presentation from cityarchriver 2015 pre-bid construction conference
DESCRIPTION
Great Rivers Greenway and its partners held a pre-bid construction conference and DBE mixer on October 7, 2013 at 1520 Market Street in St. Louis, MO. For details on the project, visit www.CityArchRiver.org or www.GreatRiversGreenway.org. Bids will be publicly opened at Great Rivers Greenway offices at 6174A Delmar Blvd, St. Louis, MO 63112 on October 24, 2013 at 2:00 p.m.TRANSCRIPT
![Page 1: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/1.jpg)
Projects
Central Riverfront ConstructionPre-Bid Conference
![Page 2: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/2.jpg)
Agenda
• Project Overview• Considerations• Project & Bid Requirements• DBE participation• DBE networking event to follow
immediately after.
![Page 3: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/3.jpg)
Great Rivers Greenway District
• About the District
• Our Role
![Page 4: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/4.jpg)
CityArchRiver 2015 Projects
Federal Highway Administration Transportation Projects• Park Over the Highway• Central Riverfront
Department of Interior (DOI) & National Park Service (NPS) Projects• Luther Ely Smith Square• Old Courthouse• Museum/Visitor Center• Arch Grounds
• Reflecting ponds• East Slopes• Processional Allees• North Gateway Park
City of St. Louis, Great Rivers Greenway & CityArchRiver 2015 Foundation Project• Kiener Plaza
![Page 5: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/5.jpg)
• Goals:– Enhancing the Gateway Arch experience for everyone.– Safe and easier access to park.
• Partners– CityArchRiver 2015 Foundation– National Park Service– Bi-State Development Agency (Metro)– MoDOT– City of St. Louis– Federal Highway Transportation Administration– Many more
CityArchRiver 2015
![Page 6: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/6.jpg)
Central Riverfront Today
![Page 7: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/7.jpg)
Central Riverfront 2015
![Page 8: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/8.jpg)
Central Riverfront 2015
![Page 9: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/9.jpg)
Central Riverfront 2015
![Page 10: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/10.jpg)
Central Riverfront Today
![Page 11: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/11.jpg)
Central Riverfront 2015
![Page 12: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/12.jpg)
Packages & DBE Goals– #4 Demolition/Earthwork (12%)– #5 Asphalt Paving (19%)– #6 Landscaping (20%)– #7 Concrete (19%)– #8 Pavers (19%)– #9 Metals/Rails (19%)– #10 Signage (20%)– #11 Sewers/Plumbing (19%)– #12 Electrical (22%)– #13 Temporary Flood Protection (9%)
![Page 13: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/13.jpg)
Bid Requirements– Bids must be for complete Bid Packages. See spec section
00310, Scope of Construction Work, for full description– Bids submitted to GRG at their office at 6174 Delmar by
2:00 pm, Thursday, October 24– All prime bidders (except landscaping, pavers, and
metals/rails) must submit or have on file a MoDOT Contractor Questionnaire on file at least 7 days prior to bid opening (October 17th). See MoDOT website.
– 5% bid bond with bid. 100 % performance and payment bonds at contract award.
![Page 14: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/14.jpg)
Order of Work• Phase 1:
Chouteau to 2/3 of Grand Staircase. Estimated start 11/2013Estimated completion 9/2014
![Page 15: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/15.jpg)
Access
Phase 1• Chouteau & Poplar Streets Closed at
LKS• Construction access from the south• Maintain Access to Material Sales• Maintain Emergency Fire / Rescue
Access to River• Maintain Access to Heliport, Riverboat,
and levee from the north• Maintain Pedestrian Access to River
from Grand Staircase
![Page 16: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/16.jpg)
Order of WorkPhase 2:• 2/3 of Grand Staircase to Biddle Street Trailhead –
N. Riverfront Trail• Estimated start 9/2014• Estimated completion 9/2015
![Page 17: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/17.jpg)
Access
Phase 2• Washington, Lucas, Morgan, Lacledes
Landing Blvd., and MLK Drive closed at LKS
• Construction access from the north• Maintain Access to First Street Parking
Garage (limited)• Maintain Access to Heliport, Riverboat,
and levee from the south• Maintain Pedestrian Access to River from
Grand Staircase
![Page 18: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/18.jpg)
Transportation Resources & SupportMissouri Procurement Technical Assistance Center (PTAC)5988 Mid Rivers Mall Drive, Suite 111 | St. Charles, MO 63304Carolyn Jones | [email protected] | (314) 643-7684
Missouri Regional Certification Committee (MRCC)707 N. First Street | St. Louis, MO 63102(314) 982-1400 x 1352www.MetroStLouis.org/DBE
U.S. Department of Transportation Small Business and Disadvantaged Business Utilization1200 New Jersey Avenue SE | Washington, D.C. 20590(800) 532-1169 or (202) 366-7228 | www.dot.gov/osdbu
Missouri Office of Equal OpportunityTruman State Office Building | 301 West High Street, Room 360Jefferson City, MO 65102 | (877) 259-2963 | www.oeo.mo.gov
![Page 19: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference](https://reader033.vdocuments.net/reader033/viewer/2022052505/5553fcbfb4c90544428b4cd6/html5/thumbnails/19.jpg)
Questions?
Connect with us for more at:www.GreatRiversGreenway.org
www.CityArchRiver.org
Please join us for our DBE mixer & networking event to immediately
follow Q&A.