RD Construction Management
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
ABOUT US INTRODUCTION
Oleg Zhukov
RD Construction Management today - is a company with a solid reputation, won over a long-term, working towards the creation of high class o� ces.
Over the past few years, «RD Construction Management has signi� cantly strengthened its position, having mastered a new market segment for itself - the construction of technically complex o� ces for major international and Russian companies.
The desire to break into new paths of development, not afraid of di� culties, is a critical component of our corporate philosophy, which encourages us to never rest, but to move foward.
Our company is client oriented. Understanding the requirements and wishes of customers - is our professional duty. It is this high quality and standard of work that has helped us earn recognition and respect of our clients and to take a leading position in the market.
If you are holding our brochure, then you have found an excellent company with which the chances of successful implementation of your project has increased to 100%! I'm sure that the investment made into your new o� ce build by our team will be one of the most best investments you can make. Do not hesitate in choosing our team - we will save your time and money.
We guarantee the quality and standards of our projects. We � rmly believe that projects constructed with our team's heart and soul results in high quality
working environment that contributes to creation of corporate success.
We support the friendship and cooperation with our counterparts and clients whom we know for many years.
I want to thank all those who chose us and our team, and who trusted us - our partners, and most importantly, our customers.
RD Construction Management
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
ABOUT US FUNCTIONS
We can undertake the following functions
ConsultantRDCM can recommend the correct solutions that will completely meet your requirements
Design ManagerLinking all project disciplines together
General PlannerAttracting the best designer and architectural bureau, along with the most experienced engineering companies to design the future o� ce of your company
General ContractorWe construct everything planned by you from the concept of the architect and match this to your quality standards.
Construction ManagerManaging contractors to the most binding controls and requirements
RD Construction Management
Zvantsov Anton Pokrovsky Nickolay
Bakanova Lubove
vacancyKostuchkova MarinaBarashenko AndreyJames ByrneAlexander Semenov
Kompanichenko Gala
Baybus Ilya Somova Olga
Marketingdepartment
Contractdepartment
Cost accountingdepartment
Accountingdepartment
Administrativedepartment
Projects performancedepartment
Engineeringdepartment
Quality control and safetydepartment
Technical Director
Kycher SvetaMaseykin PeterShemyakova Anna
Rednikina MarinaAvakyan Shogik
Kochergina LizaSverchkova Anna
Purchasesmanagers
MechanicalEngineer
MechanicalEngineer
EngineerEstimator
Marketing Specialists
CostControlEngineer
CostControlEngineer
Economist Accountant
Secretary Courier/Drivers
Site managers Site managers Site manager Site manager
Project manager
Project manager
Project manager
Approvals manager
Lead HVAC engineer Chief Electrical Engineer
Deputy of Chief Electrical Engineer
SecuritySystems Engineer
SCS and TV/AVSystems Engineer
ITEngineer
Chief Weak CurrentEngineer
Deputy of General DirectorProject Manager
Chief Project Engineer
SeniorProject Manager
General Director of RD Construction Management
GeneralDirector‘sassistant
Business Development Director Head of department CFO Head of department
Samorodova Eugenia
Zhukov Oleg
Margulis Alexander
Silov EugineFotesku Valentina
Kadeykina Vera
Tichanova AllaUsarova Dasha
Suntsov YuriySajnev Dmitriy
Mikheev Sergey
Karavaev Maxim
Kudimov IgorZvyagin Ivan
Telminov NickolayMikheev Alexander
Ilatovsky Sergey Petrachkov Alexander Kasimova LilyaKurilo Alexander
Dvornikov Juriy Bredikhin Leonid
Chernichenko Dmitriy Malinkin Oleg
Babayan EsaiKaravaev Maxim
Prokofiev Valeriy
Merzliakov Dmitriy
vacancy Chaycowskiy IlyaMauricio NinoBalikin Nickolay
Pavlovsky Yurek
Contractmanager
Accountant
Chief accountant
Project manager
Denisov Sergey
Purchases andLogisticSpecialist
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
ABOUT US COMPANY STRUCTURE
RD Construction Management
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
ABOUT US MANAGEMENT
Oleg ZhukovGeneral Director
Graduated from Moscow Road Construction institute (MMRI), faculty of Construction of roads and airdromes. After graduation from MMRI relocated to Italy entered postgraduate course in Vicenza (Italy).
''RD Construction Management is a company oriented to provide the Customer with the desired coordinated result and within the approved budget. Our close-knit team of quali� ed specialists can solve tasks of technical complexity. This accumulated experience and knowledge permits RDCM to work in di� erent areas, such as capital construction, designing and � nishing works''
Graduated from Moscow Road Construction Institute (MMCI). 1996-2003 – Engineering Manager at Hines International.
'' The main purpose of our RDCM’s activity is to provide a � nished project with maximal comfort and safe conditions for the business activities of the Customer and his clients. Our specialists are prepared to render quali� ed assistance to solve a client’s problems and complete the given tasks.
Graduated from Moscow Engineering and Construction Institute (MECI, Hons). The second highest educational award attained in the Moscow Management Institute (MMI). 1992 Director of Engineering services at Hines International. A very experienced specialist with up to 30 years in the construction business.
''Our long-term aim is the build cooperation and partnership relationships with our Customers, based on trust and open communications. We o� er a high-quality service at all stages of construction of A class real estate construction from development to concept to its commercial realization”
Graduated from Moscow State University of Foreign A� airs (MGIMO) (U) of the Ministry of Foreign A� airs of Russia, “International business and business administration” faculty. After conferral of a Management and Marketing Master’s degree he worked as a Head of the Ventilation and Conditioning for a large Engineering company from 2002.
''The goal of our company is to create a unique product of high-class quality o� ces. Our team has the ability to solve tasks of di� cult complexity. Our Specialists reply to all the questions: the more complex and more di� cult the project is the more attractive and challenging it is to RDCM. We strive for experience and knowledge, strive to create a quality product and at the same time develop partnership relations with our Customers which is the recipe of success of RD Construction Management.''
Eugene SilovDeputy General Director
Alexander MargulisTechnical Director
Ilya BaybusBusiness Development Director
RD Construction Management
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
ABOUT US PROJECT STRUCTURE
SITE MANAGER PURCHASE AND LOGISTICS SPECIALIST
TECHNICAL AND CON�STRUCTION SUPERVISORY ENGI�NEER
ELECTRICAL ENGINEER
OCCUPATIONAL HEALTH AND SAFETY ENGINEER
MECHANICAL SYSTEMSENGINEER
APPROVALS AND COMPLIANCE SPE�CIALIST
GENERAL DIRECTOR
LOW VOLTAGE SYSTEMS ENGINEER
Cordination on site.• Operational management • of the siteCooperation with • local authoritiesKeep and update local • authorities work log.
Cooperation with the client's • representative. One point of contact principle.
Coperation with all project participants• Holding meetings draw up actional minutes• Prepare and present progress reports• Manage the ongoing project• Cordination of the ongoing works•
Technical concept design• Supervision of the technical aspects of the project• Formulate technical tasks• Technical Project audit•
Quality control of materials and equipment• Quality control and inspection of works• Maintain quality log and snag lists•
Purchase and delivery • of materials to siteLiase with suppliers•
H&S instructions• Monitor and adherance • to work regulations and safety on site.
Ventilation • Air conditioning• Plumbing systems• Fire supression systems•
Site Supervision• Hidden Works • Quality Control• Acceptance works•
Power Supply• Lighting systems•
Contracts and • document approvalsWork with local authorities•
Structured cabling systems• IT• Fire alarm systems• Security systems , CCTV•
CLIENTS REPRESENTATIVE
PROJECT LEADER
QUALITY CONTROL ENGINEER
TECHNICAL DIRECTOR
RD Construction Management
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
ABOUT US REALISED PROJECTS
AddressSize
Time Line
Functions
Address SizeTime LineFunctions
AddressSizeTimelineFunctions
Address
SizeTimelineFunctions
AddressSizeTimelineFunctions
AddressSizeTimelineFunctions
AddressSizeTimelineFunctions
AddressSizeTimelineFunctions
Address
SizeTimelineFunctions
AddressSizeTimelineFunctions
AddressSizeTimelineFunctions
AddressSizeTimelineFunctions
AddressSizeTimelineFunctions
AddressSizeTimelineFunctions
AddressSizeTimelineFunctions
AddressSizeTimelineFunctions
AddressSizeTimelineFunctions
Romanov Dvor Business Centre
Val Des Roses, Luxemburg
Kellogg Brown & Root
Wrigley
Mannheimer Swartling Media Park Aif
Rectors House Romanov Dvor
Aeroclub / BCD TravelL’Oreal
Total System Services – RUS (TSYS) Troika Dialog
East Capital International AB
Kraft Foods
Baker&McKenzie
Carcade Leasing
Johnson&Johnson
Troika Dialog
4 Romanov Lane 65 000 m2
Romanov Dvor, 1 stage — 15 000 m2
Romanov Dvor, 2 stage — 35 000 m2
Romanov Dvor, 3 stage — 15 000 m2
Romanov Dvor, 1 stage — 1998-2001Romanov Dvor, 2 stage — 2001-2003Romanov Dvor, 3 stage — 2009-ongoing General Planner, General Contractor
Strassen, Grand-Duche de Luxemburg, Val Des Roses 2 600 m2
10.2008-08.2009 Consultant and advisor
8 Arbat, Midland Plaza 1 300 m2
02.2007-05.2007 General Contractor
Rublevo-uspenskoe Avenue, Moscow BC «Residence on Rublevka» 4 000 m2
08.2007-12.2007 General Contractor
4 Romanov Lane Romanov Dvor BC 800 m2
04.2008-04.2008 General Contractor
27 Electrozavodskaya St, LeFort BC 10 500 m2
07.2008-01.2009 General Contractor
11 Mohovaya St. bld.6 3 500 m2
2003-2006 General Contractor
12 Ribinskaya St, Burevestnik BC 2 200 m2
11.2008-01.2009 General Contractor
1st Golutvinskiy lane, BC «Golutvinskaya Sloboda» 7 000 m2
2.2007-04.2008 General Contractor Design & Build
4 Romanov Lane, Romanov Dvor BC 3 000 m2
02.2007-05.2007 General Contractor
18/20 Zvenigorodskoe Ave, BC «NPO Rodina» 1 200 m2
10.2008-12.2008 General Contractor
Kislovsky lane 6, BC «Lucine» 3 000 m2
10.2007-12.2007 General Contractor
4 Romanov Lane, Romanov Dvor 1 400 m2
08.2007-12.2007 / 05.2007-08.2007 General Constractor
7 Dolgorukovskaya str. Sadovaya Plaza BC 4 300 m2
09.2008-08.2009 General Contractor
Dolgorukovskaya str. 7, BC «Sadovaya Plaza» 3 700 m2
09.2008-02.2009 General Contractor
21 Stanislavskogo St. Stanislavskogo BC 2 400 m2
01.2008-04.2008 General Contractor
27 Pirogovskaya St, Luch BC 940 m2
05.2009-08.2009 General Contractor
RD Construction Management
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
ABOUT US REALISED PROJECTS
AddressSizeTimelineFunctions
AddressSizeFunctions
AddressSizeFunctions
AddressSizeFunctions
AddressSizeFunctions
AddressSizeFunctions
AddressSIzeFunctions
AddressSizeFunctions
AddressSizeFunctions
AddressSizeFunctions
BC «Rector’s house»
Nokia Siemens Networks
Honeywell
Baker&McKenzie East Capital International AB
Novatek Troika Dialog
Troika Dialog
KBRTSYS
AddressSizeTimelineFunctions
Alcatel-Lucent
Data Centre
11 Mohovaya St 3 500 m2
2003-2006 General Contractor
21 stanislavkogo Street 5 000 m2
General Contractor
8 Kievskaya, Legion III BC 2 800 m2
General Contractor
7 Dolgorukovskaya , Sadovaya Plaza BC 3 700 m2
General Contrator
4 Romanov Lane, Romanov Dvor BC 1 400 m2
General Contractor
2 Udalcova Street 12 730 m2
General Contractor
18/20 Zvenigorodskoe , NPO Rodina BC 1 200 m2
General Contractor
Kislovsky lane 6, BC «Lucine» 3 000 m2
General Contractor
8 Arbat St 1 200 m2
General Contractor
Zvenigorodkoe ave 18/20 1 200 m2 General Contractor
AddressSizeFunctions
Nycomed
2-1 Usacheva St 4 200 m2
General Contractor
AddressSizeFunction
Etihad Airways 27 Serebrianicheskaya , Silver City BC 250 m2
General Contractor
AddressSizeFunctions
Hemofarm
27 Electrozavodskaya St, Lefort BC 1 000 m2
General Contractor
AddressSizeFunctions
AirClub / BCD Travel
12 Ribinskaya, Burivestnik BC 2 200 m2 General Contractor
AddressSizeFunctions
Linxtelecom 8th of March St 14 2 500 m2
General Contractor
AddressSizeFunctions
Credit Suisse
Romanov lane 4, Romanov Dvor BC 1 700 m2
General Contractor
AddressSIzeFunctions
L’Oreal
Golutvinskiy Ln, Golutvinskaya Sloboda BC 7 000 m2
General Contractor
AddressSizeFunctions
Correa’s
4 Romanov Lane, Romanov Dvor BC 700 m2
Design & Build
AddressSizeFunctions
Otkritie 12/1Yakovoapostalskiy lane 1100 m2
General ContractorData Centre
Data Centre
Data Centre
Data Centre
27 Electrozavodskaya St. LeFort BC 3800 m2
07.2009-09.2009 General Contractor
RD Construction Management
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
DELIVERED PROJECTS JOHNSON&JOHNSON TVCI
Address: 27/4 Bolshoya Pirogvskaya Luch Business Centre
Size: 940 m2
Timeline: 06-2009 - 09-2009
Functions: General Contractor
RD Construction Management
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
DELIVERED PROJECTS HONEYWELL
Address: Legion 3 business centre 7 Kieveskaya Street
Size: 2800 m2
Timeline: 03-2010 - 07-2010 Functions:
General Contractor
RD Construction Management
Address: 2/1 Usacheva Street
Size: 4 200 m2
Timeline: 09-2010 - 12-2010
Functions: General Contractor
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
DELIVERED PROJECTS NYCOMED
RD Construction Management
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
DELIVERED PROJECTS CORREAS
Address: 4 Romanov Lane
Size: 700 m2
Timeline: 10-2010 - 11-2010
Functions: General Contractor
RD Construction Management
DELIVERED PROJECTS ETIHAD AIRWAYS
Address: 27 Serebyanicheskaya
Size: 250 m2
Timeline: 08-2010 - 10-2010
Functions: General Contractor
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
RD Construction Management
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
EAST CAPITALDELIVERED PROJECTS
Address: Romanov Dvor BC
Size: 1000 m2
Timeline: 55 days
04-2008 - 07-2008
Functions: General Contractor
RD Construction Management
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
MANNHEIMER SWARTLINGDELIVERED PROJECTS
Address: 4 Romanov Lane
Size: 600 m2
Timeline: 55 days
04-2008 - 07-2008
Functions: General Contractor
RD Construction Management
Address: 27 Elecktrozovodkaya Street
Size: 10 500 m2
Timeline: 07-2008 - 04-2009
Functions: General Contractor
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
AIFDELIVERED PROJECTS
RD Construction Management
Address: 7 Dolgorukovskaya Street Sadovaya Plaza Business Centre
Size: 3 600 m2
Timeline: 12-2008 - 03-2009
Functions: General Contractor
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
BAKER & MCKENZIEDELIVERED PROJECTS
RD Construction Management
Address: 12 Ribinskaya Burevestnik Business Centre
Size: 2 400 m2
Timeline: 11-2008 - 01-2009
Functions: General Contractor
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
AIRCLUB /BCD TRAVELDELIVERED PROJECTS
RD Construction Management
Address: 7 Dolgorukovskaya St Sadovaya Business Centre
Size: 3 800 m2
Timeline: 01-2009 - 05-2009
Functions: General Contractor
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
KRAFT FOODSDELIVERED PROJECTS
RD Construction Management
Address: 18-20 Zvenigorodskoe Shosee
Size: 1 200 m2
Timeline: 10-2008 - 11-2008
Functions: General Contractor
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
TSYS CARD TECHDELIVERED PROJECTS
RD Construction Management
Address: 100 Rubleveke shosse Residenziya BC
Size: 4 000 m2
Timeline: 11-2007 - 12-2007
Functions: General Contractor
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
WRIGLEYDELIVERED PROJECTS
RD Construction Management
DELIVERED PROJECTS TROIKA DIALOG
Address: 2 Romanov Lane Size: Total Area 2500 m2
Data Center (260 kVA) 210 m2 Trading Floor 980 m2
Back O� ce 1320 m2
Description: Tier 4 Data CentreTimeline: Design Stage 42 Weeks
Execution 9 Weeks Fine Tuning 5 weeks75 C-days (01.03.2007-14.05.2007) including dealing center and back o� ce
Functions: General Contractor Design and Build Equipment Supplier
Major engineering systems installed: - active & cross-connect equipment UPS, RC-units � APC (Ireland)- chillers – HITACHI (Spain)- dry coolers � Gunter (Germany)- diesel-generators � VOLVO (Sweden)- building management systems (BMS) – Computrols (USA)
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
Data Centre
RD Construction Management
DELIVERED PROJECTS TROIKA DIALOG
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
Data Centre
RD Construction Management
DELIVERED PROJECTS LINXTELECOM
Address: Ul. The 8th of March, «Kulon» industrial estateSize: 2 500 m2 (critical power 800 kVA)Description: Tier 3 Data CentreTimeline: 140 C-days (13.05.09-30.09.09)Functions: General Contractor
Design and Build Equipment Supplier
Major engineering systems installed: - close control AC – STULZ (Germany)- dry coolers – Gunter (Germany)- PDU – ABB (Russia)- RC-units – APC (France)- diesel-generators – Wilson (England GB)- building management systems (BMS) – Computrols (USA)
Challenges and solutions: The project special feature was a complicated and multistage process of balancing, commissioning, and start-up under the terms of electrical power de� cit. We also met the tough requirements of the potential data-center tenant – one of the biggest international IT providing company.
Data Centre
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
RD Construction Management
DELIVERED PROJECTS LINXTELECOMData Centre
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
RD Construction Management
DELIVERED PROJECTS NOKIA SIEMENS NETWORKS
Address: 26 Ul. Stanislavskogo, bl. 13, Business Center « Stanislavskii»Size: 145 m2 (critical power 225 kVA) Description: Test Bed LaboratoryTimeline: 02-2010 - 04-2010 Functions: General Contractor
Design and buildMajor engineering systems installed:
- active equipment, communication equipment and UPS � Eaton Power Ware (USA)- precision air conditioner – Uni� air (Italy)- dry coolers – Uni� air (Italy)- PDU – ABB (Russia)- automated gas � re-� ghting system � Eusebi Impianti (Italy)
Challenges and solutions: A special metal structure was installed around the racks for the electrical and data cabling traces. We will utilise this universal method when we are in situations where it’s impossible to stack cable trays to the ceiling.
Data Centre
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
RD Construction Management
Address: 27 Electrozavodskaya Street LeFort Business Centre
Size: 136 m2 (critical power 90 kVA)Description: Test bed labratoryTimeline: 91 C-days from start to � nish (07.07.09-08.10.09) Functions: General ContractorMajor engineering systems installed:
- Close control AC units with remote condenser – TRANE (GB)
- PDU – ABB (Russia)- UPS – APC- gas suppression «Automatic � re-� ghting equipment and service» (Russia)
Challenges and solutions: The test bed cooling system was operating in conditions where air temperature in the summer of 2010 was extreme. This bears witness of the proper choice of the cooling system equipment.
Data Centre
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
DELIVERED PROJECTS ALCATEL LUCENT
RD Construction Management
Data Centre
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
ONGOING PROJECTS ROMANOV DVOR DATA CENTRE
Address: 2-4 Romanov LaneSize: Timeline: in progressFunctions: General Planner
General Contractor Technical supervisorMajor engineering systems installed: Power range 1210 kVaon active Equipment 720 kVa on accessory equipment 490 kVaParameter PUE 1,68DPC Provides:1. Two independent inputs from TP �253452. TP is powered by PS 834 Zubovskaya (CHP 12) and PS 655 Nikita (GES 1)3.Reservation inputs provided from diesel power plant consisting of three DSU capacity of 700 kVA each.DSU backup scheme N+14. Active and auxiliary equipment is connected through three UPS 660 kVA, Reserved for N+15. Means the connection counters on two boards PDU, N+1 redundancy schemeWorking Time UPS – seven Minutes
Challenges and solutions: Time to start the diesel generator set rated capacity 50 seconds. All active and auxiliary equipment connected to UPS.Repair work on any element of the power supply system can be carried out at any time without disconnecting the load.
RD Construction Management
Address: 4 Romanov Lane
Size: 15 000 m2
Timeline: 2005 - to date
Functions: General Planner General Contractor Technical supervisor
Capital Const
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
CAPITAL CONSTRUCTION ROMANOV DVOR BUSINESS STAGE 3
RD Construction ManagementCapital Const
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
CAPITAL CONSTRUCTION ROMANOV DVOR BUSINESS STAGE 3
RD Construction Management
Address: 70, Grand Rue L-1660 Luxembourg
Size: 2600 m2
22 apartments
Timeline: 04-2007 - 10-2009
Functions: General Planner Consultant
Capital Const
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
CAPITAL CONSTRUCTION VAL DES ROSES, LUXEMBURG
RD Construction Management
Capital Const
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
CAPITAL CONSTRUCTION VAL DES ROSES, LUXEMBURG
RD Construction Management
Data Centre
Capital Const
Capital Const
CURRENT AND REALIZED PROJECTS
Current projects1.
Project Area Address Timing Functions Contact name Contact details
BC “ Romanov Dvor “ 4 Romanov Lane 2006-now General Contractor,
Engineering designRD Group own
projectRomanov Dvor, 3 stage 15 000
NOVATEK 12 000 2 Udalzova Str. 06.2010-04.2011 General Contractor Valentin Kolchin
[email protected]+7 985 762 7119
Philips 5 050 13 Sergeya Makeeva 11.2010-03.2011 General Contractor
Petr Adamyanz
Senior manager of
procurementdepartment
[email protected]+7 985 769 02 71
Samsung 5 100 10 Vozdvizhenka 03.2011-06.2011 General Contractor Duck Kyu Moon
[email protected] (985) 764 6376
Sotheby’s 200 4 Romanov Lane 01.2011-04.2011 General Contractor
Irina Stepanova,
General Director
[email protected]+7 (495) 760-4278
Karakan-Invest 1 150 4/7 bld 2 Vozdvizhenka 04.2011-07.2011 General Contractor Aleksey
Tokanov
[email protected]+7 916 546 27 20
Realized projects2.
Project Area Address Timing Functions Contact name Contact details
BC “Romanov Dvor” 65 000
4 Romanov Lane General Contractor,Engineering design RD Group own projectRomanov Dvor,
1 stage 15 000 1998-2001Romanov Dvor, 2 stage 35 000 2001-2003BC “Rektorskiy Domik “ 3 500 11/6 Mohovaya Str. 2003-2006 General Contractor RD Group own project
Credit Suisse 1 700 4 Romanov Lane 10.2010-02.2011 General Contractor Sergey Fillimonovsergey.� [email protected]
+7 495 967 8200
Nycomed 4 200 2/1 Usacheva Str. 09.2010-12.2010
General Contractor,Engineering project adaptation, working Architectural design
Grebennikova Ekaterina
+7 915 136 75 74
FC OTKRITIE 5 050 12/1 Yakovoapostolskiy Lane 10.2010-12.2010
General Contractor,Architectural &
Engineering design
Alexand�r PelenevDeputy of
Administrative director
[email protected]+7 903 752 42 42
Cafetera 700 4 Romanov Lane 08.2010-10.2010General Contractor,
Architectural & Engineering design
Kulmanakov Vitaliy [email protected]
+7 495 287 18 18
Etihad Airways 250 27 Serebryanicheskaya 08.2010-10.2010 General Contractor Nataliya Gorunova [email protected]
+7 905 710 0812
“Val Des Roses”, Luxemburg 2 600
“Val Des Roses”Strassen, Grand-Duche de Luxemburg
10.2008-08.2010 General Contractor Vsevolod YampolskiyGeneral Director
[email protected]+352-621-168969
Nokia Siemens Networks 5 000 21 Stanislavskogo Str. 02.2010-04.2010 General planner, General
Contractor Elena [email protected]
+7 925 507 70 17
Honeywell 3 600 Legion III7 Kievskaya Str. 03.2010-06.2010 General Contractor,
Development project Igor [email protected]
+7 495 796 9817
Troika Dialog 3 500 4 Romanov Lane 4th � oor 11.2009-01.2010 General Contractor
Kvasnikov IgorDeputy of
Administrative Director
[email protected]+7 (495) 258-0500
Hemofarm 1 000 BC “LeFort” 27 Electrozavodskaya Str. 11.2009-01.2010 General Contractor Milosh Davydovich
General Director
Alcatel-Lucent 4500 BC “LeFort” 27 Electrozavodskaya Str. 07.2009- 12.2009 General Contractor
Shmel’kov AndrejDirector Administrative
Department
+7 (915) 278 0488
Linxtelecom 2 500 Ul. The 8th of March05.2009- 09.2009 General Contractor Alexand�r Maslov
[email protected]+79857278608Data Centre
Data Centre
Capital Const
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
REFERENCES
RD Construction Management
Data Centre
Data Centre
Mediapark “AiF” 10 500 BC “LeFort” 27 Electrozavodskaya Str. 07.2008-01.2009 General Contractor,
Engineering design
Vagin Konstantin, Deputy of General
Director
[email protected]+7 (903) 974-0669
Baker&McKenzie 3 700 BC “Sadovaya Plaza” 7 Dolgorukovskaya Str. 09.2008-02.2009
General Contractor, Engineering project adaptation, working Architectural design
Laird Senotto,Project Manager
[email protected]+7 (495) 787-2700
TSYS 1 200BC “NPO “Rodina”, 18/20 Zvenigorodskoe highway
10.2008-12.2008Architectural &
Engineering design, General Contractor
Povarov Andrej,General Director
[email protected]+7 (903) 743-2612
Aeroclub/BCDTravel 2 200 BC “Burevestnik”
12 the 3rd Ribinskaya 11.2008-01.2009 General Contractor,Engineering design
Lobynceva Marina, Administrative
Director
[email protected]+7 (917) 586-6974
Kraft Foods 4 300 BC “Sadovaya Plaza” 7 Dolgorukovskaya Str. 09.2008-08.2009
General Contractor, Engineering design
adaptation
Gupaisov Sergej,Director ISDepartment
[email protected]+7 (495) 960-2480
Johnson & Johnson 1000
BC “Luch”27/4 BolshayaPirogovskaya
05.2009-08.2009 General Contractor Anna Babadjan, Project coordinator
[email protected]+7 (916) 640-6838
MannheimerSwartling 800 BC “ Romanov Dvor”
4/2 Romanov Lane 04.2008-07.2008 General Contractor,Engineering design
Tomas Johannson,Partner, layer
[email protected]+7 (495) 380-3280
Troika Dialog 3 600BC “Lucine”6 Bolsoy Kislovskiy lane
10.2007-12.2007Architectural &
Engineering design, General Contractor
Kvasnikov Igor’Deputy of
AdministrativeDirector
[email protected]+7 (495) 258-0500
Carcade Leasing 2 400 BC “Stanislavskogo”, 21 Stanislavskogo Str. 01.2008-04.2008
Architectural & Engineering design, General Contractor
Aleksejuk Natal’ja,Administrative
Director
[email protected]+7 (495) 933-8816
East Capital International AB 1 400 BC “ Romanov Dvor”
4/2 Romanov Lane05.2007-08.200704.2008-07.2008
General Contractor,Engineering design
Anna Zhukova,Administrative
Manager
[email protected]+7 (495) 380-1505
Troika Dialog 2 500BC “ Romanov Dvor”4 Romanov LaneDealing
02.2007-05.2007 General Contractor,Engineering design
Sergei Slobodin,Administrative
Management Director
[email protected]+7 (495) 258-0500
Wrigley 4 000
BC “Residenziya na Rublevke”Usovo,100 Rublevo-Uspenskoe Highway
08.2007-12.2007Architectural &
Engineering design, General Contractor
AlexandrSakoyan,
AdministrativeDirector
[email protected]+7 (906) 773-03-44
AirUnion 1 300 BC “Midland Plaza”8 Arbat Str. 05.2007-07.2007
Architectural & Engineering design, General Contractor,
Garbuzov Nikolay,Administrative
Director
[email protected]+7 (495) 411-6260
Kellogg Brown & Root 1 300 BC “Midland Plaza”
8 Arbat Str. 02.2007-05.2007Architectural &
Engineering design, General Contractor
Oscar Karash,General Director
[email protected]+7 (495) 775-7530;+1 (713)471-3014
Sotheby’s 200 BC “ Romanov Dvor”4 Romanov Lane 02.2007-04.2007 General Contractor,
Engineering designIrina Stepanova,General Director
[email protected]+7 (495) 760-4278
L’Oreal 7 000BC “Golutvinskaya Sloboda”1st Golutvinskiy Lane
12.2007-04.2008 Engineering design, Favorin Victor,Director
[email protected]+7 (495) 725-6376
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
REFERENCES
RD Construction Management
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
LICENCES (SRO)
RD Construction Management
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
CERTIFICATES ISO 9001:2000
RD Construction Management
Воздвиженка ул.
Средний Кисловский пер.
Боль
шой
Кис
ловс
кий
пер.
Большая Никитская ул.
Ром
анов
пер
.
Мох
овая
ул.
Никит
ский
пер
.
Крес
тово
здви
жен
ский
пер
.
Ник
итск
ий б
ул.
Арбатскаям
АрбатскаямАлександровский
сад м
Библиотекаим. Ленина
м
Малы
й Кисловский пер.
КОНТАКТНАЯ ИНФОРМАЦИЯ
РД Констракшн Менеджмент
125009, г. Москва,Б. Кисловский переулок, д. 6тел.: +7 (495) 937-77-48факс: +7 (495) 937-77-49www.rdcm.come-mail: biv @rdcm.com
125009, 6 Bol. Kislovsky Lane www.rdcm.com tel.:+7(495)937 77 48 fax:+7(495)937 77 49
CONTACTS