1Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Infrastructure Projects Facility in the Western BalkansPodrška infrastrukturnim projektima u zemljamaZapadnog Balkana
Albania
Bosnia &Herzegovina
Croatia
FYRoMacedonia
Kosovo
Montenegro
Serbia
Prijedor Water and Wastewater ProjectProjekat razvoja vodovodnog i
kanalizacionog sistema Opštine Prijedor
Project Preparation Feasibility StudyStudija izvodljivosti za finansiranje projekata
05 March 2013
EIB Water and Sanitation Project in Republika SrpskaProjekat vodovodne i kanalizacione infrastrukture u Republici Srpskoj
2Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Opening RemarksUvodne napomene
Marko PavićMayor of Prijedor
Gradonačelnik Prijedora
Sohail HassanEnvironment Sector Key Expert – WYG-IPF1
Ključni ekspert za sektor zaštite životne sredine – WYG-IPF1
3Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Structure of presentation
Introduction
Water supply –findings/recommendations
Wastewater collection findings/recommendations
Wastewater treatment and sludge managementfindings/recommendations
Evaluation of developmentoptions
Environment analysis
Financial analysis and appraisal
Implementation strategy
Uvod
Vodosnabdijevanje –nalazi/preporuke
Prikupljanje otpadnih voda –nalazi i preporuke
Tretman otpadnih voda i upravljanje muljem – nalazi i preporuke
Analiza razvojnih projekata
Analiza životne sredine
Finansijska analiza
Strategija implementacije
Sadržaj prezentacije
4Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Water supply and wastewater collection and treatmentVodosnabdevanje, kanalisanje i tretman otpadnih voda
Dejan AndjelkovicSenior Engineer – Water and Wastewater
Odgovorni Inženjer – Komunalna HidrotehnikaWYG-IPF1
5Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Input data
Demographics (RS Statistics Institute, estimates from Municipality and local communities)
Valid planning documentation (urban, spatial, regulation)
Areal photos, cadastral maps
Vodovod billing and maintenance database
Existing and proposed design / planning documentation from Municipality and Vodovod
Industrial flow and load data
Other relevant environmental and water/sanitation documentation and strategic plans
Demografski podaci (RZS i procene po lokalnim zajednicama)
Postojeća planska dokumentacija (urbanistički, prostorni, regulacioni...)
Aero snimci i katastarske mape
Baza potrošača i održavanja iz Vodovoda
Postojeća i planirana projektna i planska dokumentacija iz Opštine i Vodovoda
Podaci o kvantitetu i kvalitetu industrijskih otpadnih voda
Druga relevantna dokumentacija vezana za životnu sredinu, vodovod i kanalizaciju
Ulazni podaci
6Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
110000
120000
1948 1953 1961 1971 1981 1991 1993 2006 2011
Year
Popu
latio
n
Municipality Urban Rural
Overall population trends from 1948-2011Promene ukupnog stanovništva od 1948-2011
Last censusPoslednji popis
7Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Long term population projections (2011-2040)Dugoročne demografske projekcije (2011-2040)
-
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
110,000
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
Popu
latio
n / P
opul
acija
Prijedor town / Grad Prijedor Urban area / Urbano područjeRural areas / Ruralna područja Municipality / Opština
8Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Long term water demand projections (all sub-systems)Dugoročne projekcije potreba za vodom (svi podsistemi)
Prijedor - Water demand projections - Long term (all sub-systems)
-
2,500
5,000
7,500
10,000
12,500
15,000
17,500
20,000
22,500
25,000
27,500
30,00020
12
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
Wat
er d
eman
d / P
otre
be z
a vo
dom
[m3/
day]
Household sales / domacinstva fakturisano , m3/d Commercial sales / Industrija fakturisano, m3/d
Social institutions sales / Javna preduzeca fakturisano, m3/d Total NRW / Ukupna neobracunata voda, m3/d
9Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Long term WW production projections (all sub-systems)Dugoročne projekcije otpadnih voda (svi podsistemi)
-
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
11,000
12,000
13,000
14,000
15,000
16,000
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
WW
pro
duct
ion
/ Pro
dukc
ija o
tpad
nih
voda
[ m
3/d]
-
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
55,000
60,000
65,000
70,000
75,000
80,000
85,000
Popu
latio
n co
nnec
ted
/ Prik
ljuce
na p
opul
acija
Household WW / Domacinstva, m3/d Commercial WW / Industrija, m3/dSocial institutions WW / Javna preduzeca, m3/d Infiltration / Infiltracija, m3/d Population connected / Prikljucena populacija
10Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Key Water Supply Issues - 1Ključna pitanja vodosnabdevanja - 1
Advantages:Good urban coverageAvailability and capacity of water sourcesGood raw water quality requiring minimal water treatmentUpgraded and rehabilitated water intake and transmission components of the systemDeveloped SCADA and telemetry On-going development and extension of service coverageAwareness of system shortcomings and requirementsCompetent and skilled Water Utility personnel
Prednosti:Dobra urbana pokrivenostDostupnost i kapacitet izvorištaDobar kvalitet sirove vode koji zahteva minimalan tretmanUnapređeni i rekonstruisani vodozahvatni i transportni objekti u sistemuUvedena SCADA i telemetrijaKontinuirano širenje sistema za snabdevanje vodom i pokrivenostiSvest o nedostacima i potrebama sistemaKompetentno i obučeno osoblje Vodovoda
11Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Key Water Supply Issues - 2Ključna pitanja vodosnabdevanja - 2
Disadvantages:Over aged water distribution pipelines Undersized water mains / bottlenecksExtremely high NRW (around 80%)High rate (30%) of unmeteredcustomers/service connections Problems related to customer meter accuracy, calibration and replacementLimited service coverage of Prijedorwater supply system (around 80% urban, 55% rural). 55% on Municipality levelFrequent pipe breaks, insufficient network hydraulic capacity, lack of network zoningDecreasing trend of high energy consumptionLack of GIS and asset management databaseLack of calibrated hydraulic model
Nedostaci:Starost distributivnih cevovodaPostojanje „uskih grla“ i pod dimenzionisanih distributivnih cevovodaVisoka stopa neobračunate vode (oko 80%)Visok stepen (30%) nemerenih (paušalnih) kućnih priključaka / potrošačaNedostaci vezani za tačnost kućnih vodomera, njihovu kalibraciju i zamenuOgraničena pokrivenost sistemom (oko 80% gradski, 55% seoski). 55% na nivou OpštineČesti kvarovi, nedovoljni hidraulički kapacitet mreže, nedostatak zona u mrežiTrend smanjenja utroška el. energijeNedostatak GIS-a i baze podataka o objektimaNedostatak kalibrisanog matematičkog modela
12Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Prijedor Water Supply SystemsPrijedor Water Supply System Vodovodni sistem Prijedora
13Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Existing water sourcesPostojeća izvorišta
Water SourceIzvorište
Reference WellsPripadajući bunari
Maximum Capacity
Maksimalni kapacitet
(l/s)
Operational CapacityRadni kapacitet
(l/s)
Tukovi B-1, B-2 20.0 -
Matarusko polje I B-3, B-3/2, B-4, B-5 342.0 235.0
Matarusko polje II EB-1, EB-2, EB-3 235.0 150.0
Prijedorcanka PB-1, PB-3 115.0 75.0
TOTAL 712.0 460.0
Main Water Treatment / Disinfection Locations in the SystemGlavne lokacije uređaja za tretman / hlorisanje vode u sistemu
Well EB-3Bunar EB-3
Well B-5Bunar B-5
Well B-3/2Bunar B-3/2
WT BarakovacR Barakovac
PrijedorcankaPrijedorcanka
14Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Overview of existing water distribution networkPregled postojeće vodovodne mreže
15Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Basic water production and consumption dataOsnovni podaci o proizvodnji i potrošnji vode
16Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Water Balance for Prijedor Water Supply SystemBilans proizvodnje i potrošnje vode u vodovodnom sistemu Prijedor
Water Balance ComponentKomponenta bilansa 2009 2010 2011 2012
(6 months)
Water produced – Prijedor Service AreaProizvedena voda
m3 10,589,559 11,228,309 10,405,794 5,718,421
Billed Water ConsumptionFakturisana potrošnja m3 2,316,877 2,183,292 2,136,498 1,090,789
Non-Revenue WaterNeobračunata voda NRW m3 8,272,682 9,045,017 8,269,296 4,627,632
Non-Revenue Water ContributionZastupljenost NRW % 78.12 80.56 79.47 80.92
2009 2010 2011 2012(6 months)
Water produced - Prijedor Service Area (l/s)Proizvedena voda – vodovodni sistem Prijedor 335.8 356.0 330.0 367.7
Water invoiced - population (l/s)Fakturisana potrošnja - domaćinstva 63.1 59.3 57.9 60.5
Water invoiced - industry (l/s)Fakturisana potrošnja - privreda 7.6 6.5 6.9 6.3
Water invoiced - public services/institutions (l/s)Fakturisana potrošnja - institucije 2.8 3.5 2.9 3.3
Water invoiced - total (l/s)Ukupna fakturisana potrošnja 73.5 69.2 67.7 70.1
Non-Revenue water (l/s)Neobračunata voda NRW 262.3 286.8 262.2 297.6
NRW contribution (%)NRW zastupljenost 78.12% 80.56% 79.47% 80.92%
17Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Water and Wastewater Development Project in Prijedor MunicipalityProjekat Vodosnabdevanja i Kanalisanja u Opštini Prijedor
Overview of Technical Performance IndicatorsPrikaz tehničkih indikatora vodovodnog sistema Prijedor
2009 2010 2011 2012 (6 months)
Total Population in PrijedorWater Supply Service Area Broj stanovnika u Prijedorskomvodovodnom sistemu
70,385 73,037 75,828 75,881
Urban Urbano 48,198 50,005 51,890 51,942
Rural Seosko 22,188 23,032 23,938 23,939
Number of service connections Broj kućnih priključaka 13,144 13,748 14,599 16,582
Metered Connections Sa vodomerom 8,136 9,350 10,570 11,660
Non metered Connections Bez vodomera 5,008 4,398 4,029 4,922
Contribution (%) ZastupljenostMetered Consumption Merena potrošnja 62% 68% 72% 70%
Non metered Consumption Paušalna potrošnja 38% 32% 28% 30%
Population connected in Prijedor Water Supply Service Area Broj priključenih stanovnika naPrijedorski vodovodni sistem
41,587 48,252 50,580 54,518
Urban Urbano 33,262 38,562 40,231 41,282
Rural Seosko 8,325 9,690 10,349 13,235
Connection Rate Total (%) Stepen priključenosti Ukupno 59.08% 66.06% 66.70% 71.85%
Connection Rate Urban (%) Stepen priključenosti Urbani 69.01% 77.12% 77.53% 79.48%
Connection Rate Rural (%) Stepen priključenosti Seoski 37.52% 42.07% 43.23% 55.29%
2009 2010 2011 2012 (6 months)
Length of network per connected capita (m/capita)* Dužina distributivne mreže popotrošaču
3.8
Number of consumers per km of network* Broj potrošača po km distributivne mreže
265
Number of service connections per km Broj kućnih priključaka po km
64.0 67.0 71.0 80.0
Water produced - PrijedorService Area (m3) Proizvedena voda (m3/god)
10,589,559 11,228,309 10,405,794 5,718,421
Energy Consumption-Water Production (kWh) Utrošena el. Energija -proizvodnja vode (kWh/god.)
6,667,693 6,544,456 5,505,183 2,302,848
Specific Energy Consumption - Water Production (kWh/m3) Specificna potrošnjaenergije - Proizvodnja vode
0.63 0.58 0.53 0.40
* Note: Based on length of water distribution mains as per 2008 (205,377 m) and connected population as per 2012.Vrednosti na osnovu podataka o dužini distributivne mreže iz 2008. i priključenom stanovništvu iz 2012. godine.
18Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Unit Consumption RatesVrednosti specifične potrošnje
2009 2010 2011 2012 (6 months)
Unit consumption rate - gross (l/cap/day) Ukupna bruto specifična potrošnja (l/stan/dan) 697.6 637.5 563.6 582.7
Unit consumption rate - total (l/cap/day) Ukupna specifična potrošnja (l/stan/dan) 152.6 124.0 115.7 111.2
Unit consumption rate - population total (l/cap/day) Specifična potrošnja stanovništva - ukupna (l/stan/dan) 131.1 106.1 99.0 101.3
Unit consumption rate - population urban (l/cap/day) Specifična potrošnja stanovništva - urban (l/stan/dan) 132.2 109.7 103.3 101.8
Unit consumption rate - population rural (l/cap/day) Specifična potrošnja stanovništva - rural (l/stan/dan) 113.3 95.7 88.9 99.6
Unit consumption rate - industrial (l/cap/day) Specifična potrošnja privrede (l/stan/dan) 15.8 11.6 11.9 10.0
Unit consumption rate - institutional (l/cap/day) Specifična potrošnja institucija (l/stan/dan) 5.8 6.3 4.9 5.3
Unit rate - Non-Revenue water (l/cap/day) Specifična potrošnja NRW (l/stan/dan) 545.0 513.6 447.9 471.6
19Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Improvement of Water Utility’s operational efficiency.Rehabilitation and replacement of
existing water distribution network.Extension of water distribution
network in the service area of existing water supply system.Construction of water distribution
network in the settlements of “CrnoVrelo” subsystem.Development of “Tomasica lakes”
water supply subsystem.Development of water sources.
Proposed water supply improvementsPredlozi za unapređenje vodosnabdevanja
Unapređenje operativne efikasnosti vodovodog sistema PrijedorRehabilitacija i rekonstrukcija
postojeće vodovodne distributivne mrežeProširenje distributivne mreže u okviru
postojećeg vodovodnog sistema.Izgradnja distributivne mreže u
naseljima vodovodnog podsistema “Crno Vrelo”Razvoj vodovodnog podsistema
„Tomašička jezera“Dodatna istraživanja i razvoj izvorišta
vode
20Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Proposed water supply improvementsPredlozi za unapređenje vodosnabdevanja
Prijedor Water Supply SystemsPrijedor Water Supply System Vodovodni sistem Prijedora
21Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Summary of Water Supply Development Options (Priority Investment Programme) Pregled razvojnih opcija za vodosnabdevanje (Prioritetni Investicioni Program)
Total costs include escalation throughout implementation period (2013-2016)Ukupne cene korigovane za inflaciju tokom perioda implementacije (2013-2016)
Cases used in financial appraisalRazvojne opcije korišćene za finansijsku ocjenu
5,007,7304,280,110Crno Vrelo – primary networks in settlementsCrno Vrelo – primarna mreža u naseljima
Minimum Case for Financial Appraisal Minimalni Slučaj za Finansijsku Ocjenu
KM exc VATKM bez PDV-a
KM inc VATKM sa PDV-om
Rehabilitation of Prijedor central water supply systemRehabilitacija mreže – Prijedorski sistem 3,296,690 3,857,130
Total for Minimum CaseUkupno za Minimalni Slučaj 7,576,800 8,864,860
Base Case for Financial AppraisalOsnovni Slučaj za Finansijsku Ocjenu
KM exc VATKM bez PDV-a
KM inc VATKM sa PDV-om
Total Investments - Minimum Case Ukupne Investicije – Minimalni Slučaj 7,576,800 8,864,860
Tomasica Lakes project (new source, primary and secondary networks)Tomašička jezera (novo izvorište, primarne i sekundarne mreže) 7,354,700 8,605,000
Total for Base Case Ukupno za Osnovni Slučaj 14,931,500 17,469,860
High Case for Financial AppraisalViši Slučaj za Finansijsku Ocjenu
KM exc VATKM bez PDV-a
KM inc VATKM sa PDV-om
Same as Base CaseIsto kao za Osnovni SlučajTotal for High CaseUkupno za Viši Slučaj 14,931,500 17,469,860
22Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Existing wastewater systems within 1) urban and 2) Municipality areasPostojeći kanalizacioni sistemi u 1) urbanom 2) opštinskom području
Municipality border –Granica Opštine
Urban area border –Granica urbanog područja
23Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Prijedor - Existing collection system Prijedor – Postojeći kanalizacioni sistem
1590 ha currently sewered (22% of wider urban area, and 2% of municipal area)Total existing population connected = 34,030 (62% of urban population, 34% of municipal population)Existing system comprises Prijedor centre, and urban areas of Urije, Cirkin Polje, Orlovaca, RaskovacCombined system (250 km, mostly concrete, AC and some recent PVC extensions)Single main outfall to open channel tributary to Sana River, no existing wastewater treatmentDirect discharges to Puharska and other streams, and Sana and Gomjenica rivers
1590 ha pokriveno kanalizacionim sistemom (22% površine šireg urbanog područja, i 2% površine Opštine) Ukupno priključeno 34,030 stanovnika (62% urbane populacije, i 34% opštinske populacije)Postojeći sistem pokriva Prijedor centar, Urije, Čirkin Polje, Orlovača, Raskovac...Opšti sistem (250 km, uglavnom betonske i AC cevi, noviji projekti od plastičnih cevi)Jedan glavni ispust u otvoreni kanal koji se uliva u Sanu, nema tretmana otpadnih vodaDirektni ispusti u Puharsku i druge potoke, kao i u Sanu i Gomjenicu
24Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Existing wastewater system within Prijedor urban areaPostojeći kanalizacioni sistem u urbanom području Prijedora
Existing service areaObuhvat postojećeg sistema
Urban area border –Granica urbanog područja
25Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Main collector, open wastewater channel, Puharska streamGlavni kolektor, otvoreni kanal, Puharska
Outfall of open channel to Sana
river
Outfall of main collector to
open channel
Sana River
Open wastewater channel
Novi Grad- Prijedor- Banja
Luka Road
26Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Main collector, open wastewater channel, Puharska streamGlavni kolektor, otvoreni kanal, Puharska
27Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Prijedor subsystem (long term expansions)Prijedorski podsistem (dugoročna proširenja)
28Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Prijedor – Hydraulic model and analysisPrijedor – Hidraulički model i analiza
2009 flow data available for limited model calibration, best available population and water usage data usedPodaci merenja iz 2009 god. korišćeni za grubu kalibraciju modela, kao i realne procene populacije i potrošnje vodePrimary and main collectors are not more than 75% full during peak flows per section, in 2040 scenarioStepen ispunjenosti kolektora do 75% za maksimalne proticaje po deonici, na kraju projektnog perioda(2040)Self-cleaning velocities achieved for proposed diamaters even with existing average DWFSamočišćenje se postiže za predložene prečnike i sa trenutnim srednjim dnevnim proticajima u suvomperiodu
29Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Alternative options for conveyance system to WWTPAlternative transporta otpadnih voda ka PPOV
Option 1Required main collector lengthL= 5 km
Option 2Required main collector lengthL= 2.45km (cost saving cca Eur 1 Million)
30Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Proposed option for conveyance system to WWTPPredložena opcija transporta otpadnih voda ka PPOV
Overflow structure
Siphon under Puharska stream
Main collector to WWTP
Existing main collector and outfall
31Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Alternative options for Gomjenica (least cost analysis)Alternativne opcije za Gomjenicu
OPTION 1 OPTION 2
UnitSeparate
Gomjenica and Prijedor WWTPs
Pump Gomjenica flows to single Prijedor WWTP
INVESTMENTS - KEY DATAWWTPCapacity (long term) - Prijedor + Gomjenica PE - 62,000 Capacity (long term) - Prijedor PE 57,000 - Capacity (long term) - Gomjenica PE 5,000 - Pumping stationsGomjenica main pumping station (H = 4m) l/s 25
INVESTMENT COSTSPrijedor WWTP (long term, including land costs) € x 1000 6,406 6,784 Gomjenica WWTP (long term, including land costs) € x 1000 925 - Gomjenica main pumping station and pressure main (incl. land) € x 1000 - 95
INVESTMENT COST TOTAL € x 1000 7,331 6,879 Land cost € x 1000 248 237 Civil cost € x 1000 2,834 2,669 M&E cost € x 1000 4,250 3,973 OPERATION & MAINTENANCE COSTS (Annual)Maintenance € x 1000 91 86 Energy costs € x 1000
Prijedor WWTP (long term) € x 1000 48 51 Gomjenica WWTP (long term) € x 1000 21 - Gomjenica main pumping station € x 1000 2
Staff costs € x 1000 112 88 Chemical/sludge disposal € x 1000 149 145 ANNUAL O&M COSTS TOTAL € x 1000 421 371 NET PRESENT VALUES (20 years, discounted @ 8%) € x 1000 11,022 10,117LONG-TERM AVERAGE INCREMENTAL COST €/m3 0.38 0.34
32Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Conveyance schematic for Prijedor subsystem Šematski prikaz Prijedorskog podsistema
33Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Population connected - Prijedor subsystem Priključeno stanovništvo – Prijedorski podsistem
34Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
WWTP Prijedor – Designated area for proposed sitePPOV Prijedor – Šire područje za predviđenu lokaciju
35Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
WWTP Prijedor – Incoming flows and loadsPPOV Prijedor – Ulazna hidraulička i organska opterećenja
565480l/sPeak flow to preliminary treatmentMaksimalni proticaj ka preliminarnom tretmanu
ParameterParametar
UnitJedinica
Phase 1 (2030)Faza 1 (2030)
Phase 2 (2040+)Faza 2 (2040+)
Population connectedPriključeni stanovnici - 43,500 52,000
Population equivalentEkvivalentni stanovnici
PEES 51,000 62,000
Average dry weather flow (total, including infiltration)Prosecni proticaj u suvom periodu (ukupni, sa infiltracijom) l/s 123 140
Peak flow to full treatmentMaksimalni proticaj ka punom tretmanu l/s 240 282
BODBPK kg/d 3,110 3,745
SSUkupne rastvorene materije kg/d 3,565 4,300
BODBPK mg/l 287 305
NitrogenAzot mg/l 53 56
PhosphorusFosfor mg/l 8.6 9.2
SSUkupne rastvorene materije mg/l 336 357
36Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Prijedor Phase 1 WWTP – Process alternatives and cost summariesPPOV Prijedor Faza 1 – Procesne alternative i pregled troškova
92
103
103
102
94
98
Cost per PETrošak po ES
Eur
0.364645,316SBR (extended aeration)SBR (produžena aeracija)
Option - OpcijaInvestment Cost
Inv. Troškovi000 Eur
Annual Running Costs
Godišnji Op. Troškovi000 Eur
Average Incremental
CostSrednji
inkrementni trosakEur/m3
Conventional Activated Sludge with anaerobic sludge digestionKonvencionalni aktivni mulj sa anaerobnom digestijommulja
5,054 229 0.27
Activated Sludge (no primary settlement) with anaerobic sludge digestionAktivni mulj (bez primarnog taloženja) sa anaerobnomdigestijom mulja
4,878 270 0.28
Oxidation ditch (extended aeration)Oksidacioni jarak (produžena aeracija) 5,298 442 0.35
Activated Sludge (no primary settlement) with aerobic sludge stabilisationAktivni mulj (bez primarnog taloženja) sa aerobnomstabilizacijom mulja
5,340 390 0.34
SBR (primary settlement) with anaerobic sludge digestionSBR (sa primarnim taloženjem) sa anaerobnomdigestijom mulja
4,765 232 0.26
37Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Prijedor Phase 1 WWTP – Process alternatives and cost summariesPPOV Prijedor Faza 1 – Procesne alternative i pregled troškova
117
95
108
82
89
Cost per PETrošak po ES
Eur
0.314244,263
Conventional Activated Sludge with lime sludge stabilisationKonvencionalni aktivni mulj sa stabilizacijom muljakrečom
0.292155,578
Biological filter with stone media and anaerobic digestionBiološki filter sa kamenom ispunom i anaerobnom digestijom
0.313664,938Biological filter with plastic media and lime stabilisationBiološki filter sa plastičnom ispunom i stabilizacijom krečom
Option - OpcijaInvestment Cost
Inv. Troškovi000 Eur
Annual Running Costs
Godišnji Op. Troškovi000 Eur
Average Incremental
CostSrednji
inkrementni trosakEur/m3
SBR (no primary settlement) with anaerobic sludge digestionSBR (bez primarnog taloženja) sa anaerobnomdigestijom mulja
4,603 258 0.27
Membrane Bioreactor (MBR)Membranski bioreaktor (MBR) 6,042 482 0.40
38Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
WWTP Prijedor – Proposed layoutPPOV Prijedor – Predložena dispozicija
39Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
WWTP Prijedor – Process flow diagramPPOV Prijedor – Procesni dijagram
40Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
WWTP Prijedor – Main process unitsPPOV Prijedor – Glavne procesne jedinice
(2 duty + 1 standby) pumps, each @ Q=1017 m3/hInlet pumping stationUlazna pumpna stanica
UnitJedinica
Phase 1 (51,000 PE)Faza 1 (51,000 ES)
Phase 2 (62,000 PE)Faza 2 (62,000 ES)
Preliminary treatmentPreliminarni tretman
Screening, Grit Removal and Odour ControlFine rešetke, aerisani peskolov, kontrola mirisa
Primary settling tanksPrimarni taložnici 2 x D=23m 2 x D=23m
Biological treatmentBiološki tretman
4 SBR tanks (V tot=4,150 m³)
8 SBR tanks (V tot=8,300 m³)
Secondary settlementSekundarno taloženje
Not required with SBR processNije potrebno sa SBR procesom
Sludge thickeningUgušćivanje mulja
Primary thickener / Primarni ugušćivač
(1 x D=7m)
Primary thickener / Primarni ugušćivač
(1 x D=7m)
Sludge treatmentTretman mulja 2 x Anaerobic digestor (D=12m)2 x Anaerobic digestor (D=12m)
DewateringDehidracija mulja 1 x belt thickener / trakasti ugušćivač1 x belt thickener / trakasti ugušćivač
Sludge storageSkladištenje mulja
1 x sludge tank / tank za mulj(D=8 m)
1 x sludge tank / tank za mulj(D=8 m)
41Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Rehabilitation – Prijedor subsystem Rehabilitacija – Prijedorski podsistem
Design horizon up to 2030, costs include design and physical contingency (10%)
Vremenski horizont do 2030, cene uključuju projektovanje i rezervu za nepredviđene troškove (10%)
29,271,65015,011,10025,018,50012,830,000TOTAL Rehabilitation - Prijedor sub-systemUKUPNO Rehabilitacija – Prijedorski podsistem
27,378,00014,040,00023,400,00012,000,000
Long term replacement programme for combined system -Prijedor (20 year programme)Dugoročni program rehabilitacije za kombinovan sistem (20 godina)
1,825,200936,0001,560,000800,000
Immediate rehabilitation measures (estimate, actual needs defined following system survey)Hitne mere za rehabilitaciju (stvarne potrebe će biti definisane nakon detaljnog snimanja)
68,45035,10058,50030,000
Survey of existing Prijedor wastewater system (Flows and loads, CCTV)Snimanje postojećeg sistema, merenje količina i sastava otpadnih voda
[KM][€][KM][€]
Amount inc VAT / Iznos sa PDV
Amount excl VAT / Iznos bez PDV
ComponentKomponenta
42Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Sewage extensions – Prijedor subsystem Proširenje kanalizacione mreže – Prijedorski podsistem
Design horizon up to 2030, costs include design and physical contingency (10%)
Vremenski horizont do 2030, cene uključuju projektovanje i rezervu za nepredviđene troškove (10%)
26,963,53013,827,48023,045,73011,818,290TOTAL Sewage extensions –Prijedor sub-system
1,517,840778,3801,297,300665,280Remaining Prijedor secondary network and house connections
996,090510,820851,360436,590Gornja Puharska secondary network and house connections
1,043,520535,140891,900457,380Raskovac secondary network and house connections
806,360413,520689,190353,430Orlovaca secondary network and house connections
474,330243,250405,410207,900Donji Orlovci secondary network and house connections
112,94057,92096,53049,500Donja Puharska secondary network and house connections
1,438,790737,8401,229,730630,630Cejreci secondary network and house connections
996,090510,820851,360436,590Brezicani secondary network and house connections
11,167,9505,727,1509,545,2504,895,000Gomjenica primary, secondary networks and house connections
4,065,6402,084,9403,474,9001,782,000Tukovi secondary network and house connections
926,070474,910791,510405,900Primary collector Donja Puharska / Cejreci
911,010467,190778,640399,300Primary collector along Puharska stream left bank (GornjaPuharska, Gasica naselje)
1,352,710693,7001,156,160592,900Primary collector along Puharska stream right bank
1,154,190591,900986,490505,890Primary collectors from Brezicani to WWTP site
[KM][€][KM][€]
Amount inc VAT Amount excl VAT Component
43Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Conveyance and treatment – Prijedor subsystem Transport i tretman otpadnih voda – Prijedorski podsistem
Design horizon up to 2030, costs include design and physical contingency (10%)
Vremenski horizont do 2030, cene uključuju projektovanje i rezervu za nepredviđene troškove (10%)
17,913,000 9,186,150 15,310,230 7,851,400 TOTAL Conveyance and treatment - Prijedor sub-system / UKUPNO Transport I tretman - Prijedorski podsistem
5,132,010 2,631,800 4,386,330 2,249,400 Prijedor WWTP - upgrade to Phase 2 (62,000 PE total ) / PPOV Prijedor - Faza 2 (ukupno 62,000 ES)
11,015,090 5,648,760 9,414,600 4,828,000 Prijedor WWTP - Phase 1 (51,000 PE) / PPOV Prijedor - Faza 1 (51,000 ES)
180,700 92,670 154,440 79,200 WWTP bypass pipeline to river / Obilazni vod oko PPOV
1,475,680 756,760 1,261,260 646,800 Main collector to WWTP site / Glavni kolektor do PPOV
75,290 38,610 64,350 33,000 Crossing under Puharska stream (dual inverted siphon)/ Prolaz ispod Puharske (sifon)
34,230 17,550 29,250 15,000 Overflow structure upstream of existing main outfall / Prelivna građevina uzvodno od postojećeg ispusta
[KM][€][KM][€]
Amount inc VAT / Iznos sa PDV
Amount excl VAT / Iznos bez PDV
ComponentKomponenta
44Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Sewage extensions – Kozarac subsystemProširenje kanalizacione mreže – Podsistem Kozarac
45Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Costs include design and physical contingency (10%)
Cene uključuju projektovanje i rezervu za nepredviđene troškove (10%)
Sewage extensions – Kozarac subsystemProširenje kanalizacione mreže – Podsistem Kozarac
30,009,51015,389,50025,649,13013,153,400TOTAL Sewage extensions - Kozarac sub-system
1,543,440791,5101,319,180676,500Kozarusa WWTP (2850 PE)
4,594,8602,356,3403,927,2302,013,970Kozarusa primary, secondary networks and house connections
1,392,860714,2901,190,480610,500Trnopolje WWTP (2400 PE)
8,008,3004,106,8206,844,7003,510,100Trnopolje primary, secondary networks and house connections
1,028,960527,670879,450451,000Kamicani WWTP (1500 PE)
5,411,4402,775,1004,625,1602,371,880Kamicani primary, secondary networks and house connections
903,480463,320772,200396,000Kevljani-Petrov Gaj WWTP (2000 PE)
1,310,040671,8201,119,690574,200Kevljani-Petrov Gaj primary, secondary networks and house connections
1,932,440990,9901,651,650847,000Kozarac WWTP (7000 PE)
3,883,6901,991,6403,319,3901,702,250Kozarac primary, secondary networks and house connections
[KM][€][KM][€]
Amount inc VAT Amount excl VAT Component
46Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Sewage extensions – Omarska subsystemProširenje kanalizacione mreže – Podsistem Omarska
47Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Costs include design and physical contingency (10%)
Cene uključuju projektovanje i rezervu za nepredviđene troškove (10%)
Sewage extensions – Omarska subsystemProširenje kanalizacione mreže – Podsistem Omarska
23,161,59011,877,74019,796,24010,151,910TOTAL Sewage extensions –Omarska sub-system
2,384,1701,222,6502,037,7501,045,000Omarska WWTP (7600 PE)
4,208,6902,158,3003,597,1701,844,700Nisevici primary, secondary networks and house connections
3,036,0501,556,9502,594,9201,330,730Donja Lamovita primary, secondary networks and house connections
3,236,8301,659,9102,766,5201,418,730Srednja Lamovita primary, secondary networks and house connections
2,766,8901,418,9202,364,8701,212,750Srednja Omarska primary, secondary networks and house connections
2,679,0601,373,8802,289,7901,174,250Donja Omarska primary, secondary networks and house connections
4,849,9002,487,1304,145,2202,125,750Omarska primary, secondary networks and house connections
[KM][€][KM][€]
Amount inc VAT Amount excl VAT Component
48Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Costs include design and physical contingency (10%)
Cene uključuju projektovanje i rezervu za nepredviđene troškove (10%)
Sewage extensions – Rural systemsProširenje kanalizacione mreže – Ruralni sistemi
9,752,3205,001,2308,335,3204,274,510TOTAL Sewage extensions and treatment - Rural sub-systems
214,580110,040183,40094,050Rakovcani WWTP (300 PE)
282,340144,790241,320123,750Rakovcani sewage network and house connections
185,97095,370158,95081,510Rizvanovici WWTP (300 PE)
244,700125,490209,140107,250Rizvanovici sewage network and house connections
257,500132,050220,080112,860Biscani WWTP (400 PE)
338,810173,750289,580148,500Biscani sewage network and house connections
793,680407,020678,360347,880Hambarine WWTP (1200 PE)
1,082,290555,020925,040474,380Hambarine sewage network and house connections
472,070242,090403,480206,910Carakovo WWTP (600 PE)
621,140318,540530,890272,250Carakovo sewage network and house connections
472,070242,090403,480206,910Zecovi WWTP (600 PE)
621,140318,540530,890272,250Zecovi sewage network and house connections
1,443,050740,0301,233,380632,500Ljubija WWTP (2500 PE)
724,670371,630619,370317,630Ljubija secondary network and house connections
1,998,3101,024,7801,707,960875,880Ljubija primary network
[KM][€][KM][€]
Amount inc VAT Amount excl VAT Component
49Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Proposed wastewater systems (Long term)Predviđeni kanalizacioni sistemi (Dugoročno)
50Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Municipality of Prijedor – Long term strategic WW investment programmeOpština Prijedor – Dugoročni investicioni program za otpadne vode
137,071,60070,293,200117,155,15060,079,510TOTAL Long Term Strategic Investment ProgrammeUKUPNO Dugoročni Strateški Investicioni Program
9,752,3205,001,2308,335,3204,274,510TOTAL Collection and treatment – Rural sub-systemsUKUPNO Prikupljanje i tretman – Ruralni podsistemi
23,161,59011,877,74019,796,24010,151,910TOTAL Collection and treatment - Omarska sub-systemUKUPNO Prikupljanje i tretman – Podsistem Omarska
30,009,51015,389,50025,649,13013,153,400TOTAL Collection and treatment - Kozarac sub-systemUKUPNO Prikupljanje i tretman – Podsistem Kozarac
26,963,53013,827,48023,045,73011,818,290TOTAL Sewage extensions - Prijedor sub-systemUKUPNO Proširenja – Prijedorski podsistem
29,271,65015,011,10025,018,50012,830,000TOTAL Rehabilitation - Prijedor sub-systemUKUPNO Rehabilitacija – Prijedorski podsistem
17,913,0009,186,15015,310,2307,851,400TOTAL Conveyance and treatment – Prijedor sub-systemUKUPNO Glavni kolektor i tretman – Prijedorski podsistem
[KM][€][KM][€]
Amount inc VAT / Iznos sa PDV
Amount excl VAT / Iznos bez PDV
ComponentKomponenta
Costs include design and physical contingency (10%)
Cene uključuju projektovanje i rezervu za nepredviđene troškove (10%)
51Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Wastewater - Priority Investment Programme (EIB project) Otpadne vode - Prioritetni Investicioni Program (Projekat EIB)
52Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Wastewater - Priority Investment Programme Otpadne vode - Prioritetni Investicioni Program
8,301,8207,095,570Total Investments - Minimum Case Ukupne Investicije – Minimalni Slučaj
4,116,4603,518,340Tukovi - secondary network and house connections (Phase 2)Tukovi – sekundarna mreža i kućni priključci (Faza 2)
1,814,7251,551,050Conveyance system to Prijedor WWTP (overflow, main collector, bypass pipeline)Transportni sistem do PPOV Prijedor (preliv, glavni kolektor, obilazni vod)
Minimum Case for Financial Appraisal (from approved Project Fiche)Minimalni Slučaj za Finansijsku Ocjenu (po odobrenom Projektnom Fišeu)
KM exc VATKM bez PDV-a
KM inc VATKM sa PDV-om
Gomjenica - wastewater network (Phase 1)Gomjenica – kanalizacija (Faza 1)
3,577,230 4,185,360
Total for Minimum Case Ukupno za Minimalni Slučaj 7,095,570 8,301,820
Base Case for Financial Appraisal (from approved Project Fiche)Osnovni Slučaj za Finansijsku Ocjenu (po odobrenom Projektnom Fišeu)
KM exc VATKM bez PDV-a
KM inc VATKM sa PDV-om
Kozarac primary and secondary sewage and stormwater networksKozarac – primarna i sekundarna fekalna kanalizacija, kišna kanalizacija 3,422,135 4,003,900
Omarska and Donja Omarska - primary and secondary sewage and stormwater networksOmarska i Donja Omarska – primarna i sekundarna fekalna kanalizacija, kišna kanalizacija 7,674,000 8,978,580
Total for Base Case Ukupno za Osnovni Slučaj 18,191,705 21,284,300
High Case for Financial AppraisalViši Slučaj za Finansijsku Ocjenu
KM exc VATKM bez PDV-a
KM inc VATKM sa PDV-om
Total Investments – Minimum and Base CasesUkupne Investicije – Osnovni Slučaj 18,191,705 21,284,300
Prijedor WWTP (Phase 1 = 51000 PE)PPOV Prijedor (Faza 1 = 51000 ES) 9,845,360 11,519,075
Total for High Case Ukupno za Viši Slučaj 29,588,115 34,618,095
53Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Summary of Priority Investment Programme for Financial AppraisalPregled razvojnih opcija za finansijsku ocjenu
38,754,16033,123,205Total Investments (water and wastewater) - Base Case Ukupne Investicije (vodovod i kanalizacija) – Osnovni Slučaj
17,166,68014,672,370Total Investments (water and wastewater) - Minimum Case Ukupne Investicije (vodovod i kanalizacija) – Minimalni Slučaj
8,605,0007,354,700Investments - Water supplyInvesticije – Vodosnabdevanje
8,864,8607,576,800Investments - Water supplyInvesticije – Vodosnabdevanje
Minimum Case for Financial Appraisal (from approved Project Fiche)Minimalni Slučaj za Finansijsku Ocjenu (po odobrenom Projektnom Fišeu)
KM exc VATKM bez PDV-a
KM inc VATKM sa PDV-om
Investments - WastewaterInvesticije – Otpadne vode
7,095,570 8,301,820
Total for Minimum Case Ukupno za Minimalni Slučaj 14,672,370 17,166,680
Base Case for Financial Appraisal (from approved Project Fiche)Osnovni Slučaj za Finansijsku Ocjenu (po odobrenom Projektnom Fišeu)
KM exc VATKM bez PDV-a
KM inc VATKM sa PDV-om
Investments - WastewaterInvesticije – Otpadne vode 11,096,135 12,982,480
Total for Base Case Ukupno za Osnovni Slučaj 33,123,205 38,754,160
High Case for Financial AppraisalViši Slučaj za Finansijsku Ocjenu
KM exc VATKM bez PDV-a
KM inc VATKM sa PDV-om
Investments - Water supplyInvesticije – Vodosnabdevanje 0 0
Investments - WastewaterInvesticije – Otpadne vode 11,396,410 13,333,800
Total for High Case Ukupno za Viši Slučaj 44,519,615 52,087,960Total costs include escalation throughout implementation period (2013-2016)Ukupne cene korigovane za inflaciju tokom perioda implementacije (2013-2016)
Cases used in financial appraisalRazvojne opcije korišćene za finansijsku ocjenu
54Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
EnvironmentalZaštita životne sredine
Findings and recommendations in respect to proposed development project
Nalazi i preporuke predloženog razvojnog projekta
Karina ZachodniSenior Environmentalist – WYG-IPF1
Ekspert za zaštitu životne sredine – WYG-IPF1
55Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Environmental Considerations –Pitanja životne sredine
Environmental review – contentLegal ReviewWater quality, healthWastewaterWWTP locationWater
•Impact of developments:•Benefits &• Summary Impact Assessment
Pregled životne sredine - sadržajPravni aspektiKvalitet vode i zdravljeZagađenje otpadnim vodamaAlternativne lokacije za PPOVKoristi i uticaj razvojaKratka procjena uticaja Vode
56Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Existing legislativeEnvironment protection (EU Directive 85/337/EEC)Water (WFD)Nature (92/45/EEC and 79/409/EEC)Waste (WFD 2006/12/EC)Spatial PlanningCultural heritage
Drinking waterDischarges to surface watersDischarges to sewageWasteSewage sludge disposal
Postojeća regulativaZaštita životne sredine (Direktiva EU 85/337/EEC)Voda (ODV)Priroda (92/45/EEC i 79/409/EEC)Otpad (WFD 2006/12/EC)Prostorno uređenjeKulturno naslijeđe
Voda za pićeIspuštanje u površinske vodeIspuštanje u kanalizacijuOtpadOdlaganje kanalizacionog mulja
Key differences – Osnovne razlike
57Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
EIA - PUŽS
Environmental Impact Assessment in Law on Protection of Environment (OGRS, no. 53/02)EIA contents (OGRS, 118/05), projects with obligatory EIA, criteria for obligation and scope of EIA (OGRS, 07/06)
Procedure (up to 285 days):ScreeningDeciding on need for EIAScope and contents of EIA studyPublic discussionRevision of EIA studyDecision on request for EIA consent
• Procjena uticaja na životnu sredinu u Zakonu o zaštiti životne sredine (SGRS; br, 53/02)
• Sadržaj PUŽS (SGRS, 118/05), projekti za koje se sprovodi PUŽS, obaveza sprovođenja i obim PUŽS (SGRS, 07/06)
• Procedura (do 285 dana):– Prethodna PUŽS– Odluka o potrebi za PUŽS– Sadržaj studije o PUŽS– Javna rasprava– Revizija studije o PUŽS– Odobravanje PUŽS
58Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Pre-treatment of Industrial WW –Predtretman industrijskih otpadnih voda
59Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Local level – Lokalni nivo
The Decision on Water Supply and Sewage (OG no. 05/07)Decision on Approval of Draft Version of Programme for Sanitary Protection of Water (OG no. 05/05) ) Decision on Approval of Final Version of Programme for Sanitary Protection of Water (OG no. 01/06)Decision on Protection of Water Intakes Matarusko polje –Tukovi, Matarusko polje II and Prijedorcanka (OG no. 09/06)Decision on Rural Public Drinking Water Supply Structures (OG no. 01/04)
60Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Wastewater Producers -Proizvođači
otpadnih voda
Septic Tanks– Septičke
jame
Wastewater collection system –
Sistem za prikupljanje
otpadnih voda
Sana River and Streams – Rijeka Sana i pritokeGroundwater – podzemne vode
Downstream Users
- Nizvodni korisnici
polluted infiltration – zagađenje infiltracijom
untreated wastewater / solids / sludgenetretirane otpadne vode / čvrste materije / mulj
Existing Situation – Postojeće stanje
61Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Sana River Water Quality Kvalitet vode reke Sane
0.001
0.01
0.1
1
10
100
1000
10000
100000
10000000.00
1
0.01 0.1 1 10 100
1000
1000
0
1000
00
1000
000
Value at Nov
i Grad
Value at Prijedor
Ukupni fosfor
Ortofosfati
NO2‐N
Kadmijum
Uk.br. koliformnih fekalnih bakterija
Uk. br. koliformnih bakterija
Uk. br. fekalnih streptokoka
Uk. br. aerobnih organotrofa 26oC
Uk. br. aerobnih organotrofa 36 oC
No change
Novi Grad = Prijedor x 2
Novi Grad = Prijedor x 5
Novi Grad = Prijedor x 20
62Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Water Quality and Flooding Kvalitet vode i poplave
Town supplied with chlorinated groundwaterNormally good qualityRising trend of failed samples as a percentage of the total taken for both raw water and, to a lesser degree, treated waterFlooding also a construction risk
Snabdjevanje hlorisanom vodom Pretežno dobar kvalitet vodePovećan stepen neadekvatnih uzoraka za sirovu vode, i manjim delom za tretiranu voduPoplave predstavljaju rizik za izgradnju
0%
2%
4%
6%
8%
10%
Jul‐10 Aug‐10 Oct‐10 Dec‐10 Mar‐11 May‐11 Jul‐11 Sep‐11 Nov‐11 Jan‐12 Mar‐12 May‐12 Jul‐12
Cumulative % of all sam
ples failing
Failed Raw Water Samples by Supply System
% Raw (failed)
% Ljubija – Hambarine subsystem (failed)
% Urban subsystem (failed)
0%
5%
10%
15%
20%
25%
Jul‐10 Aug‐10 Oct‐10 Dec‐10 Mar‐11 May‐11 Jul‐11 Sep‐11 Nov‐11 Jan‐12 Mar‐12 May‐12 Jul‐12
Cumulative
% of all Sam
ples Failing
Failed Treated Water Samples by Distribution System
% Treated (failed)
% Donja Dragotinja (failed)
% Kozarac – Kamicani subsystem (failed)
% Ljubija – Hambarine subsystem (failed)
% Urban subsystem (failed)
63Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Wastewater - Otpadne vode
Only 34 % of municipality is sewered, 62% of urban populationPercolating septic tanks in useDischarges to Sana riverTreatment –none
Oko 34% opštinskog stanovništvaspojeno na kanalizaciju, 62% gradskogPropusne septičke jameIspusti u Sanu i pritokeTretman ne postoji
Municipality of Teslic
64Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Tomasica Lake and CatchmentTomašička jezera
Alluvial deposits
Fish ponds
Leisure Complex
Residential
development
65Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
20 km from Tomasica to Prijedor20km of Tomašica do Prijedora
Pipeline will cross river and multiple streams
Cevovod prelazi reku i potoke
66Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
WWTP Site 1 Too Close to HousesLokacija 1 – blizu kuća
67Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
No houses within 500m radius of WWTP 2Nema kuća do 500m od PPOV lokacije 2
68Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Proposed WWTP Touches Protection ZoneLokacija na samoj granici šire zone zaštite
69Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Benefits of the Project - Koristi projekta
More reliable drinking water supplyRemoves groundwater pollution riskRemoves wastewater discharges to surface waterReduces health risks
Poboljšani nivo i pouzdanost vodosnabdevanjaZaštita vrednih vodnih resursa odzagadjivanjaPoboljšanje kvaliteta povrsinskih vodaSmanjenje rizika po zdravljestanovništva
70Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Summary of impacts – PIP -Kratak pregled uticaja projekta
Summary of impacts – PIP - Kratak pregled uticaja projekta
PIP components C O C O C O
Prijedor WWTPTreatment Capacity (pe) 0 0 51,000 ‐‐ ++ Gravity sewers (m)Tukovi secondary network and house connections (Phase 2) 19200
‐‐ ++ 19200
‐‐ ++ 19200
‐‐ ++
Gomjenica primary network (Phase 1) 13500 ‐‐ ++ 13500 ‐‐ ++ 13500 ‐‐ ++ Kozarac primary and secondary sewage and stormwater networks N 1800 1800
‐‐ ++
Omarska primary and secondary sewage and stormwater networks (Omarska and Donja Omarska) N
‐‐ ++ 17650
‐‐ ++ 17650
‐‐ ++
Conveyance system to Prijedor WWTP (overflow, main collector, bypass N N 2800.0 ‐‐
Sewage pumping Gomjenica pumping station (l/s) 25 ‐‐ ++ 25 ‐‐ ++ 25 ‐‐ ++
Water supply investmentsNetwork extensions (m) 61200 ‐‐ ++ 61200 ‐‐ ++ 61200 ‐‐ ++ Crno Vrelo water supply project ‐ primary network in settlements 61200
‐‐ ++ 61200
‐‐ ++ 61200
‐‐ ++
Tomasica Lakes water supply project (new source, primary and secondary networks) N 86800
‐‐ ++ 86800
‐‐ ++
Network rehabilitation (replacement of existing pipes)Rehabilitation of Prijedor central water supply system 0 0 0
Sludge DisposalTo landfill or N N Y ‐‐ ‐‐Non‐agricultural use of sludge for soil conditioning and fertilisation N N
Y ‐‐ +++
HighMinimum Base
71Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Conclusions - ZaključciSignificant beneficial impact No potential risks to public healthGood design and construction practice = no unacceptable environmental impact
Koristan učinak je znacajanBez projekta = veliki nepovoljni uticaji na zdravlje ljudiDobro projektovanje i izvođenje – nema neprihvatljiv ekološki utjecaj
72Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Best Practicable Environmental Option – integrated evaluation of sludge treatment and use / disposal optionsPriority is to identify sludge outlets that:
Recycle nutrients and organic matter on land (agriculture, forestry, land reclamation)Recover energy (incineration, co-combustion)
Landfill disposal is the option of last resort
Sludge Management Strategic ApproachStrateški pristup upravljanju muljem
Najbolja izvodljiva ekološka opcija – integrisana evaluacija opcija za tretman mulja i njegovo korišćenje/odlaganjePriorit predstavlja identifikovanje upotrebe mulja kojom se postiže:
Recikliranje nutrienata I organskih materija na zemljištu(poljoprivreda, šumarstvo, obnavljanje zemljišta)Obnavljanje energije (spaljivanje, koinsineracija)
Odlaganje na deponiju je najmanje poželjna opcija
73Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Sludge production at WWTP design capacity: 1080 t ds/y135 ha/y required (at 8 t ds/ha)2.5% of actually cultivated landMost farms too small for sludge spreading to be practicable19 farms have 644 haMarketing programme crucialStorage necessary (6 months)
Sludge Use in AgricultureUpotreba mulja u poljoprivredi
Proizvodnja mulja pri projektovanom kapacitetu PPOV: 1080 t SM/godPotrebno je 135 ha/god (za 8t SM/ha)2,5% realno obradivog zemljištaVećina farmi je previše mala da bi upotreba mulja bila prakticna19 farmi ima 644 haMarketinški program je od suštinske važnostiPotrebno je skladište mulja (6 mjeseci)
74Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Large and long-term potential at Omarska mine250 ha currently planned to be rehabilitatedPotential demand 12,700 t ds10 years of sludge productionLong-term storage on mineOther periodic opportunities
Sludge Use in Land ReclamationUpotreba mulja u obnovi zemljišta
Značajan i dugoročni potencijal narudniku OmarskaTrenutno se planira da 250 ha budesaniranoPotencijalna potražnja je12.700 t SM10 godina proizvodnje muljaDugoročno skladištenje u rudnikuDruge periodične prilike
75Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Regional sanitary landfill ‘Stara Pruga’ Kurevo10 year waste capacityGate fee (currently only 5 KM/t)Composting facility may be installed in the futureDisposal of sludge only if no other option available
Sludge DisposalOdlaganje mulja
Regionalna sanitarna deponija “Stara Pruga' KurevoKapacitet za odlaganje otpada je 10 godinaNaknada za odlaganje otpada (trenutno samo 5 KM/t)Objekat za kompostiranje se može instalirati u budućnostiOdlaganje mulja samo ako nijedna druga opcija nije dostupna
76Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
ForestrySmall area afforested annuallyNo potential for sludge use
Energy recoveryPossible future potential Cement factory (proposed)Toplana (biomass project)
Other Options for Sludge UseUpotreba mulja za obnavljanje energije
ŠumarstvoGodišnje se pošumi mala površinaNema potencijala za upotrebu muljaDobijanje energije
Mogući budući potencijalCementara (predlozena)Toplana (projekat biomase)
77Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Evaluation of Sludge Outlets in PrijedorOpcije za upotrebu/odlaganje mulja u Prijedoru
Outlet Opcija
Practicability Prakticnost
Capacity Kapacitet
Overall Feasibility Ukupna izvodljivost
Sludge Quality Kvalitet mulja
Agriculture Poljoprivreda
High Visoka
Large Visok
High Visoka
Stabilised, cake Stabilizovan, kolac
Land reclamation Obnavljanje zemljista
High Visoka
Large Visok
High Visoka
Stabilised, cake Stabilizovan, kolac
Forestry Sumarstvo
Low Niska
Small Male
Low Niska
Stabilised, dry Stabilizovan, suv
Energy recovery Obnovljiva energija
Nil - currently Nula – trenutno
Nil Nula
Nil Nula
- -
High – future Visoka - buducnost
Large Visok
High Visoka
Cake or dry Kolac ili suv
Landfill Deponija
High Visoka
Large Visok
High Visoka
Stabilised, >35% ds Stabilizovan, >35% SU
78Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Maximise use of sludge in land rehabilitation by long-term agreement with ArcelorMittalMarket sludge to large farms and secure agreementEstablish local guidelines on sludge use as no national law yetMinimise disposal to landfill
Priorities for Sludge Strategy DevelopmentPrioriteti za razvoj strategije za mulj
Maksimalno korišćenje mulja u obnovi zemljišta kroz dugoročnisporazum sa ArcelorMittal-omUvesti mulj na tržište za velike farme i obezbijediti sporazumUspostaviti lokalne smjernice o korišćenju mulja jer još uvijek ne postoji nacionalni zakon Minimalno odlaganje na deponiju
79Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Financial AppraisalFinansijska Ocena
Results of Financial Appraisal in respect to proposed development project
Rezultati finansijske ocene predloženog razvojnog projekta
Sohail HassanEnvironment Sector Expert – WYG-IPF1
Ključni ekspert za zaštitu životne okoline – WYG-IPF1
Vladimir SurlaSenior Financial Analyst – WYG-IPF1
Finansijski analitičar – WYG-IPF1
80Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Operating financial resultOperativni finansijski rezultat
• In order to assess operating profitability of the company, bad debt costs have been estimated as difference between reported revenues and collected related amounts.•Kako bi utvrdili operativnu profitabilnost kompanije, izvršena je procena troškova rezervisanja na potraživanjima kao razlika između generisanih prihoda i odgovarajućih uporedivih iznosa naplate.
•It can be concluded that adjusted annual operating loss of the company is currently around KM 300-400 thousand. This is the additional amount needed in order for Vodovod to be able to cover all of its operating costs.•Može se zaključiti da korigovani operativni gubitak kompanije trenutno iznosi između KM 300-400 hiljada na godišnjem nivou. To predstavlja neophodan dodatni iznos sredstava kako bi Vodovod bio u mogućnosti da pokrije sve svoje tekuće operativne troškove.
•Vodovod is not able to finance significant CAPEX, while these activities are financed primarily by Municipality. •Vodovod nije u mogućnosti da finansira značajnija kapitalna ulaganja, pri čemu se finansiranje ovih aktivnosti vrši pre svega od strane Grada.
-700,000
-200,000
300,000
800,000
1,300,000
1,800,000
2,300,000
2,800,000
3,300,000
2009 2010 2011 1H2011 1H2012
Operating revenues after estimated bad debt costs Operating costs Adjusted operating lossOperativni prihodi nakon procenjenih troškova rezervisanja Operativni troškovi Korigovani operativni gubitak
81Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Operating prihodiOperativni prihodi
• Main operating revenues are generated through water-supply activities, which account for around 81% of total operating revenues. Wastewater segment generates only around 13% of operating revenues, due to lower tariffs and lower number of customers.•Ključni operativni prihodi se generišu od vodosnabdevanja koje predstavlja 81% ukupnih operativnih prihoda. Usluge kanalizacije generišu svega 13% operativnih prihoda, usled nižih cena i manjeg broja potrošača.
•Increase in operating revenues in 2011 and 1H2012 are mainly caused by increase in tariffs, and also by extension of water-supply network which increased number of customers.•Povećanje operativnih prihoda u 2011 i prvoj polovini 2012 godine je uglavnom uzrokovano povećanjem cena, kao i proširenjem sistema vodosnabdevanja što je dovelo do povećanja broja potrošača.
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
3,500,000
2009 2010 2011 1H2011 1H2012Other operating revenues Waste water services Water servicesOstali operativni prihodi Usluge kanalizacije Usluge vodosnabdevanja
82Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Present Tariff LevelsTrenutni tarifni nivo
WaterVoda
WastewaterOtpadne vode
CombinedKombinovano
From Jul 2011 in KM/m3
Od Jula 2011 u KM/m3
DomesticDomaćinstva
0.88 0.21 1.09
CommercialPrivreda
2.20 0.55 2.75
InstitutionalBudžetski potrošači
1.52 0.49 2.01
• Based on 2011 data, additional overall tariff increase of 20% would enable Vodovod to cover all current operating costs of the company. This is assuming all other things remain equal, including collection rate of 83%.•Na osnovu podataka iz 2011 godine, dodatno povećanje cena od 20% bi omogućilo Vodovodu da pokrije sve tekuće operativne troškove, pod pretpostavkom da svi ostali parametri ostanu nepromenjeni, uključujući stopu naplate od oko 83%.
•Future tariff levels should be used to cover OPEX, as well as to finance CAPEX maintenance and urgently needed investments in water and wastewater services.•Budući nivoi cena treba da se koriste za pokrivanje operativnih troškova, održavanje osnovnih sredstava, kao i za finansiranje hitno potrebnih investicija u oblasti vodosnabdevanja i otpadnih voda.
83Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Operating costsOperativni rashodi
• Main company expenses are wages which represent around 63% of total operating costs. •Glavni trošak kompanije su zarade zaposlenih koje predstavljaju 63% ukupnih operativnih troškova.
•Net wages remained practically the same in past three years, while increase in total wages expense is due to increase in related taxes and contributions. •Neto zarade se praktično nisu menjale u zadnje tri godine, dok je porast ukupnih troškova zarada uzrokovan porastom poreza i doprinosa.•Material costs are also significant company expense and represent 22% of total operating costs. This is mainly caused by high electricity costs since water is pumped into the network.•Troškovi materijala su takođe značajni i predstavljaju 22% ukupnih operativnih troškova. Ovo je pre svega usled visokih troškova električne energije koji nastaju pumpanjem vode u distributivnu mrežu.
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
3,500,000
2009 2010 2011 6m2011 6m2012Other OPEX Depreciation Wages Material costs
Ostali operativni troškovi Amortizacija Zarade Troškovi materijala
84Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
ObavezeLiabilities
• Inability to cover total operating costs leads to constant increase in liabilities of the company. Vodovod is not settling electricity bills in adequate manner which is the main reason for overall increase in liabilities.• Nemogućnost pokrivanja ukupnih operativnih troškova rezultira u konstantnom povećanju obaveza. Vodovod ne izmiruje adekvatno svoje obaveze po računima za struju što je osnovni razlog ukupnog povećanja obaveza.
•Key risk of the company is accumulated liabilities for electricity bills in total amount of KM 8.9 million. Vodovod and Municipality should immediately explore any possibilities for settling these liabilities in satisfactory manner or arranging repayment schedule.•Ključni rizik za kompaniju predstavljaju nagomilane obaveze za električnu energiju u ukupnom iznosu od KM 8.9 miliona. Vodovod i Grad bi trebalo da odmah istraže sve mogućnosti za regulisanje i/ili reprogramiranje ovihobaveza na zadovoljavajući način.•Other long-term liabilities represent debt for wages related taxes and contributions accumulated prior to 2007. Vodovod agreed with Tax Authorities to repay this debt over next 15 years, starting from 2013.•Ostale dugoročne obaveze predstavljaju dug za poreze i doprinose na zarade akumuliran u periodu pre 2007. Vodovod je sa Poreskom Upravom ugovorio otplatu ovog duga u narednih 15 godina počevši od 2013 godine.
-
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
2009 2010 2011 1H2012
Other long-term liabilities Wages liabilities Taxes and fees Financial liabilities Accounts payableOstale dugoročne obaveze Obaveze za zarade Porezi i naknade Finansijske obaveze Dobavljači
85Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Municipality borrowing capacityMogućnost zaduživanja Grada
000 KM 2010 2011 2012
Current revenues from the previous year
Redovni prihodi iz prethodne godine
23,212 24,591 28,668
Debt service
Servisiranje duga1,945 2,644 N/A
Debt service as % of current revenues
Servisiranje duga kao % odredovnih prihoda
8.4% 10.8% N/A
Max allowed debt service (18% of current revenues)
Max za servisiranje duga (18% od redovnih prihoda)
4,178 4,426 5,160
Max capacity for additional debt service
Max kapacitet za dodatno servisiranje duga
2,232 1,782 N/A
Municipality is servicing all of its financial liabilities in timely manner,
and has no overdue liabilities.Grad servisira sve svoje finansijske obaveze na vreme, i nema dospelih
neplaćenih finansijskih obaveza.
Municipality has low level of debt and significant capacity for raising
additional financial loans.Grad ima nizak nivo zaduženosti i
značajan kapacitet za dodatno finansijsko zaduživanje.
In 2011, debt service represented10.8% of current revenues generated
in the previous year, which is significantly below legally allowed
amount of 18%.U 2011, servisiranje duga je
predstavljalo svega 10.8% redovnihprihoda iz prethodne godine, što je daleko ispod zakonski dozvoljenog
iznosa od 18%.
86Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Municipality borrowing capacityMogućnost zaduživanja Grada
• If potential EIB loan in the amount of KM 15.75 million is included, debt service would be highest in 2021 when it would represent 11.2% of current revenues generated in 2011.• Uključujući potencijalni EIB kredit od KM 15.75 miliona, servisiranje duga bi bilo najviše u 2021 godini kada bi iznosilo 11.2% redovnih prihoda iz 2011 godine.
• Municipality originally estimated that EIB loan for the project would be KM 15.75 million. However, Municipality has significant capacity for raising additional debt above that level, and there would be no legal constraints if final financing structure includes higher EIB loan then initially estimated. Maximum borrowing capacity, assuming EIB loan terms, is KM 34 million.• Prvobitna procena Grada je bila da će za ovaj projekat biti potreban EIB kredit u iznosu od KM 15.75 miliona. Međutim, Grad poseduje značajan kapacitet za dodatno zaduživanje iznad tog nivoa, tako da neće biti zakonskih prepreka ukoliko konačna finansijska struktura bude uključivala veći iznos EIB kredita nego što je prvobitno procenjeno. Maksimalni zakonski kapacitet zaduživanja Grada, pretpostavljajući uslove kreditiranja EIB-a, iznosi KM 34 miliona.
Debt service schedule in KM – Raspored otplate duga u KM
-
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025Potential EIB loan Nova BL bank UniCredit bank NLB bank
Potencijalni EIB kredit Investiciono-Razvojna Banka RS Hypo bankaPotencijalni EIB kredit Nova BL banka UniCredit banka NLB banka
18% of current revenues in 2011 - 18% redovnih prihoda u 2011
87Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Alternative Development OptionsAlternativne opcije razvoja
• Investment Costs:
• Prices including VAT and local inflation
Min Base High
KM 000 KM 000 KM 000
17,167 38,754 52,088
• Financing Plan:
Min Base High
Loan 50% 50% 50%
Equity Contribution 50% 50% 50%
• Good prospects for grant contributions
• Investicioni troškovi:
• Cijene uključuju PDV i lokalnu inflaciju
Min Osnovni Max
KM 000 KM 000 KM 000
17,167 38,754 52,088
• Finansijski plan:
Min Osnovni Max
Kredit 50% 50% 50%
Doprinos korisnika 50% 50% 50%
• Dobri izgledi za doprinose u vidu donacija
88Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Assumed Terms and Conditions of EIB LoanPretpostavljeni uslovi kredita od EIB
Assumed conditions• 25 Loan maturity period• 8 years grace period• 4.5% fixed interest rate
Min Case: Loan 8.583 KM mEquity Contribution 8.583 KM m
Base Case: Loan 19.377 KM mEquity Contribution 19.377 KM m
High Case: Loan 26.044 KM mEquity Contribution 26.044 KM m
• Met from Vodovod Revenues• Debt Service Coverage Ratio of over
1.2
Pretpostavljeni uslovi• period dospijeća zajma 25 godina• grejs period 8 godina • fiksna kamatna stopa od 4.5%
Minim. projekat: Kredit 8.583 KM mDoprinos korisnika 8.583 KM m
Osnovni projekat:Kredit 19.377 KM mDoprinos korisnika 19.377 KM m
Maksim. Projekat:Kredit 26.044 KM mDoprinos korisnika 26.044 KM m
• Pokrivaju se iz prihoda Vodovoda • Koeficijent pokrivenosti servisiranja duga
preko 1.2
89Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Debt Service Implications for VodovodImplikacije servisiranja duga po Vodovod
Annual Repayments in KM
Min Case - Max 891,152 in 2020
Base Case - Max 2,011,796 in 2020
High Case - Max 2,703,977 in 2020
Godišnje servisiranje kredita u KM
Minimalni projekat - Max 891,152 u 2020
Osnovni projekat - Max 2,011,796 u 2020
Max projekat - Max 2,703,977 u 2020
‐100,000 200,000 300,000 400,000 500,000 600,000 700,000 800,000 900,000
1,000,000
Loan repayment Interest Total financial fees
Min Case ‐Minimalni projekat
‐
500,000
1,000,000
1,500,000
2,000,000
2,500,000
Loan repayment Interest Total financial fees
Base Case ‐ Osnovni projekat
90Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Summary of Financial Projections for Vodovod – Base CasePrikaz finansijskih projekcija za Vodovod – Osnovni slučaj
-500,000
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
Operating cash Total including fees, interest and principal
Discretionary Capex Cash after Discretionary Capex
91Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Future Tariff LevelsBudući tarifni nivoi
92Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Financial Internal Rate of Return (FIRR) – Base CaseFinansijska interna stopa povraćaja – Osnovni slučaj
Calculation criteriaIncremental investments and
operating costs
• Water supply investments
• Waste water investments
Incremental revenues
• Based on projected tariffsand volumes for water supply and wastewater
Results of the analysis
• FIRR: -1%
• Benefit costs ratio: 0.55
• Financing gap: 45%
Kriterijumi kalkulacijeInkrementalni investicioni i operativni
troškovi
• Investicije u vodosnabdevanje
• Investicije u otpadne vode
Inkrementalni prihodi
• Bazirano na projektovanim tarifama i količinama za vodosnabdevanje i otpadne vode
Rezultati analize
• FIRR: -1%
• Racio koristi/troškovi: 0.55
• Manjak finansiranja: 45%
93Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Economic Internal Rate of Return (EIRR) – Base CaseEkonomska interna stopa povraćaja – Osnovni slučaj
Incremental project costs:• Water supply and wastewater
investment costs
• Water supply and wastewater incremental operating costs
• Cost of removal of septic tanks
Incremental project benefits:• Secured water supply services
• Health benefits
• Increased development potential
• Resource cost saving
Results of the analysis:
• EIRR: 7%
• Benefit costs ratio: 1.15
Inkrementalni troškovi projekta:
• Investicije u vodosnabdevanje i otpadne vode
• Inkrementalni operativni troškovi vodosnabdevanja i otpadnih voda
• Troškovi uklanjanja septičkih jama
Inkrementalne koristi projekta:
• Pouzdano vodosnabdevanje
• Zdravstvene koristi
• Povećanje razvojnog potencijala
• Ušteda troškova resursa
Rezultati analize:
• EIRR: 7%
• Racio koristi/troškovi: 1.15
94Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Affordability for HouseholdsPriuštivost za domaćinstva
• Affordability Criteria – 3% to 4% of average household income for water and sewerage
• Current tariffs - account for about 1.5% of average household income
• Projected tariffs:
• Base Case would be 2.0% of household income in 2015
• Reducing to 1.6% of household income in 2025
• Kriterijum priuštivosti – 3% do 4% prosečnih prihoda domaćinstava za vodu i kanalizaciju
• Trenutne tarife – iznose oko 1.5% prosečnih prihoda domaćinstava
• Predviđene tarife:
• Osnovni projekat - 2.0% od prihoda domaćinstava u 2015. godini
• Smanjenje na 1.6% od prihoda domaćinstava u 2025. godini
95Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Financial Analysis – Key Findings and Issues Finansijska analiza – Ključni zaključci i pitanja
• Real and inflation linked tariff increases are needed and services remain affordable
• Vodovod is financially sustainable, meeting all debt financing needs and operating costs
• Funding issues – availability of local and international finance
• Potrebna su određena realna povećanja tarifa (iznad stope inflacije) ali da pri tome usluge ostanu priuštive
• Vodovod je finansijski održiv, ispunjava sve obaveze otplaćivanja duga i pokriva operativne troškove
• Sporna pitanja finansiranja – dostupnost investicija na lokalnom i međunarodnom nivou
96Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Indicative implementation plan – Base CaseIndikativni plan implementacije – Osnovni Slučaj
97Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Indicative implementation plan – Base CaseIndikativni plan implementacije – Osnovni Slučaj
98Municipality of PrijedorInfrastructure Projects Facility in the Western Balkans – Implemented by WYG
Thank you for your attention!Hvala na pažnji!