presentation by planning commission of pakistan to prime minister nawaz sharif on pcec

23

Upload: justice4pashtun

Post on 29-Sep-2015

51 views

Category:

Documents


2 download

DESCRIPTION

Presentation by Planning Commission of Pakistan to Prime Minister Nawaz Sharif on 7th April,2014 on China-Pakistan Economic Corridor PCEC

TRANSCRIPT

  • Visit

    Chinese Expert Group on Transport

    14th 27th April, 2014

  • Composition & TORs

    Planning & Transport(6), Railways(4), Road(3)

    Ports(2), Economist(1) and Advisor(1) : 17 Nos.

    Investigating and collecting economic, social andtransport data

    Conducting field investigation of related highwaysof CPEC and Early Harvest Projects(EHPs)

    Analyzing the demands and proposals of thePakistani side for highway infrastructureconstruction.

    Tech. Support for EHPs and Prioritized HighwayProjects

  • Program (1)

    14th to 16st April 2014

    Arrival on 14th at Karachi

    Travel to Gwadar on PN Aircraft on 15th

    Visit of Gwadar Port facilities on 15th

    Visit to Southern Section of M-8 by Helicopter on 16th

    Travel to Karachi by PN Aircraft on 16th evening

    MoComms, MoR, NHA, and Pakistan Railways (PR) will accompany to Gwadar.

  • Program (2)

    17th to 21st April 2014

    GROUP would split in two sub-groups

    Road and Railways

    Road

    Shall travel from Karachi to Lahore through KLM alignment with stops at Panno Akil and

    Multan (17th to 20th)

    Helicopter visit of northern portion of M8 on 18th April

    Lahore to Islamabad (21st )

    Accompanied by NHA and CSCEC Team

  • Program (2)

    14th to 16th April 2014

    Railways

    Shall travel from Karachi to Peshawar via

    Sukkur, Multan, Lahore, Rawalpindi, Havelian, through ML1 alignment

    with stops at Sukkur, Multan Lahore,

    Islamabad/Rawalpindi (17th to 21st)

    Accompanied by MoR, PR

  • Program (2)

    22nd to 27th

    Joint Plenary Session at Islamabad (22nd)

    Road

    Helicopter visit to KKH on Islambad-MansheraSection (23rd)

    Manshera to Raikot Section and Attabad Lake (24th and 25th)

    Night Stay at Pattan (23rd), Gilgit (24th/25th) and Sust (25th)

    Departure from Khunjurab (27th)

    Accompanied by MoComms, MoR, NHA, PR and CRBC

  • Ministry of Interior

    Focal Point and Core Responsibility

    Chief Secretaries / IGPs of all Provincesincluding Gilgit-Baltistan

    Overall coordination by MoComms

    At operational level NHA and PR to coordinatewith concerned Provincial Governments/LEAs

    Helicopter visits to M8 and KKH

    Travel by Navy Plane

    Close liaison with Chinese Embassy

    Security Arrangements

  • Road

    Re emphasizing importance of KLM

    Early startup of EHPs

    Sukkur-Multan

    Raikot-Islamabad

    Plenary Session

  • Railways

    Early vetting of ToRs (already shared)for joint feasibility studies

    Agree on timelines for Joint FeasibilityStudies

    Early startup of EHPs

    Upgradation of ML1 and

    Construction of Havelian Dryport

    Plenary Session

  • General

    Share field visit observations

    Data sharing

    Preliminary discussion for visits of Pakistani Expert

    Group to China

    Plenary Session

  • Thank You

  • Members of Expert Group

    1. Mr. Guan Changyu Head of Delegation, Senior Engineer (comprehensive planning);

    2. Mr. Wang Wenlong Senior Engineer (comprehensive planning);

    3. Mr. Shi Liangqing Senior Engineer (transport planning);

    4. Mr. Gao Fengnong Senior Engineer (railway engineering);

    5. Mr. Li Meng Senior Engineer (road engineering);

    6. Mr. Nie Xiangjun Senior Engineer (port);

    7. Mr. Wang Yagan Senior Engineer (road engineering);

    8. Mr. Xu Zengxin Senior Engineer (railway engineering);

    9. Mr. Liu Zengjun Senior Engineer (transport planning)

    10. Mr. Chen Zhangming Senior Engineer (railway planning);

  • Members of Expert Group

    11. Mr. Zhuo Jiancheng Engineer (railway engineering);

    12. Mr. Song Kailiang Senior Engineer (traffic engineering)

    13. Mr. Song Lianlin Senior Engineer (bridge engineering)

    14. Mr. Zhu Lixiang Senior Engineer (port and waterway engineering )

    15. Mr. Li Junxing Economist (economy)

    16. Mr. Wang Fuqiang Senior Engineer (port and waterway engineering )

    17. Ms. Zhang Hongbin Advisor, Department of International Cooperation, Ministry of Transport

    (to Islamabad only)

  • DISPUTED TERRITORY

    INDIA

    CHINA

    IRAN

    ARABIAN SEA

    SUSTJAGLOT

    MANSEHRAABBOTABAD

    HARIPUR

    CHILAS

    BURHAN

    FATEHJHANGJAND

    D.I KHAN

    TAUNSA

    MIANWALI

    SUIDERA BUGTI

    RAJANPUR

    LARKANA

    TALAGANG

    PINDIGHEB

    LAYYAH

    RATODERONAG

    PANJGUR

    HOSHABTURBAT

    Jiwani

    ATTABAD

    JARANWALASAMUNDRI

    PIR MEHAL

    KHANEWAL

    SHUJABAD

    ZAHIR PIR

    GHOTKI

    PANUAQIL

    DADU

    SAHIWAL

    OKARA

    RAHIM YAR KHAN

    CHAKWAL

    SARGODHA

    DERA MURAD JAMALI

    SIBI

    LORALAI

    YAKMUCHNOKUNDI DALBANDIN PADAG

    NOSHKI

    DARYA

    KHAN

    KUNDIAN

    PINDI

    BHATIAN

    SHORKOT

    LIARI

    MUZAFFARABAD

    KOHALA BRIDGE

    MANGLA / MIRPURDINA

    KHUNJERAB

    GILGIT

    SKARDU

    PESHAWAR

    ISLAMABAD

    LAHOREFAISALABAD

    MULTANDG KHANQUETTA

    KHUZDAR

    JACOBABAD

    SUKKUR

    HYDERABAD

    KARACHIGWADAR

    Boundary

    Existing

    Motorways

    Proposed Projects

    LKM

    Rivers

    Towns

    Main Cities

    MMM

    N-40

    N-85

    N-65

    N-25

    N-25

    N-70

    N-50

    N-95

    N-35

    N-10N-120

    S-1

    N-45

    M-8

    M-8

    N-15

    Highways

    PCEC

    National Highway

    Authority

    National Highway AuthorityExisting & Planned Network

    Lahore Multan (330 Km) Est. Cost

    US$ 1,57.48 Million

    Multan Sukkur (375 Km) Est. CostUS$ 257.88 Million

    Sukkur Hyderabad (345 Km) Est. Cost

    US$ 2,37.25 Million

    Hyderabad Karachi - M-9Length = 136 kmStatus = To be developed on BOT (RFP issued)

  • DISPUTED TERRITORY

    INDIA

    CHINA

    AFGHANISTAN

    IRAN

    ARABIAN SEA

    SUSTJAGLOT

    MANSEHRAABBOTABAD

    HARIPUR

    CHILAS

    BURHAN

    FATEHJHANGJAND

    D.I KHAN

    TAUNSA

    MIANWALI

    SUIDERA BUGTI

    RAJANPUR

    LARKANA

    TALAGANG

    PINDIGHEB

    LAYYAH

    RATODERONAG

    PANJGUR

    HOSHABTURBAT

    Jiwani

    ATTABAD

    JARANWALASAMUNDRI

    PIR MEHAL

    KHANEWAL

    SHUJABAD

    ZAHIR PIR

    GHOTKI

    PANUAQIL

    DADU

    SAHIWAL

    OKARA

    RAHIM YAR KHAN

    CHAKWAL

    SARGODHA

    DERA MURAD JAMALI

    SIBI

    LORALAI

    YAKMUCHNOKUNDI DALBANDIN PADAG

    NOSHKI

    DARYA

    KHAN

    KUNDIAN

    PINDI

    BHATIAN

    SHORKOT

    LIARI

    MUZAFFARABAD

    KOHALA BRIDGE

    MANGLA / MIRPURDINA

    KHUNJERAB

    GILGIT

    SKARDU

    PESHAWAR

    ISLAMABAD

    LAHOREFAISALABAD

    MULTANDG KHANQUETTA

    KHUZDAR

    JACOBABAD

    SUKKUR

    HYDERABAD

    KARACHIGWADAR

    Boundary

    Existing Highways

    Motorways

    Proposed Projects

    LKM

    Rivers

    Towns

    Main Cities

    MMM

    N-40

    N-85

    N-65

    N-25

    N-25

    N-70

    N-50

    N-95

    N-35

    N-10N-120

    S-1

    N-45

    M-8

    M-8

    N-15

    Highways

    PCEC

    National Highway

    Authority

    National Highway AuthorityKLM-Karachi-Hyderabad Section

    Hyderabad Karachi Motorway, M-9Length = 136 km

    Status = To be developed on BOT Modality (RFP issued)

  • DISPUTED TERRITORY

    INDIA

    CHINA

    AFGHANISTAN

    IRAN

    ARABIAN SEA

    KHUNJERAB

    GILGIT

    SKARDU

    PESHAWAR

    ISLAMABAD

    LAHOREFAISALABAD

    MULTANDG KHANQUETTA

    KHUZDAR

    JACOBABAD

    SUKKUR

    HYDERABAD

    KARACHIGWADAR

    Boundary

    Existing Highways

    Motorways

    Proposed Projects

    LKM

    Rivers

    Towns

    Main Cities

    MMM

    N-40

    N-85

    N-65

    N-25

    N-25

    N-70

    N-50

    N-95

    N-35

    N-10N-120

    S-1

    N-45

    M-8

    M-8

    N-15

    Highways

    PCEC

    National Highway

    Authority

    National Highway AuthorityM-3 Pindi BhattianFaisalabad Motorway

    Length = 53 kmEst. Cost = US$ 45MillionScope: Conversion to 6-lane

    Pindi

    Bhattian

  • DISPUTED TERRITORY

    INDIA

    CHINA

    AFGHANISTAN

    IRAN

    ARABIAN SEA

    SUSTJAGLOT

    MANSEHRAABBOTABAD

    HARIPUR

    CHILAS

    BURHAN

    FATEHJHANGJAND

    D.I KHAN

    TAUNSA

    MIANWALI

    SUIDERA BUGTI

    RAJANPUR

    LARKANA

    TALAGANG

    PINDIGHEB

    LAYYAH

    RATODERONAG

    PANJGUR

    HOSHABTURBAT

    Jiwani

    ATTABAD

    JARANWALASAMUNDRI

    PIR MEHAL

    KHANEWAL

    SHUJABAD

    ZAHIR PIR

    GHOTKI

    PANUAQIL

    DADU

    SAHIWAL

    OKARA

    RAHIM YAR KHAN

    CHAKWAL

    SARGODHA

    DERA MURAD JAMALI

    SIBI

    LORALAI

    YAKMUCHNOKUNDI DALBANDIN PADAG

    NOSHKI

    DARYA

    KHAN

    KUNDIAN

    PINDI

    BHATIAN

    SHORKOT

    LIARI

    MUZAFFARABAD

    KOHALA BRIDGE

    MANGLA / MIRPURDINA

    KHUNJERAB

    GILGIT

    SKARDU

    PESHAWAR

    ISLAMABAD

    LAHOREFAISALABAD

    MULTANDG KHANQUETTA

    KHUZDAR

    JACOBABAD

    SUKKUR

    HYDERABAD

    KARACHIGWADAR

    Boundary

    Existing Highways

    Motorways

    Proposed Projects

    LKM

    Rivers

    Towns

    Main Cities

    MMM

    N-40

    N-85

    N-65

    N-25

    N-25

    N-70

    N-50

    N-95

    N-35

    N-10N-120

    S-1

    N-45

    M-8

    M-8

    N-15

    Highways

    PCEC

    National Highway

    Authority

    National Highway AuthorityMuzaffarabad-Mirpur-Mangla Expressway

    Length = 196 kmEstimated Cost = US$

    720 MillionStatus = Feasibility/

    Preliminary Design to be undertaken.

  • Steering Committee Minister for PDR (in Chair)

    Special Assistant to the Prime Minister on Foreign Affairs

    Secretary Finance Division

    Secretary Interior Division

    Secretary Water & Power Division

    Secretary Railways Division

    Secretary Ports & Shipping Division

    Secretary Petroleum & Natural Resources Division

    Secretary Information Technology Division

    Secretary Communications Division

    Secretary Commerce Division

    Secretary Economic Affairs Division

    Secretary Foreign Affairs Division

    Secretary Board of Investment

    Additional Secretary, Prime Minster Office

    Steering Committee Prime Minister (in Chair)

    Minis ter for Finance

    Minister for Interior

    Minister for Planning, Development & Reform

    Minister for Water & Power

    Minister for Railways

    Minister for Ports & Shipping

    Minister for Petroleum & Natural Resources

    Minister for Commerce

    Special Assistant to the Prime Minister on Foreign Affairs

    Secretary to the Prime Minister

    Finance Secretary

    Composition

  • Date Activity Venue Logistics

    14th April 16 Member delegation

    arrives

    Karachi

    (stay at Sheraton

    Hotel)

    15th 16th

    April

    8 members road / ports

    experts conduct field survey

    of Gwadar Port & Khuzdar

    Motorway (M-8).

    8 members rail experts

    conduct field survey of rail

    infrastructure in Karachi.

    Gwadar

    (stay at PC Hotel)

    Karachi

    Arrival by PN

    Aircraft.

    Aerial survey of M-8

    by Helicopter.

    By cars and rail.

  • Date Activity Venue Logistics

    17th 21st

    April

    Field Survey of Karachi -

    Lahore Motorway (KLM)

    Karachi (Sheraton)-

    Sukkur (Pannu Aqil

    Cantt)- Multan

    (Ramada)-Lahore(PC)-

    Islamabad (Serena)

    By cars

    Field Survey of Karachi -

    Lahore Main Railway line

    (ML1)

    Karachi-Sukkur

    Multan-Lahore-

    Islamabad

    By rail

    21st April Field Survey of

    Rawalpindi Peshawar

    Railway line (ML1)

    Rawalpindi-Peshawar By rail and cars

    22nd April Meetings with

    stakeholders

    Presentation by Road,

    Rail and Ports Sectors

    Islamabad

  • Date Activity Venue Logistics

    23rd 26th

    April

    Reconnaissance survey from

    Islamabad to Khunjrab

    including Attabad Lake.

    (by helicopter and road)

    Islamabad (Serena)-

    Pattan (FWO rest

    house)-Gilgit

    (Serena)-Khunjrab-

    Sust (PTDC)

    By helicopter up

    to Pattan and

    then by cars.

    27th April Departure for China through

    Khunjrab Pass

    Sust / Tashkurgan By cars.

  • Expert Visit: Railways Program