ppt finale (1)

Upload: juan-carlos-ludena-choque

Post on 06-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/17/2019 PPT Finale (1)

    1/44

    Bovisa goes GREENEnergy and research park in the City

    Politecnico di Milano-School of

    Architecture and Society Master ofScience in Urban Planning and

    Policy Design

    Policy analysis

    Prof. Dente Bruno

    A.Manganelli, R.Marra, F.Martin, L.Mason, K.Matias, S.Nasiri, A.Nesterova, S.Okyere,

    A.Sallou, A.Serbana

  • 8/17/2019 PPT Finale (1)

    2/44

    BOVISA

    Bovisa is an ex industrial area, in the outskirtsof the north-east region of the city. The development

    started with chemistry firms which made it the mainhubs of the Italian industrial chemistry sector.

    Today the area is on the axes which connect Milan 

    to the Malpensa airport with an interregional

    railway system on which there is even the new

    Milano Fiera and its surrounded by mixed urbanfunction.

    Bovisa

    Fiera

    Malpensa

    PROJECT AREA

    TERZIARY SECTOR

    RESIDENTIAL AREAS

    GREEN AREAS

    INDUSTRIAL AREA

    CITY SERVICES AND NEIGHBORHOOD FACILITIES

  • 8/17/2019 PPT Finale (1)

    3/44

    CHRONOLOGY

    1985

    Idea of developing the

    area as a scientific park

    1987

    Debate on the

    development of the

    University

    1989

    Faculty of Arch. moved

    into dismissed

    warehouses

    1990

    adoption of the variation of the PGT

    called “Bovisa Gasomentri Z14” 

    1991

    define the Piano Particolareggiato by

    politecnico

    1992

    Politecnico became the owner of the

    ex-warehouses

    1994

    Ceretti -Tanfani warehouses in via

    Durando are rent to Politecnico

    1996Region takes part to the “Accordo di

    Programma” 

    2000

    different projects realization and development of the ideas

    and competition of cleaning the soil

    2003

    Politecnico decide to buy other areas in the proximity of

    Bovisa

    2005

    Politecnico proposes a Masterplan technological park and

    city of youth

    2008

    Oma masterplan by Euromilano

    Municipality

    buys ex-

    Gasometer

    area

    1981

    PoliMi Projects 

    1988 1995 1998 2001 2002 2007

    2011

    Change of

    Government

    2008

    OMAMaster

    Plan

    2012

    Revision

    of the PGT

    2006

    PoliMiMaster

    Plan

    1997

    Accordo di

    Programma

    Municipality

    Politecnico

    AEM

    Remediation

    Law 1.0 

    IshimotoMaster

    plan 

    Remediation

    Law 2.0 Bovisanational

    interest

    Remediation

    Law 2.1 

    Remediation problems

    Renewal

    Accordo di

    Programma

    with private

    partnership

  • 8/17/2019 PPT Finale (1)

    4/44

    LAND PROPERTIES and SOIL POLLUTION

  • 8/17/2019 PPT Finale (1)

    5/44

    PROBLEMS of the area

  • 8/17/2019 PPT Finale (1)

    6/44

    PROBLEMS OF GASOMETER AREA

    CONTAMINATION

  • 8/17/2019 PPT Finale (1)

    7/44

     

    PROBLEMS OF GASOMETER AREA

    CONTAMINATION

    Remediation

  • 8/17/2019 PPT Finale (1)

    8/44

     

    PROBLEMS OF GASOMETER AREA

    CONTAMINATION

    Remediation

    Political

  • 8/17/2019 PPT Finale (1)

    9/44

     

    PROBLEMS OF GASOMETER AREA

    CONTAMINATION

    Remediation

    Political

    ACTORS

  • 8/17/2019 PPT Finale (1)

    10/44

     

    PROBLEMS OF GASOMETER AREA

    CONTAMINATION

    Remediation

    Political

    LAW

    ACTORS

  • 8/17/2019 PPT Finale (1)

    11/44

     

    PROBLEMS OF GASOMETER AREA

    CONTAMINATION

    Remediation

    Political

    LAW

    ACTORS

    POLICIES

  • 8/17/2019 PPT Finale (1)

    12/44

     

    PROBLEMS OF GASOMETER AREA

    CONTAMINATION

    Remediation

    Political

    LAW

    POLICIES

    ACTORS

    Economical

  • 8/17/2019 PPT Finale (1)

    13/44

     

    PROBLEMS OF GASOMETER AREA

    CONTAMINATION

    Remediation

    Political

    LAW

    POLICIES

    FUNDSACTORS

    Economical

    PROBLEMS OF GASOMETER AREA

  • 8/17/2019 PPT Finale (1)

    14/44

     

    PROBLEMS OF GASOMETER AREA

    CONTAMINATION

    Remediation

    Political

    COSTS and BENEFITSLAW

    POLICIES

    FUNDSACTORS

    Economical

    PROBLEMS OF GASOMETER AREA

  • 8/17/2019 PPT Finale (1)

    15/44

    PROBLEMS OF GASOMETER AREA

    CONTAMINATION

    Remediation

    Political

    COSTS and BENEFITSLAW

    POLICIES

    FUNDSACTORS

    Economical

    REDEVELOPMENT / INTERVENTIONS

    PROBLEMS OF GASOMETER AREA

  • 8/17/2019 PPT Finale (1)

    16/44

    PROBLEMS OF GASOMETER AREA

    CONTAMINATION

    Remediation

    Political

    COSTS and BENEFITSLAW

    POLICIES

    FUNDSACTORS

    Economical

    REDEVELOPMENT / INTERVENTIONS

    STAGNATION

  • 8/17/2019 PPT Finale (1)

    17/44

    ACTORS’ ANALYSIS

    LIST OF THE PAST ACTORS 2007

  • 8/17/2019 PPT Finale (1)

    18/44

    LIST OF THE PAST ACTORS 2007

    Actor Type Resources Goals Role

    Politecnico di Milano Special InterestEconomic /

    Cognitive / LegalContent related

    Promoter

    (Accordo di

    Programma)

    EuroMilano Special Interest Economic / Legal Content related

    Promoter

    (Accordo di

    progrmma -

    2007)

    Municipality of MilanPolitical / Bureaucratic

    / Special Interest

    Political/Legal /

    Economic

    Content / Process-

    related

    Director (Accordo

    di programma)

     A2A / AEM Special InterestEconomic /

    Cognitive / LegalContent related

    Ally (Accordo di

    programma)

    Lombardia Region Political / Bureaucratic Political/Legal  Content relatedAlly (Accordo di

    programma)

    Provincia of Milan Political / Bureaucratic Political/Legal  Content related Ally

    M.U.R.S.T. Political / Special interest Economic Process related Ally

    Ministry of

    EnvironmentPolitical / Bureaucratic Political/Legal  Content related

    Gatekeeper -

    2001

    Minor actors * Special Interest - Content related Ally

    *  ARPA, FNM, Istituto Mario Negri, Chamber of Commerce, Telelombradia, Triennale Bovisa, Banca Intesa

    ACTORS’ NETWORK from 1997

  • 8/17/2019 PPT Finale (1)

    19/44

    ACTORS NETWORK from 1997

    DIRECTOR

    Local

    Province of

    Milan

    EuroMilano

    Banca Intesa

    POLIMI A2A / AEM

    Lombardy

    REGION

    MUNICIPALITY

    of Milan

    ACCORDO DI PROGRAMMA

    Provincial

    Local

    Regional

    National

    Ministery

    of the

    university

    and of the

    scientific and

    technologicalresearch

    (MURST)

    ACTORS’ NETWORK from 2007

  • 8/17/2019 PPT Finale (1)

    20/44

    ACTORS NETWORK from 2007

    DIRECTOR

    National

    Regional

    Provincial

    Local

    Ministery

    of

    Environment

    Province of

    Milan

    POLIMI

    EuroMilanoMUNICIPALITY 

    of Milan

    Lombardy

    REGION

    ACCORDO DI PROGRAMMA

    PUBLIC PRIVATE PARTNERSHIP

    A2A / AEM

    LIST OF THE PROPOSED ACTORS

  • 8/17/2019 PPT Finale (1)

    21/44

    Actor Interest Resources Goals Role

    A2A / AEM Special InterestEconomic /

    Cognitive / Legal

    Content / Process

    relatedPromoter  

    Politecnico di

    MilanoSpecial Interest

    Economic /

    Cognitive / LegalContent related Promoter / Ally

    Municipality of

    Milano

    Political/Bureaucratic

    / Special Interest

    Political/Legal /

    Economic

    Content / Process-

    relatedMediator /Director

    EuroMilano Special Interest Economic / LegalContent / Process

    relatedAlly / Opposer

    Zone n° 9 Political PoliticalContent / Process

    related Ally

    Provincia di Milano Political/Bureaucratic Political/LegalContent / Process-

    related Ally

    Lombardia Region Political/Bureaucratic Political/Legal  Content related Gatekeeper

    Ministry of

    Environment Political/Bureaucratic Political/Legal  Content related Gatekeeper

    European Union Political/BureauraticPolitical/Legal/Eco

    nomic

    Content /Process

    related Ally

    NGOs General InterestPolitical/Cognitiv

    eContent related Ally / Opposer

    Local groups General interest Political Content related Ally / Opposer

    LIST OF THE PROPOSED ACTORS

    PROPOSED ACTORS’ NETWORK

  • 8/17/2019 PPT Finale (1)

    22/44

    PROPOSED ACTORS NETWORK 

    DIRECTOR

    National

    Regional

    Provincial

    International

    E.U

    I.E.A

    Local

    Ministery

    of

    Environment

    Lombardy

    Region

    Province of

    Milan

    N.G.O

    Local

    Associations

    POLIMI

    EuroMilanoMUNICIPALITY 

    of Milan

    CONSORTIUM

    A2A / AEM

    Zone n°9

    ACTORS’ NETWORK from 1997

  • 8/17/2019 PPT Finale (1)

    23/44

    ACTORS NETWORK from 1997

    DIRECTOR

    Local

    Province of

    Milan

    EuroMilano

    Banca Intesa

    POLIMI A2A / AEM

    Lombardy

    REGION

    MUNICIPALITY

    of Milan

    ACCORDO DI PROGRAMMA

    Provincial

    Local

    Regional

    National

    Ministery

    of the

    university

    and of the

    scientific and

    technologicalresearch

    (MURST)

    ACTORS’ NETWORK from 2007

  • 8/17/2019 PPT Finale (1)

    24/44

    ACTORS NETWORK from 2007

    DIRECTOR

    National

    Regional

    Provincial

    Local

    Ministery

    of

    Environment

    Province of

    Milan

    POLIMI

    EuroMilanoMUNICIPALITY 

    of Milan

    Lombardy

    REGION

    ACCORDO DI PROGRAMMA

    PUBLIC PRIVATE PARTNERSHIP

    A2A / AEM

    PROJECT

  • 8/17/2019 PPT Finale (1)

    25/44

     DIRECTOR

    National

    Regional

    Provincial

    International

    E.U

    I.E.A

    Local

    Ministery

    of

    Environment

    Lombardy

    Region

    Province of

    Milan

    N.G.O

    Local

    Associations

    POLIMI

    EuroMilanoMUNICIPALITY 

    of Milan

    CONSORTIUM

    PROJECT

    A2A / AEM

  • 8/17/2019 PPT Finale (1)

    26/44

    STRATEGIES : from the idea to its implementation

    MANIPULATION OF CONTENT OF THE DECISION : our proposal

  • 8/17/2019 PPT Finale (1)

    27/44

    Energy production

    and management

    Heating and

    cogeneration

    Environment: waste

    collection and

    treatment

    Grids: electric grid,

    integrated water cycle,

    gas grids

    Research in the

    engineering faculty

    Need of new spaces

    Lessons on field – 

    Students’ involvement 

    MANIPULATION OF CONTENT OF THE DECISION : our proposal

    HOW THE ENERGY PARK ADDRESSES THE SOIL REMEDIATION

    Can co-exist with the soil pollution of the area

    It does not need to entirely remediate the area

    where the solar park is located

    Can be a temporary solution while awaiting reclamation

    Can generate additional funds for future reclamation

    Can promote research on potential remediation

    and renewable energy technologies 

    Bovisa goes GREENEnergy and research park in the City

    MANIPULATION OF CONTENT OF THE DECISION : our proposal

  • 8/17/2019 PPT Finale (1)

    28/44

    MANIPULATION OF CONTENT OF THE DECISION : our proposal

    Bovisa goes GREENEnergy and research park in the City

    Etc.

    Research

    labs POLIMI

    5.4 hectares

    Solar panels

    16 hectares

    Energy park

    service area

    1.3 hectares

    Research

    labs A2A

    3.4 hectares

    Solar power

    tower

    2 hectares

    Public open

    space

    3 hectares

    Energy

    firms offices

    1.4 hectares

    MANIPULATION OF CONTENT OF THE DECISION : our proposal

  • 8/17/2019 PPT Finale (1)

    29/44

    Reference: photovoltaic power plant of Cavriglia (Arezzo)

    Technical data

    N. of panels: 41.540 (240wp each)

    Total power: 10MWExpected annual producation: 12.609

    MWh

    Space used: 16 hectars

    Provides electricity to 3,300 homes 

    Environmental benefits

    CO2 emissions avoided: 5,531,000 kg /year

    SO2 emissions avoided: 7,470 kg / year

    NOx emissions avoided: 5,830 kg / year

    TEP saved: 2,085 TEP / year

    Economic data

    Amount investement: €  29,469,100

    Amount financed: €  22,199,000

    Equity: €  7,270,000

    Cavriglia Share capital € 2,357,500

    Duration of concession: 20 years

    Completion time expected: 4 months

    MANIPULATION OF CONTENT OF THE DECISION : our proposal

    Bovisa goes GREENEnergy and research park in the City

    MANIPULATION OF PATTERNS OF INTERACTION : inclusive strategy

  • 8/17/2019 PPT Finale (1)

    30/44

    FIRST LEVEL OF INTERACTION:

    Among the actors developing and managing the project:

    Euromilano

    Profitability:

    high land value, land

    development and

    building rights

    Common points/goals:

    Proactive interest to develop

    the area

    Need of land reclamation

    POLITECNICO

    Be a relevant component of the

    project

    Promoting functions related

    to technology and innovation

    A2A

    Enhance its

    protagonism

    on the area

    Reinforce the

    engagement

    in sustainability

    Soil reclamation

    Innovative functions

    Lowering remediation cost

    Municipality of Milan

    MANIPULATION OF PATTERNS OF INTERACTION : inclusive strategy

    MANIPULATION OF PATTERNS OF INTERACTION : inclusive strategy

  • 8/17/2019 PPT Finale (1)

    31/44

    Actors Reclamation Positive outcomes Further consequences

    MUNICIPALITY Cut costs for

    reclamation

    Innovation-oriented

    development

    POLITECNICO Possibility to avoid/minimize reclamation Research-enterprisecollaboration

    A2A Possibility to avoid

    /minimize reclamation

    Strengthen /develop

    new activities in the

    field of renewables

    EUROMILANO Reclamation in

    exchange of building

    rights

    Profitable uses

    related to the new

    functions

    FIRST LEVEL OF INTERACTION:

    Favouring COORDINATION among the consortium of actors through NEGOTIATION.

    Scheme of the stakeholders’ mutual advantage through the consortium.

    New fields of researchand closer academic+

    business relation

    City economy development

    and new employment

    Reinforce its position

    on the area

    Increase visibility on

    the marke

    And potential

    lowering of taxetion

    inclusive strategy

    MANIPULATION OF PATTERNS OF INTERACTION : inclusive strategy

  • 8/17/2019 PPT Finale (1)

    32/44

    SECOND LEVEL OF INTERACTION:

    Preventing LOCAL OPPOSITION through PUBLIC DEBATE.

    Municipality of Milan

    Circoscrizione n° 9

    Local neighbourhoods’ 

    organizations

    DECENTRALIZATION ANDBOTTOM-UP / TOP-DOWN COMMUNICATION

    • Necessity to involve the social parties in the process from the beginning

    • Necessity to make local inhabitants feel part of the project

    • Necessity to set up a process/project with positive externalities towards local neighbourhoods.

    Key institutional actor to activate in this process: CIRCOSCRIZIONE N° 9

    gy

  • 8/17/2019 PPT Finale (1)

    33/44

    MANIPULATION OF RESOURCES: EU budget

  • 8/17/2019 PPT Finale (1)

    34/44

    Increasing resources : consensus and financial aid from EU level

    European Union multi-year EU budget for 2014-20:

    Among the priorities:

    • Infrastructure

    • Technology

    • Energy efficiency

    • Renewables

    SUSTAINABLE

    GROWTH 48,5%

    147.2 billion euros: total EU budget for

    2012

    71.39 billion euros: EU budget for

    sustainable growth

    g

    MANIPULATION OF RESOURCES: EU budget

  • 8/17/2019 PPT Finale (1)

    35/44

    The EU budget 2012 - The figures for sustainable growth

    CA = commitment appropriations

    PA = payment appropriationsFinancial Transparency System (FTS)

    g

    Heading Billion € % of total

    budget

    % change from 2011

    CA PA CA PA

    Sustainable Growth 67.5 55.3 45.9 +4.7 +3.2

    MANIPULATION OF RESOURCES: EU budget

  • 8/17/2019 PPT Finale (1)

    36/44

     

    Source_ COM(2010)110, 31.3.2010, "Cohesion policy: Strategic Report 2010 on the implementation of the

    programmes 2007-2013". ;[25]

    http://ec.europa.eu/energy/renewables/targets_en.htm

    AMOUNT OF MONEY TYPE OF SERVICE FUNDING AGENCY

    €8.4bn Loans and assistance European Investment Bank

    €565m Loans and assistance European Economic Recovery Plan

    €110m Co-funding analysis and policy

    research in renewable energy

    "Intelligent Energy Europe"

    Programme

    €499m Loans and assistance to projects anddemonstrations of renewable energy

    EU Structural and Cohesion Funds

    €250m Loans and assistance EU R&D Framework Programme

    €151m Venture capital or loan guarantees EIP GIF

    €140m SEI loans European Bank for Reconstruction

    and Development

    European Union multi-year EU budget for ENERGY (Data for 2007-2013)

    g

  • 8/17/2019 PPT Finale (1)

    37/44

  • 8/17/2019 PPT Finale (1)

    38/44

  • 8/17/2019 PPT Finale (1)

    39/44

    THE PROJECT’S GOALS 

    GENERAL GOALSGENERAL GOALS SPECIFIC GOALS

  • 8/17/2019 PPT Finale (1)

    40/44

    GENERAL GOALS

    Try to include various interests andneeds of the area, such as university and local

    inhabitants participation.

    Regenerate an urban pollutedand central area with an advantageousaccessibility and proximity with Rho Fiera. 

    Find a feasible and self financed solution through

    the attempt to create a partnership

    between private and public in order tosolve financial difficulties.

    Overcome the delicate question of the

    remediation of the soil.

    Develop a project able to exploit the new activities

    which has been settled out in the last years in the

    area. 

    Research in sustainable energyconsumption and generation, developing new

    technologies.

    Relation between academic and

    business environment in terms of research,employment, production of energy.

    Reinforce economic development

    through innovation, as a benefit for theentire city.

    Promote the Politecnico’s key role in

    revitalising the urban area as well ascatalyst for the new energy research

    Involve neighbourhood into theinnovation process, developing actions for asustainable community generation.

    CASE STUDY : Bristol and Bath Science Park

  • 8/17/2019 PPT Finale (1)

    41/44

    North – East

    of Bristol 

    59 acres

    Public Private Partners

    South West Regional

    Development Agency,started acuiering the site in 2002

    Quantum Property

    Partnership  a 50/50 jointventure between Quintain Estates

    & Development and Aviva

    Investors; it was established in

    2006 and has investments in

    science parks in Bristol, Cambridge

    and Edinburgh

    University of Bath

    University of Bristol University of the West of

    England

    Science City of Bristol

    ENERGY : 200m2 of photovoltaic panels provide renewable energyEnergy centre for a more efficient provision of energy, heat and cooling across the site

    as it grows.

    BIO –  DIVERSITY : More than 15% of the site is green spaceThe courtyard area between the Forum, Innovation Centre and Grow-on space is

    landscaped to provide a communal garden area for users of the site

    COMMUNITY : Provides paths for walking, cycling and horse-riding

    incorporated across the site linking in to local transport networksBy enjoying the amenity space and landscape the development provides, local

    people have a sense of ownership, becomes a valued local resource.

    CASE STUDY : Bristol and Bath Science Park

  • 8/17/2019 PPT Finale (1)

    42/44

    MAIN GOALS

    • SUSTAINABILITY as a key element

    • high quality buildings surrounded by large, open and

    attractive shared green areas in order to

    avoid isolation and exclusivity

    • the desire to encourage the local

    community to make use of the commonareas so that the Park is lived in through the week

    • a hub for the region’s science and technology focusing

    especially on aerospace, microelectronics,

    digital, green technologies anddesign

  • 8/17/2019 PPT Finale (1)

    43/44

    INTERVIEWs

    INTERVIEWS

  • 8/17/2019 PPT Finale (1)

    44/44

    Prof. Eugenio Morello, researcher on

    energy and sustainable design

    Feasibility of the project

    Energy consulting

    Prof. Stefano Pareglio

    Professor of … 

    Feasibility of the project

    Consulting on policy related to energy

    Prof. Sabrina Saponaro

    Professor of Soil remediation

    Consulting on past and future

    remediation of the Bovisa Area

    Prof. Alessandro Balducci, vice rector

    of Milan Politecnico

    Politecnico interest and role in the

    development of the area

    Prof. Francesca Cognetti, researcher in

    the field of Urban planning

    History of the area

    Description of the previous agreement

    Prof. Antonella Bruzzese

    Professor of Urban Plannig

    History of the area and partecipatory

    role in the Masterplan for the area

    Alessandra Spada

    Secretary office of the deputy major of

    Urban Planning of Milan

    Municipality interest, resources, goals

    A2A Energie

    A2A interest and goals for the

    development of the area