Bovisa goes GREENEnergy and research park in the City
Politecnico di Milano-School of
Architecture and Society Master ofScience in Urban Planning and
Policy Design
Policy analysis
Prof. Dente Bruno
A.Manganelli, R.Marra, F.Martin, L.Mason, K.Matias, S.Nasiri, A.Nesterova, S.Okyere,
A.Sallou, A.Serbana
-
8/17/2019 PPT Finale (1)
2/44
BOVISA
Bovisa is an ex industrial area, in the outskirtsof the north-east region of the city. The development
started with chemistry firms which made it the mainhubs of the Italian industrial chemistry sector.
Today the area is on the axes which connect Milan
to the Malpensa airport with an interregional
railway system on which there is even the new
Milano Fiera and its surrounded by mixed urbanfunction.
Bovisa
Fiera
Malpensa
PROJECT AREA
TERZIARY SECTOR
RESIDENTIAL AREAS
GREEN AREAS
INDUSTRIAL AREA
CITY SERVICES AND NEIGHBORHOOD FACILITIES
-
8/17/2019 PPT Finale (1)
3/44
CHRONOLOGY
1985
Idea of developing the
area as a scientific park
1987
Debate on the
development of the
University
1989
Faculty of Arch. moved
into dismissed
warehouses
1990
adoption of the variation of the PGT
called “Bovisa Gasomentri Z14”
1991
define the Piano Particolareggiato by
politecnico
1992
Politecnico became the owner of the
ex-warehouses
1994
Ceretti -Tanfani warehouses in via
Durando are rent to Politecnico
1996Region takes part to the “Accordo di
Programma”
2000
different projects realization and development of the ideas
and competition of cleaning the soil
2003
Politecnico decide to buy other areas in the proximity of
Bovisa
2005
Politecnico proposes a Masterplan technological park and
city of youth
2008
Oma masterplan by Euromilano
Municipality
buys ex-
Gasometer
area
1981
PoliMi Projects
1988 1995 1998 2001 2002 2007
2011
Change of
Government
2008
OMAMaster
Plan
2012
Revision
of the PGT
2006
PoliMiMaster
Plan
1997
Accordo di
Programma
Municipality
Politecnico
AEM
Remediation
Law 1.0
IshimotoMaster
plan
Remediation
Law 2.0 Bovisanational
interest
Remediation
Law 2.1
Remediation problems
Renewal
Accordo di
Programma
with private
partnership
-
8/17/2019 PPT Finale (1)
4/44
LAND PROPERTIES and SOIL POLLUTION
-
8/17/2019 PPT Finale (1)
5/44
PROBLEMS of the area
-
8/17/2019 PPT Finale (1)
6/44
PROBLEMS OF GASOMETER AREA
CONTAMINATION
-
8/17/2019 PPT Finale (1)
7/44
PROBLEMS OF GASOMETER AREA
CONTAMINATION
Remediation
-
8/17/2019 PPT Finale (1)
8/44
PROBLEMS OF GASOMETER AREA
CONTAMINATION
Remediation
Political
-
8/17/2019 PPT Finale (1)
9/44
PROBLEMS OF GASOMETER AREA
CONTAMINATION
Remediation
Political
ACTORS
-
8/17/2019 PPT Finale (1)
10/44
PROBLEMS OF GASOMETER AREA
CONTAMINATION
Remediation
Political
LAW
ACTORS
-
8/17/2019 PPT Finale (1)
11/44
PROBLEMS OF GASOMETER AREA
CONTAMINATION
Remediation
Political
LAW
ACTORS
POLICIES
-
8/17/2019 PPT Finale (1)
12/44
PROBLEMS OF GASOMETER AREA
CONTAMINATION
Remediation
Political
LAW
POLICIES
ACTORS
Economical
-
8/17/2019 PPT Finale (1)
13/44
PROBLEMS OF GASOMETER AREA
CONTAMINATION
Remediation
Political
LAW
POLICIES
FUNDSACTORS
Economical
PROBLEMS OF GASOMETER AREA
-
8/17/2019 PPT Finale (1)
14/44
PROBLEMS OF GASOMETER AREA
CONTAMINATION
Remediation
Political
COSTS and BENEFITSLAW
POLICIES
FUNDSACTORS
Economical
PROBLEMS OF GASOMETER AREA
-
8/17/2019 PPT Finale (1)
15/44
PROBLEMS OF GASOMETER AREA
CONTAMINATION
Remediation
Political
COSTS and BENEFITSLAW
POLICIES
FUNDSACTORS
Economical
REDEVELOPMENT / INTERVENTIONS
PROBLEMS OF GASOMETER AREA
-
8/17/2019 PPT Finale (1)
16/44
PROBLEMS OF GASOMETER AREA
CONTAMINATION
Remediation
Political
COSTS and BENEFITSLAW
POLICIES
FUNDSACTORS
Economical
REDEVELOPMENT / INTERVENTIONS
STAGNATION
-
8/17/2019 PPT Finale (1)
17/44
ACTORS’ ANALYSIS
LIST OF THE PAST ACTORS 2007
-
8/17/2019 PPT Finale (1)
18/44
LIST OF THE PAST ACTORS 2007
Actor Type Resources Goals Role
Politecnico di Milano Special InterestEconomic /
Cognitive / LegalContent related
Promoter
(Accordo di
Programma)
EuroMilano Special Interest Economic / Legal Content related
Promoter
(Accordo di
progrmma -
2007)
Municipality of MilanPolitical / Bureaucratic
/ Special Interest
Political/Legal /
Economic
Content / Process-
related
Director (Accordo
di programma)
A2A / AEM Special InterestEconomic /
Cognitive / LegalContent related
Ally (Accordo di
programma)
Lombardia Region Political / Bureaucratic Political/Legal Content relatedAlly (Accordo di
programma)
Provincia of Milan Political / Bureaucratic Political/Legal Content related Ally
M.U.R.S.T. Political / Special interest Economic Process related Ally
Ministry of
EnvironmentPolitical / Bureaucratic Political/Legal Content related
Gatekeeper -
2001
Minor actors * Special Interest - Content related Ally
* ARPA, FNM, Istituto Mario Negri, Chamber of Commerce, Telelombradia, Triennale Bovisa, Banca Intesa
ACTORS’ NETWORK from 1997
-
8/17/2019 PPT Finale (1)
19/44
ACTORS NETWORK from 1997
DIRECTOR
Local
Province of
Milan
EuroMilano
Banca Intesa
POLIMI A2A / AEM
Lombardy
REGION
MUNICIPALITY
of Milan
ACCORDO DI PROGRAMMA
Provincial
Local
Regional
National
Ministery
of the
university
and of the
scientific and
technologicalresearch
(MURST)
ACTORS’ NETWORK from 2007
-
8/17/2019 PPT Finale (1)
20/44
ACTORS NETWORK from 2007
DIRECTOR
National
Regional
Provincial
Local
Ministery
of
Environment
Province of
Milan
POLIMI
EuroMilanoMUNICIPALITY
of Milan
Lombardy
REGION
ACCORDO DI PROGRAMMA
PUBLIC PRIVATE PARTNERSHIP
A2A / AEM
LIST OF THE PROPOSED ACTORS
-
8/17/2019 PPT Finale (1)
21/44
Actor Interest Resources Goals Role
A2A / AEM Special InterestEconomic /
Cognitive / Legal
Content / Process
relatedPromoter
Politecnico di
MilanoSpecial Interest
Economic /
Cognitive / LegalContent related Promoter / Ally
Municipality of
Milano
Political/Bureaucratic
/ Special Interest
Political/Legal /
Economic
Content / Process-
relatedMediator /Director
EuroMilano Special Interest Economic / LegalContent / Process
relatedAlly / Opposer
Zone n° 9 Political PoliticalContent / Process
related Ally
Provincia di Milano Political/Bureaucratic Political/LegalContent / Process-
related Ally
Lombardia Region Political/Bureaucratic Political/Legal Content related Gatekeeper
Ministry of
Environment Political/Bureaucratic Political/Legal Content related Gatekeeper
European Union Political/BureauraticPolitical/Legal/Eco
nomic
Content /Process
related Ally
NGOs General InterestPolitical/Cognitiv
eContent related Ally / Opposer
Local groups General interest Political Content related Ally / Opposer
LIST OF THE PROPOSED ACTORS
PROPOSED ACTORS’ NETWORK
-
8/17/2019 PPT Finale (1)
22/44
PROPOSED ACTORS NETWORK
DIRECTOR
National
Regional
Provincial
International
E.U
I.E.A
Local
Ministery
of
Environment
Lombardy
Region
Province of
Milan
N.G.O
Local
Associations
POLIMI
EuroMilanoMUNICIPALITY
of Milan
CONSORTIUM
A2A / AEM
Zone n°9
ACTORS’ NETWORK from 1997
-
8/17/2019 PPT Finale (1)
23/44
ACTORS NETWORK from 1997
DIRECTOR
Local
Province of
Milan
EuroMilano
Banca Intesa
POLIMI A2A / AEM
Lombardy
REGION
MUNICIPALITY
of Milan
ACCORDO DI PROGRAMMA
Provincial
Local
Regional
National
Ministery
of the
university
and of the
scientific and
technologicalresearch
(MURST)
ACTORS’ NETWORK from 2007
-
8/17/2019 PPT Finale (1)
24/44
ACTORS NETWORK from 2007
DIRECTOR
National
Regional
Provincial
Local
Ministery
of
Environment
Province of
Milan
POLIMI
EuroMilanoMUNICIPALITY
of Milan
Lombardy
REGION
ACCORDO DI PROGRAMMA
PUBLIC PRIVATE PARTNERSHIP
A2A / AEM
PROJECT
-
8/17/2019 PPT Finale (1)
25/44
DIRECTOR
National
Regional
Provincial
International
E.U
I.E.A
Local
Ministery
of
Environment
Lombardy
Region
Province of
Milan
N.G.O
Local
Associations
POLIMI
EuroMilanoMUNICIPALITY
of Milan
CONSORTIUM
PROJECT
A2A / AEM
-
8/17/2019 PPT Finale (1)
26/44
STRATEGIES : from the idea to its implementation
MANIPULATION OF CONTENT OF THE DECISION : our proposal
-
8/17/2019 PPT Finale (1)
27/44
Energy production
and management
Heating and
cogeneration
Environment: waste
collection and
treatment
Grids: electric grid,
integrated water cycle,
gas grids
Research in the
engineering faculty
Need of new spaces
Lessons on field –
Students’ involvement
MANIPULATION OF CONTENT OF THE DECISION : our proposal
HOW THE ENERGY PARK ADDRESSES THE SOIL REMEDIATION
Can co-exist with the soil pollution of the area
It does not need to entirely remediate the area
where the solar park is located
Can be a temporary solution while awaiting reclamation
Can generate additional funds for future reclamation
Can promote research on potential remediation
and renewable energy technologies
Bovisa goes GREENEnergy and research park in the City
MANIPULATION OF CONTENT OF THE DECISION : our proposal
-
8/17/2019 PPT Finale (1)
28/44
MANIPULATION OF CONTENT OF THE DECISION : our proposal
Bovisa goes GREENEnergy and research park in the City
Etc.
Research
labs POLIMI
5.4 hectares
Solar panels
16 hectares
Energy park
service area
1.3 hectares
Research
labs A2A
3.4 hectares
Solar power
tower
2 hectares
Public open
space
3 hectares
Energy
firms offices
1.4 hectares
MANIPULATION OF CONTENT OF THE DECISION : our proposal
-
8/17/2019 PPT Finale (1)
29/44
Reference: photovoltaic power plant of Cavriglia (Arezzo)
Technical data
N. of panels: 41.540 (240wp each)
Total power: 10MWExpected annual producation: 12.609
MWh
Space used: 16 hectars
Provides electricity to 3,300 homes
Environmental benefits
CO2 emissions avoided: 5,531,000 kg /year
SO2 emissions avoided: 7,470 kg / year
NOx emissions avoided: 5,830 kg / year
TEP saved: 2,085 TEP / year
Economic data
Amount investement: € 29,469,100
Amount financed: € 22,199,000
Equity: € 7,270,000
Cavriglia Share capital € 2,357,500
Duration of concession: 20 years
Completion time expected: 4 months
MANIPULATION OF CONTENT OF THE DECISION : our proposal
Bovisa goes GREENEnergy and research park in the City
MANIPULATION OF PATTERNS OF INTERACTION : inclusive strategy
-
8/17/2019 PPT Finale (1)
30/44
FIRST LEVEL OF INTERACTION:
Among the actors developing and managing the project:
Euromilano
Profitability:
high land value, land
development and
building rights
Common points/goals:
Proactive interest to develop
the area
Need of land reclamation
POLITECNICO
Be a relevant component of the
project
Promoting functions related
to technology and innovation
A2A
Enhance its
protagonism
on the area
Reinforce the
engagement
in sustainability
Soil reclamation
Innovative functions
Lowering remediation cost
Municipality of Milan
MANIPULATION OF PATTERNS OF INTERACTION : inclusive strategy
MANIPULATION OF PATTERNS OF INTERACTION : inclusive strategy
-
8/17/2019 PPT Finale (1)
31/44
Actors Reclamation Positive outcomes Further consequences
MUNICIPALITY Cut costs for
reclamation
Innovation-oriented
development
POLITECNICO Possibility to avoid/minimize reclamation Research-enterprisecollaboration
A2A Possibility to avoid
/minimize reclamation
Strengthen /develop
new activities in the
field of renewables
EUROMILANO Reclamation in
exchange of building
rights
Profitable uses
related to the new
functions
FIRST LEVEL OF INTERACTION:
Favouring COORDINATION among the consortium of actors through NEGOTIATION.
Scheme of the stakeholders’ mutual advantage through the consortium.
New fields of researchand closer academic+
business relation
City economy development
and new employment
Reinforce its position
on the area
Increase visibility on
the marke
And potential
lowering of taxetion
inclusive strategy
MANIPULATION OF PATTERNS OF INTERACTION : inclusive strategy
-
8/17/2019 PPT Finale (1)
32/44
SECOND LEVEL OF INTERACTION:
Preventing LOCAL OPPOSITION through PUBLIC DEBATE.
Municipality of Milan
Circoscrizione n° 9
Local neighbourhoods’
organizations
DECENTRALIZATION ANDBOTTOM-UP / TOP-DOWN COMMUNICATION
• Necessity to involve the social parties in the process from the beginning
• Necessity to make local inhabitants feel part of the project
• Necessity to set up a process/project with positive externalities towards local neighbourhoods.
Key institutional actor to activate in this process: CIRCOSCRIZIONE N° 9
gy
-
8/17/2019 PPT Finale (1)
33/44
MANIPULATION OF RESOURCES: EU budget
-
8/17/2019 PPT Finale (1)
34/44
Increasing resources : consensus and financial aid from EU level
European Union multi-year EU budget for 2014-20:
Among the priorities:
• Infrastructure
• Technology
• Energy efficiency
• Renewables
SUSTAINABLE
GROWTH 48,5%
147.2 billion euros: total EU budget for
2012
71.39 billion euros: EU budget for
sustainable growth
g
MANIPULATION OF RESOURCES: EU budget
-
8/17/2019 PPT Finale (1)
35/44
The EU budget 2012 - The figures for sustainable growth
CA = commitment appropriations
PA = payment appropriationsFinancial Transparency System (FTS)
g
Heading Billion € % of total
budget
% change from 2011
CA PA CA PA
Sustainable Growth 67.5 55.3 45.9 +4.7 +3.2
MANIPULATION OF RESOURCES: EU budget
-
8/17/2019 PPT Finale (1)
36/44
Source_ COM(2010)110, 31.3.2010, "Cohesion policy: Strategic Report 2010 on the implementation of the
programmes 2007-2013". ;[25]
http://ec.europa.eu/energy/renewables/targets_en.htm
AMOUNT OF MONEY TYPE OF SERVICE FUNDING AGENCY
€8.4bn Loans and assistance European Investment Bank
€565m Loans and assistance European Economic Recovery Plan
€110m Co-funding analysis and policy
research in renewable energy
"Intelligent Energy Europe"
Programme
€499m Loans and assistance to projects anddemonstrations of renewable energy
EU Structural and Cohesion Funds
€250m Loans and assistance EU R&D Framework Programme
€151m Venture capital or loan guarantees EIP GIF
€140m SEI loans European Bank for Reconstruction
and Development
European Union multi-year EU budget for ENERGY (Data for 2007-2013)
g
-
8/17/2019 PPT Finale (1)
37/44
-
8/17/2019 PPT Finale (1)
38/44
-
8/17/2019 PPT Finale (1)
39/44
THE PROJECT’S GOALS
GENERAL GOALSGENERAL GOALS SPECIFIC GOALS
-
8/17/2019 PPT Finale (1)
40/44
GENERAL GOALS
Try to include various interests andneeds of the area, such as university and local
inhabitants participation.
Regenerate an urban pollutedand central area with an advantageousaccessibility and proximity with Rho Fiera.
Find a feasible and self financed solution through
the attempt to create a partnership
between private and public in order tosolve financial difficulties.
Overcome the delicate question of the
remediation of the soil.
Develop a project able to exploit the new activities
which has been settled out in the last years in the
area.
Research in sustainable energyconsumption and generation, developing new
technologies.
Relation between academic and
business environment in terms of research,employment, production of energy.
Reinforce economic development
through innovation, as a benefit for theentire city.
Promote the Politecnico’s key role in
revitalising the urban area as well ascatalyst for the new energy research
Involve neighbourhood into theinnovation process, developing actions for asustainable community generation.
CASE STUDY : Bristol and Bath Science Park
-
8/17/2019 PPT Finale (1)
41/44
North – East
of Bristol
59 acres
Public Private Partners
South West Regional
Development Agency,started acuiering the site in 2002
Quantum Property
Partnership a 50/50 jointventure between Quintain Estates
& Development and Aviva
Investors; it was established in
2006 and has investments in
science parks in Bristol, Cambridge
and Edinburgh
University of Bath
University of Bristol University of the West of
England
Science City of Bristol
ENERGY : 200m2 of photovoltaic panels provide renewable energyEnergy centre for a more efficient provision of energy, heat and cooling across the site
as it grows.
BIO – DIVERSITY : More than 15% of the site is green spaceThe courtyard area between the Forum, Innovation Centre and Grow-on space is
landscaped to provide a communal garden area for users of the site
COMMUNITY : Provides paths for walking, cycling and horse-riding
incorporated across the site linking in to local transport networksBy enjoying the amenity space and landscape the development provides, local
people have a sense of ownership, becomes a valued local resource.
CASE STUDY : Bristol and Bath Science Park
-
8/17/2019 PPT Finale (1)
42/44
MAIN GOALS
• SUSTAINABILITY as a key element
• high quality buildings surrounded by large, open and
attractive shared green areas in order to
avoid isolation and exclusivity
• the desire to encourage the local
community to make use of the commonareas so that the Park is lived in through the week
• a hub for the region’s science and technology focusing
especially on aerospace, microelectronics,
digital, green technologies anddesign
-
8/17/2019 PPT Finale (1)
43/44
INTERVIEWs
INTERVIEWS
-
8/17/2019 PPT Finale (1)
44/44
Prof. Eugenio Morello, researcher on
energy and sustainable design
Feasibility of the project
Energy consulting
Prof. Stefano Pareglio
Professor of …
Feasibility of the project
Consulting on policy related to energy
Prof. Sabrina Saponaro
Professor of Soil remediation
Consulting on past and future
remediation of the Bovisa Area
Prof. Alessandro Balducci, vice rector
of Milan Politecnico
Politecnico interest and role in the
development of the area
Prof. Francesca Cognetti, researcher in
the field of Urban planning
History of the area
Description of the previous agreement
Prof. Antonella Bruzzese
Professor of Urban Plannig
History of the area and partecipatory
role in the Masterplan for the area
Alessandra Spada
Secretary office of the deputy major of
Urban Planning of Milan
Municipality interest, resources, goals
A2A Energie
A2A interest and goals for the
development of the area