulk, grout or epoxy sealant, water proofing,parging.

3 Exterior Closures-Walls Localized repairs, pointing,waterproofing, painting, replacementof individual lintels. X

4 Exterior Closures Windows &Glazed Walls

Repairs/localized replacements of frames, sash, caulk, balancingindividual replacements, etc. X X X

5 Exterio r Closures- Do ors Rep air/repla ce individual h ardw are,doors, frames; recaulking, leveling,adjustments, general operations X X X

6 Exterio r Closures- Ro ofs Clea r clogge d drains, inspe ctio ns

and repairs of roofing/flashingmaterials to maintain warranty. X X X7 Interior Construction Parti tions Paint ing walls, patching of plaster,

tape & speckle, lubricate portablepartitions. X X X

8 Interior Construction Interior Doors Repair/replace hardware, levelingadjustments, general operations. X X X

9 Interior Construction Stair Construction

Check and replace individual worntreads, tighten loose railings endfloorboards. X X

10 Interior Construction Stair Finishes Clean, seal and wax, replace misc.vinyl and repair terrazzo. X X X

11 Interior Construction Wall Finishes Preparation/painting, repair or ceramic tile sections; vinyl base/trim. X X X

Page 50 of 53

Page 51: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 51/53

PLAINFIELD HIGH SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

12 Interior Construction Floor Finishes Repair/replace floor tiles, boards,strip/wax/varnish. Localizedrepair/replacement and annualrefurbishing. X X X

13 Interior Construction Ceiling Finishes Paint, replace damaged grid, hangers,

patch plaster and textured finish(localized repair/replacement.) X X X14 Vertical Movement Elevators,, Lifts Inspect/adjust/repair motor, door 

operation, relays, flooring, lights.Usually under contract. X X X

15 Domestic cold water distribution-piping/materials

Inspect/repair/replace/service valves,seals, joints, water softener, filters,booster, pumps, etc. X X X

16 Domestic hot water supply-water heater, tank storage or convertor 

Drain/flush tanks, heater, repair thermostats, gauges, valves, controls,etc. X X X

17 Plumbing Fixtures Repair/replace seals, valves, fixturesand piping, water fountains/coolers,lab and cooking gaspiping/fixtures/controls, etc., v X X X

18 Sanitary Piping,Materials and Equipment

Chemical treatment of disposal fields,repair/replace sanitary piping, sewage

ejection or other pumps, clean greasetraps, pump septic tanks, etc. X X X19 Storm Water Riser Piper Repl ace broken o r missing g utte r,

downspouts, leaf guards, maintenanceof detention/retention basin, etc. (Clear clogged risers) X X X

20 Heating System-Boiler (Electric,Gas, Oil)

Repair piping of insulation. Repair or replace boiler components includingthermostats, valves, seals, burner, etc.Perform annual service, inspection. X X X

21 Cooling System Types, chiller withcooling tower, fan coil unit, roof topunit, split system, window air conditioner 

Chemical water treatment, cleansupply return ductwork, coils,repair/replace thermostats, valves,fans and motors, etc. Perform annualservice/inspection. X X X

22 Heating/Cooling Systems-Multi zoneroof top unit, heat exchanger, air 

handler.

Clean supply/return ductwork,repair/replace thermostats, valves,

fans and motors, etc. Perform annualservice/inspection. X X X23 Exhaust Ventilation-toilet exhaust

fans, kitchen exhaust fans/hoods labexhaust.

Replace grills, louvers, fan covers,service system-motors, belts, blades,lubrication, etc. Annual certification of hoods. X X X

Page 51 of 53

Page 52: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 52/53

PLAINFIELD HIGH SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

24 Control System- Pneumatic.Electronic, DDC

Annual service/inspection. Repair or replacecomponents, piping. Controllers, wiring. X X X

25 Fire Sprinkler System-Wet or Dry

I

Annual service and inspection. Test flow andtamper switches, replace broken sprinkler heads,repair or replace valves, fire departmentconnection, gauges. etc. X X X

26 Standpipe & Hose Systems-Wet or Dry

Exercise zone valves, Repair or replace defectivevalves, hoses, etc. X X X

27 Building Service (400-4000) ampsHigh Voltage Main to Low VoltageDistribution Panel

Replace defective breakers in high or low voltageside of transformer. Annual testing. Run newground. X X X

28 Branch Panels Replace individual breakers or panels. Wiredevices from panel or panel to point of service. X X X

29 Interior Lighting Replace/rewire switches, install individual lights,

replace tights, replace fixtures, etc. X X X30 Exterior Lighting Replace fixtures, day/night individual sensors,damaged light pole, etc. X X X

31 Exit Signs Repairs due to breakage/vandalism or replacement. X X X

32 Power & Outlets New convenience use power outlets. Newmiscellaneous power outlets repair or replacementof interior parts (wall switches, wall outlets,exclusive of covers). X X X

33 Communication & Security Annual testing, service and inspection, replacebroken components-control panel, motion control,other security device, speaker system or video.

X X X34 Special Systems/Hardwired

Central Systems such as Fire

Alarms,Fire Control, Clock, Closed CircuitTV, Data Pods, Central Video,Telephone

Annual testing, service and inspection, replacebroken components of or hard-wiring for 

non-security devices.

X X X35

 _ 

Emergency Power/Generators &Fuel Tanks & Lines

Annual testing, service and inspection,Replacement of broken components, new or replaced feet lines, tank containment or wiring. X X X

Page 52 of 53

Page 53: PPSD Comprehensive Maint. 2009-12

8/7/2019 PPSD Comprehensive Maint. 2009-12

http://slidepdf.com/reader/full/ppsd-comprehensive-maint-2009-12 53/53

PLAINFIELD HIGH SCHOOL PLAINFIELD BOARD OF EDUCATION COMPREHENSIVE MAINTENANCE PLAN REPORT COUNTY 39STATE CODE 4160

System # System Description Required Maintenance 09-10 Actual 10-11 Budgeted 11-12 Planned

36 Site improvement such as: parking,Driveways, Walkways, - DirectionalSignage, landscaping bicycle racks,site signage, irrigation systems or other site improvements.

Repair, replacement or painting of any security or safety-related fencing/gates; repair or replacementof uneven or cracked walkways, driveway and/or parking areas, including “potholes”, addition of or improvement to surface course, base or sub-baseof any walkway, driveway or parking area; additionof repair to or replacement of curbs or concretebumpers. X X X

37Athl etic Facilities Re placeme nt or rep air o f lo calize d equip mentrequired to implement the Core CurriculumContent Standards X X X

38 Fixed Furnishings (Subject to $2000capitalization threshold per item)