presentazione standard di powerpoint...-5.1.8 ( may 2019 ): buf fixing on the eps verification...

15
VERSUS Last upgrades and developments Capt. Batignani Francesco COSMO GM-2019, 9-13 September 2019 Rome

Upload: others

Post on 09-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentazione standard di PowerPoint...-5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management

VERSUSLast upgrades and developments

Capt. Batignani Francesco

COSMO GM-2019, 9-13 September 2019 Rome

Page 2: Presentazione standard di PowerPoint...-5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management

OUTLINE

- Versus new patches (September 2017 - present)

- Buoys data new bufr template verification

- Numeric results

- Wind gust verification

- Numeric results

COSMO GM-2019, 9-13 September 2019 Rome

Page 3: Presentazione standard di PowerPoint...-5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management

NEW PATCHES

- 5.1.4/5.1.5 ( Sept17/May18 ): implementation of verification for new BUFR format buoy data, correct visualization for cross verification graphics and for EPS verification pdf.

- 5.1.6 ( Oct 2018 ): management of the new synop messages BUFR template (SYNN), concerning cumulated/averaged fields defined by “time period” descriptor (windgust, precipitation…)

- 5.1.7 ( Jan 2019): bug fixing on software installation process, availability of txt output file for every EPS verification score.

COSMO GM-2019, 9-13 September 2019 Rome

Page 4: Presentazione standard di PowerPoint...-5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management

- 5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management of the new buoy/sounding wind speed descriptor (bufr mapping setting).

- 5.1.9 ( May 2019 ): implementation of the code for the management of the new bufr template for sounding observations ( obs type = 2, obs subtype = 109/111 ).

NEW PATCHES

COSMO GM-2019, 9-13 September 2019 Rome

Page 5: Presentazione standard di PowerPoint...-5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management

BUOYS DATA VERIFICATION

COSMO GM-2019, 9-13 September 2019 Rome

Observation level: Former code descriptors: "key" : "regionNumber",

"value" : 6,"units" : "CODE TABLE"

"key" : "wmoRegionSubArea","value" : 1,"units" : "Numeric"

"key" : "buoyOrPlatformIdentifier","value" : 1003,"units" : "Numeric"

New code descriptor: "key" : "marineObservingPlatformIdentifier","value" : 6101003,"units" : "Numeric"

Page 6: Presentazione standard di PowerPoint...-5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management

BUOYS DATA VERIFICATION

COSMO GM-2019, 9-13 September 2019 Rome

Forecast level: Management for GRIB ‘’Time Range Indicator’’ = 10 unavailable

Verification stops at step = 0

SOLVED

WarningAssure to remove from DB every wave model grib with different TRI value

Page 7: Presentazione standard di PowerPoint...-5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management

BUOYS DATA VERIFICATION

COSMO GM-2019, 9-13 September 2019 Rome

Page 8: Presentazione standard di PowerPoint...-5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management

NUMERIC RESULTS: SWH

DJF 2018/19

COSMO GM-2019, 9-13 September 2019 Rome

Page 9: Presentazione standard di PowerPoint...-5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management

NUMERIC RESULTS : SWH

DJF 2018/19

COSMO GM-2019, 9-13 September 2019 Rome

Page 10: Presentazione standard di PowerPoint...-5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management

NUMERIC RESULTS: Wind Speed 10m

DJF 2018/19

COSMO GM-2019, 9-13 September 2019 Rome

Page 11: Presentazione standard di PowerPoint...-5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management

NUMERIC RESULTS : Wind Speed 10m

DJF 2018/19

COSMO GM-2019, 9-13 September 2019 Rome

Page 12: Presentazione standard di PowerPoint...-5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management

WIND GUST VERIFICATION

COSMO GM-2019, 9-13 September 2019 Rome

- Observed parameter creation: “name” = ex. Windgust-3h, “obs type” =

surface, “bufr code” = 11041, “unit” = m/s (check bufr field).

- Bufr mapping setup: ex. 3 hour case – “bufr code” = 11041, “wmo code” = 5

digits number not already in use for other parameters ( ex. 88888), “displacement” = 180 minutes.

- Forecast parameter creation: “grib code” = 187, “code table” = 201.

- Average period control: once fixed the average time for the verification it is

responsibility of the user to introduce in the system only grib files with the coherent average time (3 hours in our case).

- Grib set: before loading grib files in the FE it is necessary to set the field TRI to 0

and remove from the DB any old record with different TRI value.

Page 13: Presentazione standard di PowerPoint...-5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management

NUMERIC RESULTS: Wind Gust 3h

COSMO GM-2019, 9-13 September 2019 Rome

MAM 2019

CommonArea 1

Page 14: Presentazione standard di PowerPoint...-5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management

COSMO GM-2019, 9-13 September 2019 Rome

NUMERIC RESULTS: Wind Gust 3h

MAM 2019

CommonArea 1

Page 15: Presentazione standard di PowerPoint...-5.1.8 ( May 2019 ): buf fixing on the EPS verification system (rank histogram graphics production), implementation of the code for the management

COSMO GM-2019, 9-13 September 2019 Rome

THANKS FOR YOUR ATTENTION!