Presentation to Grangegorman Project Team Environmental Health Sciences Institute Update
(14th Nov 2012)
What is in EHSI?: Research Diversity
The EHSI facility will house a diverse range of researchers.
Social & Educational ResearchHealth InformaticsBioengineeringMolecular & Cell BiologyAnalytical ChemistryFood Safety/QualityEnergy LabVision Sciences
Proposed Research Building
Central Quad (Science, Health & Food)
AcademicHub
HSE PrimaryCommunityCare
Engineering& Built Enviro(future)
Elec & EE Eng
Site of Environmental Health Science Institute (EHSI)
Design Team (Gov’t Procurement )
Architects RKD ArchitectsProject Management
Sweett Group
Civil & Structural Engineering Ove Arup Civil & Structural
Quantity Surveying Bruce Shaw
PSDPBSSM Safety Management
Fire Safety Consultant J Gardner & Associates
Science Centre UCD
23 tenders submitted, six shortlisted & evaluated for contract > € ½ million
Some EHSI issues
• To meet planning guidelines MUST be 41/2 to 6 storey in height.
• BUT, building of this height (at 2500m2) is inefficient.
• Critical mass of building not optimal for impact
Hothouse Incubation Centre Funding?• Enterprise Ireland funding for an Incubator Centre
possible. Hothouse relocation
• Combining Incubator and EHSI – economy of scale, better use of research space, raises profile of both facilities
• Notification of funding before Christmas
• Proceed to design on basis of joint building
EHSI/Hothouse Combined Building
UL Tierney Building combines Incubation Centre with Research Spaces
•Similar Centres elsewhere in Ireland: Tierney Building in UL latest example.
•Enterprise Ireland Funding
•Preliminary Costs ca 4.5 million for Incubator (HH)
•Total Area (Hothouse &EHSI): ca 4,600 m2
Advantages of a Combined BuildingOverall this is a very positive development:
• Larger building is more efficient to design • Cost of incubation lower than separate build.• Positive impact in contribution to local area.• Building a critical mass on campus• Improve research ->innovation pipeline• Engagement with industry/synergy
ACTIVITY DURATION TIMELINES
Tender Period 12 weeks Feb. 2012
Appointment of Design Team May 2012
Preliminary Design (Stage 1) 14 weeks (max)
May-Aug. 2012
Scheme Design , Planning Application Documents (Stage 2a)
18 weeks Aug.-Dec. 2012
Detailed Design (Stage 2b) 20 weeks Dec. 2012-May 2013
Pre qualification, Tender Action. Evaluation and award of Tender (Stage 3)
27weeks* Feb. 2013 – Aug. 2013
Construction (Stage 4) 88 weeks Aug 2013 – Apr. 2015
Hand over & Final Account 4 weeks May 2015
Occupation _ June 2015
*Stage 3 and Stage 2b overlap by 10 weeks
Building TIMELINE
Progress• Site location Review and
Infrastructure requirements• Lab Occupancy/Adjacency
Planning• Lab Workstation Design and
Configuration• Room Data Sheets• Exemplar facilities • Sustainability targets
(BREEAM-Ready status)
Space Planning
Current status:
• 5 storey building
• Ca 4600 sqm
• 21/2 floors of Incubation Centre
• 21/2 floors of EHSI
• Common spaces for networking/ideas exchange
Ground Floor
First Floor
Second Floor
Third Floor
Fourth Floor
First view of possible of elevations – this design still evolving
• Thank You