pres_on_dpr

Upload: riyasbasheer

Post on 04-Apr-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 Pres_on_DPR

    1/17

    Provision of Urban Amenities in Rural Areas

    (PURA) Scheme

    7th December 2010

    Presentation on the DPR Template

  • 7/30/2019 Pres_on_DPR

    2/17

    2.

    Agenda

    2

    2 Contents of the DPR

    Contents of the DPR

    3

    3 Timelines & way forward

    Timelines & way forward

    1

    1 Objective of the presentation

    Objective of the presentation

  • 7/30/2019 Pres_on_DPR

    3/17

    3.

    Agenda

    2

    2 Contents of the DPR

    Contents of the DPR

    3

    3 Timelines & way forward

    Timelines & way forward

    1

    1 Objective of the presentation

    Objective of the presentation

  • 7/30/2019 Pres_on_DPR

    4/17

    4.

    Objectives of the presentation

    1. Provide an overview of the DPR Template1. Provide an overview of the DPR Template

    2. To link the sections of the DPR with the Concession Agreement2. To link the sections of the DPR with the Concession Agreement

    With an aim to highlight the directly affected clauses in the Concession Agreement With an aim to highlight the directly affected clauses in the Concession Agreement

    With an aim to standardize the submissions With an aim to standardize the submissions

  • 7/30/2019 Pres_on_DPR

    5/17

    5.

    Agenda

    22Contents of the DPRContents of the DPR

    33 Timelines & way forwardTimelines & way forward

    11 Objective of the presentationObjective of the presentation

  • 7/30/2019 Pres_on_DPR

    6/17

    6.

    Table of Contents of the DPR

    22 Project scopeProject scope

    33 Construction milestonesConstruction milestones

    11 Introduction to the PURA clusterIntroduction to the PURA cluster

    44 Construction specifications & standardsConstruction specifications & standards

    55 Construction related cash flowsConstruction related cash flows

    66 Operations & maintenance standardsOperations & maintenance standards

    77 Sustainability of the proposed projectSustainability of the proposed project

    88 Financial analysisFinancial analysis

  • 7/30/2019 Pres_on_DPR

    7/17

    7.

    Introduction to the PURA Cluster

    Contents

    Location of the PURA cluster.

    Details on the Gram Panchayat(s) involved

    Details of the villages covered.

    Maps depicting the PURA cluster and its boundaries.

    Results of the baseline survey, which will involve:

    Demographic profile of the cluster

    Details (including maps) of the existing infrastructure in the cluster

    Bidders should enclose a certificate from the concerned public authorities to corroborate

    status on the existing infrastructure

    Note on uniqueness of the proposed PURA concept and its relevance (Executive summary of the DPR)

    Details of variation from Concept Plan

    Contents

    Location of the PURA cluster.

    Details on the Gram Panchayat(s) involved

    Details of the villages covered.

    Maps depicting the PURA cluster and its boundaries.

    Results of the baseline survey, which will involve:

    Demographic profile of the cluster

    Details (including maps) of the existing infrastructure in the cluster

    Bidders should enclose a certificate from the concerned public authorities to corroborate

    status on the existing infrastructure

    Note on uniqueness of the proposed PURA concept and its relevance (Executive summary of the DPR)

    Details of variation from Concept Plan

    Chap 1 Chap 2 Chap 3 Chap 5 Chap 6 Chap 7 Chap 8Chap 4

  • 7/30/2019 Pres_on_DPR

    8/17

    8.

    Project scope

    Contents

    Scope and output parameters of facilities under:

    MoRD schemes Non MoRD schemes

    Funded add on economic facilities

    Add on economic facilities

    Each activity proposed to be undertaken in the above mentioned facilities shall be detailed.

    Contents

    Scope and output parameters of facilities under:

    MoRD schemes

    Non MoRD schemes

    Funded add on economic facilities

    Add on economic facilities

    Each activity proposed to be undertaken in the above mentioned facilities shall be detailed.

    Chap 1 Chap 2 Chap 3 Chap 5 Chap 6 Chap 7 Chap 8Chap 4

    This chapter shall correspond to Section C1 in Schedule C of CA

    Clauses impacted

    Clause 5 of the Part I of the Concession Agreement

    Following articles in the Part II of the Concession Agreement

    Article 10 Construction of Project Facilities

    Article 11 Monitoring of Construction

    Article 12 Tests, Interim completion certificate & Project completion certificate

    Clauses impacted

    Clause 5 of the Part I of the Concession Agreement

    Following articles in the Part II of the Concession Agreement

    Article 10 Construction of Project Facilities

    Article 11 Monitoring of Construction

    Article 12 Tests, Interim completion certificate & Project completion certificate

  • 7/30/2019 Pres_on_DPR

    9/17

    9.

    Construction milestones

    Contents

    Detailing of each of the construction milestones for the project facilities;

    Submit a manual detailing the construction procedures for all the activities proposed;

    Submission of a work plan with timelines in Gantt chart format;

    Submission of a detailed Bill of Quantities;

    Submission of design calculations along with structural drawings;

    Submission of Quality Manual covering QA/QC measures to be adopted.

    Contents

    Detailing of each of the construction milestones for the project facilities;

    Submit a manual detailing the construction procedures for all the activities proposed;

    Submission of a work plan with timelines in Gantt chart format;

    Submission of a detailed Bill of Quantities;

    Submission of design calculations along with structural drawings;

    Submission of Quality Manual covering QA/QC measures to be adopted.

    Chap 1 Chap 2 Chap 3 Chap 5 Chap 6 Chap 7 Chap 8Chap 4

    This chapter shall correspond to Section C2 in Schedule C of CA

    Clauses impacted

    Following articles in the Part II of the Concession Agreement

    Article 10 Construction of Project Facilities

    Article 11 Monitoring of Construction

    Article 12 Tests, Interim completion certificate & Project completion certificate

    Article 26 - Termination

    Clauses impacted

    Following articles in the Part II of the Concession Agreement

    Article 10 Construction of Project Facilities

    Article 11 Monitoring of Construction

    Article 12 Tests, Interim completion certificate & Project completion certificate

    Article 26 - Termination

  • 7/30/2019 Pres_on_DPR

    10/17

    10.

    Construction specifications and standards

    Contents

    Detailing of the construction specifications & standards, corresponding to the BOQ for all the facilities

    under:

    MoRD schemes

    Non MoRD schemes

    Funded add on economic facilities

    Add on economic facilities

    For each of the above, to affirm to the standards specified in the Concession Agreement.

    Contents

    Detailing of the construction specifications & standards, corresponding to the BOQ for all the facilities

    under:

    MoRD schemes

    Non MoRD schemes

    Funded add on economic facilities

    Add on economic facilities

    For each of the above, to affirm to the standards specified in the Concession Agreement.

    Chap 1 Chap 2 Chap 3 Chap 5 Chap 6 Chap 7 Chap 8Chap 4

    This chapter shall correspond to Section C3 in Schedule C of CA

    Clauses impacted

    Following article in the Part II of the Concession Agreement

    Article 10 Construction of Project Facilities

    Clauses impacted

    Following article in the Part II of the Concession Agreement Article 10 Construction of Project Facilities

  • 7/30/2019 Pres_on_DPR

    11/17

    11.

    Construction related cash flows

    Contents

    Detailing of the construction costs

    Submission of the schedule of rates corresponding to the BOQ

    Estimation of construction cost on an item rate basis

    Detailing of the funding sources.

    Details of the schemes funds tapped along with specific references to the clauses in the respective

    scheme guidelines.

    Submission of filled templates as per scheme guidelines for sourcing scheme funds.

    Contents

    Detailing of the construction costs

    Submission of the schedule of rates corresponding to the BOQ

    Estimation of construction cost on an item rate basis

    Detailing of the funding sources.

    Details of the schemes funds tapped along with specific references to the clauses in the respective

    scheme guidelines.

    Submission of filled templates as per scheme guidelines for sourcing scheme funds.

    Chap 1 Chap 2 Chap 3 Chap 5 Chap 6 Chap 7 Chap 8Chap 4

    This chapter shall correspond to Section C4 in Schedule C of CA

    Clauses impacted

    Following articles in the Part II of the Concession Agreement

    Article 20 Grant

    Article 26 - Termination

    Clauses impacted

    Following articles in the Part II of the Concession Agreement

    Article 20 Grant

    Article 26 - Termination

  • 7/30/2019 Pres_on_DPR

    12/17

    12.

    Operations and maintenance standards

    Contents

    Preparation of a Quality Manual detailing of the operation & maintenance standards for all the facilities

    under:

    MoRD schemes

    Non MoRD schemes

    Funded add on economic facilities

    Add on economic facilities

    The standards shall cover periodic and routine maintenance activities

    Submission of consumer grievance redressal mechanism

    Contents

    Preparation of a Quality Manual detailing of the operation & maintenance standards for all the facilities

    under:

    MoRD schemes

    Non MoRD schemes

    Funded add on economic facilities

    Add on economic facilities

    The standards shall cover periodic and routine maintenance activities

    Submission of consumer grievance redressal mechanism

    Chap 1 Chap 2 Chap 3 Chap 5 Chap 6 Chap 7 Chap 8Chap 4

    This chapter shall correspond to Section C5 in Schedule C of CA

    Clauses impacted

    Following articles in the Part II of the Concession Agreement

    Article 15 Operations and Maintenance

    Article 22 User charges

    Clauses impacted

    Following articles in the Part II of the Concession Agreement

    Article 15 Operations and Maintenance

    Article 22 User charges

  • 7/30/2019 Pres_on_DPR

    13/17

    13.

    Sustainability of the proposed project

    Contents

    Steps to be adopted to ensure continuity of standards during

    Construction phase

    Operations phase

    Detailed steps to be taken to ensure community participation.

    Measures to be taken to ensure sustainability of the ecosystem.

    Contents

    Steps to be adopted to ensure continuity of standards during

    Construction phase

    Operations phase

    Detailed steps to be taken to ensure community participation.

    Measures to be taken to ensure sustainability of the ecosystem.

    Chap 1 Chap 2 Chap 3 Chap 5 Chap 6 Chap 7 Chap 8Chap 4

  • 7/30/2019 Pres_on_DPR

    14/17

    14.

    Financial analysis

    Contents

    Detailing of the assumptions

    Capital cost (from chapter 5)

    Financing mix

    Detailing of the projected financial statements.

    Key results and scenario analysis.

    Submission of the final PURA Grant Estimation sheet (as per format prescribed)

    Contents

    Detailing of the assumptions

    Capital cost (from chapter 5)

    Financing mix

    Detailing of the projected financial statements.

    Key results and scenario analysis.

    Submission of the final PURA Grant Estimation sheet (as per format prescribed)

    Chap 1 Chap 2 Chap 3 Chap 5 Chap 6 Chap 7 Chap 8Chap 4

    This chapter shall correspond to Section C6 in Schedule C of CA

    Clauses impacted

    Following articles in the Part II of the Concession Agreement

    Article 20 Grant

    Article 26 - Termination

    Clauses impacted

    Following articles in the Part II of the Concession Agreement

    Article 20 Grant

    Article 26 - Termination

  • 7/30/2019 Pres_on_DPR

    15/17

    15.

    Agenda

    22Contents of the DPRContents of the DPR

    33 Timelines & way forwardTimelines & way forward

    11 Objective of the presentationObjective of the presentation

  • 7/30/2019 Pres_on_DPR

    16/17

    16.

    Timelines & way forward

    15th December 2010 to 6th January 2011State Government Consultations

    31st

    December 2010Last date of submission of DPR

  • 7/30/2019 Pres_on_DPR

    17/17

    17.

    Thank you