pressure equipment integrity management program … boot piping_2017-… · barlow thickness, api...

4
PRESSURE EQUIPMENT INTEGRITY MANAGEMENT PROGRAM Ultrasonic Inspection Report Exhibit #9200 Revision 0 April 23, 2015 Page 1 of 3 ULTRASONIC INSPECTION REPORT Report #: Client: Invoice Address: Work Location: Procedure: Accept. Standard: EXAMINATION OF: Job #: Date: P.O. #: W.O. #: Page of ULTRASONIC EQUIPMENT Flaw Detector: Make: Model: Serial Number: Cal. Date: Cal Block(s): 1: SN: 2: 3: SN: SN: Transducers: Transducer Angle Frequency MHz Crystal Size Crystal Type Single/Dual Serial No. Primary Reference Gain dB Scanning Gain dB Time Base Range (mm) Scanning Limitations: Transfer Value: TECHNICIAN(S) Interpretation is in accordance with the above mentioned standards, to the best of my professional ability. Tech-1: __________________ CGSB Level: _______ Reg. No: ____________ Sign: ____________________ Tech-2: __________________ CGSB Level: ________ Reg. No:_____________ Sign: ____________________ Clients Representative(Print)___________________________ Sign: _______________________ Date: _______

Upload: others

Post on 01-Apr-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

PRESSURE EQUIPMENT INTEGRITY MANAGEMENT PROGRAM

Ultrasonic Inspection Report Exhibit #9200

Revision 0 April 23, 2015 Page 1 of 3

ULTRASONIC INSPECTION REPORT Report #:

Client: Invoice Address: Work Location: Procedure: Accept. Standard: EXAMINATION OF:

Job #: Date: P.O. #: W.O. #: Page of

ULTRASONIC EQUIPMENT

Flaw Detector:

Make: Model: Serial Number: Cal. Date:

Cal Block(s):

1: SN:

2: 3: SN: SN:

Transducers:

Transducer Angle

Frequency MHz

Crystal Size Crystal Type Single/Dual

Serial No. Primary Reference Gain dB

Scanning Gain dB

Time Base Range (mm)

Scanning Limitations:

Transfer Value:

TECHNICIAN(S) Interpretation is in accordance with the above mentioned standards, to the best of my professional ability. Tech-1: __________________ CGSB Level: _______ Reg. No: ____________ Sign: ____________________ Tech-2: __________________ CGSB Level: ________ Reg. No:_____________ Sign: ____________________ Clients Representative(Print)___________________________ Sign: _______________________ Date: _______

PRESSURE EQUIPMENT INTEGRITY MANAGEMENT PROGRAM

Ultrasonic Inspection Report Exhibit #9200

Revision 0 April 23, 2015 Page 2 of 3

Scope:

Results:

bdrader
Text Box
Barlow Thickness, API 574-2016 Comments: E=1 for fitting P =100PSIP/SE =0.011 D =2.375Inchesshould be < 0.385* S =15000PSID/6 =0.396 E =0.6t should be < this* t = PD/2SE = 0.0132Inches 0.3351mm x 1.5 for flanged fittings
bdrader
Text Box
Barlow Thickness, API 574-2016 Comments: E=1 for fitting P =100PSIP/SE =0.007 D =2.375Inchesshould be < 0.385* S =15000PSID/6 =0.396 E =1t should be < this* t = PD/2SE = 0.0079Inches 0.2011mm x 1.5 for flanged fittings
bdrader
Text Box
General Comments: Piping at CML Location 060 should be replaced
dradeb
Text Box
0 Years, Grade 1