Presented By: Mukesh BhutaVice Chairman - IPUA

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 2: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

IPUA’s Role:Ozone Cell, Ministry of Environment & Forest, Government of India is preparing HCFC Phase-out Management Plan (HPMP) which may be published in due course. The Indian Polyurethane Association with an endeavor to best serve the interests of the member community and the Indian Polyurethane Association has been assisting Ozone Cell in this HPMP programme.

Which is to……

Identify all the sectors of foams where HCFCs are being used

Survey the number of enterprises consuming HCFCs directly or indirectly.

Estimate the total consumption of HCFCs in India for the years 2007-2012 more importantly for 2009-2012.

Create awareness amongst the industry representatives, about the phase out scenario.

Suggest strategy which can facilitate a successful implementation of HCFCs phase out.

Recommend regulatory policies which can be industry friendly rather than restrictive.

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 3: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

India PU Foam SectorPresent scenario:Main PU Foam sectors consuming HCFCs

are:Domestic Refrigeration / AppliancesCommercial RefrigerationContinuous PanelDiscontinuous PanelGeneral Insulation Spray / In-SituThermowareIntegral SkinThermo Plastic Foam

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 4: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

Alternatives Blowing Agents:Current & Futuristic Most promising alternative technologies for Indian Foam

Sector are:CompoundCompound MWMW Physical Physical StateState

Boiling Boiling Point Point ((ooC)C)

Flash Flash PointPoint

LFL/UFLLFL/UFL LambdaLambda

2525ooC C (mW/mk)(mW/mk)

ODPODP GWPGWP

HFC-134aHFC-134a 102102 GasGas -27-27 NoneNone NoneNone 00 13001300

HFC-245faHFC-245fa 134134 LiquidLiquid 1515 NoneNone NoneNone 1313 00 820820

HFC-365mfcHFC-365mfc 148148 LiquidLiquid 4040 -24-24 3.4/133.4/13 1212 00 840840

n-Pentanen-Pentane 7272 LiquidLiquid 3636 -49-49 1.51.5 1515 00 1111

Iso-PentaneIso-Pentane 7272 LiquidLiquid 2828 -51-51 1.41.4 1414 00 1111

Cyclo-PentaneCyclo-Pentane 7070 LiquidLiquid 4949 -7-7 1.51.5 1313 00 1111

MethylalMethylal 7676 LiquidLiquid 42.342.3 -18-18 2.2/19.92.2/19.9 00 Very LowVery Low

Methyl FormateMethyl Formate 6060 LiquidLiquid 31.531.5 -19-19 5/205/20 10.710.7 00 Very LowVery Low

FEA-1100-DupontFEA-1100-Dupont NANA LiquidLiquid 3333 10.710.7 NoneNone NANA 00 Very LowVery Low

HBA-2-HoneywellHBA-2-Honeywell NANA LiquidLiquid NANA NANA NoneNone NANA NegligibleNegligible Very LowVery Low

AFA-L1-ArkemaAFA-L1-Arkema NANA LiquidLiquid NANA 1010 NoneNone NoneNone NegligibleNegligible Very LowVery Low

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 5: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

Application: Domestic, Commercial Appliance & ThemowareDomestic ApplianceKey requirements:Foam insulation

properties ( K-factor)

Fast productivity

Commercial ApplianceApplication:supermarket counters horizontal freezerVisi-coolersfood service equipment

ThermowareKey requirement:

Fast productivity

Low cost Blowing Agent Options :Zero ODP:HFC -134a low level, HFC -245 fa & HFC -134a/HFC- 365, Ecomate

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 6: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

Application: Discontinuous & Continuous Building Panels

Application

Cold storeBuilding Panel Telecom Shelter

Key requirements Low k-valueFaster Productivity FR

Blowing Agent Options :Zero ODP:HFC -134°, HFC -134a/HFC -365, HFC- 245fa, Ecomate

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 7: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

Application: General Insulation & SprayApplications include: Walls, crawl spaces, enclosed

attics, roof decksKey requirements Good Foam mechanical propertiesGood Foam insulation propertiesLow Moisture vapor resistance Low Flame spread Low Smoke generation

Blowing Agent Options :Zero ODP:HFC -134a, HFC 134a & HFC -134a/HFC- 365, HFC -245fa, Ecomate

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 8: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

Application: Integral SkinApplications:steering wheelfurniture (armrest, headrest, seat)

Key requirements:Skin formationAestheticsGood Abrasion resistance

Blowing Agent Options :Zero ODP:HFC -134a, & HFC -245fa/365, Ecomate

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 9: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

Considerations for selection of alternative technologies:

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 10: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

India PU Foam SectorPresent scenario:In India today HCFCs are being used by more than 450 units

in processing of PU Foams and other foams. This foam sectors is

dominated by large number of small and medium sized enterprises.

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 11: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

The consumption split of HCFCs across various foam sector:

2009 2010

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 12: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

IPUA Final Analysis:Total estimated consumption of HCFC (mainly 141b) is as

under:

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Note: Above are survey figures, they can be more and may be known when the stakeholders submit their actual data’s

Page 13: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

IPUA Final Analysis:The consumption split across various industry sectors is

estimated as under:

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 14: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

Suggestions & Recommendations:The industry sector groupings for phasing out of HCFC have

been arrived at , based on the following criteria:

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 15: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

Suggestions & Recommendations: Sector Consumption

Size of sector in terms of HCFC consumption e.g. (Phase out initiatives in sectors consuming larger quantities of HCFC would aid in delivering accelerated phase out of HCFC’s)

  Competitive Intensity

Number of Players in each of the sectors (Sectors having fewer players are likely to be more organized with large companies that have strong financial standing & technical capabilities to execute phase out projects)

Substitutes/Alternatives Sectors where mature, proven and cost effective alternatives for HCFC phase out are available

  Growth rate of the sector

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 16: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

Suggestions & Recommendations:Based on the selected criteria we have grouped the various sectors in order

to formulate different strategies timelines for each of the groupings. The table below

summarizes these groupings:

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 17: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

Suggestions & Recommendations:Recommended Strategy & Policy Changes:

The IPUA recommends the sector strategies in 2 phases:

Phase 1 StrategyA Multi-pronged approach is being suggested as under. One

for sectors falling under Group 1 i.e. Domestic Refrigeration and another

for sectors falling under Group 2 i.e. Continuous Panel and Integral Skin

Foam.

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 18: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 19: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

Suggestions & Recommendations:Phase 2 StrategyFor the other sectors i.e. Discontinuous panels, General

Insulation, Commercial Refrigeration & Thermoware we observe that an overall strategic approach covering the entire sector is not

feasible at the moment due to: Lack of proven cost effective alternate technologyLarge number of users making it difficult to manage the

transition that is equitable to ensure a level playing fieldSmaller consumption levels and slow growth rates

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 20: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

Suggestions & Recommendations:Phase 2 recommendations:

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11

Page 21: Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11

Mentioned below are certain fundamental recommendations across both phases:

Stakeholder Workshop on HPMP – 21st / 22nd October’ 11