PRESENTATION ON INDIAN RAILWAY
Presented by- HARIOM GAUTAM
![Page 2: Presentationonindianrailway 120501134424 Phpapp02 121207072416 Phpapp01](https://reader035.vdocuments.net/reader035/viewer/2022062322/55cf920e550346f57b931835/html5/thumbnails/2.jpg)
Indian Railway
![Page 3: Presentationonindianrailway 120501134424 Phpapp02 121207072416 Phpapp01](https://reader035.vdocuments.net/reader035/viewer/2022062322/55cf920e550346f57b931835/html5/thumbnails/3.jpg)
History of Indian RailwayFirst Indian Railway line was
opened on 16th April 1853.
![Page 4: Presentationonindianrailway 120501134424 Phpapp02 121207072416 Phpapp01](https://reader035.vdocuments.net/reader035/viewer/2022062322/55cf920e550346f57b931835/html5/thumbnails/4.jpg)
The first train consisting of one steam engine and four coaches , traversed a stretch of 21-miles between Mumbai(Bombay) and Thane. Operated by private company -Englishmen.
Indian Railway has a glorious past of more than150 years serving the nation.
![Page 5: Presentationonindianrailway 120501134424 Phpapp02 121207072416 Phpapp01](https://reader035.vdocuments.net/reader035/viewer/2022062322/55cf920e550346f57b931835/html5/thumbnails/5.jpg)
![Page 6: Presentationonindianrailway 120501134424 Phpapp02 121207072416 Phpapp01](https://reader035.vdocuments.net/reader035/viewer/2022062322/55cf920e550346f57b931835/html5/thumbnails/6.jpg)
Features of Indian RailwayIndian Railway has a 3 tier management system.In 1951 the system were nationalized as one unit.Railway has 9213 locomotive 59,713 coaches & 2.5 lack of wagon.It is one of the world largest railway networks comprising 115,000km of track over a route of 65,000km.No strike in last 30 years in spite of 19 lakhs workers.
![Page 7: Presentationonindianrailway 120501134424 Phpapp02 121207072416 Phpapp01](https://reader035.vdocuments.net/reader035/viewer/2022062322/55cf920e550346f57b931835/html5/thumbnails/7.jpg)
17 zones in Indian railway.IR Headquater – New Delhi.It is largest railway system in Asia and 2nd largest railway system in world under one management system.
![Page 8: Presentationonindianrailway 120501134424 Phpapp02 121207072416 Phpapp01](https://reader035.vdocuments.net/reader035/viewer/2022062322/55cf920e550346f57b931835/html5/thumbnails/8.jpg)
It carries 1.4 crore passengers and 16 lakh tonnes of goods every day. More than any rail system on earth.
![Page 9: Presentationonindianrailway 120501134424 Phpapp02 121207072416 Phpapp01](https://reader035.vdocuments.net/reader035/viewer/2022062322/55cf920e550346f57b931835/html5/thumbnails/9.jpg)
It runs 12000 trains everydayIt is biggest civilian employer in the world.As of 31 march 2012 . 22,224km (34%) of the total 65,000 km route length was electrified.India first electric train “DECCAN QUEEN” started on 1920 between Mumbai to Pune.Himsagar express – it is largest distance travel in India between Jammutavi to Kannyakumari (3,726km).
![Page 10: Presentationonindianrailway 120501134424 Phpapp02 121207072416 Phpapp01](https://reader035.vdocuments.net/reader035/viewer/2022062322/55cf920e550346f57b931835/html5/thumbnails/10.jpg)
It is fuel efficient system.7500 stations & about 500 computerized passenger reservation system.It is a lifeline of country.
![Page 11: Presentationonindianrailway 120501134424 Phpapp02 121207072416 Phpapp01](https://reader035.vdocuments.net/reader035/viewer/2022062322/55cf920e550346f57b931835/html5/thumbnails/11.jpg)
ORGANISATION:- Top- railway board or ministry of
railway headed by chairman railway board.
Middle- 17 zones headed by General Manager.
Bottom- 68 division headed by Division Railway Manager.
![Page 12: Presentationonindianrailway 120501134424 Phpapp02 121207072416 Phpapp01](https://reader035.vdocuments.net/reader035/viewer/2022062322/55cf920e550346f57b931835/html5/thumbnails/12.jpg)
Speed of TrainsShatabdi max 140kmph.
Rajdhani max 130kmph.
Others max 110kmph.
![Page 13: Presentationonindianrailway 120501134424 Phpapp02 121207072416 Phpapp01](https://reader035.vdocuments.net/reader035/viewer/2022062322/55cf920e550346f57b931835/html5/thumbnails/13.jpg)
NUMBERING OF TRAIN 4 digit numbering for express
3 digit numbering for passenger trains
train no start with 2 –superfast
All shatabdi train starts with no 20 & last two digit vary from 01 to 84.
![Page 14: Presentationonindianrailway 120501134424 Phpapp02 121207072416 Phpapp01](https://reader035.vdocuments.net/reader035/viewer/2022062322/55cf920e550346f57b931835/html5/thumbnails/14.jpg)
Railway Track or Permanent Way
Combination of rails, fitted on sleepers and resting on ballast and subgrade is called the railway track or permanent way.
![Page 15: Presentationonindianrailway 120501134424 Phpapp02 121207072416 Phpapp01](https://reader035.vdocuments.net/reader035/viewer/2022062322/55cf920e550346f57b931835/html5/thumbnails/15.jpg)
Technical details track and gauge
Indian railway uses 4 gauges:-
Broad gauge- 1,676mm. It is standard gauge.it is used in 91% of total track.
Meter gauge- 1,000mm. Used in 8000km route.
Narrow gauges- 762mm. Used in 2000km only.
![Page 16: Presentationonindianrailway 120501134424 Phpapp02 121207072416 Phpapp01](https://reader035.vdocuments.net/reader035/viewer/2022062322/55cf920e550346f57b931835/html5/thumbnails/16.jpg)
Problem Increasing number of passenger/
customerPoor customer
service/satisfaction.Rising input cost upto 200%