presentation to “i.e.n.e.” · presentation to “i.e.n.e.” the big picture of exploration...

27
Dr. Elias KONOFAGOS, Executive Vice President Athens March 12 h , 2018 October 30 th 2018 Presentation to “I.E.N.E.”

Upload: others

Post on 26-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Dr. Elias KONOFAGOS, Executive Vice PresidentAthens March 12h

, 2018October 30th

2018

Presentation to “I.E.N.E.”

Page 2: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

The Big Picture of Exploration & Production

Investments in Cyprus & Greece, Oct. 2018

Dr. Elias Konofagos

22

BLOCKS

12

I.O.C.’s

Page 3: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

The East Mediterranean

Main Type of Reservoirs

Sandstone Limestone

Page 4: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Sandstone Reservoirs &

Limestone Resevoirs

NOT TO SCALE

SANDSTONE RES.

TARGETS

LIMESTONE

RES.TARGETS

Page 5: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Comparison of Gas Field Sizes

ΚΥΠΡΟΣ

Zohr

Cyprus

EEZ

Egypt

EEZ

Israel EEZ

FIELDS: SIZE RESERVES

LEVIATHAN

Sandstone 340 km2 20 Tcf

ZOHR

Limestone 100 km2 30 Tcf

Leviathan

Page 6: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Offshore Technical Production Costs &

Natural Gas Fields Commerciallity

Dr. Elias Konofagos

ΕΝΙ: Discovery

of “Zohr”

Sept. 2015

Presentation to

“IENE” October 2018

Page 7: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Technical Production Cost

Natural Gas

T.P.C. =

▪Expressed in $/Mcft or $/boe

▪Includes Financing Costs

(Calculated Before Royalties, Taxes & Profit)

▪Yearly Total Gas Field Operating Cost

Estimated between 6% to 9% of Development

Cost (Production Period of 20 to 30 Years) .

Total Cost (Expl. + Dev/ment + Op/ting)

Total Recoverable Reserves

Dr. Elias KONOFAGOS

Page 8: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

E.U. Mean Import

Natural Gas price 2011 - 2016

7.2

20182011

Dr. Elias Konofagos

Price in boe

~$38/boe

$/Mcf

122013

Page 9: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

EastMed Natural Gas

Technical Production Costs

Examples

Dr. Elias Konofagos

Tamar, Zohr & Expected New South

Cyprus-South Crete Discoveries

Page 10: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Water Depth

1.700 m

Source: Noble Energy

150km

TAMAR Processing

Platform

Dr. Elias Konofagos

▪Discovery 2009,

▪First Production 2013

▪Banks Consortium

Financing, by HSBC &

Barclay’s etc

Page 11: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Subsea Well Heads

Umbilical Steel Tubes (240 km)

Flexible Pipes

Tamar Field: Subsea Well Heads Offshore Development Scheme

Dr. Elias Konofagos

Key Point: Unmaned Remote Production Management from Platform

Page 12: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Source: Noble Energy

▪Exploration= ~$1 B

▪Total Development= $5 B

▪ 20 Years Production: 8,4 Tcf

▪Annual Production= ~420 Bcft

▪Operating Cost= ~$600 MM/Year

“Tamar” Gas Field Production Investments

Dr. Elias KONOFAGOS

Page 13: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Source: Noble Energy

Technical Production Cost “Tamar”

Dr. Elias KONOFAGOS

~$2,1/Mcft

~$13/boe

Israel Contractual Price:

$5,8/Mcft

Project IRR=~20%

Subsea Wells

Water Depth 1.678m

150 km Pilelines &

Umbilical Cablesor

Page 14: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

“Zohr” ENI

Discovery

Dr. Elias Konofagos

SEPTEMBER 2017

Page 15: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

“Zohr” Gas Field, Full Subsea Development

500.000 boe/dayDr. Elias KONOFAGOS

Page 16: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Zohr

Development Scheme of “Zohr” Gas Field

Total 600km Subsea Steel Tubes

Umbilical Providing Electrical &

Hydraulic Connections with Well Heads

Dr. Elias Konofagos

Page 17: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Zohr

Development Scheme of “Zohr” Gas Field

ECONOMICS

▪Exploration =

~$1Billion

▪Prod. Wells =

~$2 Billion

▪Development=

~$11 Billion

▪ Operating

Cost= ~$1,1 B/Year

▪Yearly Prod.

= ~900 Bcf

▪30 Years Prod.

= 26Tcf

Dr. Elias Konofagos

Page 18: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Zohr

Development Scheme of “Zohr” Gas Field

~$1,8/Mcft

~$11/boe

Gas Price Paid by Egypt:

$4/Μcft - $5,88/Mcft

=

=

or

Wells

Equivalence: $30/bbl = $5/Mcft IRR =~35% Dr. Elias Konofagos

Contractual Terms

65% - 35%

Page 19: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

South of Cyprus or South of Crete Expected

Gas Discovery Cases, Rec. Res. 2,5 Tcf

70 km Gas to

Shore Pipeline

South Crete Case:

Water Depth ~2.500m

Rec. Reserv. ~5 Tcf

South Cyprus Case:

Water Depth ~2.500m

Rec Reserv ~5 Tcf

100 km Gas to

Shore Pipeline

Dr. Elias Konofagos

Page 20: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

South Cyprus or Crete Gas Field Case,

Reserves 5 Tcf, Production Investments

Subsea

Production

Well Heads.

▪Exploration Cost= ~ 1 Billion

▪Wells: Drilling Depth 3.500m

▪Well Cost= ~$100 Million

▪Development= ~$6 Billion

▪Annual Production, 180 Bcf

▪18 Years Production, 5,5 Tcf

▪Operating Cost: $600 Million/Year

Floating

Production

Facilities

Dr. Elias Konofagos

Page 21: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Dr. Elias Konofagos

~$4,5/Mcft

~$27/boe

Natural Gas Contract

Price: $5/Mcft (~$30/boe)

Subsea Production

Well Heads.

Floating

Production

Facilities

South Cyprus or South Crete Gas Field Case,

Reserves 5 Tcf, Technical Production Cost

Contractual Terms

40%-60% Sharing

Project IRR= ~0%

=

=

or

Page 22: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Dr. Elias Konofagos

~$4,5/Mcft

~$27/boe

Natural Gas Contract

Price: $7/Mcft (~$30/boe)

Subsea Production

Well Heads.

Floating

Production

Facilities

South Cyprus or South Crete Gas Field Case,

Reserves 5 Tcf, Technical Production Cost

Contractual Terms

40%-60% Sharing

Project IRR= ~12%

=

=

or

Page 23: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Expected Limestone Biogenic Gas Reservoirs

Expected Sandstone Gas Reservoirs

▪Cyprus: ~3 Tcm

▪Lebanon: ~1,4 Tcm

▪Greece : ~3 Tcm

▪ Israel: ~1,4 Tcm

▪ Egypt: ~3 Tcm

NG Ressources, with 50% Probability

?

~100 TCF

Crete Cyprus

Egypt

Page 24: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

Future Natural Gas Discoveries &

Stand Alone Commerciality Challenges

Dr. Elias Konofagos

▪Reservoirs of Sufficient Size

▪High Natural Gas Pay Zones (>10Tcf)

▪High Wells Production Rate, ~35MMcf/day

▪Contactual Commercial Terms

Compatible with the Risks Involved

Water Depths >2.500m

Page 25: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS

THANK YOU

Dr. Elias KONOFAGOS

Executive V.P.

Presentation to I.E.N.E.

Athens, October 30th

2018

Page 26: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS
Page 27: Presentation to “I.E.N.E.” · Presentation to “I.E.N.E.” The Big Picture of Exploration & Production Investments in Cyprus & Greece, Oct. 2018 Dr. Elias Konofagos 22 BLOCKS