Page 1: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

ByN.SENTHIL KUMAR

AGM

Presentation - Olympia Technology Park

Page 2: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

1. About Olympia Group

Page 3: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Background:

The Olympia Group was born out of the alliance of Two strong business houses –The Khivraj Group & The MK Group.

The Chennai-based renowned Khivraj Group, has over 5 decades of successful business history spanning variousindustries such as Real Estate, Automobile, Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & MrBharat Kumar Chordia.

Mr Ajit Kumar Chordia, the Managing Director is also an Founding member of IGBC and actively involved inIGBC.

The MK Group Kolkata have an impressive track record of large-scale property development in several sectors ofReal Estate - MSB Residential Apartments, Clubhouses and Shopping Malls among others represented by MrChandrakant Kankaria.

Mr. Ajit Kumar Chordia

Mr. Chandrakant Kankaria

Mr. Bharat Kumar Chordia

Page 4: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Projects – A snap shot

OLYMPIA TECH PARK

GUINDY• Sprawling 2 million Sq.ft. campus

• LEED Certified Gold Rated Green

Building by USGBC

• In operation for the past 14 Years

• IGBC Platinum Certified Building

OLYMPIA PLATINA• 100,000 Sq.ft. of completed space

• Adjacent to Olympia Technology

Park

• Fully Occupied

• Under Certification of IGBC

Platinum Rating

OLYMPIA TEKNOS• 130,000 Sq.ft. of completed space

• Structure of B+S+10

• Typical floor Plate (sft) 13,000

• Fully Occupied

• Under Certification of IGBC

Gold Rating

OLYMPIA NATIONAL

TOWERS• Total Area – 72,904 Sq.ft

• Building Structure – 2B+Stilt+10

• Typical floor Plate 2 – 10 – 7,424 Sq.ft

• Fully Occupied

• Under Certification of IGBC

Gold Rating

OLYMPIA INSPIRE

GUINDY• Total Area – 2,00,000 Sq.ft

• Building Structure – 2B+Stilt+10

• Awaiting CC

• Under Certification of USGBC

Gold Rating

OLYMPIA OPALINE• Types of Flats: 2, 3 BHK

• Project Status: Completed

- No of Flats – 1200

OLYMPIA OPALINE

SEQUEL• Types of Flats: 3 & 4 BHK

• Apartment Range: 1145 sq.ft – 2343

Sq.ft

• No. of Flats: 608

- Project completed

OLYMPIA SKY VILLAS• Types of Flats: 4 BHK

• Apartment Range: 6150 sq.ft – 6300

sq.ft

• No. of Flats: 18 Luxury Duplex

- Project completed & Occupied

PARK RESIDENCES

BY OLYMPIA• Total Area – 1,05,000 Sq.ft

• Luxury Apartments

• Project Completed and Occupied

• Gold Certified under IGBC Green Home

Rating System.

Page 5: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Education Projects – A snap shot

VELAMMAL NEXTGEN SCHOOL

• State of Art school for Velammal group of schools designed by expats working at RSP. The concept of learning street is the major highlight of the design.

• Total Area is 90KSF on 1.35 Acres of land.

• Project delivered and school is in operations for last couple of years.

KC HIGH SCHOOL

• School for KC High run by Mrs Valli to have their Kotturpuram school is relocated and cater for expansion.

• School affiliated to Cambridge International Board.• Total Area of 1.3 lakh Sq.ft on 3.25 Acres of land.• Amenities like Basket ball court, Auditorium, Mini

Soccer Field, Swimming pool etc. • Project delivered and school is in operations for

last couple of years.

Page 6: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

2. OTP Energy Consumption Overview

Page 7: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Energy Sources of Olympia Technology Park

ROOF TOP SOLAR

OLYMPIA

ENERGY

SOURCE

WIND ENERGY TNEB GRID

DG – CAPTIVE

Page 8: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Energy Consumption Details for 3 Years

Source of Energy Units in KWh

2017-18 2018-19 2019-20

TNEB 11153209 3725848 5612421

Diesel Generators 1453610 1904570 705110

Solar Energy 658436 1582834 1628935

Wind Energy 17898006 22639484 21433293

Total 31163261 29852736 29379759

Description

Units in KWh

2017-18 2018-19 2019-20

Green Energy 18556442 24222318 23062228

Non-Green Energy 12606819 5630418 6317531

Total 31163261 29852736 29379759

0%

20%

40%

60%

80%

100%

2017-18 2018-19 2019-20

60%

81% 78%

40%

19% 22%

Green Energy Non-Green Energy

Page 9: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Energy Consumption FY 2019-20

Description of Energy Source

EnergyConsumption

( in KWh )

TNEB 5612421

Diesel Generators 705110

Solar Energy 1628935

Wind Energy 21433293

Total 29379759

TNEB Energy

19%

Diesel Generators

2%

Solar Energy 6%

Wind Energy

73%

TNEB Energy Diesel Generators Solar Energy Wind Energy

Page 10: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

3. OTP Specific Energy Consumption

Page 11: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Specific Energy Consumption – Past 3 years

Parameters Units 2017-18 2018-19 2019 - 20

Total Annual Energy Consumption KWh 31163261 29852736 29379759

Built Up Area Sq. M 181631 181631 181631

Specific Electrical Energy Consumption

KWh / Sq.M 171.57 164.36 161.76

171.57

164.36

161.76

156

158

160

162

164

166

168

170

172

174

2017-18 2018-19 2019 - 20

Specific Energy Consumption

Page 12: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Year on Year Improvement of Specific Energy Consumption

Description 2017-18 2018-19 2019-20

Specific Energy Consumption 171.57 164.36 161.76

Variation - 4.39 1.61

Improvement % - 4.39 % 1.61 %

Reasons for Improvement in SEC :

• Conversion of existing PL light fittings into LED advance lighting system in Phase -1 & 3 liftlobbies with automation control.

• Conversion of DX AC Units into Chilled water operated CSU units in Phase -1 & 3 lift lobby.

Page 13: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

4. Information on Competitors, National & Global Benchmark

Page 14: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Information on Competitors, National & Global Benchmark

Sl.No Competitor Name SEC

1 Tata Consultancy Services, Cochin 81.2

SEC Benchmark - Competitor:

EPI Bench Mark for Office Buildings

Climate Zone Less than 50% AC

More than 50% AC

Warm & Humid 101 182

Composite 85 179

Hot & Dry 90 173

Moderate 94 179

National SEC Bench Mark ( BEE ):

Office Building EPI depends upon multiple factors like climate zone, operating hours, occupancy trends etc..

Olympia Tech Park Campus comes under mixed category. Combination of Office, Data labs, Food court & Amenities, Banks, ATM and GYM etc. with 95% Air conditioned space.

Chennai comes under Warm & Humid Climate Zone and our campus comes under the category of more than 50 % Airconditioned area. Hence EPI Bench Mark as BEE - 182.

Our EPI FY 2019-20 - 161.76

Page 15: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Road Map for Further Improvement of SEC

Optimum utilization of HVAC System.

Continuous monitoring and audits of energy.

Maximize utilization of Day Light effectively andreduce the lighting consumption in day time.

Greater Use of Energy Efficient Equipment's

Greater Use of energy efficient lights

Inclusion of digital technologies in operations ofbuilding and management of energy.

Page 16: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Major Encon Project Planned FY 2020-21

• Installation of Auto Tube Cleaning Technology for 3 Nos of 750 TR Water Cooled Chillers to improve the chiller Efficiency and save the energy.

Project Cost – INR 2.56 Millions.

• Installation of Control Command Centre for enhancement of IBMS System in the view effective monitoring and help us for energy saving in HVAC Systems.

Project Cost – INR 10.2 Millions.

Page 17: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

5. Energy Savings Projects Implemented

in last 3 Years.

Page 18: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Energy Savings Projects Implemented in last 3 Years

Important Projects in 2017- 18, 2018-19 & 2019-20

Installation of additional one water cooled chiller.

Conversion of PL light fittings into LED light fitting in various locations of Office Premises.

Conversion of existing PL light fittings into LED advance lighting system in Phase -1 & 3 lift lobbies with automation control

Conversion of DX AC Units into Chilled water operated CSU units in Phase -1 & 3 lift lobby.

Year No of ProposalsInvestments

( in Million INR) Savings

( in Million INR ) Payback

( Months )

2017 -18 7 31.68 17.59 21

2018 -19 4 9.48 3.91 29

2019 -20 2 1.42 0.75 22

Page 19: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Encon Project Implemented in 2019-20

Converted the 5.5 TR DXC Unit – 8 Nos into Chilled Water CSU Unit – 6 Nos in Phase -1 & 2 lift lobby area.

Optimization the energy consumption and reduced the common area energy consumption.

Energy Saved - 62437 Units / Year

Cost Saving Achieved – INR 5.62 Lakhs / Year

Investment Cost – INR 8.02 Lakhs

Payback Period - 17 Months

During CSU ReplacementBefore

Conversion of DX Units to Chilled Water CSU Unit

Page 20: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

6. Innovative Projects Implemented.

Page 21: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Innovative Projects Implemented

Source of Idea Solution Advantage

Non availability of alternate fire fighting arrangements in HSD Yard for the existing 50 Ltrs DCP Extinguisher available.

Worked out the alternate option to implement 200 Ltrs AFF Mechanical Foam Fire Extinguisher system

Implementation Cost – INR 1.18 Lakhs

Two modes of fire extinguishing arrangements available for HSD Yard.

Reliability of safety in HSD yard is increased.

AFFF ( Aqueous Film Forming Foam ) Fire Fighting System for HSD Yard

Page 22: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

7. Utilisation of Renewable Energy

Sources.

Page 23: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Utilisation of Renewable Energy Sources FY 19-20

Type of RE Type of Energy Onsite/Off siteInstalled Capacity

(MW)Generation

(Million Units)% of Overall

Electrical Energy

Solar PV Electrical Onsite 1.1 1.62 5.54%

Wind Electrical Off site 15.15 21.43 72.95%

Wind – 72.95% (21.42 Million units))

Solar - 5.54% (1.62 Million units)

Page 24: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Investment Made & Capacity Addition in last 3 years

Project Name TypeInstalled

Capacity (MW) Year of Installation Investment Cost

Roof Top Solar Plant Onsite

Renewable Energy 1.1 June -2017 INR – 5.08 Cr

Year Energy Generation ( in KWh ) Remarks

2017-18 658436Installed in June -2017 and commenced the partial generation.

2018-19 1582834

2019-20 1628935

PROJECT DETAILS

Capacity 1.1 MW

Type Direct Online Grid

Make of Solar PV Panel Trina

Rating & Qty. of Solar PV Panel

315 Watts, 3510 Nos

Make of Inverter Delta

Rating & Qty. of Inverter 50 KW , 19 Nos

Energy Generation / Year ( in KWh )

1582834

Investment Cost ( in INR ) 5.08 Cr

ROI ( Months ) 46

Page 25: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

RPO Obligation

Year Solar Non – Solar Total

2017-18 5 % 9 % 14 %

2018-19 -- -

2019-20 6.75 % 10.25% 17 %

RPO Achieved at site

Year Solar Non – Solar Total

2017-18 2.11 % 57.43 % 59.55 %

2018-19 5.3 % 75.84 % 81.14 %

2019-20 5.54 % 72.95 % 78.50 %

RPO Target fixed in Tamil Nadu

Reference Source

https://www.iexindia.com/

Page 26: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Group Total Capacity & Unit Capacity ( MW )

WINDMIL DETAILS – OFF SITE

S.No WEG HT SC NOCapacity in

MW Location

1 79204721737 0.8

Theni, Tirunelveli,

Udumalaipet.

2 59224760079 0.85

3 59224760083 850

4 79204720772 0.75

5 79204720517 0.95

6 79204720683 0.75

7 79204720684 0.75

8 79224723414 0.60

9 79224723413 0.60

10 39224340917 1.65

11 79244700344 2.0

12 79244700338 2.0

15 79204720531 0.95

16 79204721545 1.65

Total Capacity ( in MW ) 15.15

Page 27: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

8. GHG Inventorisation.

Page 28: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

GHG Inventorisation

Year Energy Consumption Details ( in Kwh ) Ton of CO 2 Emission

TNEB Wind Solar DG Total TNEB DG Total

2017-18 11153209 17898006 658436 1453610 31163261 9145.6 828.6 9974.2

2018-19 3725848 22639484 1582834 1904570 29852736 3055.2 1085.6 4140.8

2019-20 5612421 21433293 1628935 705110 29379759 4602.2 401.9 5004.1

0

5000000

10000000

15000000

20000000

25000000

30000000

2016 -17 2017-18 2018-19 2019-20

Renewable Energy Usage in KWh

0

2000

4000

6000

8000

10000

12000

14000

2016 -17 2017-18 2018-19 2019-20

Reduction of CO 2 Emission ( in Ton

Page 29: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Target for CO 2 Emission Reduction

Action Plan :

a. Encourage the usage of Public Transportation and shuttle services by Employees.

b. Exploring replacement of Existing DG sets into Hybrid DG Sets to reduce the diesel consumption and operate DG Sets by using Biofuel.

c. Increase the usage of renewal energy and reduce the energy usage of Utility and DG Sets.

Page 30: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

9. Green Supply Chain Management

Page 31: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Green Purchase Policy

Green Purchasing is the practice of procuring goods and services that cause less harm to the environment, and the living beings that depend upon it for survival. Olympia Tech Park will strive to purchase materials that are:

Durable, as opposed to single use or disposable

Non-toxic or minimally toxic, preferably biodegradable

Highly energy-efficient

Recyclable or safely disposable

Made from raw materials obtained in an environmentally sound, sustainable manner

The cause of minimal or no environmental damage during normal use or maintenance.

Shipped with minimal packaging (consistent with care of the product), preferably made of recycled and/or recyclable materials

Products which have obtained Greenpro or any other Eco labeling

The Products should have low VOC and lesser health impacts

The products should be local materials sourced within 400km range

Page 32: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Information on other Green Projects implemented

Sl. No Project Status

1 Olympia-Merlin Reflection IGBC Pre- certified Platinum

2 Olympia Platina Under Certification – Attempting for IGBC Platinum Rating

3 Olympia Park Residences Achieved IGBC Gold Rating.

4 Olympia – Teknos Under Certification – Attempting for IGBC Gold Rating

5 Olympia – National Under Certification – Attempting for IGBC Gold Rating

6Olympia – Goodwood Residence

Pre-certified IGBC Platinum Rating

7 Olympia – InspireUnder Certification – Attempting for LEED BD+CPlatinum Rating

8 Olympia – Cyberspace Under WELL Certification

Page 33: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

10. Team Work, Employee Involvement &

Monitoring

Page 34: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Daily Monitoring System

Monitor the Energy, Water Consumption details on daily basis.

Updation of Daily Energy & Water Consumption data along with cumulative consumption data. Compare the data with previous days.

Monitoring of HVAC Energy Consumption, Common Area consumption & Occupant Energy usage details on daily basis.

Monitoring of operation parameter of MEP Equipment on daily basis and take the action if any abnormality.

Monitoring of raw water procurement and STP treated water usage details on daily basis. Take the necessary action to minimise raw water procurement.

Monitoring of Employee , Visitor head count on daily basis.

Monitoring of Two Wheeler, Four Wheeler count on daily basis and take the action to increase the usage of public transport, shuttle services.

Page 35: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Monitoring

Use of Advanced Equipments and Tools for Monitoring.

Integrated Building Management System for Monitoring and Control.

Thermal Image Scanner Power Quality Analyser Anemometer

Page 36: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Review Meeting Chaired by

1st level of review meeting is being conducted & chaired by Shift Engineer on weekly basis.

2nd level of review meeting is being conducted & chaired by Technical Manager level once in two weeks.

3rd level of review meeting is being conducted & chaired by Property Manager once in a month.

4th level of review meeting is being conducted & chaired by Top Management once in 3 months.

Discussion Points :

It is a practice to conduct the review meeting with in-house team ( Technical, HK & Security team ) to discuss the below mentioned points.

a. Further improvement of building operations.

b. Optimisation of Energy & Water Consumption.

c. Usage of day light effectively and reduce the usage of lights during day time.

d. Awareness training on energy conservation measures.

Page 37: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Energy Efficiency/ Awareness Training Program

Page 38: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Projects Implemented through Kaizens

Source of Idea Solution Advantages

Take the safety measures for prevention of COVID -19 by using in house team.

Arrangement of foot operated type hand sanitizer dispenser by using PVC pipe and fittings.

Involving in house team to arrange food operated Hand Sanitizer -15 Nos required for common area.

Implementation Cost INR – 7500 / ( Rate / Each – INR 500 )

Avoided the expenses on procurement of automatic hand sanitizer dispenser for common area.

Cost saving of INR – 60,000 / -

Usage of in-house team effectively during lockdown

Foot Operated Hand Sanitizer Dispenser

Page 39: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

11. Implementation of ISO 50001 / Green CO /

IGBC Rating

Page 40: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

IGBC Rating

Olympia Technology Park has obtained Platinum Certification in June -2020 from IGBC for existing building category

Page 41: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

SCORE CARD:

IGBC Rating

S.No CREDIT NAME POINTS ACHIEVED

1 Site Facility & Management 14

2 Water Efficiency 26

3 Energy Efficiency 26

4 Health & Comfort 10

5 Innovation Category 12

Total Points 88

Certified 50-59 points, Silver 60-69 Points, Gold 70-79 Points, Platinum 80-100 points.

Total Points Targeted 90

Points Achieved 88

Targeted Rating Platinum

Achieved Rating Platinum

Page 42: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Implementation of ISO 50001

Engaged an ISO 50001 Certified Agency & Energy Auditor to implement ENMS at site by co-ordinating with IGBC.

Awaiting for proposal from IGBC to obtain ISO 50001 Certification.

Page 43: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

12. Long Term Vision on Energy Efficiency

Page 44: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Long Term Vision on Energy Efficiency

LONG TERM TARGET ON ENERGY EFFICIENCY

Increase the usage of renewable energy from 78 % to 85 %

Improve the EPI from 161.36 to 150

Enhancement of onsite solar energy from 1.1 MW to 1.2 MW

Optimization of Annual Energy in Chiller Consumption of Chiller – 68.27 Lakhs Units to 60 Lakhs units

Page 45: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Other Relevant Information

USGBC LEED Certification for GOLD

Olympia Technology Parkwas awarded “The BRY AIRAWARDS 2008” for the “BestHVAC Design” and thisaward is in its 3rd year andconsidered as prestigiousfor it certifies excellence inEnergy conservation &Innovative design in HVAC.

Best HVAC Design Award

Excellent Energy Efficient Unit Award-2019 from CII

Page 46: Presentation - Olympia Technology Park...Presentation - Olympia Technology Park. 1. About ... Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia

Other Relevant Information

Postal Dept. has released the special cover with Olympia Tech Park image on

29.12.2006

Best Green Building Award

Girem Award wasconferred uponOlympia TechnologyPark for the best greenbuilding in India -2009.