presented by arcadis › media › b › 3 › a › {b3a9cde8-8fea-42f6...arcadis united states...
TRANSCRIPT
Programmatic ApproachPresented by Arcadis
May 2016
Programmatic ApproachIntroductionSpeaker: Scott Lumbrezer, PE
Safety CommentAwareness of Changing Conditions
W: 419 213 1634 M: 419 450 1560E: [email protected]
About Arcadis
Our Global Reach
North America
∼6,400
United Kingdom
∼3,700Continental
Europe
∼5,900
Middle East
∼2,200
Asia
∼5,000
Australia∼600
27,000 people │ 400+ offices │ 40+ countries │ 30,000+ projects
AustraliaAbu Dhabi – UAEBahrainBelgiumBrazilBruneiCanadaChileChina
Czech RepublicDubai – UAEFranceGermanyHong KongIndiaIndonesiaItalyJordan
KazakhstanKoreaMacauMalaysiaMexicoMozambiqueNetherlandsOmanPeru
PhilippinesPolandQatarRomaniaRussiaSaudi ArabiaSerbiaSingaporeSlovakia
SpainSwitzerlandTaiwanThailandUnited KingdomUnited StatesVietnam
Head OfficeARCADIS NV‘Symphony’Gustav Mahlerplein 97-1031082 MS AmsterdamP.O.Box 78951008 AB AmsterdamThe Netherlands+31 (0)20 2011 [email protected]
Our global network enables us to seamlessly bring our knowledge and experience of projects worldwide and apply that expertise to specific local needs and situations
LatAm
∼3,200
Arcadis United States Coverage
Reno - 9
Las Vegas - 11
Portland - 28
Seattle –45
Liberty Lake -2
Helena - 12
Butte - 2
Buffalo -23
San Louis Obispo - 23
Tucson - 13
Phoenix - 119Scottsdale - 16
San Diego - 23Carlsbad - 16
Roseville - 46
• San Francisco, CA - 48• Emeryville, CA - 47• Walnut Creek, CA - 37• San Rafael, CA - 19• San Jose, CA - 26
• Los Angeles, CA - 102• Long Beach, CA - 2• Riverside, CA - 5• Irvine, CA - 132
Boulder - 12Denver - 20
Lakewood -52
Highlands Ranch - 268 Lenexa - 24
Tulsa - 12
Little Rock - 4
Dallas - 25Fort Worth - 12Midland - 19
El Paso - 19
Austin - 30
San Antonio - 3
Corpus Christi - 5
Houston - 142
Lufkin – 5Baton Rouge - 51
Metairie, LA - 16
Mobile - 10
Birmingham - 25
• Boynton Beach – 57• Plantation, FL - 15
Pensacola – 3Tallahassee - 25Jacksonville -
67
Maitland -11 Tampa - 93
Sarasota - 2
Kennesaw - 36Atlanta –184 Augusta
- 12
Greenville - 24
Lexington - 19
Russellville -2
• Raleigh - 71• Durham - 13• Greensboro - 9• Charlotte - 9
Bluefield - 8
Minneapolis - 26
Milwaukee - 46
Hoffman Estates - 31Chicago - 128
Indianapolis - 60
Ft. Wayne - 4 Toledo - 61
• Detroit - 11• Lansing - 15• Brighton - 53• Novi - 74
Columbus - 106Cincinnati - 43
Akron -54
Cleveland -35
Wexford - 70
Buffalo -32
Chesapeake Area• Richmond, VA - 38• Newport News, VA - 41• Virginia Beach, VA - 10• Arlington, MD - 55• Washington DC - 3• Columbia, MD - 51• Annapolis,MD - 3• Millersville,MD - 41• Laurel, MD - 5• Baltimore, MD - 77
Philadelphia Area• Wilmington - 25• Philadelphia - 50• Newtown - 80
NJ - NYC Area• Cranbury, NJ - 54• Edison, NJ - 15• Branchburg, NJ - 34• Fair Lawn, NJ - 77• New York, NY - 71• Long Island City, NY - 43• Melville, NY - 31• White Plains, NY - 178
Syracuse - 269Clifton
Park - 97
MA – CT - RI• Middletown Ct - 49• Manchester, CT - 41• Springfield, MA - 7• Warwick, RI - 12• Braintree, MA - 19• Boston, MA - 9• Wakefield, MA - 14• Chelmsford, MA - 33
Knoxville - 33
Chattanooga - 57Nashville- 7
•Puerto Rico – 34,two offices•Anchorage, AK – 38•Honolulu, HI - 12
Programmatic Approach – Why?• Drivers Creating the Demand
o Economic Opportunitieso Regulatoryo Efficiencieso Safetyo Technologyo Specialized Expertise
• Recognize Challenges Facing Organizationso Staffing constraintso Organizational structureo Speed to Marketo Priority overload
Benefits of a Programmatic Approach
Standardized Solutions
Efficient Implementation
Minimal Disruption to Current Workload
Drives Consistent
Results
Result: Improve the value
Key Components of a Programmatic Approach
• Core Teamso Owner Operations Representative(s)o Planning/Engineering Resourceso Equipment/Material Supplierso Construction Contractor Resources
• Communication with Stakeholderso Pilot Testing / Continuous Feedback
Plan Do Check Adjust
Program Opportunities
• New Markets/Customers• Increase/Optimize Thruput
Strategic Initiatives
• Facility IntegrationAcquisitions
• Vapor Recovery ProgramSystem Optimization
Examples of Programs• Facility Drawing Updates• New Product/Additive Integration• Fire Protection Systems• Vapor Control Systems• Electrical Maintenance• Facility Integration• Pipeline Water Crossing
Asset Management• Drawing Accuracy Verification• Valve/Equipment Identification• Maintenance Record Keeping• Pipe Integrity• System Analysis• Electrical Documentation/Validation• Cathodic Protection• Pavement Maintenance
Regulatory Compliance• Fire Protection• SPCC Plans• Groundwater Monitoring• Air Permitting• Arc Flash• Leak Detection
Other Programs
• Technology Enhancementso Facility Automation
• Safetyo Fall Protectiono Site Security Infrastructureo Construction Oversighto Electrical Safety
• Coastal Resiliency• Incident Response
Summary
• Programmatic Approaches promote:o Standard Systemso Consistent Resultso Repeatabilityo Speed to Market
Results lead to added value and improving your company’s bottom line
Questions/DiscussionScott Lumbrezer, PE | Program Manager | [email protected]. +1 419 213 1634