November 19, 2009 1

Preparing for Extraordinary Preparing for Extraordinary Flood Flow on the Green Flood Flow on the Green River in 2009River in 2009Presentation to the Advisory CommitteeNovember 19, 2009

Protecting public safety, the regional economy and critical infrastructure.

Page 2: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 2

Presentation OverviewPresentation Overview

Overview of Howard Hanson Dam SituationOverview of Howard Hanson Dam Situation Technical Analyses to Develop Temporary Technical Analyses to Develop Temporary

Containment OptionsContainment Options Implementation of Temporary Containment Implementation of Temporary Containment

StructuresStructures FCD Support for Planning, Outreach, and FCD Support for Planning, Outreach, and

CommunicationsCommunications

Page 3: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 3

Howard A. Hanson Dam is a U.S. Army Corps of Howard A. Hanson Dam is a U.S. Army Corps of Engineers flood control damEngineers flood control dam

Designed, built, operated and maintained by the Designed, built, operated and maintained by the U.S. Army Corps of Engineers (operational since U.S. Army Corps of Engineers (operational since 1962)1962)

Primary purposes are flood control in the winter, Primary purposes are flood control in the winter, fish enhancement in the summer, and water supplyfish enhancement in the summer, and water supply

Overview Overview USACE Howard Hanson DamUSACE Howard Hanson Dam

Page 4: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 4

Howard Hanson Dam

Page 5: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 5

Page 6: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 6

Page 7: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 7

Page 8: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 8

Lower Green River ValleyLower Green River Valley

Page 9: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 9

Page 10: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 10

Technical Analyses: Technical Analyses: Identifying Emergency Measures for the Identifying Emergency Measures for the

Lower ValleyLower Valley 2007 2007 -- Flood Study and Model Flood Study and Model May 2009 May 2009 -- Inundation Maps (Corps)Inundation Maps (Corps) June 2009 June 2009 -- Levee overtopping mapsLevee overtopping maps August 2009 August 2009 -- Impacts of levee raising on flood Impacts of levee raising on flood

elevationselevations September 2009 September 2009 -- Levee Stability Geotechnical Levee Stability Geotechnical

AnalysesAnalyses Active BTC Participation throughoutActive BTC Participation throughout

Page 11: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 11

Page 12: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 12

Page 13: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 13

Page 14: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 14

Page 15: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 15

Maps Reflect Major Maps Reflect Major AssumptionsAssumptions

Inflow to ReservoirInflow to ReservoirPerformance of DamPerformance of DamLocal Inflow (below dam)Local Inflow (below dam)Performance of Levee SystemPerformance of Levee System

Page 16: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 16

Confidence

Lead Time

ForecastDilemma

Page 17: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 17

Flood Risk Reduction ActionsFlood Risk Reduction Actions

HHD Grout Curtain HHD Grout Curtain –– USACEUSACE Levee Raising and Pump Stations ($8.4M)Levee Raising and Pump Stations ($8.4M)

FCDFCD CitiesCities USACEUSACE

Outreach and CommunicationsOutreach and Communications Regional Emergency Response Planning EffortsRegional Emergency Response Planning Efforts Expert Review of Green River StrategyExpert Review of Green River Strategy

Page 18: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 18

Grouting Operations• Boulders• Drill casing• Primary Grout• Secondary Grout• Ancient Silt layer

Bedrock Lower Aquifer

Landslide Materials

USACE Grout Curtain Construction

Slide Courtesy USACE, Seattle District

Page 19: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 19

Mason Thorson ExtensionMason Thorson ExtensionMiddle Fork Snoqualmie RiverMiddle Fork Snoqualmie RiverWednesday, January 7, 2009Wednesday, January 7, 2009

Examples of OvertoppingExamples of Overtopping

SR 202 Overtopping and Substantial Damage

Page 20: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 20

Green River Levee RaisingGreen River Levee Raising

Page 21: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 21

Page 22: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 22

Black River Pump StationBlack River Pump Station

Outlet channel Outlet channel containmentcontainment

Electrical Electrical generatorsgenerators

FuelFuel Debris control Debris control BackBack--up pumpsup pumps

Page 23: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 23

Outreach and PlanningOutreach and Planning

Direct mailings to Direct mailings to 170,000 addresses170,000 addresses

Extensive media Extensive media coveragecoverage

Public meetings, Public meetings, community groups, community groups, businessesbusinesses

Support for regional Support for regional preparedness planningpreparedness planning

Page 24: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 24

Expert ReviewExpert Review

Panel of 8 external expertsPanel of 8 external experts Licensed Engineers, geotechnical experts, floodplain Licensed Engineers, geotechnical experts, floodplain

management expertsmanagement experts

Review Green River Flood Risk Reduction Review Green River Flood Risk Reduction Strategy in light of Howard Hanson Dam Strategy in light of Howard Hanson Dam operational changesoperational changes

Recommendations due end of NovemberRecommendations due end of November

Page 25: Preparing for Extraordinary Flood Flow on the Green River in 2009 · 2018-10-04 · Flood Flow on the Green River in 2009 Presentation to the Advisory Committee November 19, 2009

November 19, 2009 25

Questions?Questions?