prenflo psg & pdq - tu-freiberg.de · latest developments based on decades of gasification...

26
1 PRENFLO PSG and PDQ Latest Developments based on Decades of Gasification Experience Fourth International Conference on Clean Coal Technologies CCT 2009 3rd International Freiberg Conference on IGCC & XtL Technologies Dresden, Germany 18-21 May 2009 Dr. Stefan Hamel, Uhde GmbH, Germany

Upload: others

Post on 22-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

  • 1

    PRENFLO PSG and PDQ Latest Developments based on

    Decades of Gasification Experience

    Fourth International Conference on Clean Coal Technologies CCT 2009 3rd International Freiberg Conference on IGCC & XtL Technologies

    Dresden, Germany 18-21 May 2009

    Dr. Stefan Hamel, Uhde GmbH, Germany

    http://www.cct2009.org/

  • 2

    Does Gasification make any sense @ ~50 US$/bbl?

    Yes, because

    • Gasification feedstock is unrelated to short-term oil price volatility

    • Gasification is a poly-generation technology

    • Gasification enables power generation with CCS

    • Gasification is clean, efficient, and well-proven

    • and...

  • 3

    Energy Reserves (billion tons, oil equivalent)

    • ...Gasification applies sustainable resources

  • 4

    Uhde‘s Gasification Highlights – SUMMARY:

    Development, Design and Construction of

    first Koppers-Totzek Coal Gasification Plant

    first Texaco Coal Gasification Plant

    first HTW Coal Gasification Plant

    first Shell-Koppers Coal Gasification Plant

    first PRENFLO Coal Gasification Plant

    Over 100 Gasifiers designed, built and put into successful operation by Uhde

    Invention of Entrained-Flow Gasification:

    Koppers-Totzek: dry-fed, membrane wall, multiple burners (1941)

  • 5

    Uhde‘s proprietary Koppers-Totzek Gasification Process First Entrained-Flow Gasification Technology

    Koppers-Totzek gasification plant Modderfontein, South Africa

    1,000 t/d of ammonia

    Koppers-Totzek gasification plant Ramagundam, India 900 t/d of ammonia

  • 6

    HTW coal gasification plant Berrenrath, Germany

    1,000 t/d of ammonia

    GE (Texaco) coal gasification plant Oberhausen, Germany hydrogen, oxochemicals

    First GE (Texaco) Coal Gasification Plant with radiant cooler First HTW Coal Gasification Plant in commercial-scale

  • 7

    First PRENFLO Demonstration Plant – 1980‘s

    PRENFLO plant in Fürstenhausen / Germany

  • 8World‘s largest single-train IGCC: PRENFLO Gasification Elcogas, Puertollano, Spain

    Feedstock: petcoke / coal with addition of biomass

    PRENFLO Gasifier

    Gas Treatment

    Coal PreparationASU

    Combined Cycle

    New CO2 capture Pilot Plant under implementation

  • 9

    PRENFLO gasifier and waste heat boiler (PSG)

    • dry coal/petcoke powder feed• 4 horizontal co-annular burners• membrane wall• waste heat boiler (PSG)

  • 10

    PRENFLO Membrane Wall protected by the slag layer

    BFW, 40-70 bar

    Water Tube(membrane wall)

    Gasification Reactor

    > 1500 °C

    molten slag flows downwards

    solidified slagmolten slag

  • 11

    PRENFLO Gasifier Membrane Wall

    View to gasifier membrane wall after operation (PRENFLO burner)

    View to gasifier membrane wall before 1st operation (PRENFLO burner)

    Perfect slag layer protecting membrane wall

  • 12PRENFLO Gasifier - erection of internals (Puertollano)

  • 13

    Lifting of PRENFLO Gasifier / HP-Boiler (Puertollano)

  • 14Puertollano IGCC: Operating Experience

    General

    Gasification is flexible with broad range of solid fuelshigh-ash hard coal and petroleum coke

    addition of biomass successully demonstrated

    Flexible load change behaviourNearly constant gas heating value irrespective of fuelNo formation of higher hydrocarbons, methane < 0.1 vol. %Non-leachable slag productionFly ash sold to cement industryElcogas statistics show that the vast majority of down-times was caused by non-gasifier related issues

  • 15

    PRENFLOwith Direct Quench

    PDQ

  • 16The PRENFLO process with Direct Quench (PDQ)

    TargetsIntegrate Lessons Learned from >10 years operation of Puertollano IGCC

    Optimize PRENFLO technology for chemical and hydrogen applications

    Identify areas of significant Capital Cost Reduction

    Water Quench instead of Gas Quench and Waste Heat Boiler

    Keep commercially proven elements of PRENFLO technology

    Design of a robust system

  • 17The PRENFLO process with Direct Quench (PDQ)

    Process characteristicsPressurized entrained-flow gasification

    Dry coal dust feeding

    Multiple co-annular burners (horizontal, tangential arrangement)

    Membrane Wall, no refractory

    Operation pressure flexible to requirementsapprox. 25 - 40 bar

    Raw gas temperature outlet of quenchapprox. 200 - 250 °C

    Slag lock-hopper system

  • 18

    Slag

    Feed,oxygen

    Waste heat boilers

    Raw gas(incl. fly ash)

    Raw gas

    Slag

    Feed,oxygen

    PRENFLO gasifier with Direct Quench (PDQ)

    PRENFLO gasifier with Steam Generation (PSG)

    Direct Quench

    Feed,oxygen

    Raw gas

    Samegasifier design

  • 19

    PRENFLO with Direct Quench

    1000 MWth , 40 bar

    PRENFLOTMwith

    Direct Quench

    PDQ

    © Uhde 2008

  • 20

    Raw Gas

    S/G=1.3

    PSG Gasifier Gas Quench

    Waste H. Boiler

    FAFilter

    Scrubber

    CO-Shift

    Saturator H2 Gas

    Steam

    Raw gas

    S/G=1.3

    PDQ Gasifier Direct Quench

    Scrubber CO-Shift

    H2 Gas

    Steam

    PSG:

    PDQ:

    PRENFLO PSG vs. PRENFLO PDQ Impact on Cost: Process Configuration (e.g. H2 plant)

    substituted by Direct Quench

  • 21

    PRENFLO PSG vs. PRENFLO PDQ Impact on Cost: Plant Layout

    PRENFLO (PDQ)

    PRENFLO (PSG)

    EPC cost savings: ~30 %

  • 22

    -4,0%

    -3,5%

    -3,0%

    -2,5%

    -2,0%

    -1,5%

    -1,0%

    -0,5%

    0,0%

    0% 20% 40% 60% 80% 100%

    shifted gas fraction

    Δ o

    f ele

    ctric

    effi

    cien

    cy [%

    -poi

    nts]

    • CTC• CTL • IGCC-CCS

    PRENFLO PSG vs. PRENFLO PDQ Impact on Efficiency

    IGCC H2

    In the targeted applications, PDQ is -1.0 to -1.8 %-points lower than PSGthis low impact does notjustify the higher capital costof a waste heat boiler design

  • 23

    February 2009:New Co-operation Agreement Elcogas ~ Uhde

    • Extensive integration of Operating Experience with technology and engineering know-how

    • Joint implementation of R&D projects• Platform for plant reliability, operator training,

    operating and maintenance services• Regular exchange and presence on site

  • 24One of the latest projects: TransGas Coal-to-Liquids Complex (18,000 bpd)

    2 x PRENFLO Gasification with MTG based on Coal

    Mingo County, West Virginia

  • 25

    Summary

    Gasification will play an increasingly important role in our future. Oil and gas supply and demand do not match any longer.

    February 2009: Co-operation Agreement signed between Elcogas and Uhde: Operating experience and engineering fully integrated into PRENFLO

    Lessons Learned from >10 years operation of the Puertollano plant and decades of experience in coal gasification and all related down-stream processes provide full benefit to successful future projects

    As a technology-driven engineering company, Uhde can act as integrated Licensor, E, EP or EPCM contractor – PRENFLO is a product

    Depending on the application, PRENFLO is available with conventional steam generation (PSG) or direct quench mode (PDQ) with significant cost savings

  • 26

    Thank you for your attention.

    PRENFLO IGCC, Puertollano, SpainMay 2009 www.prenflo.com

    Slide Number 1Does Gasification make any sense �@ ~50 US$/bbl?Slide Number 3Uhde‘s Gasification Highlights – SUMMARY:Uhde‘s proprietary Koppers-Totzek Gasification Process�First Entrained-Flow Gasification TechnologyFirst GE (Texaco) Coal Gasification Plant with radiant cooler�First HTW Coal Gasification Plant in commercial-scaleFirst PRENFLO Demonstration Plant – 1980‘s World‘s largest single-train IGCC: PRENFLO Gasification Elcogas, Puertollano, Spain�Feedstock: petcoke / coal with addition of biomassPRENFLO gasifier and waste heat boiler (PSG)PRENFLO Membrane Wall protected by the slag layerPRENFLO Gasifier Membrane WallPRENFLO Gasifier - erection of internals (Puertollano)Lifting of PRENFLO Gasifier / HP-Boiler (Puertollano)Puertollano IGCC: Operating ExperienceSlide Number 15The PRENFLO process with Direct Quench (PDQ)The PRENFLO process with Direct Quench (PDQ)PRENFLO gasifier �with Steam Generation (PSG)PRENFLO �with Direct Quench��1000 MWth, 40 bar �Slide Number 20Slide Number 21Slide Number 22Slide Number 23One of the latest projects:�TransGas Coal-to-Liquids Complex (18,000 bpd) �2 x PRENFLO Gasification with MTG based on CoalSummarySlide Number 26