Activity ID Activity Name Original Duration Start Finish Performance % Complete Total Float MULTI STORE CAR PARK BUILDING, EXTERNAL W 1032.38 30-Jun-14 A 23-Nov-17 8.42% -99.63 Key Access Date 1032.38 30-Jun-14 A 23-Nov-17 8.42% -99.63 MIP2-6-1000 LOA 0.00 30-Jun-14 A 100% MIP2-6-1010 Notice to Proceed 5.00 30-Jun-14 A 24-Jul-14 A 100% MIP2-6-1020 TNB Substation (Month 42) 0.00 06-Oct-15* 0% -79.38 MIP2-6-1030 System Equipment Room Ready (Month 46) 0.00 03-Mar-16* 0% -99.69 MIP2-6-1040 Practical Completion (Month 54) 0.00 28-Oct-16* 0% -99.63 Care of Work 329.00 29-Oct-16 23-Nov-17 0% -99.63 MIP2-6-20050 Care of Work 329.00 29-Oct-16 23-Nov-17 0% -99.63 TENDER DESIGN 706.63 30-Jun-14 A 27-Oct-16 35.56% -99.63 PRELIMINARY, CONTRACTUAL DELIVERABLES 619.75 30-Jun-14 A 01-Jul-16 37.5% -2.25 MIP2-6-1050 Insurance 24.00 30-Jun-14 A 03-Sep-14 A 100% MIP2-6-1060 CIDB 27.00 25-Jul-14 A 03-Oct-14 A 100% MIP2-6-1070 Construction Drawing from PDP 1.00 25-Jul-14 A 25-Jul-14 A 100% MIP2-6-1080 Development Order from PDP 1.00 25-Jul-14 A 25-Jul-14 A 100% MIP2-6-1180 Performance Bond 24.00 28-Jul-14 A 30-Jul-14 A 100% MIP2-6-1090 DBKL DO Approval 3.00 17-Sep-14 A 03-Oct-14 A 100% MIP2-6-1170 Accommodation and Buildings 520.00 23-Sep-14 A 23-Jun-16 19.62% -4.72 MIP2-6-1171 Services 520.00 23-Sep-14 A 23-Jun-16 19.62% -4.72 MIP2-6-1172 Plant & Tools Equipment 520.00 23-Sep-14 A 23-Jun-16 19.62% -4.72 MIP2-6-1173 Temporary Works 520.00 23-Sep-14 A 23-Jun-16 19.62% -4.72 MIP2-6-1110 Install Site Hoarding 6.00 03-Oct-14 A 09-Feb-15 30% -11.37 MIP2-6-1120 Site, Safety and Security Screening Office 520.00 03-Oct-14 A 01-Jul-16 19.15% -11.37 MIP2-6-1130 Install Project Signboard 3.00 03-Oct-14 A 07-Oct-14 A 100% MIP2-6-1150 Temporary Earth Drain 6.00 04-Nov-14 A 09-Feb-15 30% -97.89 MIP2-6-1100 SO Confirmation of Work 1.00 05-Nov-14 A 06-Nov-14 A 100% MIP2-6-1140 Silt Trap 6.00 04-Feb-15* 09-Feb-15 0% -97.89 MIP2-6-1160 Wash Trough 6.00 04-Feb-15 10-Feb-15 0% -99.69 Satellite Office 83.00 25-Jul-14 A 05-Nov-14 A 100% MIP2-6-1190 Renovation 56.00 25-Jul-14 A 01-Oct-14 A 100% MIP2-6-1200 Furniture 13.00 01-Oct-14 A 17-Oct-14 A 100% MIP2-6-1210 Equipment 13.00 18-Oct-14 A 05-Nov-14 A 100% Traffic Management Plan (TMP) 532.75 26-Jul-14 A 03-May-16 40% 36.88 MIP2-6-1220 Report 56.00 26-Jul-14 A 18-Oct-14 A 100% MIP2-6-1230 1st Stage 1.00 23-Dec-14 A 24-Dec-14 A 100% MIP2-6-1240 2nd Stage 1.00 15-Apr-15 16-Apr-15 0% 240.25 MIP2-6-1250 3rd Stage 1.00 27-Jan-16 28-Jan-16 0% 5.88 MIP2-6-1260 4th Stage 1.00 30-Apr-16 03-May-16 0% 36.88 Safety & Health Plan (SHP) 127.75 26-Jul-14 A 27-Dec-14 A 100% MIP2-6-1270 Submission 56.00 26-Jul-14 A 13-Oct-14 A 100% MIP2-6-1280 Approval 1.00 21-Nov-14 A 27-Dec-14 A 100% Project Quality Plan (PQP) 156.25 26-Jul-14 A 20-Jan-15 A 100% MIP2-6-1290 Submission 56.00 26-Jul-14 A 07-Oct-14 A 100% MIP2-6-1300 Approval 1.00 20-Jan-15 A 20-Jan-15 A 100% Survey Quality Plan (SQP) 157.38 26-Jul-14 A 04-Feb-15 100% -19.88 MIP2-6-1310 Submission 56.00 26-Jul-14 A 18-Oct-14 A 100% MIP2-6-1320 Approval 1.00 04-Feb-15 04-Feb-15 0% -19.88 Baseline Program (BP) 132.88 26-Jul-14 A 12-Dec-14 A 100% MIP2-6-1330 Submission 56.00 26-Jul-14 A 08-Dec-14 A 100% MIP2-6-1340 Approval 1.00 12-Dec-14 A 12-Dec-14 A 100% Environmental Management Plan (EMP) 597.38 26-Jul-14 A 30-Apr-16 100% 46.99 MIP2-6-1350 Method Statement and Equipment Calibration Report 28.00 13-Aug-14 A 30-Sep-14 A 100% MIP2-6-1360 Approval 1.00 04-Feb-15 04-Feb-15 0% 64.99 MIP2-6-1370 Complete EMP Report Approval 0.88 02-Mar-15 03-Mar-15 0% 46.99 Establish Baseline Report 555.38 17-Sep-14 A 30-Apr-16 0% 46.99 MIP2-6-1390 Noise Level Record 6.88 17-Sep-14 A 07-Oct-14 A 100% MIP2-6-1400 Dust Level Record 4.88 17-Sep-14 A 07-Oct-14 A 100% MIP2-6-1380 Water Sample Report 3.00 17-Sep-14 A 07-Oct-14 A 100% MIP2-6-1420 Baseline Report Submission 0.88 07-Oct-14 A 07-Oct-14 A 100% MIP2-6-1410 Routine Monitoring 416.88 21-Nov-14 A 30-Apr-16 15.2% 46.99 Erosion Sediment Control Plan (ESCP) 157.38 26-Jul-14 A 04-Feb-15 100% -4.72 MIP2-6-1430 Submission 46.00 26-Jul-14 A 01-Dec-14 A 100% MIP2-6-1440 Approval 1.00 04-Feb-15 04-Feb-15 0% -4.72 GENERAL 685.25 25-Jul-14 A 27-Oct-16 27.66% -99.63 QAQC Submission 231.38 25-Jul-14 A 02-May-15 0% 279.25 1st Submission 7.00 25-Jul-14 A 04-Aug-14 A 0% MIP2-6-1450 SUB CONTRACTING 7.00 25-Jul-14 A 04-Aug-14 A 100% MIP2-6-1460 CIVIL & STRUCTURE 7.00 25-Jul-14 A 04-Aug-14 A 100% MIP2-6-1470 ARCHITECTURE 7.00 25-Jul-14 A 04-Aug-14 A 100% MIP2-6-1480 MECHANICAL & ELECTRICAL 7.00 25-Jul-14 A 04-Aug-14 A 100% MIP2-6-1490 TNB SUBSTATION 7.00 25-Jul-14 A 04-Aug-14 A 100% 2nd Submission 6.88 09-Sep-14 A 17-Sep-14 A 0% MIP2-6-1500 SUB CONTRACTING 7.00 09-Sep-14 A 17-Sep-14 A 100% MIP2-6-1510 CIVIL & STRUCTURE 7.00 09-Sep-14 A 17-Sep-14 A 100% MIP2-6-1520 ARCHITECTURE 7.00 09-Sep-14 A 17-Sep-14 A 100% MIP2-6-1530 MECHANICAL & ELECTRICAL 7.00 09-Sep-14 A 17-Sep-14 A 100% MIP2-6-1540 TNB SUBSTATION 7.00 09-Sep-14 A 17-Sep-14 A 100% A J A J J A J J J A J J A 4 2015 2016 2017 LOA, 30-Jun-14 A TNB Substation (Month 42), System Equipment Ro Practical Co 27-Oct-16, 01-Jul-16, PREL 05-Nov-14 A, Satellite Office 03-May-16, Traffic M 27-Dec-14 A, Safety & Health Plan (SHP) 20-Jan-15 A, Project Quality Plan (PQP) 04-Feb-15, Survey Quality Plan (SQP) 12-Dec-14 A, Baseline Program (BP) 30-Apr-16, Environm 30-Apr-16, Establish 04-Feb-15, Erosion Sediment Control Pl a 27-Oct-16, 02-May-15, QAQC Submission 04-Aug-14 A, 1st Submission 17-Sep-14 A, 2nd Submission MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32 Actual Work Remaining Work Critical Remaining Work Milestone Page 1 of 33 TASK filter: All Activities © Oracle Corporation

Upload: wan-azri

Post on 12-Jul-2016

74 views

Category:

Documents


23 download

DESCRIPTION

Primavera P6

TRANSCRIPT

Page 1: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MULTI STOREMULTI STORE CAR PARK BUILDING, EXTERNAL W 1032.38 30-Jun-14 A 23-Nov-17 8.42% -99.63

Key Access DaKey Access Date 1032.38 30-Jun-14 A 23-Nov-17 8.42% -99.63

MIP2-6-1000 LOA 0.00 30-Jun-14 A 100%

MIP2-6-1010 Notice to Proceed 5.00 30-Jun-14 A 24-Jul-14 A 100%

MIP2-6-1020 TNB Substation (Month 42) 0.00 06-Oct-15* 0% -79.38

MIP2-6-1030 System Equipment Room Ready (Month 46) 0.00 03-Mar-16* 0% -99.69

MIP2-6-1040 Practical Completion (Month 54) 0.00 28-Oct-16* 0% -99.63

Care of WorkCare of Work 329.00 29-Oct-16 23-Nov-17 0% -99.63

MIP2-6-20050 Care of Work 329.00 29-Oct-16 23-Nov-17 0% -99.63

TENDER DESIGNTENDER DESIGN 706.63 30-Jun-14 A 27-Oct-16 35.56% -99.63

PRELIMINARY, COPRELIMINARY, CONTRACTUAL DELIVERABLES 619.75 30-Jun-14 A 01-Jul-16 37.5% -2.25

MIP2-6-1050 Insurance 24.00 30-Jun-14 A 03-Sep-14 A 100%

MIP2-6-1060 CIDB 27.00 25-Jul-14 A 03-Oct-14 A 100%

MIP2-6-1070 Construction Drawing from PDP 1.00 25-Jul-14 A 25-Jul-14 A 100%

MIP2-6-1080 Development Order from PDP 1.00 25-Jul-14 A 25-Jul-14 A 100%

MIP2-6-1180 Performance Bond 24.00 28-Jul-14 A 30-Jul-14 A 100%

MIP2-6-1090 DBKL DO Approval 3.00 17-Sep-14 A 03-Oct-14 A 100%

MIP2-6-1170 Accommodation and Buildings 520.00 23-Sep-14 A 23-Jun-16 19.62% -4.72

MIP2-6-1171 Services 520.00 23-Sep-14 A 23-Jun-16 19.62% -4.72

MIP2-6-1172 Plant & Tools Equipment 520.00 23-Sep-14 A 23-Jun-16 19.62% -4.72

MIP2-6-1173 Temporary Works 520.00 23-Sep-14 A 23-Jun-16 19.62% -4.72

MIP2-6-1110 Install Site Hoarding 6.00 03-Oct-14 A 09-Feb-15 30% -11.37

MIP2-6-1120 Site, Safety and Security Screening Office 520.00 03-Oct-14 A 01-Jul-16 19.15% -11.37

MIP2-6-1130 Install Project Signboard 3.00 03-Oct-14 A 07-Oct-14 A 100%

MIP2-6-1150 Temporary Earth Drain 6.00 04-Nov-14 A 09-Feb-15 30% -97.89

MIP2-6-1100 SO Confirmation of Work 1.00 05-Nov-14 A 06-Nov-14 A 100%

MIP2-6-1140 Silt Trap 6.00 04-Feb-15* 09-Feb-15 0% -97.89

MIP2-6-1160 Wash Trough 6.00 04-Feb-15 10-Feb-15 0% -99.69

Satellite OfficeSatellite Office 83.00 25-Jul-14 A 05-Nov-14 A 100%

MIP2-6-1190 Renovation 56.00 25-Jul-14 A 01-Oct-14 A 100%

MIP2-6-1200 Furniture 13.00 01-Oct-14 A 17-Oct-14 A 100%

MIP2-6-1210 Equipment 13.00 18-Oct-14 A 05-Nov-14 A 100%

Traffic ManagemeTraffic Management Plan (TMP) 532.75 26-Jul-14 A 03-May-16 40% 36.88

MIP2-6-1220 Report 56.00 26-Jul-14 A 18-Oct-14 A 100%

MIP2-6-1230 1st Stage 1.00 23-Dec-14 A 24-Dec-14 A 100%

MIP2-6-1240 2nd Stage 1.00 15-Apr-15 16-Apr-15 0% 240.25

MIP2-6-1250 3rd Stage 1.00 27-Jan-16 28-Jan-16 0% 5.88

MIP2-6-1260 4th Stage 1.00 30-Apr-16 03-May-16 0% 36.88

Safety & Health PSafety & Health Plan (SHP) 127.75 26-Jul-14 A 27-Dec-14 A 100%

MIP2-6-1270 Submission 56.00 26-Jul-14 A 13-Oct-14 A 100%

MIP2-6-1280 Approval 1.00 21-Nov-14 A 27-Dec-14 A 100%

Project Quality PlProject Quality Plan (PQP) 156.25 26-Jul-14 A 20-Jan-15 A 100%

MIP2-6-1290 Submission 56.00 26-Jul-14 A 07-Oct-14 A 100%

MIP2-6-1300 Approval 1.00 20-Jan-15 A 20-Jan-15 A 100%

Survey Quality PlSurvey Quality Plan (SQP) 157.38 26-Jul-14 A 04-Feb-15 100% -19.88

MIP2-6-1310 Submission 56.00 26-Jul-14 A 18-Oct-14 A 100%

MIP2-6-1320 Approval 1.00 04-Feb-15 04-Feb-15 0% -19.88

Baseline ProgramBaseline Program (BP) 132.88 26-Jul-14 A 12-Dec-14 A 100%

MIP2-6-1330 Submission 56.00 26-Jul-14 A 08-Dec-14 A 100%

MIP2-6-1340 Approval 1.00 12-Dec-14 A 12-Dec-14 A 100%

Environmental MEnvironmental Management Plan (EMP) 597.38 26-Jul-14 A 30-Apr-16 100% 46.99

MIP2-6-1350 Method Statement and Equipment Calibration Report 28.00 13-Aug-14 A 30-Sep-14 A 100%

MIP2-6-1360 Approval 1.00 04-Feb-15 04-Feb-15 0% 64.99

MIP2-6-1370 Complete EMP Report Approval 0.88 02-Mar-15 03-Mar-15 0% 46.99

Establish BaseliEstablish Baseline Report 555.38 17-Sep-14 A 30-Apr-16 0% 46.99

MIP2-6-1390 Noise Level Record 6.88 17-Sep-14 A 07-Oct-14 A 100%

MIP2-6-1400 Dust Level Record 4.88 17-Sep-14 A 07-Oct-14 A 100%

MIP2-6-1380 Water Sample Report 3.00 17-Sep-14 A 07-Oct-14 A 100%

MIP2-6-1420 Baseline Report Submission 0.88 07-Oct-14 A 07-Oct-14 A 100%

MIP2-6-1410 Routine Monitoring 416.88 21-Nov-14 A 30-Apr-16 15.2% 46.99

Erosion SedimenErosion Sediment Control Plan (ESCP) 157.38 26-Jul-14 A 04-Feb-15 100% -4.72

MIP2-6-1430 Submission 46.00 26-Jul-14 A 01-Dec-14 A 100%

MIP2-6-1440 Approval 1.00 04-Feb-15 04-Feb-15 0% -4.72

GENERALGENERAL 685.25 25-Jul-14 A 27-Oct-16 27.66% -99.63

QAQC SubmissionQAQC Submission 231.38 25-Jul-14 A 02-May-15 0% 279.25

1st Submission1st Submission 7.00 25-Jul-14 A 04-Aug-14 A 0%

MIP2-6-1450 SUB CONTRACTING 7.00 25-Jul-14 A 04-Aug-14 A 100%

MIP2-6-1460 CIVIL & STRUCTURE 7.00 25-Jul-14 A 04-Aug-14 A 100%

MIP2-6-1470 ARCHITECTURE 7.00 25-Jul-14 A 04-Aug-14 A 100%

MIP2-6-1480 MECHANICAL & ELECTRICAL 7.00 25-Jul-14 A 04-Aug-14 A 100%

MIP2-6-1490 TNB SUBSTATION 7.00 25-Jul-14 A 04-Aug-14 A 100%

2nd Submission2nd Submission 6.88 09-Sep-14 A 17-Sep-14 A 0%

MIP2-6-1500 SUB CONTRACTING 7.00 09-Sep-14 A 17-Sep-14 A 100%

MIP2-6-1510 CIVIL & STRUCTURE 7.00 09-Sep-14 A 17-Sep-14 A 100%

MIP2-6-1520 ARCHITECTURE 7.00 09-Sep-14 A 17-Sep-14 A 100%

MIP2-6-1530 MECHANICAL & ELECTRICAL 7.00 09-Sep-14 A 17-Sep-14 A 100%

MIP2-6-1540 TNB SUBSTATION 7.00 09-Sep-14 A 17-Sep-14 A 100%

J A J A JJA J A JA J A JJA

14 2015 2016 2017

LOA, 30-Jun-14 A

TNB Substation (Month 42),

System Equipment Ro

Practical Co

27-Oct-16,

01-Jul-16, PREL

05-Nov-14 A, Satellite Office

03-May-16, Traffic M

27-Dec-14 A, Safety & Health Plan (SHP)

20-Jan-15 A, Project Quality Plan (PQP)

04-Feb-15, Survey Quality Plan (SQP)

12-Dec-14 A, Baseline Program (BP)

30-Apr-16, Environm

30-Apr-16, Establish

04-Feb-15, Erosion Sediment Control Pla

27-Oct-16,

02-May-15, QAQC Submission

04-Aug-14 A, 1st Submission

17-Sep-14 A, 2nd Submission

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 1 of 33 TASK filter: All Activities

© Oracle Corporation

Page 2: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

3rd Submission3rd Submission 7.00 24-Oct-14 A 03-Nov-14 A 0%

MIP2-6-1550 SUB CONTRACTING 7.00 24-Oct-14 A 03-Nov-14 A 100%

MIP2-6-1560 CIVIL & STRUCTURE 7.00 24-Oct-14 A 03-Nov-14 A 100%

MIP2-6-1570 ARCHITECTURE 7.00 24-Oct-14 A 03-Nov-14 A 100%

MIP2-6-1580 MECHANICAL & ELECTRICAL 7.00 24-Oct-14 A 03-Nov-14 A 100%

MIP2-6-1590 TNB SUBSTATION 7.00 24-Oct-14 A 03-Nov-14 A 100%

4th Submission4th Submission 7.00 20-Dec-14 A 29-Dec-14 A 0%

MIP2-6-1600 SUB CONTRACTING 7.00 20-Dec-14 A 29-Dec-14 A 100%

MIP2-6-1610 CIVIL & STRUCTURE 7.00 20-Dec-14 A 29-Dec-14 A 100%

MIP2-6-1620 ARCHITECTURE 7.00 20-Dec-14 A 29-Dec-14 A 100%

MIP2-6-1630 MECHANICAL & ELECTRICAL 7.00 20-Dec-14 A 29-Dec-14 A 100%

MIP2-6-1640 TNB SUBSTATION 7.00 20-Dec-14 A 29-Dec-14 A 100%

5th Submission5th Submission 6.88 06-Feb-15 A 13-Feb-15 A 0%

MIP2-6-1650 SUB CONTRACTING 7.00 06-Feb-15 A 13-Feb-15 A 100%

MIP2-6-1660 CIVIL & STRUCTURE 7.00 06-Feb-15 A 13-Feb-15 A 100%

MIP2-6-1670 ARCHITECTURE 7.00 06-Feb-15 A 13-Feb-15 A 100%

MIP2-6-1680 MECHANICAL & ELECTRICAL 7.00 06-Feb-15 A 13-Feb-15 A 100%

MIP2-6-1690 TNB SUBSTATION 7.00 06-Feb-15 A 13-Feb-15 A 100%

6th Submission6th Submission 7.00 12-Mar-15 20-Mar-15 0% 279.25

MIP2-6-1700 SUB CONTRACTING 7.00 12-Mar-15 20-Mar-15 0% 279.25

MIP2-6-1710 CIVIL & STRUCTURE 7.00 12-Mar-15 20-Mar-15 0% 279.25

MIP2-6-1720 ARCHITECTURE 7.00 12-Mar-15 20-Mar-15 0% 279.25

MIP2-6-1730 MECHANICAL & ELECTRICAL 7.00 12-Mar-15 20-Mar-15 0% 279.25

MIP2-6-1740 TNB SUBSTATION 7.00 12-Mar-15 20-Mar-15 0% 279.25

7th Submission7th Submission 7.00 23-Apr-15 02-May-15 0% 279.25

MIP2-6-1770 SUB CONTRACTING 7.00 23-Apr-15 02-May-15 0% 279.25

MIP2-6-1780 CIVIL & STRUCTURE 7.00 23-Apr-15 02-May-15 0% 279.25

MIP2-6-1790 ARCHITECTURE 7.00 23-Apr-15 02-May-15 0% 279.25

MIP2-6-1750 MECHANICAL & ELECTRICAL 7.00 23-Apr-15 02-May-15 0% 279.25

MIP2-6-1760 TNB SUBSTATION 7.00 23-Apr-15 02-May-15 0% 279.25

Site SurveySite Survey 19.88 02-Sep-14 A 25-Sep-14 A 100%

MIP2-6-1800 EGL Survey Fieldwork 5.00 02-Sep-14 A 08-Sep-14 A 100%

MIP2-6-1810 Survey Report 10.00 08-Sep-14 A 19-Sep-14 A 100%

MIP2-6-1820 Earthwork Preparation Survey 5.00 20-Sep-14 A 25-Sep-14 A 100%

Soil InvestigationSoil Investigation 61.13 26-Jan-15 A 11-Mar-15 67% 324.45

MIP2-6-1830 Request Start Soil Investigation Work By R.E. 1.00 26-Jan-15 A 26-Jan-15 A 100%

MIP2-6-1840 Soil Investigation 60.00 27-Jan-15 A 10-Mar-15 67% 324.45

MIP2-6-1850 S. I. Report 1.00 10-Mar-15 11-Mar-15 0% 324.45

Dilapidation SurvDilapidation Survey 32.13 08-Aug-14 A 15-Sep-14 A 100%

MIP2-6-1860 Proposal 9.00 08-Aug-14 A 19-Aug-14 A 100%

MIP2-6-1870 Dilapidation Survey Fieldwork 8.00 19-Aug-14 A 28-Aug-14 A 100%

MIP2-6-1880 Dilapidation Survey Report 15.00 28-Aug-14 A 15-Sep-14 A 100%

Instrumentation &Instrumentation & Monitoring 294.75 10-Dec-14 A 08-Sep-15 81.1% 172.88

MIP2-6-1920 Install Crack meter 7.00 10-Dec-14 A 17-Dec-14 A 100%

MIP2-6-1900 Install Surface settlement Marker 5.00 19-Dec-14 A 24-Dec-14 A 100%

MIP2-6-1890 Install Building Settlement Marker 5.00 20-Dec-14 A 23-Dec-14 A 100%

MIP2-6-1910 Install Inclinometer 7.00 27-Dec-14 A 13-Jan-15 A 100%

MIP2-6-1930 Install Water Standpipe 3.00 27-Dec-14 A 13-Jan-15 A 100%

MIP2-6-1940 Install Wall Settlement Marker 5.00 04-Feb-15 09-Feb-15 0% 172.88

MonitoringMonitoring 182.75 09-Jan-15 A 08-Sep-15 2.08% 172.88

MIP2-6-1950 1st and 2nd Month (Weekly Data) 58.00 09-Jan-15 A 15-Apr-15 6.25% 172.88

MIP2-6-1960 3rd and 4th Month (Two Week Data) 60.00 15-Apr-15 25-Jun-15 0% 172.88

MIP2-6-1970 5th and 6th month (Once in 4 Week Data) 61.00 26-Jun-15 08-Sep-15 0% 172.88

APPROVAL BY AUAPPROVAL BY AUTHORITIES 122.94 07-Jun-16 27-Oct-16 0% -99.63

MIP2-6-2010 Landscape Department 11.00 07-Jun-16 20-Jun-16 0% 2.31

MIP2-6-2020 Indah Water Consortium 10.00 25-Aug-16 07-Sep-16 0% -67.63

MIP2-6-1980 Bomba Inspection 10.00 27-Aug-16 05-Sep-16 0% -66.38

MIP2-6-1990 TNB Inspection 10.00 05-Oct-16 17-Oct-16 0% -99.63

MIP2-6-2000 Majlis Perbandaran 10.00 22-Oct-16 27-Oct-16 0% -99.63

SHOP DRAWINGSHOP DRAWING 174.00 25-Feb-15 22-Sep-15 0% 162.25

MIP2-6-2030 Compile All Document 3.00 18-Sep-15 22-Sep-15 0% 162.25

STRUCTURESTRUCTURE 90.00 25-Feb-15 11-Jun-15 0% 222.25

MIP2-6-2040 Metal Works 89.00 25-Feb-15 10-Jun-15 0% 162.25

MIP2-6-2050 Approval 1.00 10-Jun-15 11-Jun-15 0% 222.25

ARCHITECTUREARCHITECTURE 120.00 25-Feb-15 16-Jul-15 0% 35.38

MIP2-6-2060 Finishes 119.00 25-Feb-15 15-Jul-15 0% 35.38

MIP2-6-2070 Approval 1.00 15-Jul-15 16-Jul-15 0% 35.38

ELECTRICALELECTRICAL 60.00 25-Feb-15 07-May-15 0% 252.25

MIP2-6-2080 Main Switchboard (MSB), SSB & DB 59.00 25-Feb-15 06-May-15 0% 252.25

MIP2-6-2100 Lightning & Power 59.00 25-Feb-15 06-May-15 0% 252.25

MIP2-6-2120 Telecommunication 59.00 25-Feb-15 06-May-15 0% 252.25

MIP2-6-2140 Earthling & Lightning Protection System 59.00 25-Feb-15 06-May-15 0% 252.25

MIP2-6-2160 Generator Set 59.00 25-Feb-15 06-May-15 0% 252.25

MIP2-6-2090 Approval 1.00 06-May-15 07-May-15 0% 252.25

MIP2-6-2110 Approval 1.00 06-May-15 07-May-15 0% 252.25

MIP2-6-2130 Approval 1.00 06-May-15 07-May-15 0% 252.25

MIP2-6-2150 Approval 1.00 06-May-15 07-May-15 0% 252.25

MIP2-6-2170 Approval 1.00 06-May-15 07-May-15 0% 252.25

J A J A JJA J A JA J A JJA

14 2015 2016 2017

03-Nov-14 A, 3rd Submission

29-Dec-14 A, 4th Submission

13-Feb-15 A, 5th Submission

20-Mar-15, 6th Submission

02-May-15, 7th Submission

25-Sep-14 A, Site Survey

11-Mar-15, Soil Investigation

15-Sep-14 A, Dilapidation Survey

08-Sep-15, Instrumentation & M

08-Sep-15, Monitoring

27-Oct-16, A

22-Sep-15, SHOP DRAWING

11-Jun-15, STRUCTURE

16-Jul-15, ARCHITECTURE

07-May-15, ELECTRICAL

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 2 of 33 TASK filter: All Activities

© Oracle Corporation

Page 3: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MECHANICALMECHANICAL 61.00 10-Jun-15 21-Aug-15 0% 162.25

MIP2-6-2180 Soil, Waste & Vent Pipe System 60.00 10-Jun-15 20-Aug-15 0% 162.25

MIP2-6-2200 Cold Water 60.00 10-Jun-15 20-Aug-15 0% 162.25

MIP2-6-2220 Environmental Control System 60.00 10-Jun-15 20-Aug-15 0% 162.25

MIP2-6-2240 Fire Protection & Detection System 60.00 10-Jun-15 20-Aug-15 0% 162.25

MIP2-6-2260 Lift Service 60.00 10-Jun-15 20-Aug-15 0% 162.25

MIP2-6-2190 Approval 1.00 20-Aug-15 21-Aug-15 0% 162.25

MIP2-6-2210 Approval 1.00 20-Aug-15 21-Aug-15 0% 162.25

MIP2-6-2230 Approval 1.00 20-Aug-15 21-Aug-15 0% 162.25

MIP2-6-2250 Approval 1.00 20-Aug-15 21-Aug-15 0% 162.25

MIP2-6-2270 Approval 1.00 20-Aug-15 21-Aug-15 0% 162.25

PRIME COST SUMPRIME COST SUM 99.00 09-May-16 06-Sep-16 0% -57.50

LIFT SERVICESLIFT SERVICES 89.00 19-May-16 06-Sep-16 0% -57.50

LIFT SERVICES INLIFT SERVICES INSTALLATION 89.00 19-May-16 06-Sep-16 0% -57.50

MIP2-6-2280 Installation of Lift Frame 21.00 19-May-16 15-Jun-16 0% -57.50

MIP2-6-2290 Installation of Passenger Lift Car 20.00 15-Jun-16 12-Jul-16 0% -57.50

MIP2-6-2300 Installation of Bomba Lift Car 20.00 15-Jun-16 12-Jul-16 0% -57.50

MIP2-6-2310 Cable 20.00 15-Jun-16 12-Jul-16 0% -57.50

MIP2-6-2320 Fitting & Accessories 28.00 12-Jul-16 12-Aug-16 0% -57.50

MIP2-6-2330 Testing & Commissioning 20.00 12-Aug-16 06-Sep-16 0% -57.50

Car Park Building Car Park Building Signage System 57.13 09-May-16 22-Jul-16 0% -18.63

MIP2-6-2340 Installation System 30.00 09-May-16 10-Jun-16 0% -18.63

MIP2-6-2350 TESTING & COMMISSIONING 30.00 10-Jun-16 22-Jul-16 0% -18.63

Office FurnitureOffice Furniture 49.38 04-Jul-16 29-Aug-16 0% -60.75

MIP2-6-2360 Measurement 20.00 04-Jul-16 28-Jul-16 0% -60.75

MIP2-6-2370 Fabrication 20.00 29-Jul-16 19-Aug-16 0% -60.75

MIP2-6-2380 Delivery 10.00 19-Aug-16 29-Aug-16 0% -60.75

PROVISIONAL SUPROVISIONAL SUM 547.63 20-Sep-14 A 16-Jul-16 13.99% -13.88

MIP2-6-2390 Investigated Utility Area Including Survey Work 57.00 20-Sep-14 A 13-Feb-15 85% 21.70

MIP2-6-2400 Detection Survey & Report 30.00 27-Nov-14 A 18-Feb-15 85.42% 21.70

MIP2-6-2410 Testing Material And Work 146.00 04-Feb-15 29-Jul-15 0% 276.38

MIP2-6-2430 Centralised Labour Quarter 118.00 04-Feb-15 24-Jun-15 0% 295.25

MIP2-6-2420 Landscaping & Turfing 61.00 25-Mar-16 07-Jun-16 0% 2.31

PROTECTION & RPROTECTION & RELOCATION OF UTILITIES 229.75 20-Sep-14 A 08-Oct-15 0% 81.88

MIP2-6-2440 Receive Utility Information From Consultant 29.00 20-Sep-14 A 26-Dec-14 A 100%

MIP2-6-2450 Pilot Trenching with S.O. Approval 30.00 20-Nov-14 A 10-Mar-15 50% 21.70

MIP2-6-2460 Relocation Work Design Process 30.00 17-Mar-15* 20-Apr-15 0% 15.88

MIP2-6-2470 Approval 10.00 21-Apr-15 02-May-15 0% 15.88

TELECOMUNICATTELECOMUNICATION WORKS 80.00 02-May-15 07-Aug-15 0% 81.88

MIP2-6-2480 Excavation 15.00 02-May-15 21-May-15 0% 81.88

MIP2-6-2490 Installation of Pipe & Cable 15.00 21-May-15 09-Jun-15 0% 81.88

MIP2-6-2500 Manhole Installation 25.00 09-Jun-15 07-Jul-15 0% 81.88

MIP2-6-2510 Backfilling 10.00 07-Jul-15 21-Jul-15 0% 81.88

MIP2-6-2520 Inspection & Commissioning 15.00 21-Jul-15 07-Aug-15 0% 81.88

ELECTRICAL WOELECTRICAL WORKS 120.50 02-May-15 26-Sep-15 0% 81.88

MIP2-6-2530 Excavation 15.00 02-May-15 21-May-15 0% 116.88

MIP2-6-2540 Installation of Pipe & Cable 30.00 21-May-15 25-Jun-15 0% 116.88

MIP2-6-2550 Backfilling 11.25 07-Aug-15 20-Aug-15 0% 81.88

MIP2-6-2560 Overhead Pole Installation 15.25 20-Aug-15 09-Sep-15 0% 81.88

MIP2-6-2570 Inspection & Commissioning 14.00 09-Sep-15 26-Sep-15 0% 81.88

STREET LIGHTINSTREET LIGHTING WORKS 130.38 02-May-15 08-Oct-15 0% 81.88

MIP2-6-2580 Excavation 15.00 02-May-15 21-May-15 0% 112.00

MIP2-6-2590 Installation of Pipe & Cable 20.00 21-May-15 15-Jun-15 0% 112.00

MIP2-6-2600 Backfilling 30.00 15-Jun-15 21-Jul-15 0% 112.00

MIP2-6-2610 Overhead Pole Installation 10.00 21-Jul-15 01-Aug-15 0% 112.00

MIP2-6-2620 Feeder Pillar Installation 15.38 01-Aug-15 19-Aug-15 0% 112.00

MIP2-6-2630 Inspection & Commissioning 10.00 26-Sep-15 08-Oct-15 0% 81.88

WATER RETICULWATER RETICULATION 99.00 02-May-15 29-Aug-15 0% 15.88

MIP2-6-2640 JBA Approval 15.00 02-May-15 21-May-15 0% 15.88

MIP2-6-2650 Excavation 30.00 21-May-15 25-Jun-15 0% 15.88

MIP2-6-2660 Dismantling & Installation of Pipeline 30.00 26-Jun-15 01-Aug-15 0% 15.88

MIP2-6-2670 Backfilling 9.00 01-Aug-15 12-Aug-15 0% 15.88

MIP2-6-2680 Inspection & Commissioning 15.00 12-Aug-15 29-Aug-15 0% 15.88

Unforseen DesignUnforseen Design/Authorities Requirement 224.00 29-Aug-15 28-May-16 0% 15.88

Architectural DesArchitectural Design 165.00 29-Aug-15 19-Mar-16 0% 74.88

MIP2-6-2690 Discussion Progress 30.38 29-Aug-15 03-Oct-15 0% 15.88

MIP2-6-2700 Design 29.00 03-Oct-15 06-Nov-15 0% 15.88

MIP2-6-2710 Approval 1.00 06-Nov-15 07-Nov-15 0% 15.88

MIP2-6-2720 Additional Work 87.00 03-Dec-15 19-Mar-16 0% 74.88

C&S DesignC&S Design 167.00 07-Nov-15 28-May-16 0% 15.88

MIP2-6-2730 Discussion Progress 30.38 07-Nov-15 10-Dec-15 0% 15.88

MIP2-6-2740 Design 29.00 10-Dec-15 15-Jan-16 0% 15.88

MIP2-6-2750 Approval 1.00 18-Jan-16 19-Jan-16 0% 15.88

MIP2-6-2760 Additional Work 87.00 17-Feb-16 28-May-16 0% 15.88

Additional ChangeAdditional Change Requirement M&E System Work 165.00 07-Nov-15 26-May-16 0% 17.88

MIP2-6-2770 Discussion Progress 30.38 07-Nov-15 10-Dec-15 0% 17.88

MIP2-6-2780 Design 29.00 10-Dec-15 15-Jan-16 0% 17.88

MIP2-6-2790 Approval 1.00 15-Jan-16 16-Jan-16 0% 17.88

J A J A JJA J A JA J A JJA

14 2015 2016 2017

21-Aug-15, MECHANICAL

06-Sep-16, PR

06-Sep-16, LI

06-Sep-16, LI

22-Jul-16, Car P

29-Aug-16, Of

16-Jul-16, PROV

08-Oct-15, PROTECTION &

07-Aug-15, TELECOMUNICATI

26-Sep-15, ELECTRICAL WO

08-Oct-15, STREET LIGHTIN

29-Aug-15, WATER RETICULA

28-May-16, Unfors

19-Mar-16, Architectu

28-May-16, C&S D

26-May-16, Additio

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 3 of 33 TASK filter: All Activities

© Oracle Corporation

Page 4: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-2800 Additional Work 87.00 15-Feb-16 26-May-16 0% 17.88

Additional InterfacAdditional Interfacing M&E C&S Architectural and System Work 165.00 07-Nov-15 26-May-16 0% 17.88

MIP2-6-2810 Interfacing Progress and Decision 27.00 07-Nov-15 10-Dec-15 0% 17.88

Architectural DesArchitectural Design 138.00 10-Dec-15 26-May-16 0% 17.88

MIP2-6-2820 Design 29.00 10-Dec-15 15-Jan-16 0% 17.88

MIP2-6-2830 Approval 1.00 15-Jan-16 16-Jan-16 0% 17.88

MIP2-6-2840 Additional Work 87.00 15-Feb-16 26-May-16 0% 17.88

C&S DesignC&S Design 138.00 10-Dec-15 26-May-16 0% 17.88

MIP2-6-2850 Design 29.00 10-Dec-15 15-Jan-16 0% 17.88

MIP2-6-2860 Approval 1.00 15-Jan-16 16-Jan-16 0% 17.88

MIP2-6-2870 Additional Work 87.00 15-Feb-16 26-May-16 0% 17.88

M&E DesignM&E Design 138.00 10-Dec-15 26-May-16 0% 17.88

MIP2-6-2880 Design 29.00 10-Dec-15 15-Jan-16 0% 17.88

MIP2-6-2890 Approval 1.00 15-Jan-16 16-Jan-16 0% 17.88

MIP2-6-2900 Additional Work 87.00 15-Feb-16 26-May-16 0% 17.88

Interfacing Work WInterfacing Work With Taman Mewar Station and Adjacent Development 146.00 04-Feb-15 29-Jul-15 0% 276.38

MIP2-6-2910 Taman Mewar Station 146.00 04-Feb-15 29-Jul-15 0% 276.38

MIP2-6-2920 Adjacent Development 146.00 04-Feb-15 29-Jul-15 0% 276.38

Car park TicketingCar park Ticketing Booth 263.00 29-Aug-15 16-Jul-16 0% -23.00

STRUCTURESTRUCTURE 114.00 29-Aug-15 16-Jan-16 0% -23.00

MIP2-6-2930 Footing 27.00 29-Aug-15 03-Oct-15 0% -23.00

MIP2-6-2940 Stump 10.00 03-Oct-15 15-Oct-15 0% -23.00

MIP2-6-2950 Ground Beam 10.00 16-Oct-15 27-Oct-15 0% -23.00

MIP2-6-2960 Ground Slab 9.00 27-Oct-15 06-Nov-15 0% -23.00

MIP2-6-2970 Column 10.00 06-Nov-15 19-Nov-15 0% -23.00

MIP2-6-2980 Roof Beam 19.00 19-Nov-15 10-Dec-15 0% -23.00

MIP2-6-2990 Roof Truss 29.00 11-Dec-15 16-Jan-16 0% -23.00

ARCHITECTUREARCHITECTURE 149.00 16-Jan-16 16-Jul-16 0% -23.00

MIP2-6-3000 Roof Covering 19.00 16-Jan-16 11-Feb-16 0% -23.00

MIP2-6-3010 Brick Work 20.00 12-Feb-16 05-Mar-16 0% -23.00

MIP2-6-3020 Plastering 30.00 05-Mar-16 08-Apr-16 0% -23.00

MIP2-6-3030 Floor Screeding 20.00 09-Apr-16 03-May-16 0% -23.00

MIP2-6-3040 Door & Window 10.00 03-May-16 14-May-16 0% -23.00

MIP2-6-3050 Ceiling 10.00 14-May-16 27-May-16 0% -23.00

MIP2-6-3060 Painting 10.00 27-May-16 09-Jun-16 0% -23.00

MIP2-6-3070 Perimeter Drain 30.00 09-Jun-16 16-Jul-16 0% -23.00

CONSTRUCTIONCONSTRUCTION 620.38 06-Nov-14 A 19-Oct-16 1.71% -92.50

SITE PREPARATIOSITE PREPARATION 248.00 06-Nov-14 A 31-Jul-15 14.64% 205.13

MIP2-6-3080 Temporary Access Road 248.00 06-Nov-14 A 31-Jul-15 40.27% 205.13

Site Clearance, DSite Clearance, Demolition & Earthwork 248.00 06-Nov-14 A 31-Jul-15 7.11% 205.13

MIP2-6-3090 General Site Clearance 2.00 06-Nov-14 A 08-Nov-14 A 100%

MIP2-6-3100 Slope Protection Works 58.00 08-Nov-14 A 13-Feb-15 85% 344.55

EarthworkEarthwork 145.63 11-Mar-15 31-Jul-15 0% 75.13

MIP2-6-3120 Cut and Fill Within Site 11.25 28-Mar-15 10-Apr-15 0% -19.88

Remove ConstrRemove Construction Debris 15.00 11-Mar-15 28-Mar-15 0% -19.88

MIP2-6-3130 Level 60m and 59m 9.00 11-Mar-15 21-Mar-15 0% -19.88

MIP2-6-3140 Level 58m and 57m 6.00 21-Mar-15 28-Mar-15 0% -19.88

Import EarthImport Earth 119.38 10-Apr-15 31-Jul-15 0% 75.13

MIP2-6-3150 Level 57m 9.00 10-Apr-15 20-Apr-15 0% -19.88

MIP2-6-3160 Level 58m 14.00 20-Apr-15 08-May-15 0% -19.88

MIP2-6-3170 Level 59m 20.00 08-May-15 01-Jun-15 0% -19.88

MIP2-6-3180 Level 60m 30.00 01-Jun-15 07-Jul-15 0% 75.13

MIP2-6-3190 Level 61m 45.00 08-Jul-15 31-Jul-15 0% 75.13

GROUND TREATGROUND TREATMENT 29.00 04-Feb-15 11-Mar-15 0% -19.88

MIP2-6-3200 Disposal Unsuitable Material 29.00 04-Feb-15 11-Mar-15 0% -19.88

STRUCTURAL TESSTRUCTURAL TEST PILE IN FOUNDATION ENGINEER DRAWING 122.50 29-Nov-14 A 25-Feb-15 7.72% -79.44

MIP2-6-3210 Boring 1.00 29-Nov-14 A 29-Nov-14 A 100%

MIP2-6-3220 Steel Bar 1.00 01-Dec-14 A 01-Dec-14 A 100%

MIP2-6-3230 Concrete 1.00 02-Dec-14 A 02-Dec-14 A 100%

MIP2-6-3240 Approval 2.00 16-Dec-14 A 16-Dec-14 A 100%

PDA Test and RepPDA Test and Report 11.00 10-Feb-15 25-Feb-15 0% -79.44

MIP2-6-3250 Test 2.00 10-Feb-15 12-Feb-15 0% -79.44

MIP2-6-3260 Report 9.00 12-Feb-15 25-Feb-15 0% -79.44

Load Test and ReLoad Test and Report 16.00 04-Feb-15 A 24-Feb-15 100% -78.44

MIP2-6-3270 Test 14.00 04-Feb-15 A 06-Feb-15 A 100%

MIP2-6-3280 Report 10.00 10-Feb-15 24-Feb-15 0% -78.44

RETAINING WALLRETAINING WALL 250.94 10-Feb-15 09-Dec-15 0% 43.31

Reinforced ModuReinforced Modular Wall 134.81 29-Jun-15 09-Dec-15 0% -34.69

MIP2-6-3290 Earthwork to Platform Level 5.00 29-Jun-15 04-Jul-15 0% -34.69

MIP2-6-3300 Crusher Run Base 600mm 5.00 04-Jul-15 10-Jul-15 0% -34.69

MIP2-6-3310 RC. Levelling Pad Formwork 7.00 10-Jul-15 25-Jul-15 0% -34.69

MIP2-6-3320 RC. Levelling Pad Steel Bar and Concrete 7.00 25-Jul-15 01-Aug-15 0% -34.69

Layer 1Layer 1 14.88 01-Aug-15 19-Aug-15 0% -34.69

MIP2-6-3330 Install Modular Block 9.88 01-Aug-15 13-Aug-15 0% -34.69

MIP2-6-3340 Perforated Subsoil Pipe 100mm 1.00 13-Aug-15 14-Aug-15 0% -34.69

MIP2-6-3350 Earth Fill Layer 1 3.00 14-Aug-15 18-Aug-15 0% -34.69

MIP2-6-3360 Sand Blanket 1.00 18-Aug-15 19-Aug-15 0% -34.69

Layer 2Layer 2 13.88 19-Aug-15 07-Sep-15 0% -34.69

MIP2-6-3370 Install Modular Block 7.88 19-Aug-15 29-Aug-15 0% -34.69

J A J A JJA J A JA J A JJA

14 2015 2016 2017

26-May-16, Additio

26-May-16, Archite

26-May-16, C&S D

26-May-16, M&E D

29-Jul-15, Interfacing Work With

16-Jul-16, Car p

16-Jan-16, STRUCTURE

16-Jul-16, ARCH

19-Oct-16,

31-Jul-15, SITE PREPARATION

31-Jul-15, Site Clearance, Demo

31-Jul-15, Earthwork

28-Mar-15, Remove Construction Deb

31-Jul-15, Import Earth

11-Mar-15, GROUND TREATMENT

25-Feb-15, STRUCTURAL TEST PILE

25-Feb-15, PDA Test and Report

24-Feb-15, Load Test and Report

09-Dec-15, RETAINING W

09-Dec-15, Reinforced Mo

19-Aug-15, Layer 1

07-Sep-15, Layer 2

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 4 of 33 TASK filter: All Activities

© Oracle Corporation

Page 5: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-3380 Perforated Subsoil Pipe 100mm 1.00 29-Aug-15 01-Sep-15 0% -34.69

MIP2-6-3390 Discharge Sand Blanket 1.00 01-Sep-15 02-Sep-15 0% -34.69

MIP2-6-3400 Earth Fill Layer 2 3.00 02-Sep-15 05-Sep-15 0% -34.69

MIP2-6-3410 Sand Blanket 1.00 05-Sep-15 07-Sep-15 0% -34.69

Layer 3Layer 3 12.88 07-Sep-15 22-Sep-15 0% -34.69

MIP2-6-3420 Install Modular Block 7.88 07-Sep-15 15-Sep-15 0% -34.69

MIP2-6-3430 Perforated Subsoil Pipe 100mm 1.00 15-Sep-15 17-Sep-15 0% -34.69

MIP2-6-3440 Earth Fill Layer 3 3.00 17-Sep-15 21-Sep-15 0% -34.69

MIP2-6-3450 Sand Blanket 1.00 21-Sep-15 22-Sep-15 0% -34.69

Layer 4Layer 4 12.88 22-Sep-15 08-Oct-15 0% -34.69

MIP2-6-3460 Install Modular Block 7.88 22-Sep-15 02-Oct-15 0% -34.69

MIP2-6-3470 Perforated Subsoil Pipe 100mm 1.00 02-Oct-15 03-Oct-15 0% -34.69

MIP2-6-3480 Earth Fill Layer 4 3.00 03-Oct-15 07-Oct-15 0% -34.69

MIP2-6-3490 Sand Blanket 1.00 07-Oct-15 08-Oct-15 0% -34.69

Layer 5Layer 5 12.88 08-Oct-15 23-Oct-15 0% -34.69

MIP2-6-3500 Install Modular Block 7.88 08-Oct-15 17-Oct-15 0% -34.69

MIP2-6-3510 Perforated Subsoil Pipe 100mm 1.00 17-Oct-15 19-Oct-15 0% -34.69

MIP2-6-3520 Earth Fill Layer 5 3.00 19-Oct-15 22-Oct-15 0% -34.69

MIP2-6-3530 Sand Blanket 1.00 22-Oct-15 23-Oct-15 0% -34.69

Layer 6Layer 6 13.88 23-Oct-15 09-Nov-15 0% -34.69

MIP2-6-3540 Install Modular Block 8.88 23-Oct-15 03-Nov-15 0% -34.69

MIP2-6-3550 Perforated Subsoil Pipe 100mm 1.00 03-Nov-15 04-Nov-15 0% -34.69

MIP2-6-3560 Earth Fill Layer 6 3.00 04-Nov-15 07-Nov-15 0% -34.69

MIP2-6-3570 Sand Blanket 1.00 07-Nov-15 09-Nov-15 0% -34.69

Layer 7Layer 7 12.88 09-Nov-15 25-Nov-15 0% -34.69

MIP2-6-3580 Install Modular Block 7.88 09-Nov-15 19-Nov-15 0% -34.69

MIP2-6-3590 Perforated Subsoil Pipe 100mm 1.00 19-Nov-15 20-Nov-15 0% -34.69

MIP2-6-3600 Earth Fill Layer 7 3.00 20-Nov-15 24-Nov-15 0% -34.69

MIP2-6-3610 Sand Blanket 1.00 24-Nov-15 25-Nov-15 0% -34.69

Layer 8Layer 8 12.88 25-Nov-15 09-Dec-15 0% -34.69

MIP2-6-3620 Install Modular Block 7.88 25-Nov-15 03-Dec-15 0% -34.69

MIP2-6-3630 Perforated Subsoil Pipe 100mm 1.00 03-Dec-15 04-Dec-15 0% -34.69

MIP2-6-3640 Earth Fill Layer 8 3.00 04-Dec-15 08-Dec-15 0% -34.69

MIP2-6-3650 Sand Blanket 1.00 08-Dec-15 09-Dec-15 0% -34.69

Wall 4Wall 4 64.88 10-Feb-15 28-Apr-15 0% 229.38

RC. Wall 1(11.6m)RC. Wall 1(11.6m) 27.88 27-Mar-15 28-Apr-15 0% 0.50

MIP2-6-3660 Survey Setting out 1.00 27-Mar-15 28-Mar-15 0% 0.50

MIP2-6-3670 Traffic & Safety Fieldwork 5.88 28-Mar-15 03-Apr-15 0% 4.50

MIP2-6-3680 Earthwork 5.00 03-Apr-15 03-Apr-15 0% 4.50

MIP2-6-3690 Base Preparation 3.00 03-Apr-15 07-Apr-15 0% 4.50

MIP2-6-3700 Formwork 6.00 07-Apr-15 14-Apr-15 0% 4.50

MIP2-6-3710 Steel Bar 4.00 14-Apr-15 18-Apr-15 0% 4.50

MIP2-6-3720 Concrete 2.00 18-Apr-15 22-Apr-15 0% 4.50

MIP2-6-3730 Remove Formwork 1.00 27-Apr-15 28-Apr-15 0% 0.50

Sheet Pile WallSheet Pile Wall 44.88 10-Feb-15 04-Apr-15 0% 249.38

MIP2-6-3740 Platform 5.00 10-Feb-15 16-Feb-15 0% 0.50

MIP2-6-3750 Survey Setting out 1.00 16-Feb-15 17-Feb-15 0% 0.50

MIP2-6-3760 Driving Sheet Pile 19.00 17-Feb-15 13-Mar-15 0% 0.50

MIP2-6-3770 Capping Beam Formwork and Steel Bar 10.00 13-Mar-15 25-Mar-15 0% 0.50

MIP2-6-3780 Concrete 2.00 25-Mar-15 27-Mar-15 0% 0.50

MIP2-6-3790 Shot Crete on Exposed Surface 7.88 27-Mar-15 04-Apr-15 0% 249.38

RC. Wall 2(10m)RC. Wall 2(10m) 25.88 28-Mar-15 27-Apr-15 0% 0.50

MIP2-6-3800 Survey Setting out 1.00 28-Mar-15 28-Mar-15 0% 0.50

MIP2-6-3810 Traffic & Safety Fieldwork 5.88 30-Mar-15 04-Apr-15 0% 0.50

MIP2-6-3820 Earthwork 5.00 04-Apr-15 10-Apr-15 0% 0.50

MIP2-6-3830 Base Preparation 3.00 10-Apr-15 14-Apr-15 0% 0.50

MIP2-6-3840 Formwork 5.00 14-Apr-15 20-Apr-15 0% 0.50

MIP2-6-3850 Steel Bar 3.00 20-Apr-15 23-Apr-15 0% 0.50

MIP2-6-3860 Concrete 2.00 23-Apr-15 25-Apr-15 0% 0.50

MIP2-6-3870 Remove Formwork 1.00 25-Apr-15 27-Apr-15 0% 0.50

ELEVATED STRUCELEVATED STRUCTURE BORED PILE & CONTIGUOS BORED PILE RET 216.38 06-Dec-14 A 15-Oct-15 4.39% 18.88

Bore pile Team 1Bore pile Team 1 114.00 10-Feb-15 26-Jun-15 0% -79.44

MIP2-6-3880 Cut off Existing pile 2.00 10-Feb-15 12-Feb-15 0% -72.06

Zone AZone A 57.00 25-Feb-15 02-May-15 0% -46.63

Bore Pile 2.2mBore Pile 2.2m 57.00 25-Feb-15 02-May-15 0% -46.63

Row 1Row 1 13.00 25-Feb-15 12-Mar-15 0% -41.63

MIP2-6-3890 Survey Setting out 1.00 25-Feb-15 26-Feb-15 0% -79.44

MIP2-6-3900 Boring 10.00 26-Feb-15 10-Mar-15 0% -79.44

MIP2-6-3910 Steel Bar Fabrication 10.00 27-Feb-15 11-Mar-15 0% -41.63

MIP2-6-3920 Concrete 10.00 28-Feb-15 12-Mar-15 0% -41.63

Row 2Row 2 14.00 10-Mar-15 26-Mar-15 0% -43.63

MIP2-6-3930 Survey Setting out 2.00 10-Mar-15 12-Mar-15 0% -79.44

MIP2-6-3940 Boring 10.00 12-Mar-15 24-Mar-15 0% -79.44

MIP2-6-3950 Steel Bar Fabrication 10.00 13-Mar-15 25-Mar-15 0% -43.63

MIP2-6-3960 Concrete 10.00 14-Mar-15 26-Mar-15 0% -43.63

Row 3Row 3 13.00 24-Mar-15 07-Apr-15 0% -44.63

MIP2-6-3970 Survey Setting out 1.00 24-Mar-15 25-Mar-15 0% -79.44

MIP2-6-3980 Boring 10.00 25-Mar-15 04-Apr-15 0% -79.44

J A J A JJA J A JA J A JJA

14 2015 2016 2017

22-Sep-15, Layer 3

08-Oct-15, Layer 4

23-Oct-15, Layer 5

09-Nov-15, Layer 6

25-Nov-15, Layer 7

09-Dec-15, Layer 8

28-Apr-15, Wall 4

28-Apr-15, RC. Wall 1(11.6m)

04-Apr-15, Sheet Pile Wall

27-Apr-15, RC. Wall 2(10m)

15-Oct-15, ELEVATED STRU

26-Jun-15, Bore pile Team 1

02-May-15, Zone A

02-May-15, Bore Pile 2.2m

12-Mar-15, Row 1

26-Mar-15, Row 2

07-Apr-15, Row 3

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 5 of 33 TASK filter: All Activities

© Oracle Corporation

Page 6: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-3990 Steel Bar Fabrication 10.00 26-Mar-15 06-Apr-15 0% -44.63

MIP2-6-4000 Concrete 10.00 27-Mar-15 07-Apr-15 0% -44.63

Row 4Row 4 12.00 04-Apr-15 18-Apr-15 0% -45.63

MIP2-6-4010 Survey Setting out 1.00 04-Apr-15 06-Apr-15 0% -79.44

MIP2-6-4020 Boring 9.00 06-Apr-15 16-Apr-15 0% -79.44

MIP2-6-4030 Steel Bar Fabrication 9.00 07-Apr-15 17-Apr-15 0% -45.63

MIP2-6-4040 Concrete 9.00 08-Apr-15 18-Apr-15 0% -45.63

Row 5Row 5 13.00 16-Apr-15 02-May-15 0% -46.63

MIP2-6-4050 Survey Setting out 1.00 16-Apr-15 17-Apr-15 0% -79.44

MIP2-6-4060 Boring 10.00 17-Apr-15 29-Apr-15 0% -79.44

MIP2-6-4070 Steel Bar Fabrication 10.00 18-Apr-15 30-Apr-15 0% -46.63

MIP2-6-4080 Concrete 10.00 20-Apr-15 02-May-15 0% -46.63

Zone DZone D 30.00 29-Apr-15 04-Jun-15 0% -77.44

Bore Pile 2.2mBore Pile 2.2m 30.00 29-Apr-15 04-Jun-15 0% -77.44

Row 1Row 1 12.00 29-Apr-15 15-May-15 0% -75.44

MIP2-6-4090 Survey Setting out 2.00 29-Apr-15 02-May-15 0% -79.44

MIP2-6-4100 Boring 8.00 02-May-15 13-May-15 0% -79.44

MIP2-6-4110 Steel Bar Fabrication 8.00 05-May-15 14-May-15 0% -75.44

MIP2-6-4120 Concrete 8.00 06-May-15 15-May-15 0% -75.44

Row 2Row 2 11.00 13-May-15 25-May-15 0% -76.44

MIP2-6-4130 Survey Setting out 1.00 13-May-15 14-May-15 0% -79.44

MIP2-6-4140 Boring 8.00 14-May-15 23-May-15 0% -79.44

MIP2-6-4150 Steel Bar Fabrication 8.00 15-May-15 23-May-15 0% -76.44

MIP2-6-4160 Concrete 8.00 16-May-15 25-May-15 0% -76.44

Row 3Row 3 11.00 23-May-15 04-Jun-15 0% -77.44

MIP2-6-4170 Survey Setting out 1.00 23-May-15 23-May-15 0% -79.44

MIP2-6-4180 Boring 8.00 25-May-15 02-Jun-15 0% -79.44

MIP2-6-4190 Steel Bar Fabrication 8.00 26-May-15 03-Jun-15 0% -77.44

MIP2-6-4200 Concrete 8.00 27-May-15 04-Jun-15 0% -77.44

Zone GZone G 20.00 02-Jun-15 26-Jun-15 0% -79.44

Bore Pile 2.2mBore Pile 2.2m 20.00 02-Jun-15 26-Jun-15 0% -79.44

Row 1Row 1 8.00 02-Jun-15 12-Jun-15 0% -77.44

MIP2-6-4210 Survey Setting out 1.00 02-Jun-15 03-Jun-15 0% -79.44

MIP2-6-4220 Boring 5.00 03-Jun-15 10-Jun-15 0% -79.44

MIP2-6-4230 Steel Bar Fabrication 5.00 04-Jun-15 11-Jun-15 0% -77.44

MIP2-6-4240 Concrete 5.00 05-Jun-15 12-Jun-15 0% -77.44

Row 2Row 2 8.00 10-Jun-15 19-Jun-15 0% -78.44

MIP2-6-4250 Survey Setting out 1.00 10-Jun-15 11-Jun-15 0% -79.44

MIP2-6-4260 Boring 5.00 11-Jun-15 17-Jun-15 0% -79.44

MIP2-6-4270 Steel Bar Fabrication 5.00 12-Jun-15 18-Jun-15 0% -78.44

MIP2-6-4280 Concrete 5.00 13-Jun-15 19-Jun-15 0% -78.44

Row 3Row 3 8.00 17-Jun-15 26-Jun-15 0% -79.44

MIP2-6-4290 Survey Setting out 1.00 17-Jun-15 18-Jun-15 0% -79.44

MIP2-6-4300 Boring 5.00 18-Jun-15 24-Jun-15 0% -79.44

MIP2-6-4310 Steel Bar Fabrication 5.00 19-Jun-15 25-Jun-15 0% -79.44

MIP2-6-4320 Concrete 5.00 20-Jun-15 26-Jun-15 0% -79.44

Bore pile Team 2Bore pile Team 2 168.25 12-Feb-15 03-Sep-15 0% 52.00

MIP2-6-4330 Cut off Existing pile 3.00 12-Feb-15 16-Feb-15 0% -72.06

Bore Pile 1.2mBore Pile 1.2m 159.25 25-Feb-15 03-Sep-15 0% 52.00

Zone B2Zone B2 27.63 25-Feb-15 28-Mar-15 0% -35.63

MIP2-6-4340 Survey Setting out 1.00 25-Feb-15 26-Feb-15 0% -78.06

MIP2-6-4350 Boring 24.63 26-Feb-15 26-Mar-15 0% -78.06

MIP2-6-4360 Steel Bar Fabrication 24.63 27-Feb-15 27-Mar-15 0% -35.63

MIP2-6-4370 Concrete 24.63 28-Feb-15 28-Mar-15 0% -35.63

Zone CZone C 14.75 26-Mar-15 13-Apr-15 0% -25.00

MIP2-6-4380 Survey Setting out 1.00 26-Mar-15 27-Mar-15 0% -78.06

MIP2-6-4390 Boring 12.00 27-Mar-15 10-Apr-15 0% -25.00

MIP2-6-4400 Steel Bar Fabrication 11.75 28-Mar-15 11-Apr-15 0% -25.00

MIP2-6-4410 Concrete 11.75 30-Mar-15 13-Apr-15 0% -25.00

Zone DZone D 21.38 27-Mar-15 21-Apr-15 0% -75.69

MIP2-6-4420 Survey Setting out 1.00 27-Mar-15 28-Mar-15 0% -78.06

MIP2-6-4430 Boring 18.50 28-Mar-15 18-Apr-15 0% -78.06

MIP2-6-4440 Steel Bar Fabrication 18.38 30-Mar-15 20-Apr-15 0% -75.69

MIP2-6-4450 Concrete 18.38 31-Mar-15 21-Apr-15 0% -75.69

Zone E2Zone E2 24.50 18-Apr-15 19-May-15 0% -78.06

MIP2-6-4460 Survey Setting out 1.88 18-Apr-15 21-Apr-15 0% -78.06

MIP2-6-4470 Boring 20.63 21-Apr-15 16-May-15 0% -78.06

MIP2-6-4480 Steel Bar Fabrication 20.63 22-Apr-15 18-May-15 0% -78.06

MIP2-6-4490 Concrete 20.63 23-Apr-15 19-May-15 0% -78.06

Zone IZone I 8.88 16-May-15 27-May-15 0% -77.94

MIP2-6-4500 Survey Setting out 1.00 16-May-15 18-May-15 0% -77.94

MIP2-6-4510 Boring 5.88 18-May-15 25-May-15 0% -77.94

MIP2-6-4520 Steel Bar Fabrication 5.88 19-May-15 26-May-15 0% -77.94

MIP2-6-4530 Concrete 5.88 20-May-15 27-May-15 0% -77.94

Zone H2Zone H2 81.75 27-May-15 03-Sep-15 0% 52.00

MIP2-6-4540 Survey Setting out 1.00 27-May-15 28-May-15 0% 52.00

MIP2-6-4550 Boring 26.25 28-May-15 29-Jun-15 0% 52.00

MIP2-6-4560 Steel Bar Fabrication 26.25 30-Jun-15 01-Aug-15 0% 52.00

MIP2-6-4570 Concrete 26.25 03-Aug-15 03-Sep-15 0% 52.00

J A J A JJA J A JA J A JJA

14 2015 2016 2017

18-Apr-15, Row 4

02-May-15, Row 5

04-Jun-15, Zone D

04-Jun-15, Bore Pile 2.2m

15-May-15, Row 1

25-May-15, Row 2

04-Jun-15, Row 3

26-Jun-15, Zone G

26-Jun-15, Bore Pile 2.2m

12-Jun-15, Row 1

19-Jun-15, Row 2

26-Jun-15, Row 3

03-Sep-15, Bore pile Team 2

03-Sep-15, Bore Pile 1.2m

28-Mar-15, Zone B2

13-Apr-15, Zone C

21-Apr-15, Zone D

19-May-15, Zone E2

27-May-15, Zone I

03-Sep-15, Zone H2

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 6 of 33 TASK filter: All Activities

© Oracle Corporation

Page 7: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

Bore pile Team 3Bore pile Team 3 85.38 25-Feb-15 05-Jun-15 0% -50.31

Bore Pile 1.2mBore Pile 1.2m 85.38 25-Feb-15 05-Jun-15 0% -50.31

Zone FZone F 32.50 25-Feb-15 03-Apr-15 0% -73.06

MIP2-6-4580 Survey Setting out 1.00 25-Feb-15 26-Feb-15 0% -79.38

MIP2-6-4590 Boring 29.50 26-Feb-15 01-Apr-15 0% -79.38

MIP2-6-4600 Steel Bar Fabrication 29.50 27-Feb-15 02-Apr-15 0% -73.06

MIP2-6-4610 Concrete 29.50 28-Feb-15 03-Apr-15 0% -73.06

Zone B1Zone B1 22.38 01-Apr-15 27-Apr-15 0% -79.38

MIP2-6-4620 Survey Setting out 1.00 01-Apr-15 02-Apr-15 0% -79.38

MIP2-6-4630 Boring 19.50 02-Apr-15 24-Apr-15 0% -79.38

MIP2-6-4640 Steel Bar Fabrication 19.38 03-Apr-15 25-Apr-15 0% -79.38

MIP2-6-4650 Concrete 19.38 04-Apr-15 27-Apr-15 0% -79.38

Zone GZone G 15.63 24-Apr-15 14-May-15 0% -79.19

MIP2-6-4660 Survey Setting out 1.88 24-Apr-15 27-Apr-15 0% -79.19

MIP2-6-4670 Boring 11.75 27-Apr-15 12-May-15 0% -79.19

MIP2-6-4680 Steel Bar Fabrication 11.75 28-Apr-15 13-May-15 0% -79.19

MIP2-6-4690 Concrete 11.75 29-Apr-15 14-May-15 0% -79.19

Zone E1Zone E1 25.50 24-Apr-15 26-May-15 0% -41.44

MIP2-6-4700 Survey Setting out 1.88 24-Apr-15 27-Apr-15 0% -50.31

MIP2-6-4710 Boring 21.75 27-Apr-15 23-May-15 0% -50.31

MIP2-6-4720 Steel Bar Fabrication 21.63 28-Apr-15 25-May-15 0% -41.44

MIP2-6-4730 Concrete 21.63 29-Apr-15 26-May-15 0% -41.44

Zone H1Zone H1 10.75 23-May-15 05-Jun-15 0% -50.31

MIP2-6-4740 Survey Setting out 0.88 23-May-15 25-May-15 0% -50.31

MIP2-6-4750 Boring 7.88 25-May-15 03-Jun-15 0% -50.31

MIP2-6-4760 Steel Bar Fabrication 7.88 26-May-15 04-Jun-15 0% -50.31

MIP2-6-4770 Concrete 7.88 27-May-15 05-Jun-15 0% -50.31

Bore pile Team 4Bore pile Team 4 205.38 14-Jan-15 A 15-Oct-15 0.04% 5.88

CPB Wall 1CPB Wall 1 90.25 14-Jan-15 A 13-May-15 0.15% 97.25

MIP2-6-4780 Pilling Rig Platform 20.00 14-Jan-15 A 02-Mar-15 25% -99.69

CBP Wall A1CBP Wall A1 60.75 03-Mar-15 13-May-15 0% -4.38

MIP2-6-4790 Survey Setting out 2.00 03-Mar-15 05-Mar-15 0% -99.69

MIP2-6-4800 Boring 8.75 05-Mar-15 14-Mar-15 0% -99.69

MIP2-6-4810 Steel Bar 8.75 06-Mar-15 16-Mar-15 0% 14.38

MIP2-6-4820 Concrete 10.00 07-Mar-15 19-Mar-15 0% 14.38

MIP2-6-4830 Capping Beam A1 3.00 19-Mar-15 23-Mar-15 0% 14.38

MIP2-6-4840 Remove Existing Sheet Pile 2.00 13-Apr-15 15-Apr-15 0% -3.38

MIP2-6-4850 Earthwork 2.00 15-Apr-15 17-Apr-15 0% -3.38

MIP2-6-4860 Skin Wall A1 10.00 18-Apr-15 30-Apr-15 0% -4.38

MIP2-6-4870 Remove Form Work 3.00 11-May-15 13-May-15 0% -4.38

CBP Wall B1CBP Wall B1 50.00 16-Mar-15 13-May-15 0% 97.25

MIP2-6-4880 Survey Setting out 2.00 16-Mar-15 17-Mar-15 0% -99.69

MIP2-6-4890 Boring 16.00 18-Mar-15 04-Apr-15 0% -99.69

MIP2-6-4900 Steel Bar 16.00 19-Mar-15 06-Apr-15 0% -4.38

MIP2-6-4910 Concrete 16.00 20-Mar-15 07-Apr-15 0% -4.38

MIP2-6-4920 Capping Beam B1 5.00 07-Apr-15 13-Apr-15 0% -4.38

MIP2-6-4930 Remove Existing Sheet Pile 3.00 13-Apr-15 16-Apr-15 0% -4.38

MIP2-6-4940 Earthwork 2.00 16-Apr-15 18-Apr-15 0% -4.38

MIP2-6-4950 Skin Wall B1 10.00 18-Apr-15 30-Apr-15 0% -4.38

MIP2-6-4960 Remove Form Work 3.00 11-May-15 13-May-15 0% 97.25

Bore Pile 0.9mBore Pile 0.9m 180.88 25-Feb-15 15-Oct-15 0% 5.88

Zone CZone C 47.63 25-Feb-15 21-Apr-15 0% -99.69

MIP2-6-4970 Survey Setting out 0.38 25-Feb-15 25-Feb-15 0% -66.31

MIP2-6-4980 Boring 3.88 04-Apr-15 09-Apr-15 0% -99.69

MIP2-6-4990 Steel Bar Fabrication 4.00 10-Apr-15 15-Apr-15 0% -99.69

MIP2-6-5000 Concrete 4.00 16-Apr-15 21-Apr-15 0% -99.69

Zone B2Zone B2 4.88 21-Apr-15 25-Apr-15 0% -42.13

MIP2-6-5010 Survey Setting out 1.00 21-Apr-15 22-Apr-15 0% -99.69

MIP2-6-5020 Boring 1.75 22-Apr-15 23-Apr-15 0% -99.69

MIP2-6-5030 Steel Bar Fabrication 1.75 23-Apr-15 24-Apr-15 0% -42.13

MIP2-6-5040 Concrete 1.88 24-Apr-15 25-Apr-15 0% -42.13

Zone DZone D 4.88 24-Apr-15 29-Apr-15 0% 82.38

MIP2-6-5050 Survey Setting out 1.00 24-Apr-15 24-Apr-15 0% -99.69

MIP2-6-5060 Boring 1.88 25-Apr-15 27-Apr-15 0% -99.69

MIP2-6-5070 Steel Bar Fabrication 1.88 25-Apr-15 28-Apr-15 0% 82.38

MIP2-6-5080 Concrete 1.88 27-Apr-15 29-Apr-15 0% 82.38

Zone IZone I 10.88 27-Apr-15 12-May-15 0% -99.69

MIP2-6-5090 Survey Setting out 1.00 27-Apr-15 28-Apr-15 0% -99.69

MIP2-6-5100 Boring 7.63 28-Apr-15 09-May-15 0% -99.69

MIP2-6-5110 Steel Bar Fabrication 7.63 29-Apr-15 11-May-15 0% -99.69

MIP2-6-5120 Concrete 7.88 30-Apr-15 12-May-15 0% -99.69

Zone B1Zone B1 11.88 09-May-15 22-May-15 0% -98.31

MIP2-6-5130 Survey Setting out 1.00 09-May-15 11-May-15 0% -98.31

MIP2-6-5140 Boring 3.00 11-May-15 14-May-15 0% -98.31

MIP2-6-5150 Steel Bar Fabrication 3.00 15-May-15 18-May-15 0% -98.31

MIP2-6-5160 Concrete 2.88 20-May-15 22-May-15 0% -98.31

Zone H2Zone H2 5.00 22-May-15 28-May-15 0% -98.31

MIP2-6-5170 Survey Setting out 1.00 22-May-15 23-May-15 0% -98.31

J A J A JJA J A JA J A JJA

14 2015 2016 2017

05-Jun-15, Bore pile Team 3

05-Jun-15, Bore Pile 1.2m

03-Apr-15, Zone F

27-Apr-15, Zone B1

14-May-15, Zone G

26-May-15, Zone E1

05-Jun-15, Zone H1

15-Oct-15, Bore pile Team 4

13-May-15, CPB Wall 1

13-May-15, CBP Wall A1

13-May-15, CBP Wall B1

15-Oct-15, Bore Pile 0.9m

21-Apr-15, Zone C

25-Apr-15, Zone B2

29-Apr-15, Zone D

12-May-15, Zone I

22-May-15, Zone B1

28-May-15, Zone H2

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 7 of 33 TASK filter: All Activities

© Oracle Corporation

Page 8: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-5180 Boring 1.88 23-May-15 26-May-15 0% -98.31

MIP2-6-5190 Steel Bar Fabrication 2.00 25-May-15 27-May-15 0% -98.31

MIP2-6-5200 Concrete 2.00 26-May-15 28-May-15 0% -98.31

Zone GZone G 23.63 26-May-15 23-Jun-15 0% -50.88

MIP2-6-5210 Survey Setting out 1.00 26-May-15 27-May-15 0% -50.88

MIP2-6-5220 Boring 6.88 27-May-15 04-Jun-15 0% -50.88

MIP2-6-5230 Steel Bar Fabrication 6.88 05-Jun-15 15-Jun-15 0% -50.88

MIP2-6-5240 Concrete 6.88 16-Jun-15 23-Jun-15 0% -50.88

Zone H1Zone H1 5.00 23-Jun-15 29-Jun-15 0% -50.88

MIP2-6-5250 Survey Setting out 1.00 23-Jun-15 24-Jun-15 0% -50.88

MIP2-6-5260 Boring 2.00 24-Jun-15 26-Jun-15 0% -50.88

MIP2-6-5270 Steel Bar Fabrication 2.00 25-Jun-15 27-Jun-15 0% -50.88

MIP2-6-5280 Concrete 2.00 26-Jun-15 29-Jun-15 0% -50.88

CBP Wall A2CBP Wall A2 77.63 26-Jun-15 15-Oct-15 0% 5.88

MIP2-6-5290 Survey Setting out 3.00 26-Jun-15 30-Jun-15 0% 5.88

MIP2-6-5300 Boring 20.00 30-Jun-15 23-Jul-15 0% 5.88

MIP2-6-5310 Steel Bar 20.00 01-Jul-15 24-Jul-15 0% 5.88

MIP2-6-5320 Concrete 20.00 02-Jul-15 27-Jul-15 0% 5.88

MIP2-6-5330 Capping Beam A2 9.00 27-Jul-15 11-Aug-15 0% 5.88

MIP2-6-5340 Skin Wall A2 10.00 11-Aug-15 18-Sep-15 0% 5.88

MIP2-6-5350 Remove Form Work 3.00 26-Sep-15 15-Oct-15 0% 5.88

Bore pile Team 5Bore pile Team 5 120.92 06-Dec-14 A 05-Jun-15 13.98% 112.83

CPB Wall 2CPB Wall 2 94.29 06-Dec-14 A 11-May-15 76.89% -1.41

MIP2-6-5360 Pilling Rig Platform 25.00 06-Dec-14 A 27-Jan-15 A 100%

MIP2-6-5370 Survey Setting out 3.00 30-Dec-14 A 30-Dec-14 A 100%

MIP2-6-5380 Boring 20.00 30-Dec-14 A 16-Feb-15 76% -1.41

MIP2-6-5390 Steel Bar 20.00 30-Dec-14 A 16-Feb-15 76% -1.41

MIP2-6-5400 Concrete 21.00 30-Dec-14 A 16-Feb-15 76% -1.41

MIP2-6-5410 Earthwork 20.00 16-Feb-15 13-Mar-15 0% -1.41

MIP2-6-5420 Capping Beam 2 9.00 13-Mar-15 24-Mar-15 0% -1.41

MIP2-6-5430 Skin Wall 2 10.00 24-Mar-15 22-Apr-15 0% -1.41

MIP2-6-5440 Remove Form Work 3.00 30-Apr-15 11-May-15 0% -1.41

CPB Wall 5CPB Wall 5 63.00 14-Feb-15 30-Apr-15 0% 142.45

MIP2-6-5450 Survey Setting out 3.00 14-Feb-15 18-Feb-15 0% 112.83

MIP2-6-5460 Boring 30.00 18-Feb-15 26-Mar-15 0% 112.83

MIP2-6-5470 Steel Bar 30.00 21-Feb-15 27-Mar-15 0% 142.45

MIP2-6-5480 Concrete 30.00 23-Feb-15 28-Mar-15 0% 142.45

MIP2-6-5490 Capping Beam 5 9.00 28-Mar-15 08-Apr-15 0% 142.45

MIP2-6-5500 Skin Wall 5 10.00 08-Apr-15 20-Apr-15 0% 142.45

MIP2-6-5510 Remove Form Work 2.00 28-Apr-15 30-Apr-15 0% 142.45

CPB Wall 6CPB Wall 6 59.63 26-Mar-15 05-Jun-15 0% 112.83

CBP Wall A3CBP Wall A3 48.63 26-Mar-15 23-May-15 0% 123.83

MIP2-6-5520 Survey Setting out 1.00 26-Mar-15 27-Mar-15 0% 112.83

MIP2-6-5530 Boring 20.00 27-Mar-15 20-Apr-15 0% 112.83

MIP2-6-5540 Steel Bar 20.00 28-Mar-15 21-Apr-15 0% 123.83

MIP2-6-5550 Concrete 20.00 30-Mar-15 22-Apr-15 0% 123.83

MIP2-6-5560 Capping Beam A3 10.00 22-Apr-15 06-May-15 0% 123.83

MIP2-6-5570 Skin Wall A3 15.00 06-May-15 20-May-15 0% 123.83

MIP2-6-5580 Remove Form Work 2.88 20-May-15 23-May-15 0% 123.83

CBP Wall B2CBP Wall B2 38.63 20-Apr-15 05-Jun-15 0% 112.83

MIP2-6-5590 Survey Setting out 1.00 20-Apr-15 21-Apr-15 0% 112.83

MIP2-6-5600 Boring 20.00 21-Apr-15 06-May-15 0% 112.83

MIP2-6-5610 Steel Bar 20.00 22-Apr-15 06-May-15 0% 112.83

MIP2-6-5620 Concrete 20.00 23-Apr-15 06-May-15 0% 112.83

MIP2-6-5630 Capping Beam B2 8.00 06-May-15 15-May-15 0% 112.83

MIP2-6-5640 Skin Wall B2 15.00 15-May-15 01-Jun-15 0% 112.83

MIP2-6-5650 Remove Form Work 3.75 01-Jun-15 05-Jun-15 0% 112.83

R.C Square Pile 30R.C Square Pile 300mmx300mm 159.69 01-Jun-15 10-Dec-15 0% -24.69

Pilling and Cut OPilling and Cut Off Pile Head 159.69 01-Jun-15 10-Dec-15 0% -24.69

MIP2-6-5660 Area A 26.38 01-Jun-15 02-Jul-15 0% -19.88

MIP2-6-5670 Area B 24.88 02-Jul-15 01-Aug-15 0% -19.88

MIP2-6-5680 Area C 25.00 01-Aug-15 01-Sep-15 0% -19.88

MIP2-6-5690 Area D 25.38 02-Sep-15 02-Oct-15 0% -19.88

MIP2-6-5700 Area F 20.00 02-Oct-15 27-Oct-15 0% -19.88

Pile Slab ConstrPile Slab Construction 133.31 02-Jul-15 10-Dec-15 0% -24.69

Area AArea A 22.50 02-Jul-15 30-Jul-15 0% 86.13

MIP2-6-5710 Excavation 9.75 02-Jul-15 13-Jul-15 0% 86.13

MIP2-6-5720 Formwork 4.88 13-Jul-15 21-Jul-15 0% 86.13

MIP2-6-5730 Steel Bar 4.88 16-Jul-15 24-Jul-15 0% 86.13

MIP2-6-5740 Concrete 2.00 24-Jul-15 27-Jul-15 0% 86.13

MIP2-6-5750 Remove Formwork 1.00 29-Jul-15 30-Jul-15 0% 86.13

Area BArea B 31.75 01-Aug-15 09-Sep-15 0% 52.00

MIP2-6-5760 Excavation 10.00 01-Aug-15 13-Aug-15 0% 61.00

MIP2-6-5770 Formwork 4.88 13-Aug-15 19-Aug-15 0% 61.00

MIP2-6-5780 Steel Bar 4.88 17-Aug-15 21-Aug-15 0% 61.00

MIP2-6-5790 Concrete 2.00 03-Sep-15 05-Sep-15 0% 52.00

MIP2-6-5800 Remove Formwork 1.00 08-Sep-15 09-Sep-15 0% 52.00

Area CArea C 23.38 02-Sep-15 30-Sep-15 0% 35.38

J A J A JJA J A JA J A JJA

14 2015 2016 2017

23-Jun-15, Zone G

29-Jun-15, Zone H1

15-Oct-15, CBP Wall A2

05-Jun-15, Bore pile Team 5

11-May-15, CPB Wall 2

30-Apr-15, CPB Wall 5

05-Jun-15, CPB Wall 6

23-May-15, CBP Wall A3

05-Jun-15, CBP Wall B2

10-Dec-15, R.C Square Pi

10-Dec-15, Pilling and Cut

10-Dec-15, Pile Slab Cons

30-Jul-15, Area A

09-Sep-15, Area B

30-Sep-15, Area C

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 8 of 33 TASK filter: All Activities

© Oracle Corporation

Page 9: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-5810 Excavation 10.63 02-Sep-15 14-Sep-15 0% 35.38

MIP2-6-5820 Formwork 4.88 14-Sep-15 21-Sep-15 0% 35.38

MIP2-6-5830 Steel Bar 4.88 18-Sep-15 23-Sep-15 0% 35.38

MIP2-6-5840 Concrete 2.00 25-Sep-15 26-Sep-15 0% 35.38

MIP2-6-5850 Remove Formwork 1.00 29-Sep-15 30-Sep-15 0% 35.38

Area DArea D 58.06 02-Oct-15 10-Dec-15 0% -34.69

MIP2-6-5860 Excavation 8.88 02-Oct-15 13-Oct-15 0% 1.75

MIP2-6-5870 Formwork 4.88 13-Oct-15 20-Oct-15 0% 1.75

MIP2-6-5880 Steel Bar 4.88 17-Oct-15 23-Oct-15 0% 1.75

MIP2-6-5890 Concrete 2.00 23-Oct-15 24-Oct-15 0% 1.75

MIP2-6-5900 Remove Formwork 1.00 09-Dec-15 10-Dec-15 0% -34.69

Area FArea F 23.25 27-Oct-15 24-Nov-15 0% -19.88

MIP2-6-5910 Excavation 9.63 27-Oct-15 06-Nov-15 0% -19.88

MIP2-6-5920 Formwork 5.88 06-Nov-15 14-Nov-15 0% -19.88

MIP2-6-5930 Steel Bar 4.88 12-Nov-15 18-Nov-15 0% -19.88

MIP2-6-5940 Concrete 2.00 18-Nov-15 20-Nov-15 0% -19.88

MIP2-6-5950 Remove Formwork 0.88 23-Nov-15 24-Nov-15 0% -19.88

WORK BELOW LOWORK BELOW LOWEST FLOOR 179.25 28-Mar-15 31-Oct-15 0% 68.50

Pile CapsPile Caps 113.63 28-Mar-15 12-Aug-15 0% -77.88

Zone AZone A 19.00 02-May-15 25-May-15 0% -46.63

20A2220A22 19.00 02-May-15 25-May-15 0% -46.63

MIP2-6-5960 Excavation 7.00 02-May-15 12-May-15 0% -46.63

MIP2-6-5970 Formwork 5.00 12-May-15 18-May-15 0% -46.63

MIP2-6-5980 Steel Bar 3.00 15-May-15 19-May-15 0% -46.63

MIP2-6-5990 Concrete 3.00 19-May-15 22-May-15 0% -46.63

MIP2-6-6000 Remove formwork 1.00 25-May-15 25-May-15 0% -46.63

Zone B2Zone B2 34.88 28-Mar-15 09-May-15 0% -42.13

Part1Part1 10.00 27-Apr-15 09-May-15 0% -42.13

MIP2-6-6010 Excavation 1.00 27-Apr-15 27-Apr-15 0% -42.13

2B09032B0903 6.00 28-Apr-15 06-May-15 0% -42.13

MIP2-6-6020 Formwork 1.00 28-Apr-15 28-Apr-15 0% -42.13

MIP2-6-6030 Steel Bar 1.00 29-Apr-15 29-Apr-15 0% -42.13

MIP2-6-6040 Concrete 1.00 30-Apr-15 30-Apr-15 0% -42.13

MIP2-6-6050 Remove formwork 1.00 05-May-15 06-May-15 0% -42.13

2B09042B0904 9.00 28-Apr-15 09-May-15 0% -42.13

MIP2-6-6060 Formwork 1.00 28-Apr-15 28-Apr-15 0% -42.13

MIP2-6-6070 Steel Bar 1.00 29-Apr-15 29-Apr-15 0% -42.13

MIP2-6-6080 Concrete 1.00 30-Apr-15 30-Apr-15 0% -42.13

MIP2-6-6090 Remove formwork 1.00 05-May-15 06-May-15 0% -42.13

MIP2-6-6100 Backfilling 3.00 06-May-15 09-May-15 0% -42.13

Part2Part2 11.00 28-Mar-15 10-Apr-15 0% -18.25

MIP2-6-6110 Excavation 2.00 28-Mar-15 31-Mar-15 0% -18.25

3B12073B1207 6.00 31-Mar-15 07-Apr-15 0% -18.25

MIP2-6-6120 Formwork 1.00 31-Mar-15 01-Apr-15 0% -18.25

MIP2-6-6130 Steel Bar 1.00 01-Apr-15 02-Apr-15 0% -18.25

MIP2-6-6140 Concrete 1.00 02-Apr-15 03-Apr-15 0% -18.25

MIP2-6-6150 Remove formwork 1.00 06-Apr-15 07-Apr-15 0% -18.25

3B12083B1208 6.00 31-Mar-15 07-Apr-15 0% -18.25

MIP2-6-6160 Formwork 1.00 31-Mar-15 01-Apr-15 0% -18.25

MIP2-6-6170 Steel Bar 1.00 01-Apr-15 02-Apr-15 0% -18.25

MIP2-6-6180 Concrete 1.00 02-Apr-15 03-Apr-15 0% -18.25

MIP2-6-6190 Remove formwork 1.00 06-Apr-15 07-Apr-15 0% -18.25

3B12113B1211 6.00 31-Mar-15 07-Apr-15 0% -18.25

MIP2-6-6200 Formwork 1.00 31-Mar-15 01-Apr-15 0% -18.25

MIP2-6-6210 Steel Bar 1.00 01-Apr-15 02-Apr-15 0% -18.25

MIP2-6-6220 Concrete 1.00 02-Apr-15 03-Apr-15 0% -18.25

MIP2-6-6230 Remove formwork 1.00 06-Apr-15 07-Apr-15 0% -18.25

3B12123B1212 9.00 31-Mar-15 10-Apr-15 0% -18.25

MIP2-6-6240 Formwork 1.00 31-Mar-15 01-Apr-15 0% -18.25

MIP2-6-6250 Steel Bar 1.00 01-Apr-15 02-Apr-15 0% -18.25

MIP2-6-6260 Concrete 1.00 02-Apr-15 03-Apr-15 0% -18.25

MIP2-6-6270 Remove formwork 1.00 06-Apr-15 07-Apr-15 0% -18.25

MIP2-6-6280 Backfilling 3.00 07-Apr-15 10-Apr-15 0% -18.25

Part3Part3 17.00 28-Mar-15 17-Apr-15 0% -24.25

MIP2-6-6290 Excavation 2.00 28-Mar-15 31-Mar-15 0% -35.63

5B12155B1215 6.00 31-Mar-15 07-Apr-15 0% -35.63

MIP2-6-6300 Formwork 1.00 31-Mar-15 01-Apr-15 0% -35.63

MIP2-6-6310 Steel Bar 1.00 01-Apr-15 02-Apr-15 0% -35.63

MIP2-6-6320 Concrete 1.00 02-Apr-15 03-Apr-15 0% -35.63

MIP2-6-6330 Remove formwork 1.00 06-Apr-15 07-Apr-15 0% -35.63

5B12165B1216 9.00 07-Apr-15 17-Apr-15 0% -24.25

MIP2-6-6340 Formwork 1.00 07-Apr-15 08-Apr-15 0% -35.63

MIP2-6-6350 Steel Bar 1.00 08-Apr-15 09-Apr-15 0% -35.63

MIP2-6-6360 Concrete 1.00 09-Apr-15 10-Apr-15 0% -35.63

MIP2-6-6370 Remove formwork 1.00 13-Apr-15 14-Apr-15 0% -24.25

MIP2-6-6380 Backfilling 3.00 14-Apr-15 17-Apr-15 0% -24.25

Zone CZone C 15.00 13-Apr-15 29-Apr-15 0% -25.00

Part1Part1 11.00 13-Apr-15 24-Apr-15 0% -21.00

MIP2-6-6390 Excavation 2.00 13-Apr-15 15-Apr-15 0% -25.00

J A J A JJA J A JA J A JJA

14 2015 2016 2017

10-Dec-15, Area D

24-Nov-15, Area F

31-Oct-15, WORK BELOW

12-Aug-15, Pile Caps

25-May-15, Zone A

25-May-15, 20A22

09-May-15, Zone B2

09-May-15, Part1

06-May-15, 2B0903

09-May-15, 2B0904

10-Apr-15, Part2

07-Apr-15, 3B1207

07-Apr-15, 3B1208

07-Apr-15, 3B1211

10-Apr-15, 3B1212

17-Apr-15, Part3

07-Apr-15, 5B1215

17-Apr-15, 5B1216

29-Apr-15, Zone C

24-Apr-15, Part1

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 9 of 33 TASK filter: All Activities

© Oracle Corporation

Page 10: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

2C09012C0901 5.00 15-Apr-15 20-Apr-15 0% -20.00

MIP2-6-6400 Formwork 1.00 15-Apr-15 16-Apr-15 0% -20.00

MIP2-6-6410 Steel Bar 1.00 16-Apr-15 17-Apr-15 0% -20.00

MIP2-6-6420 Concrete 1.00 16-Apr-15 17-Apr-15 0% -20.00

MIP2-6-6430 Remove formwork 1.00 20-Apr-15 20-Apr-15 0% -20.00

2c09022c0902 6.00 15-Apr-15 21-Apr-15 0% -21.00

MIP2-6-6440 Formwork 1.00 15-Apr-15 16-Apr-15 0% -21.00

MIP2-6-6450 Steel Bar 1.00 16-Apr-15 17-Apr-15 0% -21.00

MIP2-6-6460 Concrete 1.00 17-Apr-15 18-Apr-15 0% -21.00

MIP2-6-6470 Remove formwork 1.00 21-Apr-15 21-Apr-15 0% -21.00

2c09032c0903 6.00 15-Apr-15 21-Apr-15 0% -21.00

MIP2-6-6480 Formwork 1.00 15-Apr-15 16-Apr-15 0% -21.00

MIP2-6-6490 Steel Bar 1.00 16-Apr-15 17-Apr-15 0% -21.00

MIP2-6-6500 Concrete 1.00 17-Apr-15 18-Apr-15 0% -21.00

MIP2-6-6510 Remove formwork 1.00 21-Apr-15 21-Apr-15 0% -21.00

2C09062C0906 9.00 15-Apr-15 24-Apr-15 0% -21.00

MIP2-6-6520 Formwork 1.00 15-Apr-15 16-Apr-15 0% -21.00

MIP2-6-6530 Steel Bar 1.00 16-Apr-15 17-Apr-15 0% -21.00

MIP2-6-6540 Concrete 1.00 17-Apr-15 18-Apr-15 0% -21.00

MIP2-6-6550 Remove formwork 1.00 21-Apr-15 21-Apr-15 0% -21.00

MIP2-6-6560 Backfilling 3.00 22-Apr-15 24-Apr-15 0% -21.00

Part2Part2 13.00 15-Apr-15 29-Apr-15 0% -25.00

MIP2-6-6570 Excavation 2.00 15-Apr-15 17-Apr-15 0% -25.00

3C12043C1204 8.00 17-Apr-15 25-Apr-15 0% -25.00

MIP2-6-6580 Formwork 2.00 17-Apr-15 18-Apr-15 0% -25.00

MIP2-6-6590 Steel Bar 2.00 20-Apr-15 21-Apr-15 0% -25.00

MIP2-6-6600 Concrete 1.00 22-Apr-15 22-Apr-15 0% -25.00

MIP2-6-6610 Remove formwork 1.00 25-Apr-15 25-Apr-15 0% -25.00

2C12052C1205 8.00 17-Apr-15 25-Apr-15 0% -25.00

MIP2-6-6620 Formwork 2.00 17-Apr-15 18-Apr-15 0% -25.00

MIP2-6-6630 Steel Bar 2.00 20-Apr-15 21-Apr-15 0% -25.00

MIP2-6-6640 Concrete 1.00 22-Apr-15 22-Apr-15 0% -25.00

MIP2-6-6650 Remove formwork 1.00 25-Apr-15 25-Apr-15 0% -25.00

3C12073C1207 8.00 17-Apr-15 25-Apr-15 0% -25.00

MIP2-6-6660 Formwork 2.00 17-Apr-15 18-Apr-15 0% -25.00

MIP2-6-6670 Steel Bar 2.00 20-Apr-15 21-Apr-15 0% -25.00

MIP2-6-6680 Concrete 1.00 22-Apr-15 22-Apr-15 0% -25.00

MIP2-6-6690 Remove formwork 1.00 25-Apr-15 25-Apr-15 0% -25.00

3C12083C1208 8.00 17-Apr-15 25-Apr-15 0% -25.00

MIP2-6-6700 Formwork 2.00 17-Apr-15 18-Apr-15 0% -25.00

MIP2-6-6710 Steel Bar 2.00 20-Apr-15 21-Apr-15 0% -25.00

MIP2-6-6720 Concrete 1.00 22-Apr-15 22-Apr-15 0% -25.00

MIP2-6-6730 Remove formwork 1.00 25-Apr-15 25-Apr-15 0% -25.00

2C12092C1209 11.00 17-Apr-15 29-Apr-15 0% -25.00

MIP2-6-6740 Formwork 2.00 17-Apr-15 18-Apr-15 0% -25.00

MIP2-6-6750 Steel Bar 2.00 20-Apr-15 21-Apr-15 0% -25.00

MIP2-6-6760 Concrete 1.00 22-Apr-15 22-Apr-15 0% -25.00

MIP2-6-6770 Remove formwork 1.00 25-Apr-15 25-Apr-15 0% -25.00

MIP2-6-6780 Backfilling 3.00 25-Apr-15 29-Apr-15 0% -25.00

Zone DZone D 51.00 21-Apr-15 22-Jun-15 0% -77.44

Part1Part1 14.00 04-Jun-15 22-Jun-15 0% -77.44

MIP2-6-6790 Excavation 3.00 04-Jun-15 09-Jun-15 0% -77.44

9D229D22 11.00 09-Jun-15 22-Jun-15 0% -77.44

MIP2-6-6800 Formwork 3.00 09-Jun-15 12-Jun-15 0% -77.44

MIP2-6-6810 Steel Bar 3.00 12-Jun-15 16-Jun-15 0% -77.44

MIP2-6-6820 Concrete 2.00 16-Jun-15 18-Jun-15 0% -77.44

MIP2-6-6830 Remove formwork 1.00 20-Jun-15 22-Jun-15 0% -77.44

Part2Part2 19.25 21-Apr-15 16-May-15 0% -75.69

MIP2-6-6840 Excavation 4.00 21-Apr-15 25-Apr-15 0% -75.69

2D12012D1201 10.00 25-Apr-15 09-May-15 0% -71.44

MIP2-6-6850 Formwork 5.00 25-Apr-15 02-May-15 0% -71.44

MIP2-6-6860 Steel Bar 3.00 28-Apr-15 02-May-15 0% -71.44

MIP2-6-6870 Concrete 2.00 02-May-15 06-May-15 0% -71.44

MIP2-6-6880 Remove formwork 1.00 08-May-15 09-May-15 0% -71.44

2D12022D1202 10.00 25-Apr-15 09-May-15 0% -71.44

MIP2-6-6890 Formwork 5.00 25-Apr-15 02-May-15 0% -71.44

MIP2-6-6900 Steel Bar 5.00 28-Apr-15 06-May-15 0% -71.44

MIP2-6-6910 Concrete 2.00 06-May-15 08-May-15 0% -71.44

MIP2-6-6920 Remove formwork 1.00 08-May-15 09-May-15 0% -71.44

4D12034D1203 10.00 25-Apr-15 09-May-15 0% -71.44

MIP2-6-6930 Formwork 5.00 25-Apr-15 02-May-15 0% -71.44

MIP2-6-6940 Steel Bar 3.00 28-Apr-15 02-May-15 0% -71.44

MIP2-6-6950 Concrete 2.00 02-May-15 06-May-15 0% -71.44

MIP2-6-6960 Remove formwork 1.00 08-May-15 09-May-15 0% -71.44

5D12045D1204 10.00 25-Apr-15 09-May-15 0% -71.44

MIP2-6-6970 Formwork 5.00 25-Apr-15 02-May-15 0% -71.44

MIP2-6-6980 Steel Bar 3.00 28-Apr-15 02-May-15 0% -71.44

MIP2-6-6990 Concrete 2.00 02-May-15 06-May-15 0% -71.44

J A J A JJA J A JA J A JJA

14 2015 2016 2017

20-Apr-15, 2C0901

21-Apr-15, 2c0902

21-Apr-15, 2c0903

24-Apr-15, 2C0906

29-Apr-15, Part2

25-Apr-15, 3C1204

25-Apr-15, 2C1205

25-Apr-15, 3C1207

25-Apr-15, 3C1208

29-Apr-15, 2C1209

22-Jun-15, Zone D

22-Jun-15, Part1

22-Jun-15, 9D22

16-May-15, Part2

09-May-15, 2D1201

09-May-15, 2D1202

09-May-15, 4D1203

09-May-15, 5D1204

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 10 of 33 TASK filter: All Activities

© Oracle Corporation

Page 11: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-7000 Remove formwork 1.00 08-May-15 09-May-15 0% -71.44

2D12052D1205 10.00 25-Apr-15 09-May-15 0% -71.44

MIP2-6-7010 Formwork 5.00 25-Apr-15 02-May-15 0% -71.44

MIP2-6-7020 Steel Bar 3.00 28-Apr-15 02-May-15 0% -71.44

MIP2-6-7030 Concrete 2.00 02-May-15 06-May-15 0% -71.44

MIP2-6-7040 Remove formwork 1.00 08-May-15 09-May-15 0% -71.44

2D12062D1206 10.00 25-Apr-15 09-May-15 0% -71.44

MIP2-6-7050 Formwork 5.00 25-Apr-15 02-May-15 0% -71.44

MIP2-6-7060 Steel Bar 3.00 28-Apr-15 02-May-15 0% -71.44

MIP2-6-7070 Concrete 2.00 02-May-15 06-May-15 0% -71.44

MIP2-6-7080 Remove formwork 1.00 08-May-15 09-May-15 0% -71.44

2D12072D1207 15.25 25-Apr-15 16-May-15 0% -75.69

MIP2-6-7090 Formwork 5.00 25-Apr-15 02-May-15 0% -75.69

MIP2-6-7100 Steel Bar 3.00 02-May-15 08-May-15 0% -75.69

MIP2-6-7110 Concrete 2.00 08-May-15 12-May-15 0% -75.69

MIP2-6-7120 Remove formwork 1.00 14-May-15 16-May-15 0% -75.69

2D09082D0908 15.25 25-Apr-15 16-May-15 0% -75.69

MIP2-6-7130 Formwork 5.00 25-Apr-15 02-May-15 0% -75.69

MIP2-6-7140 Steel Bar 3.00 02-May-15 08-May-15 0% -75.69

MIP2-6-7150 Concrete 2.00 08-May-15 12-May-15 0% -75.69

MIP2-6-7160 Remove formwork 1.00 14-May-15 16-May-15 0% -75.69

Zone E2Zone E2 17.00 19-May-15 09-Jun-15 0% -78.06

Part1Part1 15.00 19-May-15 05-Jun-15 0% -77.06

MIP2-6-7170 Excavation 2.00 19-May-15 21-May-15 0% -78.06

4E12034E1203 13.00 21-May-15 05-Jun-15 0% -77.06

MIP2-6-7180 Formwork 5.00 21-May-15 27-May-15 0% -77.06

MIP2-6-7190 Steel Bar 3.00 27-May-15 30-May-15 0% -77.06

MIP2-6-7200 Concrete 2.00 30-May-15 02-Jun-15 0% -77.06

MIP2-6-7210 Remove formwork 1.00 04-Jun-15 05-Jun-15 0% -77.06

4E12044E1204 13.00 21-May-15 05-Jun-15 0% -77.06

MIP2-6-7220 Formwork 5.00 21-May-15 27-May-15 0% -77.06

MIP2-6-7230 Steel Bar 3.00 27-May-15 30-May-15 0% -77.06

MIP2-6-7240 Concrete 2.00 30-May-15 02-Jun-15 0% -77.06

MIP2-6-7250 Remove formwork 1.00 04-Jun-15 05-Jun-15 0% -77.06

4E12074E1207 13.00 21-May-15 05-Jun-15 0% -77.06

MIP2-6-7260 Formwork 5.00 21-May-15 27-May-15 0% -77.06

MIP2-6-7270 Steel Bar 3.00 27-May-15 30-May-15 0% -77.06

MIP2-6-7280 Concrete 2.00 30-May-15 02-Jun-15 0% -77.06

MIP2-6-7290 Remove formwork 1.00 04-Jun-15 05-Jun-15 0% -77.06

Part2Part2 15.00 21-May-15 09-Jun-15 0% -78.06

MIP2-6-7300 Excavation 2.00 21-May-15 23-May-15 0% -78.06

5E12085E1208 13.00 23-May-15 09-Jun-15 0% -78.06

MIP2-6-7310 Formwork 5.00 23-May-15 29-May-15 0% -78.06

MIP2-6-7320 Steel Bar 3.00 29-May-15 02-Jun-15 0% -78.06

MIP2-6-7330 Concrete 2.00 02-Jun-15 04-Jun-15 0% -78.06

MIP2-6-7340 Remove formwork 1.00 08-Jun-15 09-Jun-15 0% -78.06

3E12113E1211 13.00 23-May-15 09-Jun-15 0% -78.06

MIP2-6-7350 Formwork 5.00 23-May-15 29-May-15 0% -78.06

MIP2-6-7360 Steel Bar 3.00 29-May-15 02-Jun-15 0% -78.06

MIP2-6-7370 Concrete 2.00 02-Jun-15 04-Jun-15 0% -78.06

MIP2-6-7380 Remove formwork 1.00 08-Jun-15 09-Jun-15 0% -78.06

3E12123E1212 13.00 23-May-15 09-Jun-15 0% -78.06

MIP2-6-7390 Formwork 5.00 23-May-15 29-May-15 0% -78.06

MIP2-6-7400 Steel Bar 3.00 29-May-15 02-Jun-15 0% -78.06

MIP2-6-7410 Concrete 2.00 02-Jun-15 04-Jun-15 0% -78.06

MIP2-6-7420 Remove formwork 1.00 08-Jun-15 09-Jun-15 0% -78.06

Zone IZone I 23.50 12-May-15 09-Jun-15 0% -78.06

Part1Part1 10.13 27-May-15 09-Jun-15 0% -78.06

MIP2-6-7430 Excavation 1.00 27-May-15 28-May-15 0% -77.94

2I12012I1201 9.13 28-May-15 09-Jun-15 0% -78.06

MIP2-6-7440 Formwork 2.00 28-May-15 30-May-15 0% -77.94

MIP2-6-7450 Steel Bar 2.00 30-May-15 02-Jun-15 0% -77.94

MIP2-6-7460 Concrete 2.00 02-Jun-15 04-Jun-15 0% -77.94

MIP2-6-7470 Remove formwork 1.00 08-Jun-15 09-Jun-15 0% -78.06

2I12022I1202 9.00 28-May-15 09-Jun-15 0% -77.94

MIP2-6-7480 Formwork 2.00 28-May-15 30-May-15 0% -77.94

MIP2-6-7490 Steel Bar 2.00 30-May-15 02-Jun-15 0% -77.94

MIP2-6-7500 Concrete 2.00 02-Jun-15 04-Jun-15 0% -77.94

MIP2-6-7510 Remove formwork 1.00 08-Jun-15 09-Jun-15 0% -77.94

2I12052I1205 9.00 28-May-15 09-Jun-15 0% -77.94

MIP2-6-7520 Formwork 2.00 28-May-15 30-May-15 0% -77.94

MIP2-6-7530 Steel Bar 2.00 30-May-15 02-Jun-15 0% -77.94

MIP2-6-7540 Concrete 2.00 02-Jun-15 04-Jun-15 0% -77.94

MIP2-6-7550 Remove formwork 1.00 08-Jun-15 09-Jun-15 0% -77.94

Part2Part2 17.00 12-May-15 30-May-15 0% -99.69

MIP2-6-7560 Excavation 2.00 12-May-15 14-May-15 0% -99.69

2I09032I0903 12.00 14-May-15 28-May-15 0% -97.69

MIP2-6-7570 Formwork 3.00 14-May-15 18-May-15 0% -97.69

MIP2-6-7580 Steel Bar 3.00 18-May-15 21-May-15 0% -97.69

J A J A JJA J A JA J A JJA

14 2015 2016 2017

09-May-15, 2D1205

09-May-15, 2D1206

16-May-15, 2D1207

16-May-15, 2D0908

09-Jun-15, Zone E2

05-Jun-15, Part1

05-Jun-15, 4E1203

05-Jun-15, 4E1204

05-Jun-15, 4E1207

09-Jun-15, Part2

09-Jun-15, 5E1208

09-Jun-15, 3E1211

09-Jun-15, 3E1212

09-Jun-15, Zone I

09-Jun-15, Part1

09-Jun-15, 2I1201

09-Jun-15, 2I1202

09-Jun-15, 2I1205

30-May-15, Part2

28-May-15, 2I0903

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 11 of 33 TASK filter: All Activities

© Oracle Corporation

Page 12: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-7590 Concrete 3.00 21-May-15 25-May-15 0% -97.69

MIP2-6-7600 Remove formwork 1.00 27-May-15 28-May-15 0% -97.69

2I09042I0904 12.00 14-May-15 28-May-15 0% -97.69

MIP2-6-7610 Formwork 3.00 14-May-15 18-May-15 0% -97.69

MIP2-6-7620 Steel Bar 3.00 18-May-15 21-May-15 0% -97.69

MIP2-6-7630 Concrete 3.00 21-May-15 25-May-15 0% -97.69

MIP2-6-7640 Remove formwork 1.00 27-May-15 28-May-15 0% -97.69

2I09062I0906 12.00 14-May-15 28-May-15 0% -97.69

MIP2-6-7650 Formwork 3.00 14-May-15 18-May-15 0% -97.69

MIP2-6-7660 Steel Bar 3.00 18-May-15 21-May-15 0% -97.69

MIP2-6-7670 Concrete 3.00 21-May-15 25-May-15 0% -97.69

MIP2-6-7680 Remove formwork 1.00 27-May-15 28-May-15 0% -97.69

2I09072I0907 12.00 14-May-15 28-May-15 0% -97.69

MIP2-6-7690 Formwork 3.00 14-May-15 18-May-15 0% -97.69

MIP2-6-7700 Steel Bar 3.00 18-May-15 21-May-15 0% -97.69

MIP2-6-7710 Concrete 3.00 21-May-15 25-May-15 0% -97.69

MIP2-6-7720 Remove formwork 1.00 27-May-15 28-May-15 0% -97.69

2I09082I0908 12.00 14-May-15 28-May-15 0% -97.69

MIP2-6-7730 Formwork 3.00 14-May-15 18-May-15 0% -97.69

MIP2-6-7740 Steel Bar 3.00 18-May-15 21-May-15 0% -97.69

MIP2-6-7750 Concrete 3.00 21-May-15 25-May-15 0% -97.69

MIP2-6-7760 Remove formwork 1.00 27-May-15 28-May-15 0% -97.69

2I09092I0909 12.00 14-May-15 28-May-15 0% -97.69

MIP2-6-7770 Formwork 3.00 14-May-15 18-May-15 0% -97.69

MIP2-6-7780 Steel Bar 3.00 18-May-15 21-May-15 0% -97.69

MIP2-6-7790 Concrete 3.00 21-May-15 25-May-15 0% -97.69

MIP2-6-7800 Remove formwork 1.00 27-May-15 28-May-15 0% -97.69

2I09102I0910 15.00 14-May-15 30-May-15 0% -99.69

MIP2-6-7810 Formwork 3.00 14-May-15 18-May-15 0% -99.69

MIP2-6-7820 Steel Bar 3.00 18-May-15 21-May-15 0% -99.69

MIP2-6-7830 Concrete 3.00 21-May-15 25-May-15 0% -99.69

MIP2-6-7840 Remove formwork 1.00 30-May-15 30-May-15 0% -99.69

2I09112I0911 15.00 14-May-15 30-May-15 0% -99.69

MIP2-6-7850 Formwork 3.00 14-May-15 18-May-15 0% -96.69

MIP2-6-7860 Steel Bar 3.00 18-May-15 21-May-15 0% -96.69

MIP2-6-7870 Concrete 3.00 21-May-15 25-May-15 0% -96.69

MIP2-6-7880 Remove formwork 1.00 30-May-15 30-May-15 0% -99.69

Zone H2Zone H2 53.50 28-May-15 01-Aug-15 0% -99.69

Part1Part1 13.00 03-Jul-15 21-Jul-15 0% -99.69

MIP2-6-7890 Excavation 5.00 03-Jul-15 09-Jul-15 0% -99.69

24H1224H12 8.00 09-Jul-15 21-Jul-15 0% -99.69

MIP2-6-7900 Formwork 2.00 09-Jul-15 11-Jul-15 0% -99.69

MIP2-6-7910 Steel Bar 2.00 10-Jul-15 13-Jul-15 0% -99.69

MIP2-6-7920 Concrete 2.00 13-Jul-15 15-Jul-15 0% -99.69

MIP2-6-7930 Remove formwork 1.00 17-Jul-15 21-Jul-15 0% -99.69

Part2Part2 53.50 28-May-15 01-Aug-15 0% -99.69

MIP2-6-7940 Excavation 1.00 21-Jul-15 22-Jul-15 0% -99.69

2H12022H1202 9.00 22-Jul-15 01-Aug-15 0% -99.69

MIP2-6-7950 Formwork 2.00 22-Jul-15 24-Jul-15 0% -99.69

MIP2-6-7960 Steel Bar 2.00 24-Jul-15 27-Jul-15 0% -99.69

MIP2-6-7970 Concrete 2.00 27-Jul-15 29-Jul-15 0% -99.69

MIP2-6-7980 Remove formwork 1.00 31-Jul-15 01-Aug-15 0% -99.69

2H12032H1203 9.00 22-Jul-15 01-Aug-15 0% -99.69

MIP2-6-7990 Formwork 2.00 22-Jul-15 24-Jul-15 0% -99.69

MIP2-6-8000 Steel Bar 2.00 24-Jul-15 27-Jul-15 0% -99.69

MIP2-6-8010 Concrete 2.00 27-Jul-15 29-Jul-15 0% -99.69

MIP2-6-8020 Remove formwork 1.00 31-Jul-15 01-Aug-15 0% -99.69

2H12042H1204 9.00 22-Jul-15 01-Aug-15 0% -99.69

MIP2-6-8030 Formwork 2.00 22-Jul-15 24-Jul-15 0% -99.69

MIP2-6-8040 Steel Bar 2.00 24-Jul-15 27-Jul-15 0% -99.69

MIP2-6-8050 Concrete 2.00 27-Jul-15 29-Jul-15 0% -99.69

MIP2-6-8060 Remove formwork 1.00 31-Jul-15 01-Aug-15 0% -99.69

2H12062H1206 9.00 22-Jul-15 01-Aug-15 0% -99.69

MIP2-6-8070 Formwork 2.00 22-Jul-15 24-Jul-15 0% -99.69

MIP2-6-8080 Steel Bar 2.00 24-Jul-15 27-Jul-15 0% -99.69

MIP2-6-8090 Concrete 2.00 27-Jul-15 29-Jul-15 0% -99.69

MIP2-6-8100 Remove formwork 1.00 31-Jul-15 01-Aug-15 0% -99.69

Part3Part3 8.38 28-May-15 08-Jun-15 0% -99.69

MIP2-6-8110 Excavation 1.00 28-May-15 29-May-15 0% -98.31

2H09072H0907 6.00 01-Jun-15 08-Jun-15 0% -99.69

MIP2-6-8120 Formwork 1.00 01-Jun-15 01-Jun-15 0% -99.69

MIP2-6-8130 Steel Bar 1.00 02-Jun-15 02-Jun-15 0% -99.69

MIP2-6-8140 Concrete 1.00 03-Jun-15 03-Jun-15 0% -99.69

MIP2-6-8150 Remove formwork 1.00 08-Jun-15 08-Jun-15 0% -99.69

2H09092H0909 7.38 29-May-15 08-Jun-15 0% -99.69

MIP2-6-8160 Formwork 1.00 29-May-15 30-May-15 0% -98.31

MIP2-6-8170 Steel Bar 1.00 30-May-15 01-Jun-15 0% -98.31

MIP2-6-8180 Concrete 1.00 01-Jun-15 02-Jun-15 0% -98.31

J A J A JJA J A JA J A JJA

14 2015 2016 2017

28-May-15, 2I0904

28-May-15, 2I0906

28-May-15, 2I0907

28-May-15, 2I0908

28-May-15, 2I0909

30-May-15, 2I0910

30-May-15, 2I0911

01-Aug-15, Zone H2

21-Jul-15, Part1

21-Jul-15, 24H12

01-Aug-15, Part2

01-Aug-15, 2H1202

01-Aug-15, 2H1203

01-Aug-15, 2H1204

01-Aug-15, 2H1206

08-Jun-15, Part3

08-Jun-15, 2H0907

08-Jun-15, 2H0909

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 12 of 33 TASK filter: All Activities

© Oracle Corporation

Page 13: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-8190 Remove formwork 1.00 08-Jun-15 08-Jun-15 0% -99.69

Zone FZone F 14.00 03-Apr-15 20-Apr-15 0% -17.38

Part1Part1 14.00 03-Apr-15 20-Apr-15 0% -17.38

MIP2-6-8200 Excavation 2.00 03-Apr-15 06-Apr-15 0% -17.38

4F12014F1201 11.00 07-Apr-15 20-Apr-15 0% -17.38

MIP2-6-8210 Formwork 3.00 07-Apr-15 10-Apr-15 0% -17.38

MIP2-6-8220 Steel Bar 3.00 10-Apr-15 14-Apr-15 0% -17.38

MIP2-6-8230 Concrete 2.00 14-Apr-15 16-Apr-15 0% -17.38

MIP2-6-8240 Remove formwork 1.00 18-Apr-15 20-Apr-15 0% -17.38

4F12024F1202 11.00 07-Apr-15 20-Apr-15 0% -17.38

MIP2-6-8250 Formwork 3.00 07-Apr-15 10-Apr-15 0% -17.38

MIP2-6-8260 Steel Bar 3.00 10-Apr-15 14-Apr-15 0% -17.38

MIP2-6-8270 Concrete 2.00 14-Apr-15 16-Apr-15 0% -17.38

MIP2-6-8280 Remove formwork 1.00 18-Apr-15 20-Apr-15 0% -17.38

2F12032F1203 11.00 07-Apr-15 20-Apr-15 0% -17.38

MIP2-6-8290 Formwork 3.00 07-Apr-15 10-Apr-15 0% -17.38

MIP2-6-8300 Steel Bar 3.00 10-Apr-15 14-Apr-15 0% -17.38

MIP2-6-8310 Concrete 2.00 14-Apr-15 16-Apr-15 0% -17.38

MIP2-6-8320 Remove formwork 1.00 18-Apr-15 20-Apr-15 0% -17.38

4F12044F1204 11.00 07-Apr-15 20-Apr-15 0% -17.38

MIP2-6-8330 Formwork 3.00 07-Apr-15 10-Apr-15 0% -17.38

MIP2-6-8340 Steel Bar 3.00 08-Apr-15 11-Apr-15 0% -17.38

MIP2-6-8350 Concrete 2.00 14-Apr-15 16-Apr-15 0% -17.38

MIP2-6-8360 Remove formwork 1.00 18-Apr-15 20-Apr-15 0% -17.38

Part2Part2 13.00 03-Apr-15 18-Apr-15 0% -73.06

MIP2-6-8370 Excavation 2.00 03-Apr-15 06-Apr-15 0% -73.06

4F12054F1205 9.00 07-Apr-15 17-Apr-15 0% -73.06

MIP2-6-8380 Formwork 3.00 07-Apr-15 10-Apr-15 0% -73.06

MIP2-6-8390 Steel Bar 3.00 08-Apr-15 11-Apr-15 0% -73.06

MIP2-6-8400 Concrete 2.00 11-Apr-15 14-Apr-15 0% -73.06

MIP2-6-8410 Remove formwork 1.00 16-Apr-15 17-Apr-15 0% -73.06

2F12062F1206 10.00 06-Apr-15 17-Apr-15 0% -73.06

MIP2-6-8420 Formwork 3.00 06-Apr-15 09-Apr-15 0% -72.06

MIP2-6-8430 Steel Bar 3.00 07-Apr-15 10-Apr-15 0% -72.06

MIP2-6-8440 Concrete 2.00 10-Apr-15 13-Apr-15 0% -72.06

MIP2-6-8450 Remove formwork 1.00 16-Apr-15 17-Apr-15 0% -73.06

4F12074F1207 11.00 06-Apr-15 18-Apr-15 0% -73.06

MIP2-6-8460 Formwork 3.00 06-Apr-15 09-Apr-15 0% -71.06

MIP2-6-8470 Steel Bar 3.00 07-Apr-15 10-Apr-15 0% -71.06

MIP2-6-8480 Concrete 2.00 10-Apr-15 13-Apr-15 0% -71.06

MIP2-6-8490 Remove formwork 1.00 17-Apr-15 18-Apr-15 0% -73.06

4F12084F1208 11.00 06-Apr-15 18-Apr-15 0% -73.06

MIP2-6-8500 Formwork 3.00 06-Apr-15 09-Apr-15 0% -71.06

MIP2-6-8510 Steel Bar 3.00 07-Apr-15 10-Apr-15 0% -71.06

MIP2-6-8520 Concrete 2.00 10-Apr-15 13-Apr-15 0% -71.06

MIP2-6-8530 Remove formwork 1.00 17-Apr-15 18-Apr-15 0% -73.06

2F12092F1209 11.00 06-Apr-15 18-Apr-15 0% -73.06

MIP2-6-8540 Formwork 3.00 06-Apr-15 09-Apr-15 0% -71.06

MIP2-6-8550 Steel Bar 3.00 07-Apr-15 10-Apr-15 0% -71.06

MIP2-6-8560 Concrete 2.00 10-Apr-15 13-Apr-15 0% -71.06

MIP2-6-8570 Remove formwork 1.00 17-Apr-15 18-Apr-15 0% -73.06

Zone GZone G 74.63 14-May-15 12-Aug-15 0% -86.31

Part1Part1 38.25 26-Jun-15 12-Aug-15 0% -99.69

MIP2-6-8580 Excavation 3.00 26-Jun-15 30-Jun-15 0% -79.44

9G229G22 35.25 30-Jun-15 12-Aug-15 0% -99.69

MIP2-6-8590 Formwork 5.00 30-Jun-15 06-Jul-15 0% -79.44

MIP2-6-8600 Steel Bar 5.00 31-Jul-15 06-Aug-15 0% -99.69

MIP2-6-8610 Concrete 2.00 06-Aug-15 08-Aug-15 0% -99.69

MIP2-6-8620 Remove formwork 1.00 11-Aug-15 12-Aug-15 0% -99.69

Part2Part2 9.00 09-Jun-15 19-Jun-15 0% -99.69

MIP2-6-8630 Excavation 1.00 09-Jun-15 09-Jun-15 0% -99.69

4G12014G1201 8.00 10-Jun-15 18-Jun-15 0% -99.69

MIP2-6-8640 Formwork 2.00 10-Jun-15 11-Jun-15 0% -99.69

MIP2-6-8650 Steel Bar 2.00 12-Jun-15 13-Jun-15 0% -99.69

MIP2-6-8660 Concrete 1.00 13-Jun-15 15-Jun-15 0% -99.69

MIP2-6-8670 Remove formwork 1.00 17-Jun-15 18-Jun-15 0% -99.69

4G12024G1202 8.00 10-Jun-15 19-Jun-15 0% -99.69

MIP2-6-8680 Formwork 2.00 10-Jun-15 11-Jun-15 0% -98.69

MIP2-6-8690 Steel Bar 2.00 11-Jun-15 12-Jun-15 0% -98.69

MIP2-6-8700 Concrete 1.00 13-Jun-15 13-Jun-15 0% -98.69

MIP2-6-8710 Remove formwork 1.00 17-Jun-15 19-Jun-15 0% -99.69

Part3Part3 12.13 19-Jun-15 03-Jul-15 0% -99.69

MIP2-6-8720 Excavation 3.00 19-Jun-15 22-Jun-15 0% -99.69

4G09034G0903 9.25 22-Jun-15 02-Jul-15 0% -98.94

MIP2-6-8730 Formwork 4.00 22-Jun-15 26-Jun-15 0% -98.94

MIP2-6-8740 Steel Bar 3.00 24-Jun-15 27-Jun-15 0% -98.94

MIP2-6-8750 Concrete 2.00 27-Jun-15 29-Jun-15 0% -98.94

MIP2-6-8760 Remove formwork 1.00 02-Jul-15 02-Jul-15 0% -98.94

4G09044G0904 10.00 22-Jun-15 03-Jul-15 0% -99.69

J A J A JJA J A JA J A JJA

14 2015 2016 2017

20-Apr-15, Zone F

20-Apr-15, Part1

20-Apr-15, 4F1201

20-Apr-15, 4F1202

20-Apr-15, 2F1203

20-Apr-15, 4F1204

18-Apr-15, Part2

17-Apr-15, 4F1205

17-Apr-15, 2F1206

18-Apr-15, 4F1207

18-Apr-15, 4F1208

18-Apr-15, 2F1209

12-Aug-15, Zone G

12-Aug-15, Part1

12-Aug-15, 9G22

19-Jun-15, Part2

18-Jun-15, 4G1201

19-Jun-15, 4G1202

03-Jul-15, Part3

02-Jul-15, 4G0903

03-Jul-15, 4G0904

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 13 of 33 TASK filter: All Activities

© Oracle Corporation

Page 14: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-8770 Formwork 4.00 22-Jun-15 26-Jun-15 0% -99.69

MIP2-6-8780 Steel Bar 3.00 24-Jun-15 27-Jun-15 0% -99.69

MIP2-6-8790 Concrete 2.00 27-Jun-15 30-Jun-15 0% -99.69

MIP2-6-8800 Remove formwork 1.00 02-Jul-15 03-Jul-15 0% -99.69

6G09056G0905 10.00 22-Jun-15 03-Jul-15 0% -99.69

MIP2-6-8810 Formwork 4.00 22-Jun-15 26-Jun-15 0% -99.69

MIP2-6-8820 Steel Bar 2.88 24-Jun-15 27-Jun-15 0% -99.69

MIP2-6-8830 Concrete 2.00 27-Jun-15 30-Jun-15 0% -99.69

MIP2-6-8840 Remove formwork 1.00 02-Jul-15 03-Jul-15 0% -99.69

6G09076G0907 10.00 22-Jun-15 03-Jul-15 0% -99.69

MIP2-6-8850 Formwork 4.00 22-Jun-15 26-Jun-15 0% -98.69

MIP2-6-8860 Steel Bar 3.00 24-Jun-15 27-Jun-15 0% -98.69

MIP2-6-8870 Concrete 2.00 27-Jun-15 30-Jun-15 0% -98.69

MIP2-6-8880 Remove formwork 1.00 02-Jul-15 03-Jul-15 0% -99.69

Part4Part4 10.00 14-May-15 26-May-15 0% -21.69

MIP2-6-8890 Excavation 2.00 14-May-15 16-May-15 0% -25.06

4G12064G1206 8.00 16-May-15 26-May-15 0% -21.69

MIP2-6-8900 Formwork 2.00 16-May-15 19-May-15 0% -21.69

MIP2-6-8910 Steel Bar 2.00 18-May-15 20-May-15 0% -21.69

MIP2-6-8920 Concrete 2.00 20-May-15 22-May-15 0% -21.69

MIP2-6-8930 Remove formwork 1.00 25-May-15 26-May-15 0% -21.69

3G12083G1208 8.00 16-May-15 26-May-15 0% -21.69

MIP2-6-8940 Formwork 2.00 16-May-15 19-May-15 0% -21.69

MIP2-6-8950 Steel Bar 2.00 18-May-15 20-May-15 0% -21.69

MIP2-6-8960 Concrete 2.00 20-May-15 22-May-15 0% -21.69

MIP2-6-8970 Remove formwork 1.00 25-May-15 26-May-15 0% -21.69

3G12093G1209 8.00 16-May-15 26-May-15 0% -21.69

MIP2-6-8980 Formwork 2.00 16-May-15 19-May-15 0% -25.06

MIP2-6-8990 Steel Bar 2.00 18-May-15 20-May-15 0% -25.06

MIP2-6-9000 Concrete 2.00 20-May-15 22-May-15 0% -25.06

MIP2-6-9010 Remove formwork 1.00 25-May-15 26-May-15 0% -21.69

Zone B1Zone B1 30.75 27-Apr-15 03-Jun-15 0% -21.69

Part1Part1 7.00 26-May-15 03-Jun-15 0% -21.69

MIP2-6-9020 Excavation 1.00 26-May-15 27-May-15 0% -21.69

2B09012B0901 6.00 27-May-15 03-Jun-15 0% -21.69

MIP2-6-9030 Formwork 1.00 27-May-15 28-May-15 0% -21.69

MIP2-6-9040 Steel Bar 1.00 28-May-15 29-May-15 0% -21.69

MIP2-6-9050 Concrete 1.00 29-May-15 30-May-15 0% -21.69

MIP2-6-9060 Remove formwork 1.00 02-Jun-15 03-Jun-15 0% -21.69

2B09022B0902 6.00 27-May-15 03-Jun-15 0% -21.69

MIP2-6-9070 Formwork 1.00 27-May-15 28-May-15 0% -21.69

MIP2-6-9080 Steel Bar 1.00 28-May-15 29-May-15 0% -21.69

MIP2-6-9090 Concrete 1.00 29-May-15 30-May-15 0% -21.69

MIP2-6-9100 Remove formwork 1.00 02-Jun-15 03-Jun-15 0% -21.69

Part2Part2 13.00 27-Apr-15 14-May-15 0% -79.38

MIP2-6-9110 Excavation 3.00 27-Apr-15 30-Apr-15 0% -79.38

2B12052B1205 10.00 30-Apr-15 14-May-15 0% -79.38

MIP2-6-9120 Formwork 3.00 30-Apr-15 06-May-15 0% -79.38

MIP2-6-9130 Steel Bar 3.00 05-May-15 08-May-15 0% -79.38

MIP2-6-9140 Concrete 2.00 08-May-15 11-May-15 0% -79.38

MIP2-6-9150 Remove formwork 1.00 13-May-15 14-May-15 0% -79.38

2B12062B1206 10.00 30-Apr-15 14-May-15 0% -79.38

MIP2-6-9160 Formwork 3.00 30-Apr-15 06-May-15 0% -79.38

MIP2-6-9170 Steel Bar 3.00 05-May-15 08-May-15 0% -79.38

MIP2-6-9180 Concrete 2.00 08-May-15 11-May-15 0% -79.38

MIP2-6-9190 Remove formwork 1.00 13-May-15 14-May-15 0% -79.38

3B12093B1209 10.00 30-Apr-15 14-May-15 0% -79.38

MIP2-6-9200 Formwork 3.00 30-Apr-15 06-May-15 0% -79.38

MIP2-6-9210 Steel Bar 3.00 05-May-15 08-May-15 0% -79.38

MIP2-6-9220 Concrete 2.00 08-May-15 11-May-15 0% -79.38

MIP2-6-9230 Remove formwork 1.00 13-May-15 14-May-15 0% -79.38

3B12103B1210 10.00 30-Apr-15 14-May-15 0% -79.38

MIP2-6-9240 Formwork 3.00 30-Apr-15 06-May-15 0% -79.38

MIP2-6-9250 Steel Bar 3.00 05-May-15 08-May-15 0% -79.38

MIP2-6-9260 Concrete 2.00 08-May-15 11-May-15 0% -79.38

MIP2-6-9270 Remove formwork 1.00 13-May-15 14-May-15 0% -79.38

4B12134B1213 10.00 30-Apr-15 14-May-15 0% -79.38

MIP2-6-9280 Formwork 3.00 30-Apr-15 06-May-15 0% -79.38

MIP2-6-9290 Steel Bar 3.00 05-May-15 08-May-15 0% -79.38

MIP2-6-9300 Concrete 2.00 08-May-15 11-May-15 0% -79.38

MIP2-6-9310 Remove formwork 1.00 13-May-15 14-May-15 0% -79.38

4B12144B1214 10.00 30-Apr-15 14-May-15 0% -79.38

MIP2-6-9320 Formwork 3.00 30-Apr-15 06-May-15 0% -79.38

MIP2-6-9330 Steel Bar 3.00 05-May-15 08-May-15 0% -79.38

MIP2-6-9340 Concrete 2.00 08-May-15 11-May-15 0% -79.38

MIP2-6-9350 Remove formwork 1.00 13-May-15 14-May-15 0% -79.38

Zone E1Zone E1 9.00 04-Jun-15 16-Jun-15 0% -49.94

Part1Part1 9.00 04-Jun-15 16-Jun-15 0% -49.94

J A J A JJA J A JA J A JJA

14 2015 2016 2017

03-Jul-15, 6G0905

03-Jul-15, 6G0907

26-May-15, Part4

26-May-15, 4G1206

26-May-15, 3G1208

26-May-15, 3G1209

03-Jun-15, Zone B1

03-Jun-15, Part1

03-Jun-15, 2B0901

03-Jun-15, 2B0902

14-May-15, Part2

14-May-15, 2B1205

14-May-15, 2B1206

14-May-15, 3B1209

14-May-15, 3B1210

14-May-15, 4B1213

14-May-15, 4B1214

16-Jun-15, Zone E1

16-Jun-15, Part1

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 14 of 33 TASK filter: All Activities

© Oracle Corporation

Page 15: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-9360 Excavation 2.00 04-Jun-15 08-Jun-15 0% -49.94

4E12014E1201 7.00 08-Jun-15 16-Jun-15 0% -49.94

MIP2-6-9370 Formwork 2.00 08-Jun-15 10-Jun-15 0% -49.94

MIP2-6-9380 Steel Bar 2.00 09-Jun-15 11-Jun-15 0% -49.94

MIP2-6-9390 Concrete 1.00 11-Jun-15 12-Jun-15 0% -49.94

MIP2-6-9400 Remove formwork 1.00 15-Jun-15 16-Jun-15 0% -49.94

4E12024E1202 7.00 08-Jun-15 16-Jun-15 0% -49.94

MIP2-6-9410 Formwork 2.00 08-Jun-15 10-Jun-15 0% -49.94

MIP2-6-9420 Steel Bar 2.00 09-Jun-15 11-Jun-15 0% -49.94

MIP2-6-9430 Concrete 1.00 11-Jun-15 12-Jun-15 0% -49.94

MIP2-6-9440 Remove formwork 1.00 15-Jun-15 16-Jun-15 0% -49.94

4E12054E1205 7.00 08-Jun-15 16-Jun-15 0% -49.94

MIP2-6-9450 Formwork 2.00 08-Jun-15 10-Jun-15 0% -49.94

MIP2-6-9460 Steel Bar 2.00 09-Jun-15 11-Jun-15 0% -49.94

MIP2-6-9470 Concrete 1.00 11-Jun-15 12-Jun-15 0% -49.94

MIP2-6-9480 Remove formwork 1.00 15-Jun-15 16-Jun-15 0% -49.94

Part2Part2 9.00 04-Jun-15 16-Jun-15 0% -49.94

MIP2-6-9490 Excavation 2.00 04-Jun-15 08-Jun-15 0% -49.94

4E12064E1206 7.00 08-Jun-15 16-Jun-15 0% -49.94

MIP2-6-9500 Formwork 2.00 08-Jun-15 10-Jun-15 0% -49.94

MIP2-6-9510 Steel Bar 2.00 09-Jun-15 11-Jun-15 0% -49.94

MIP2-6-9520 Concrete 1.00 11-Jun-15 12-Jun-15 0% -49.94

MIP2-6-9530 Remove formwork 1.00 15-Jun-15 16-Jun-15 0% -49.94

4E12094E1209 7.00 08-Jun-15 16-Jun-15 0% -49.94

MIP2-6-9540 Formwork 2.00 08-Jun-15 10-Jun-15 0% -49.94

MIP2-6-9550 Steel Bar 2.00 09-Jun-15 11-Jun-15 0% -49.94

MIP2-6-9560 Concrete 1.00 11-Jun-15 12-Jun-15 0% -49.94

MIP2-6-9570 Remove formwork 1.00 15-Jun-15 16-Jun-15 0% -49.94

3E12103E1210 7.00 08-Jun-15 16-Jun-15 0% -49.94

MIP2-6-9580 Formwork 2.00 08-Jun-15 10-Jun-15 0% -49.94

MIP2-6-9590 Steel Bar 2.00 09-Jun-15 11-Jun-15 0% -49.94

MIP2-6-9600 Concrete 1.00 11-Jun-15 12-Jun-15 0% -49.94

MIP2-6-9610 Remove formwork 1.00 15-Jun-15 16-Jun-15 0% -49.94

Zone H1Zone H1 28.88 05-Jun-15 09-Jul-15 0% -50.88

Part1Part1 9.00 05-Jun-15 17-Jun-15 0% -50.31

MIP2-6-9620 Excavation 2.00 05-Jun-15 09-Jun-15 0% -50.31

4H12014H1201 7.00 09-Jun-15 17-Jun-15 0% -50.31

MIP2-6-9630 Formwork 2.00 09-Jun-15 11-Jun-15 0% -50.31

MIP2-6-9640 Steel Bar 2.00 11-Jun-15 13-Jun-15 0% -50.31

MIP2-6-9650 Concrete 2.00 13-Jun-15 16-Jun-15 0% -50.31

MIP2-6-9660 Remove formwork 1.00 16-Jun-15 17-Jun-15 0% -50.31

4H12054H1205 7.00 09-Jun-15 17-Jun-15 0% -50.31

MIP2-6-9670 Formwork 2.00 09-Jun-15 11-Jun-15 0% -50.31

MIP2-6-9680 Steel Bar 2.00 11-Jun-15 13-Jun-15 0% -50.31

MIP2-6-9690 Concrete 2.00 13-Jun-15 16-Jun-15 0% -50.31

MIP2-6-9700 Remove formwork 1.00 16-Jun-15 17-Jun-15 0% -50.31

Part2Part2 9.00 29-Jun-15 09-Jul-15 0% -50.88

MIP2-6-9710 Excavation 1.00 29-Jun-15 30-Jun-15 0% -50.88

8H09088H0908 8.00 30-Jun-15 09-Jul-15 0% -50.88

MIP2-6-9720 Formwork 2.00 30-Jun-15 02-Jul-15 0% -50.88

MIP2-6-9730 Steel Bar 2.00 02-Jul-15 04-Jul-15 0% -50.88

MIP2-6-9740 Concrete 1.00 04-Jul-15 06-Jul-15 0% -50.88

MIP2-6-9750 Remove formwork 1.00 08-Jul-15 09-Jul-15 0% -50.88

Stump and M&E CStump and M&E Compartment 128.63 10-Apr-15 12-Sep-15 0% -52.25

Zone AZone A 37.00 26-May-15 08-Jul-15 0% 2.00

Lift Core EA0Lift Core EA0 24.00 26-May-15 23-Jun-15 0% 15.00

MIP2-6-9770 Formwork 7.00 26-May-15 02-Jun-15 0% 15.00

MIP2-6-9780 Steel Bar 5.00 03-Jun-15 10-Jun-15 0% 15.00

MIP2-6-9790 Concrete 3.00 11-Jun-15 15-Jun-15 0% 15.00

MIP2-6-9800 Remove formwork 2.00 17-Jun-15 19-Jun-15 0% 15.00

MIP2-6-9810 Cement Screte & Waterproofing 3.00 19-Jun-15 23-Jun-15 0% 15.00

Water Tank andWater Tank and Stump 37.00 26-May-15 08-Jul-15 0% -6.00

MIP2-6-9820 Setup 7.00 26-May-15 02-Jun-15 0% -6.00

MIP2-6-9830 Formwork 14.00 02-Jun-15 19-Jun-15 0% -6.00

MIP2-6-9840 Steel Bar & Fitting 9.00 19-Jun-15 30-Jun-15 0% -6.00

MIP2-6-9850 Concrete 3.00 30-Jun-15 03-Jul-15 0% -6.00

MIP2-6-9860 Remove formwork 2.00 06-Jul-15 08-Jul-15 0% -6.00

TrenchesTrenches 27.00 26-May-15 26-Jun-15 0% -46.63

MIP2-6-9870 Excavation 3.00 26-May-15 28-May-15 0% -46.63

MIP2-6-9880 Formwork 10.00 29-May-15 10-Jun-15 0% -46.63

MIP2-6-9890 Steel Bar 5.00 10-Jun-15 16-Jun-15 0% -46.63

MIP2-6-9900 Concrete 2.00 16-Jun-15 18-Jun-15 0% -46.63

MIP2-6-9910 Remove formwork 2.00 20-Jun-15 23-Jun-15 0% -46.63

MIP2-6-9920 Cement Screte & Waterproofing 3.00 23-Jun-15 26-Jun-15 0% -46.63

Zone B2Zone B2 33.88 10-Apr-15 21-May-15 0% -42.13

TrenchesTrenches 17.00 10-Apr-15 30-Apr-15 0% -35.63

MIP2-6-9940 Formwork 5.00 10-Apr-15 16-Apr-15 0% -35.63

MIP2-6-9950 Steel Bar 4.00 16-Apr-15 21-Apr-15 0% -35.63

MIP2-6-9960 Concrete 2.00 21-Apr-15 23-Apr-15 0% -35.63

J A J A JJA J A JA J A JJA

14 2015 2016 2017

16-Jun-15, 4E1201

16-Jun-15, 4E1202

16-Jun-15, 4E1205

16-Jun-15, Part2

16-Jun-15, 4E1206

16-Jun-15, 4E1209

16-Jun-15, 3E1210

09-Jul-15, Zone H1

17-Jun-15, Part1

17-Jun-15, 4H1201

17-Jun-15, 4H1205

09-Jul-15, Part2

09-Jul-15, 8H0908

12-Sep-15, Stump and M&E C

08-Jul-15, Zone A

23-Jun-15, Lift Core EA0

08-Jul-15, Water Tank and Stump

26-Jun-15, Trenches

21-May-15, Zone B2

30-Apr-15, Trenches

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 15 of 33 TASK filter: All Activities

© Oracle Corporation

Page 16: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-9970 Remove formwork 1.00 25-Apr-15 27-Apr-15 0% -35.63

MIP2-6-9980 Cement Screte & Waterproofing 3.00 27-Apr-15 30-Apr-15 0% -35.63

StumpStump 10.00 09-May-15 21-May-15 0% -42.13

MIP2-6-9990 Formwork 3.00 09-May-15 13-May-15 0% -42.13

MIP2-6-10000 Steel Bar 3.00 13-May-15 16-May-15 0% -42.13

MIP2-6-10010 Concrete 1.00 16-May-15 18-May-15 0% -42.13

MIP2-6-10020 Remove formwork 1.00 20-May-15 21-May-15 0% -42.13

Zone CZone C 40.13 29-Apr-15 18-Jun-15 0% -2.50

TrenchesTrenches 23.00 21-May-15 18-Jun-15 0% -42.13

MIP2-6-10040 Formwork 10.00 21-May-15 02-Jun-15 0% -42.13

MIP2-6-10050 Steel Bar 5.00 02-Jun-15 09-Jun-15 0% -42.13

MIP2-6-10060 Concrete 2.00 09-Jun-15 11-Jun-15 0% -42.13

MIP2-6-10070 Remove formwork 1.00 13-Jun-15 15-Jun-15 0% -42.13

MIP2-6-10080 Cement Screte & Waterproofing 3.00 15-Jun-15 18-Jun-15 0% -42.13

StumpStump 33.13 29-Apr-15 10-Jun-15 0% 4.50

MIP2-6-10090 Formwork 3.00 29-Apr-15 05-May-15 0% 27.63

MIP2-6-10100 Steel Bar 3.00 05-May-15 08-May-15 0% 27.63

MIP2-6-10110 Concrete 1.00 08-May-15 09-May-15 0% 27.63

MIP2-6-10120 Remove formwork 1.00 09-Jun-15 10-Jun-15 0% 4.50

Zone DZone D 56.75 12-May-15 17-Jul-15 0% -6.00

Lift Core ED0Lift Core ED0 32.50 10-Jun-15 17-Jul-15 0% -6.00

MIP2-6-10140 Formwork 7.00 10-Jun-15 18-Jun-15 0% 4.50

MIP2-6-10150 Steel Bar 5.00 18-Jun-15 24-Jun-15 0% 4.50

MIP2-6-10160 Concrete 3.00 06-Jul-15 09-Jul-15 0% -6.00

MIP2-6-10170 Remove formwork 2.00 11-Jul-15 14-Jul-15 0% -6.00

MIP2-6-10180 Cement Screte & Waterproofing 3.00 14-Jul-15 17-Jul-15 0% -6.00

StumpStump 33.25 12-May-15 20-Jun-15 0% -42.13

MIP2-6-10190 Formwork 3.00 12-May-15 15-May-15 0% -18.88

MIP2-6-10200 Steel Bar 2.00 15-May-15 18-May-15 0% -18.88

MIP2-6-10210 Concrete 1.00 18-May-15 19-May-15 0% -18.88

MIP2-6-10220 Remove formwork 2.00 18-Jun-15 20-Jun-15 0% -42.13

Zone E2Zone E2 25.75 20-Jun-15 22-Jul-15 0% -50.88

StumpStump 25.75 20-Jun-15 22-Jul-15 0% -50.88

MIP2-6-10230 Formwork 3.00 20-Jun-15 24-Jun-15 0% -42.13

MIP2-6-10240 Steel Bar 2.00 24-Jun-15 26-Jun-15 0% -42.13

MIP2-6-10250 Concrete 1.00 26-Jun-15 27-Jun-15 0% -42.13

MIP2-6-10260 Remove formwork 2.00 09-Jul-15 11-Jul-15 0% -50.88

MIP2-6-10270 Earthwork 7.00 11-Jul-15 22-Jul-15 0% -50.88

Zone FZone F 17.00 13-Apr-15 02-May-15 0% -17.38

StumpStump 17.00 13-Apr-15 02-May-15 0% -17.38

MIP2-6-10280 Formwork 3.00 13-Apr-15 16-Apr-15 0% -17.38

MIP2-6-10290 Steel Bar 2.00 16-Apr-15 18-Apr-15 0% -17.38

MIP2-6-10300 Concrete 1.00 18-Apr-15 20-Apr-15 0% -17.38

MIP2-6-10310 Remove formwork 2.00 22-Apr-15 24-Apr-15 0% -17.38

MIP2-6-10320 Earthwork 7.00 24-Apr-15 02-May-15 0% -17.38

Zone GZone G 93.63 22-May-15 12-Sep-15 0% -52.25

MIP2-6-10330 Earthwork 7.00 04-Sep-15 12-Sep-15 0% -99.69

Lift Core EG0Lift Core EG0 22.00 12-Aug-15 08-Sep-15 0% -48.25

MIP2-6-10340 Formwork 7.00 12-Aug-15 19-Aug-15 0% -99.69

MIP2-6-10350 Steel Bar 5.00 20-Aug-15 25-Aug-15 0% -99.69

MIP2-6-10360 Concrete 3.00 25-Aug-15 29-Aug-15 0% -99.69

MIP2-6-10370 Remove formwork 2.00 02-Sep-15 04-Sep-15 0% -99.69

MIP2-6-10380 Cement Screte & Waterproofing 3.00 04-Sep-15 08-Sep-15 0% -48.25

StumpStump 12.00 22-May-15 05-Jun-15 0% -25.06

MIP2-6-10390 Formwork 4.00 22-May-15 27-May-15 0% -25.06

MIP2-6-10400 Steel Bar 2.00 27-May-15 29-May-15 0% -25.06

MIP2-6-10410 Concrete 2.00 29-May-15 01-Jun-15 0% -25.06

MIP2-6-10420 Remove formwork 2.00 03-Jun-15 05-Jun-15 0% -25.06

Zone H2Zone H2 74.50 02-Jun-15 01-Sep-15 0% -42.25

MIP2-6-10430 Earthwork 7.00 22-Aug-15 01-Sep-15 0% -90.19

Lift CoreLift Core 35.00 21-Jul-15 01-Sep-15 0% -42.25

MIP2-6-10440 Formwork 12.00 21-Jul-15 04-Aug-15 0% -90.19

MIP2-6-10450 Steel Bar 9.00 04-Aug-15 14-Aug-15 0% -90.19

MIP2-6-10460 Concrete 3.00 14-Aug-15 17-Aug-15 0% -90.19

MIP2-6-10470 Remove formwork 2.00 20-Aug-15 21-Aug-15 0% -90.19

MIP2-6-10480 Cement Screte & Waterproofing 7.00 22-Aug-15 01-Sep-15 0% -42.25

StumpStump 14.00 02-Jun-15 19-Jun-15 0% -36.69

MIP2-6-10490 Formwork 5.00 02-Jun-15 09-Jun-15 0% -36.69

MIP2-6-10500 Steel Bar 3.00 09-Jun-15 12-Jun-15 0% -36.69

MIP2-6-10510 Concrete 2.00 12-Jun-15 15-Jun-15 0% -36.69

MIP2-6-10520 Remove formwork 2.00 17-Jun-15 19-Jun-15 0% -36.69

Zone IZone I 30.00 25-May-15 29-Jun-15 0% -36.19

StumpStump 30.00 25-May-15 29-Jun-15 0% -36.19

MIP2-6-10530 Formwork 9.00 25-May-15 03-Jun-15 0% -36.19

MIP2-6-10540 Steel Bar 7.00 04-Jun-15 12-Jun-15 0% -36.19

MIP2-6-10550 Concrete 3.00 13-Jun-15 16-Jun-15 0% -36.19

MIP2-6-10560 Remove formwork 2.00 18-Jun-15 20-Jun-15 0% -36.19

MIP2-6-10570 Earthwork 7.00 20-Jun-15 29-Jun-15 0% -36.19

Zone B1Zone B1 15.00 11-May-15 27-May-15 0% -60.88

J A J A JJA J A JA J A JJA

14 2015 2016 2017

21-May-15, Stump

18-Jun-15, Zone C

18-Jun-15, Trenches

10-Jun-15, Stump

17-Jul-15, Zone D

17-Jul-15, Lift Core ED0

20-Jun-15, Stump

22-Jul-15, Zone E2

22-Jul-15, Stump

02-May-15, Zone F

02-May-15, Stump

12-Sep-15, Zone G

08-Sep-15, Lift Core EG0

05-Jun-15, Stump

01-Sep-15, Zone H2

01-Sep-15, Lift Core

19-Jun-15, Stump

29-Jun-15, Zone I

29-Jun-15, Stump

27-May-15, Zone B1

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 16 of 33 TASK filter: All Activities

© Oracle Corporation

Page 17: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

StumpStump 15.00 11-May-15 27-May-15 0% -60.88

MIP2-6-10580 Formwork 3.00 11-May-15 14-May-15 0% -60.88

MIP2-6-10590 Steel Bar 3.00 14-May-15 16-May-15 0% -60.88

MIP2-6-10600 Concrete 1.00 18-May-15 18-May-15 0% -60.88

MIP2-6-10610 Remove formwork 1.00 21-May-15 21-May-15 0% -60.88

MIP2-6-10620 Earthwork 5.00 22-May-15 27-May-15 0% -60.88

Zone E1Zone E1 28.00 12-Jun-15 15-Jul-15 0% -46.63

StumpStump 28.00 12-Jun-15 15-Jul-15 0% -46.63

MIP2-6-10630 Formwork 5.00 12-Jun-15 18-Jun-15 0% -39.63

MIP2-6-10640 Steel Bar 3.00 26-Jun-15 30-Jun-15 0% -46.63

MIP2-6-10650 Concrete 2.00 30-Jun-15 02-Jul-15 0% -46.63

MIP2-6-10660 Remove formwork 2.00 04-Jul-15 07-Jul-15 0% -46.63

MIP2-6-10670 Earthwork 7.00 07-Jul-15 15-Jul-15 0% -46.63

Zone H1Zone H1 23.00 17-Jun-15 13-Jul-15 0% -50.31

StumpStump 23.00 17-Jun-15 13-Jul-15 0% -50.31

MIP2-6-10680 Formwork 7.00 17-Jun-15 24-Jun-15 0% -50.31

MIP2-6-10690 Steel Bar 3.00 25-Jun-15 27-Jun-15 0% -50.31

MIP2-6-10700 Concrete 2.00 27-Jun-15 30-Jun-15 0% -50.31

MIP2-6-10710 Remove formwork 2.00 02-Jul-15 04-Jul-15 0% -50.31

MIP2-6-10720 Earthwork 7.00 04-Jul-15 13-Jul-15 0% -50.31

Lower Ground BeLower Ground Beam & Slab 122.63 30-Apr-15 28-Sep-15 0% -94.25

Zone AZone A 54.75 30-Apr-15 04-Jul-15 0% -79.38

MIP2-6-10730 Excavation 3.00 30-Apr-15 05-May-15 0% -35.63

MIP2-6-10740 Formwork 6.00 06-May-15 12-May-15 0% -35.63

MIP2-6-10750 Steel Bar 5.00 07-May-15 12-May-15 0% -35.63

MIP2-6-10760 Concrete 2.00 02-Jul-15 04-Jul-15 0% -79.38

Zone BZone B 32.50 27-May-15 04-Jul-15 0% -77.50

MIP2-6-10770 Excavation 3.00 27-May-15 30-May-15 0% -60.88

MIP2-6-10780 Formwork 6.00 30-May-15 08-Jun-15 0% -60.88

MIP2-6-10790 Steel Bar 5.00 01-Jun-15 08-Jun-15 0% -56.00

MIP2-6-10800 Concrete 2.00 02-Jul-15 04-Jul-15 0% -77.50

Zone CZone C 23.50 08-Jun-15 04-Jul-15 0% -73.38

MIP2-6-10810 Excavation 3.00 08-Jun-15 11-Jun-15 0% -60.88

MIP2-6-10820 Formwork 6.00 11-Jun-15 18-Jun-15 0% -60.88

MIP2-6-10830 Steel Bar 5.00 12-Jun-15 18-Jun-15 0% -60.88

MIP2-6-10840 Concrete 2.00 02-Jul-15 04-Jul-15 0% -73.38

Zone DZone D 11.00 18-Jun-15 01-Jul-15 0% -22.88

MIP2-6-10850 Excavation 3.00 18-Jun-15 22-Jun-15 0% -22.88

MIP2-6-10860 Formwork 6.00 22-Jun-15 29-Jun-15 0% -22.88

MIP2-6-10870 Steel Bar 5.00 23-Jun-15 29-Jun-15 0% -22.88

MIP2-6-10880 Concrete 2.00 29-Jun-15 01-Jul-15 0% -22.88

Zone EZone E 11.00 22-Jul-15 04-Aug-15 0% -50.88

MIP2-6-10890 Excavation 3.00 22-Jul-15 25-Jul-15 0% -50.88

MIP2-6-10900 Formwork 8.00 25-Jul-15 04-Aug-15 0% -50.88

MIP2-6-10910 Steel Bar 5.00 27-Jul-15 01-Aug-15 0% -50.88

MIP2-6-10920 Concrete 2.00 01-Aug-15 04-Aug-15 0% -50.88

Zone FZone F 11.00 02-May-15 16-May-15 0% -17.38

MIP2-6-10930 Excavation 3.00 02-May-15 07-May-15 0% -17.38

MIP2-6-10940 Formwork 8.00 07-May-15 16-May-15 0% -17.38

MIP2-6-10950 Steel Bar 5.00 08-May-15 14-May-15 0% -17.38

MIP2-6-10960 Concrete 2.00 14-May-15 16-May-15 0% -17.38

Zone GZone G 11.00 12-Sep-15 28-Sep-15 0% -99.69

MIP2-6-10970 Excavation 3.00 12-Sep-15 17-Sep-15 0% -99.69

MIP2-6-10980 Formwork 8.00 17-Sep-15 28-Sep-15 0% -99.69

MIP2-6-10990 Steel Bar 5.00 18-Sep-15 25-Sep-15 0% -99.69

MIP2-6-11000 Concrete 2.00 25-Sep-15 28-Sep-15 0% -99.69

Zone HZone H 11.00 01-Sep-15 14-Sep-15 0% -90.19

MIP2-6-11010 Excavation 3.00 01-Sep-15 04-Sep-15 0% -90.19

MIP2-6-11020 Formwork 8.00 04-Sep-15 14-Sep-15 0% -90.19

MIP2-6-11030 Steel Bar 5.00 05-Sep-15 11-Sep-15 0% -90.19

MIP2-6-11040 Concrete 2.00 11-Sep-15 14-Sep-15 0% -90.19

Zone IZone I 11.00 29-Jun-15 11-Jul-15 0% -36.19

MIP2-6-11050 Excavation 3.00 29-Jun-15 02-Jul-15 0% -36.19

MIP2-6-11060 Formwork 6.00 02-Jul-15 09-Jul-15 0% -36.19

MIP2-6-11070 Steel Bar 5.00 03-Jul-15 09-Jul-15 0% -36.19

MIP2-6-11080 Concrete 2.00 09-Jul-15 11-Jul-15 0% -36.19

Lower Ground ToLower Ground Top Slab & Beam 138.38 16-May-15 31-Oct-15 0% 68.50

Zone AZone A 24.25 04-Jul-15 05-Aug-15 0% -79.38

MIP2-6-11090 Column Formwork 3.00 04-Jul-15 09-Jul-15 0% -79.38

MIP2-6-11100 Steel Bar 2.00 13-Jul-15 15-Jul-15 0% -79.38

MIP2-6-11110 Concrete 2.00 16-Jul-15 21-Jul-15 0% -79.38

MIP2-6-11111 Beam & Slab Formwork 4.00 21-Jul-15 27-Jul-15 0% -79.38

MIP2-6-11112 Steel Bar 3.00 28-Jul-15 01-Aug-15 0% -79.38

MIP2-6-11113 Concrete 1.00 03-Aug-15 05-Aug-15 0% -79.38

Zone BZone B 23.25 04-Jul-15 03-Aug-15 0% -77.50

MIP2-6-11120 Column Formwork 3.00 04-Jul-15 09-Jul-15 0% -77.50

MIP2-6-11130 Steel Bar 2.00 10-Jul-15 13-Jul-15 0% -77.50

MIP2-6-11140 Concrete 2.00 14-Jul-15 16-Jul-15 0% -77.50

J A J A JJA J A JA J A JJA

14 2015 2016 2017

27-May-15, Stump

15-Jul-15, Zone E1

15-Jul-15, Stump

13-Jul-15, Zone H1

13-Jul-15, Stump

28-Sep-15, Lower Ground Be

04-Jul-15, Zone A

04-Jul-15, Zone B

04-Jul-15, Zone C

01-Jul-15, Zone D

04-Aug-15, Zone E

16-May-15, Zone F

28-Sep-15, Zone G

14-Sep-15, Zone H

11-Jul-15, Zone I

31-Oct-15, Lower Ground T

05-Aug-15, Zone A

03-Aug-15, Zone B

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 17 of 33 TASK filter: All Activities

© Oracle Corporation

Page 18: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-11141 Beam & Slab Formwork 4.00 17-Jul-15 25-Jul-15 0% -77.50

MIP2-6-11142 Steel Bar 3.00 27-Jul-15 31-Jul-15 0% -77.50

MIP2-6-11143 Concrete 1.00 01-Aug-15 03-Aug-15 0% -77.50

Zone CZone C 18.25 04-Jul-15 29-Jul-15 0% -73.38

MIP2-6-11150 Column Formwork 3.00 04-Jul-15 09-Jul-15 0% -73.38

MIP2-6-11160 Steel Bar 2.00 09-Jul-15 11-Jul-15 0% -73.38

MIP2-6-11170 Concrete 2.00 11-Jul-15 14-Jul-15 0% -73.38

MIP2-6-11171 Beam & Slab Formwork 4.00 14-Jul-15 22-Jul-15 0% -73.38

MIP2-6-11172 Steel Bar 3.00 22-Jul-15 27-Jul-15 0% -73.38

MIP2-6-11173 Concrete 1.00 27-Jul-15 29-Jul-15 0% -73.38

Zone DZone D 18.25 01-Jul-15 25-Jul-15 0% -22.88

MIP2-6-11180 Column Formwork 3.00 01-Jul-15 06-Jul-15 0% -22.88

MIP2-6-11190 Steel Bar 2.00 06-Jul-15 08-Jul-15 0% -22.88

MIP2-6-11200 Concrete 2.00 08-Jul-15 11-Jul-15 0% -22.88

MIP2-6-11201 Beam & Slab Formwork 4.00 11-Jul-15 16-Jul-15 0% -22.88

MIP2-6-11202 Steel Bar 3.00 16-Jul-15 23-Jul-15 0% -22.88

MIP2-6-11203 Concrete 1.00 23-Jul-15 25-Jul-15 0% -22.88

Zone EZone E 18.88 04-Aug-15 26-Aug-15 0% -50.88

MIP2-6-11210 Column Formwork 3.00 04-Aug-15 07-Aug-15 0% -50.88

MIP2-6-11220 Steel Bar 2.00 07-Aug-15 11-Aug-15 0% -50.88

MIP2-6-11230 Concrete 2.00 11-Aug-15 14-Aug-15 0% -50.88

MIP2-6-11231 Beam & Slab Formwork 4.00 14-Aug-15 19-Aug-15 0% -50.88

MIP2-6-11232 Steel Bar 3.00 19-Aug-15 24-Aug-15 0% -50.88

MIP2-6-11233 Concrete 1.00 24-Aug-15 26-Aug-15 0% -50.88

Zone FZone F 19.38 16-May-15 10-Jun-15 0% -17.38

MIP2-6-11240 Column Formwork 3.00 16-May-15 20-May-15 0% -17.38

MIP2-6-11250 Steel Bar 2.00 20-May-15 23-May-15 0% -17.38

MIP2-6-11260 Concrete 2.00 23-May-15 27-May-15 0% -17.38

MIP2-6-11261 Beam & Slab Formwork 4.00 27-May-15 02-Jun-15 0% -17.38

MIP2-6-11262 Steel Bar 3.00 02-Jun-15 08-Jun-15 0% -17.38

MIP2-6-11263 Concrete 1.00 08-Jun-15 10-Jun-15 0% -17.38

Zone GZone G 18.63 28-Sep-15 21-Oct-15 0% -99.69

MIP2-6-11270 Column Formwork 3.00 28-Sep-15 01-Oct-15 0% -99.69

MIP2-6-11280 Steel Bar 2.00 01-Oct-15 03-Oct-15 0% -99.69

MIP2-6-11290 Concrete 2.00 03-Oct-15 07-Oct-15 0% -99.69

MIP2-6-11291 Beam & Slab Formwork 4.00 07-Oct-15 13-Oct-15 0% -99.69

MIP2-6-11292 Steel Bar 3.00 13-Oct-15 19-Oct-15 0% -99.69

MIP2-6-11293 Concrete 1.00 19-Oct-15 21-Oct-15 0% -99.69

Zone HZone H 19.00 14-Sep-15 09-Oct-15 0% -90.19

MIP2-6-11300 Column Formwork 3.00 14-Sep-15 19-Sep-15 0% -90.19

MIP2-6-11310 Steel Bar 2.00 19-Sep-15 23-Sep-15 0% -90.19

MIP2-6-11320 Concrete 2.00 23-Sep-15 26-Sep-15 0% -90.19

MIP2-6-11321 Beam & Slab Formwork 4.00 26-Sep-15 02-Oct-15 0% -90.19

MIP2-6-11322 Steel Bar 3.00 02-Oct-15 07-Oct-15 0% -90.19

MIP2-6-11323 Concrete 1.00 07-Oct-15 09-Oct-15 0% -90.19

Zone IZone I 18.25 11-Jul-15 04-Aug-15 0% -36.19

MIP2-6-11330 Column Formwork 3.00 11-Jul-15 16-Jul-15 0% -36.19

MIP2-6-11340 Steel Bar 2.00 16-Jul-15 21-Jul-15 0% -36.19

MIP2-6-11350 Concrete 2.00 21-Jul-15 24-Jul-15 0% -36.19

MIP2-6-11351 Beam & Slab Formwork 4.00 24-Jul-15 30-Jul-15 0% -36.19

MIP2-6-11352 Steel Bar 3.00 30-Jul-15 03-Aug-15 0% -36.19

MIP2-6-11353 Concrete 1.00 03-Aug-15 04-Aug-15 0% -36.19

StaircaseStaircase 80.75 25-Jul-15 31-Oct-15 0% 35.38

SA0SA0 6.00 05-Aug-15 12-Aug-15 0% 100.50

MIP2-6-11360 Formwork 5.00 05-Aug-15 11-Aug-15 0% 100.50

MIP2-6-11370 Steel Bar 3.00 07-Aug-15 11-Aug-15 0% 100.50

MIP2-6-11380 Concrete 1.00 11-Aug-15 12-Aug-15 0% 100.50

SD0SD0 9.00 25-Jul-15 05-Aug-15 0% 107.13

MIP2-6-11390 Formwork 5.00 25-Jul-15 31-Jul-15 0% 107.13

MIP2-6-11400 Steel Bar 3.00 31-Jul-15 04-Aug-15 0% 107.13

MIP2-6-11410 Concrete 1.00 04-Aug-15 05-Aug-15 0% 107.13

SG0SG0 9.00 21-Oct-15 31-Oct-15 0% 35.38

MIP2-6-11420 Formwork 5.00 21-Oct-15 27-Oct-15 0% 35.38

MIP2-6-11430 Steel Bar 3.00 27-Oct-15 30-Oct-15 0% 35.38

MIP2-6-11440 Concrete 1.00 30-Oct-15 31-Oct-15 0% 35.38

SH0SH0 9.00 09-Oct-15 20-Oct-15 0% 44.88

MIP2-6-11450 Formwork 5.00 09-Oct-15 16-Oct-15 0% 44.88

MIP2-6-11460 Steel Bar 3.00 16-Oct-15 19-Oct-15 0% 44.88

MIP2-6-11470 Concrete 1.00 20-Oct-15 20-Oct-15 0% 44.88

RampRamp 17.00 04-Aug-15 22-Aug-15 0% 124.00

RI0RI0 17.00 04-Aug-15 22-Aug-15 0% 124.00

MIP2-6-11480 Formwork 10.00 04-Aug-15 15-Aug-15 0% 124.00

MIP2-6-11490 Steel Bar 5.00 15-Aug-15 21-Aug-15 0% 124.00

MIP2-6-11500 Concrete 2.00 21-Aug-15 22-Aug-15 0% 124.00

FrameFrame 277.75 25-Jul-15 27-Jun-16 0% -1.50

Ground FloorGround Floor 120.75 25-Jul-15 17-Dec-15 0% 48.50

Zone B & CZone B & C 20.00 03-Aug-15 26-Aug-15 0% -66.38

MIP2-6-11510 Column Formwork 3.00 03-Aug-15 06-Aug-15 0% -66.38

J A J A JJA J A JA J A JJA

14 2015 2016 2017

29-Jul-15, Zone C

25-Jul-15, Zone D

26-Aug-15, Zone E

10-Jun-15, Zone F

21-Oct-15, Zone G

09-Oct-15, Zone H

04-Aug-15, Zone I

31-Oct-15, Staircase

12-Aug-15, SA0

05-Aug-15, SD0

31-Oct-15, SG0

20-Oct-15, SH0

22-Aug-15, Ramp

22-Aug-15, RI0

27-Jun-16, Fram

17-Dec-15, Ground Floor

26-Aug-15, Zone B & C

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 18 of 33 TASK filter: All Activities

© Oracle Corporation

Page 19: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-11520 Steel Bar 2.00 06-Aug-15 08-Aug-15 0% -66.38

MIP2-6-11530 Concrete 2.00 10-Aug-15 12-Aug-15 0% -66.38

MIP2-6-11540 Beam and Top Slab Formwork 5.00 13-Aug-15 19-Aug-15 0% -66.38

MIP2-6-11550 Steel Bar 2.00 20-Aug-15 22-Aug-15 0% -66.38

MIP2-6-11560 Concrete 2.00 24-Aug-15 26-Aug-15 0% -66.38

Zone AZone A 9.00 05-Aug-15 15-Aug-15 0% -57.25

MIP2-6-11570 Column Formwork 3.00 05-Aug-15 08-Aug-15 0% -57.25

MIP2-6-11580 Steel Bar 1.00 06-Aug-15 07-Aug-15 0% -57.25

MIP2-6-11590 Concrete 1.00 07-Aug-15 08-Aug-15 0% -57.25

MIP2-6-11600 Beam and Top Slab Formwork 3.00 08-Aug-15 12-Aug-15 0% -57.25

MIP2-6-11610 Steel Bar 2.00 11-Aug-15 13-Aug-15 0% -57.25

MIP2-6-11620 Concrete 2.00 13-Aug-15 15-Aug-15 0% -57.25

Zone D, E & FZone D, E & F 20.00 26-Aug-15 22-Sep-15 0% -50.88

MIP2-6-11630 Column Formwork 3.00 26-Aug-15 01-Sep-15 0% -50.88

MIP2-6-11640 Steel Bar 2.00 28-Aug-15 01-Sep-15 0% -50.88

MIP2-6-11650 Concrete 2.00 01-Sep-15 03-Sep-15 0% -50.88

MIP2-6-11660 Beam and Top Slab Formwork 10.00 03-Sep-15 15-Sep-15 0% -50.88

MIP2-6-11670 Steel Bar 5.00 11-Sep-15 18-Sep-15 0% -50.88

MIP2-6-11680 Concrete 3.00 18-Sep-15 22-Sep-15 0% -50.88

Zone G,H & IZone G,H & I 49.00 21-Oct-15 17-Dec-15 0% -99.69

MIP2-6-11690 Column Formwork 3.00 21-Oct-15 24-Oct-15 0% -99.69

MIP2-6-11700 Steel Bar 2.00 22-Oct-15 24-Oct-15 0% -99.69

MIP2-6-11710 Concrete 2.00 24-Oct-15 27-Oct-15 0% -99.69

MIP2-6-11720 Beam and Top Slab Formwork 10.00 27-Oct-15 07-Nov-15 0% -99.69

MIP2-6-11730 Steel Bar 5.00 04-Nov-15 10-Nov-15 0% -99.69

MIP2-6-11740 Concrete 3.00 10-Nov-15 14-Nov-15 0% -99.69

MIP2-6-11750 Remove formwork 1.00 16-Dec-15 17-Dec-15 0% -99.69

Lift CoreLift Core 80.75 25-Jul-15 31-Oct-15 0% 82.38

EA1EA1 9.00 05-Aug-15 15-Aug-15 0% 142.50

MIP2-6-11760 Formwork 3.00 05-Aug-15 08-Aug-15 0% 142.50

MIP2-6-11770 Steel Bar 3.00 07-Aug-15 11-Aug-15 0% 142.50

MIP2-6-11780 Concrete 1.00 11-Aug-15 12-Aug-15 0% 142.50

MIP2-6-11790 Remove formwork 1.00 14-Aug-15 15-Aug-15 0% 142.50

ED1ED1 9.00 25-Jul-15 05-Aug-15 0% 153.13

MIP2-6-11800 Formwork 3.00 25-Jul-15 29-Jul-15 0% 153.13

MIP2-6-11810 Steel Bar 3.00 28-Jul-15 31-Jul-15 0% 153.13

MIP2-6-11820 Concrete 1.00 31-Jul-15 01-Aug-15 0% 153.13

MIP2-6-11830 Remove formwork 1.00 04-Aug-15 05-Aug-15 0% 153.13

EG1EG1 9.00 21-Oct-15 31-Oct-15 0% 82.38

MIP2-6-11840 Formwork 3.00 21-Oct-15 24-Oct-15 0% 82.38

MIP2-6-11850 Steel Bar 3.00 23-Oct-15 27-Oct-15 0% 82.38

MIP2-6-11860 Concrete 1.00 27-Oct-15 28-Oct-15 0% 82.38

MIP2-6-11870 Remove formwork 1.00 30-Oct-15 31-Oct-15 0% 82.38

EH1EH1 9.00 09-Oct-15 20-Oct-15 0% 91.88

MIP2-6-11880 Formwork 3.00 09-Oct-15 13-Oct-15 0% 91.88

MIP2-6-11890 Steel Bar 3.00 12-Oct-15 16-Oct-15 0% 91.88

MIP2-6-11900 Concrete 1.00 16-Oct-15 17-Oct-15 0% 91.88

MIP2-6-11910 Remove formwork 1.00 20-Oct-15 20-Oct-15 0% 91.88

StaircaseStaircase 85.13 15-Aug-15 27-Nov-15 0% 24.38

SA1SA1 9.00 15-Aug-15 26-Aug-15 0% 100.50

MIP2-6-11920 Formwork 5.00 15-Aug-15 21-Aug-15 0% 100.50

MIP2-6-11930 Steel Bar 3.00 21-Aug-15 25-Aug-15 0% 100.50

MIP2-6-11940 Concrete 1.00 25-Aug-15 26-Aug-15 0% 100.50

SD1SD1 9.00 26-Sep-15 06-Oct-15 0% 68.13

MIP2-6-11950 Formwork 5.00 26-Sep-15 02-Oct-15 0% 68.13

MIP2-6-11960 Steel Bar 3.00 02-Oct-15 05-Oct-15 0% 68.13

MIP2-6-11970 Concrete 1.00 06-Oct-15 06-Oct-15 0% 68.13

SG1SG1 9.00 18-Nov-15 27-Nov-15 0% 24.38

MIP2-6-11980 Formwork 5.00 18-Nov-15 23-Nov-15 0% 24.38

MIP2-6-11990 Steel Bar 3.00 23-Nov-15 26-Nov-15 0% 24.38

MIP2-6-12000 Concrete 1.00 26-Nov-15 27-Nov-15 0% 24.38

SH1SH1 9.00 18-Nov-15 27-Nov-15 0% 24.38

MIP2-6-12010 Formwork 5.00 18-Nov-15 23-Nov-15 0% 24.38

MIP2-6-12020 Steel Bar 3.00 23-Nov-15 26-Nov-15 0% 24.38

MIP2-6-12030 Concrete 1.00 26-Nov-15 27-Nov-15 0% 24.38

RampRamp 93.13 15-Aug-15 07-Dec-15 0% 57.50

RA1RA1 17.00 15-Aug-15 07-Sep-15 0% 133.63

MIP2-6-12040 Formwork 10.00 15-Aug-15 28-Aug-15 0% 133.63

MIP2-6-12050 Steel Bar 5.00 28-Aug-15 04-Sep-15 0% 133.63

MIP2-6-12060 Concrete 2.00 04-Sep-15 07-Sep-15 0% 133.63

RI1RI1 17.00 18-Nov-15 07-Dec-15 0% 57.50

MIP2-6-12070 Formwork 10.00 18-Nov-15 28-Nov-15 0% 57.50

MIP2-6-12080 Steel Bar 5.00 28-Nov-15 04-Dec-15 0% 57.50

MIP2-6-12090 Concrete 2.00 04-Dec-15 07-Dec-15 0% 57.50

1st Floor1st Floor 119.75 05-Aug-15 29-Dec-15 0% 57.50

Zone A, B & CZone A, B & C 20.00 26-Aug-15 21-Sep-15 0% -66.38

MIP2-6-12100 Column Formwork 3.00 26-Aug-15 01-Sep-15 0% -66.38

MIP2-6-12110 Steel Bar 2.00 28-Aug-15 01-Sep-15 0% -66.38

J A J A JJA J A JA J A JJA

14 2015 2016 2017

15-Aug-15, Zone A

22-Sep-15, Zone D, E & F

17-Dec-15, Zone G,H & I

31-Oct-15, Lift Core

15-Aug-15, EA1

05-Aug-15, ED1

31-Oct-15, EG1

20-Oct-15, EH1

27-Nov-15, Staircase

26-Aug-15, SA1

06-Oct-15, SD1

27-Nov-15, SG1

27-Nov-15, SH1

07-Dec-15, Ramp

07-Sep-15, RA1

07-Dec-15, RI1

29-Dec-15, 1st Floor

21-Sep-15, Zone A, B & C

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 19 of 33 TASK filter: All Activities

© Oracle Corporation

Page 20: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-12120 Concrete 2.00 01-Sep-15 03-Sep-15 0% -66.38

MIP2-6-12130 Beam and Top Slab Formwork 10.00 03-Sep-15 15-Sep-15 0% -66.38

MIP2-6-12140 Steel Bar 5.00 11-Sep-15 18-Sep-15 0% -66.38

MIP2-6-12150 Concrete 3.00 18-Sep-15 21-Sep-15 0% -66.38

Zone D, E & FZone D, E & F 20.00 22-Sep-15 16-Oct-15 0% -50.88

MIP2-6-12160 Column Formwork 3.00 22-Sep-15 26-Sep-15 0% -50.88

MIP2-6-12170 Steel Bar 2.00 23-Sep-15 26-Sep-15 0% -50.88

MIP2-6-12180 Concrete 2.00 26-Sep-15 29-Sep-15 0% -50.88

MIP2-6-12190 Beam and Top Slab Formwork 10.00 29-Sep-15 09-Oct-15 0% -50.88

MIP2-6-12200 Steel Bar 5.00 07-Oct-15 12-Oct-15 0% -50.88

MIP2-6-12210 Concrete 3.00 12-Oct-15 16-Oct-15 0% -50.88

Zone G,H & IZone G,H & I 20.00 14-Nov-15 07-Dec-15 0% -99.63

MIP2-6-12220 Column Formwork 3.00 14-Nov-15 17-Nov-15 0% -99.63

MIP2-6-12230 Steel Bar 2.00 16-Nov-15 17-Nov-15 0% -99.63

MIP2-6-12240 Concrete 2.00 18-Nov-15 19-Nov-15 0% -99.63

MIP2-6-12250 Beam and Top Slab Formwork 10.00 20-Nov-15 01-Dec-15 0% -99.63

MIP2-6-12260 Steel Bar 5.00 27-Nov-15 03-Dec-15 0% -99.63

MIP2-6-12270 Concrete 3.00 03-Dec-15 07-Dec-15 0% -99.63

Lift CoreLift Core 77.75 05-Aug-15 07-Nov-15 0% 82.38

EA2EA2 6.00 15-Aug-15 22-Aug-15 0% 142.50

MIP2-6-12280 Formwork 3.00 15-Aug-15 19-Aug-15 0% 142.50

MIP2-6-12290 Steel Bar 3.00 18-Aug-15 21-Aug-15 0% 142.50

MIP2-6-12300 Concrete 1.00 21-Aug-15 22-Aug-15 0% 142.50

ED2ED2 6.00 05-Aug-15 11-Aug-15 0% 153.13

MIP2-6-12310 Formwork 3.00 05-Aug-15 08-Aug-15 0% 153.13

MIP2-6-12320 Steel Bar 3.00 07-Aug-15 10-Aug-15 0% 153.13

MIP2-6-12330 Concrete 1.00 11-Aug-15 11-Aug-15 0% 153.13

EG2EG2 6.00 31-Oct-15 07-Nov-15 0% 82.38

MIP2-6-12340 Formwork 3.00 31-Oct-15 04-Nov-15 0% 82.38

MIP2-6-12350 Steel Bar 3.00 03-Nov-15 06-Nov-15 0% 82.38

MIP2-6-12360 Concrete 1.00 06-Nov-15 07-Nov-15 0% 82.38

EH2EH2 6.00 21-Oct-15 27-Oct-15 0% 91.88

MIP2-6-12370 Formwork 3.00 21-Oct-15 23-Oct-15 0% 91.88

MIP2-6-12380 Steel Bar 3.00 23-Oct-15 26-Oct-15 0% 91.88

MIP2-6-12390 Concrete 1.00 26-Oct-15 27-Oct-15 0% 91.88

StaircaseStaircase 75.00 22-Sep-15 19-Dec-15 0% 16.38

SA2SA2 11.00 22-Sep-15 05-Oct-15 0% 80.38

MIP2-6-12400 Formwork 7.00 22-Sep-15 30-Sep-15 0% 80.38

MIP2-6-12410 Steel Bar 3.00 30-Sep-15 03-Oct-15 0% 80.38

MIP2-6-12420 Concrete 1.00 03-Oct-15 05-Oct-15 0% 80.38

SD2SD2 11.00 16-Oct-15 29-Oct-15 0% 60.13

MIP2-6-12430 Formwork 7.00 16-Oct-15 24-Oct-15 0% 60.13

MIP2-6-12440 Steel Bar 3.00 24-Oct-15 28-Oct-15 0% 60.13

MIP2-6-12450 Concrete 1.00 28-Oct-15 29-Oct-15 0% 60.13

SG2SG2 11.00 07-Dec-15 19-Dec-15 0% 16.38

MIP2-6-12460 Formwork 7.00 07-Dec-15 15-Dec-15 0% 16.38

MIP2-6-12470 Steel Bar 3.00 15-Dec-15 18-Dec-15 0% 16.38

MIP2-6-12480 Concrete 1.00 18-Dec-15 19-Dec-15 0% 16.38

SH2SH2 11.00 07-Dec-15 19-Dec-15 0% 16.38

MIP2-6-12490 Formwork 7.00 07-Dec-15 15-Dec-15 0% 16.38

MIP2-6-12500 Steel Bar 3.00 15-Dec-15 18-Dec-15 0% 16.38

MIP2-6-12510 Concrete 1.00 18-Dec-15 19-Dec-15 0% 16.38

RampRamp 81.00 22-Sep-15 29-Dec-15 0% 57.50

RA2RA2 17.00 22-Sep-15 12-Oct-15 0% 121.50

MIP2-6-12520 Formwork 10.00 22-Sep-15 03-Oct-15 0% 121.50

MIP2-6-12530 Steel Bar 5.00 03-Oct-15 09-Oct-15 0% 121.50

MIP2-6-12540 Concrete 2.00 09-Oct-15 12-Oct-15 0% 121.50

RI2RI2 17.00 07-Dec-15 29-Dec-15 0% 57.50

MIP2-6-12550 Formwork 10.00 07-Dec-15 18-Dec-15 0% 57.50

MIP2-6-12560 Steel Bar 5.00 18-Dec-15 26-Dec-15 0% 57.50

MIP2-6-12570 Concrete 2.00 26-Dec-15 29-Dec-15 0% 57.50

2nd Floor2nd Floor 131.75 12-Aug-15 19-Jan-16 0% 54.50

Zone A, B & CZone A, B & C 20.00 22-Sep-15 16-Oct-15 0% -66.38

MIP2-6-12580 Column Formwork 3.00 22-Sep-15 25-Sep-15 0% -66.38

MIP2-6-12590 Steel Bar 2.00 23-Sep-15 25-Sep-15 0% -66.38

MIP2-6-12600 Concrete 2.00 26-Sep-15 28-Sep-15 0% -66.38

MIP2-6-12610 Beam and Top Slab Formwork 10.00 28-Sep-15 09-Oct-15 0% -66.38

MIP2-6-12620 Steel Bar 5.00 06-Oct-15 12-Oct-15 0% -66.38

MIP2-6-12630 Concrete 3.00 12-Oct-15 16-Oct-15 0% -66.38

Zone D, E & FZone D, E & F 18.00 16-Oct-15 06-Nov-15 0% -50.88

MIP2-6-12640 Column Formwork 3.00 16-Oct-15 20-Oct-15 0% -50.88

MIP2-6-12650 Steel Bar 2.00 17-Oct-15 20-Oct-15 0% -50.88

MIP2-6-12660 Concrete 2.00 17-Oct-15 20-Oct-15 0% -50.88

MIP2-6-12670 Beam and Top Slab Formwork 10.00 20-Oct-15 31-Oct-15 0% -50.88

MIP2-6-12680 Steel Bar 5.00 28-Oct-15 03-Nov-15 0% -50.88

MIP2-6-12690 Concrete 3.00 03-Nov-15 06-Nov-15 0% -50.88

Zone G,H & IZone G,H & I 20.00 07-Dec-15 02-Jan-16 0% -99.63

MIP2-6-12700 Column Formwork 3.00 07-Dec-15 10-Dec-15 0% -99.63

J A J A JJA J A JA J A JJA

14 2015 2016 2017

16-Oct-15, Zone D, E & F

07-Dec-15, Zone G,H & I

07-Nov-15, Lift Core

22-Aug-15, EA2

11-Aug-15, ED2

07-Nov-15, EG2

27-Oct-15, EH2

19-Dec-15, Staircase

05-Oct-15, SA2

29-Oct-15, SD2

19-Dec-15, SG2

19-Dec-15, SH2

29-Dec-15, Ramp

12-Oct-15, RA2

29-Dec-15, RI2

19-Jan-16, 2nd Floor

16-Oct-15, Zone A, B & C

06-Nov-15, Zone D, E & F

02-Jan-16, Zone G,H & I

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 20 of 33 TASK filter: All Activities

© Oracle Corporation

Page 21: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-12710 Steel Bar 2.00 08-Dec-15 10-Dec-15 0% -99.63

MIP2-6-12720 Concrete 2.00 10-Dec-15 12-Dec-15 0% -99.63

MIP2-6-12730 Beam and Slab Formwork 10.00 12-Dec-15 26-Dec-15 0% -99.63

MIP2-6-12740 Steel Bar 5.00 21-Dec-15 29-Dec-15 0% -99.63

MIP2-6-12750 Concrete 3.00 29-Dec-15 02-Jan-16 0% -99.63

Lift CoreLift Core 77.75 12-Aug-15 14-Nov-15 0% 82.38

EA3EA3 6.00 22-Aug-15 01-Sep-15 0% 142.50

MIP2-6-12760 Formwork 3.00 22-Aug-15 26-Aug-15 0% 142.50

MIP2-6-12770 Steel Bar 3.00 25-Aug-15 29-Aug-15 0% 142.50

MIP2-6-12780 Concrete 1.00 29-Aug-15 01-Sep-15 0% 142.50

ED3ED3 6.00 12-Aug-15 18-Aug-15 0% 153.13

MIP2-6-12790 Formwork 3.00 12-Aug-15 14-Aug-15 0% 153.13

MIP2-6-12800 Steel Bar 3.00 14-Aug-15 17-Aug-15 0% 153.13

MIP2-6-12810 Concrete 1.00 17-Aug-15 18-Aug-15 0% 153.13

EG3EG3 6.00 07-Nov-15 14-Nov-15 0% 82.38

MIP2-6-12820 Formwork 3.00 07-Nov-15 12-Nov-15 0% 82.38

MIP2-6-12830 Steel Bar 3.00 10-Nov-15 14-Nov-15 0% 82.38

MIP2-6-12840 Concrete 1.00 14-Nov-15 14-Nov-15 0% 82.38

EH3EH3 6.00 27-Oct-15 03-Nov-15 0% 91.88

MIP2-6-12850 Formwork 3.00 27-Oct-15 30-Oct-15 0% 91.88

MIP2-6-12860 Steel Bar 3.00 29-Oct-15 02-Nov-15 0% 91.88

MIP2-6-12870 Concrete 1.00 02-Nov-15 03-Nov-15 0% 91.88

StaircaseStaircase 75.00 16-Oct-15 14-Jan-16 0% 7.38

SA3SA3 11.00 16-Oct-15 29-Oct-15 0% 71.38

MIP2-6-12880 Formwork 7.00 16-Oct-15 24-Oct-15 0% 71.38

MIP2-6-12890 Steel Bar 3.00 24-Oct-15 28-Oct-15 0% 71.38

MIP2-6-12900 Concrete 1.00 28-Oct-15 29-Oct-15 0% 71.38

SD3SD3 11.00 06-Nov-15 20-Nov-15 0% 53.13

MIP2-6-12910 Formwork 7.00 06-Nov-15 16-Nov-15 0% 53.13

MIP2-6-12920 Steel Bar 3.00 16-Nov-15 19-Nov-15 0% 53.13

MIP2-6-12930 Concrete 1.00 19-Nov-15 20-Nov-15 0% 53.13

SG3SG3 11.00 02-Jan-16 14-Jan-16 0% 7.38

MIP2-6-12940 Formwork 7.00 02-Jan-16 09-Jan-16 0% 7.38

MIP2-6-12950 Steel Bar 3.00 11-Jan-16 13-Jan-16 0% 7.38

MIP2-6-12960 Concrete 1.00 14-Jan-16 14-Jan-16 0% 7.38

SH3SH3 11.00 02-Jan-16 14-Jan-16 0% 7.38

MIP2-6-12970 Formwork 7.00 02-Jan-16 09-Jan-16 0% 7.38

MIP2-6-12980 Steel Bar 3.00 11-Jan-16 13-Jan-16 0% 7.38

MIP2-6-12990 Concrete 1.00 14-Jan-16 14-Jan-16 0% 7.38

RampRamp 79.00 16-Oct-15 19-Jan-16 0% 54.50

RA3RA3 15.00 16-Oct-15 03-Nov-15 0% 118.50

MIP2-6-13000 Formwork 10.00 16-Oct-15 28-Oct-15 0% 118.50

MIP2-6-13010 Steel Bar 3.00 28-Oct-15 31-Oct-15 0% 118.50

MIP2-6-13020 Concrete 2.00 31-Oct-15 03-Nov-15 0% 118.50

RI3RI3 15.00 02-Jan-16 19-Jan-16 0% 54.50

MIP2-6-13030 Formwork 10.00 02-Jan-16 13-Jan-16 0% 54.50

MIP2-6-13040 Steel Bar 3.00 14-Jan-16 16-Jan-16 0% 54.50

MIP2-6-13050 Concrete 2.00 16-Jan-16 19-Jan-16 0% 54.50

3rd Floor3rd Floor 145.75 18-Aug-15 16-Feb-16 0% 49.50

Zone A, B & CZone A, B & C 49.00 16-Oct-15 12-Dec-15 0% -24.63

MIP2-6-13060 Column Formwork 3.00 16-Oct-15 20-Oct-15 0% -66.38

MIP2-6-13070 Steel Bar 2.00 17-Oct-15 20-Oct-15 0% -66.38

MIP2-6-13080 Concrete 2.00 20-Oct-15 22-Oct-15 0% -66.38

MIP2-6-13090 Beam and Top Slab Formwork 10.00 22-Oct-15 03-Nov-15 0% -66.38

MIP2-6-13100 Steel Bar 5.00 30-Oct-15 05-Nov-15 0% -66.38

MIP2-6-13110 Concrete 3.00 05-Nov-15 09-Nov-15 0% -66.38

MIP2-6-13120 Remove formwork 1.00 11-Dec-15 12-Dec-15 0% -24.63

Zone D, E & FZone D, E & F 20.00 06-Nov-15 30-Nov-15 0% -50.88

MIP2-6-13130 Column Formwork 3.00 06-Nov-15 10-Nov-15 0% -50.88

MIP2-6-13140 Steel Bar 2.00 07-Nov-15 10-Nov-15 0% -50.88

MIP2-6-13150 Concrete 2.00 10-Nov-15 13-Nov-15 0% -50.88

MIP2-6-13160 Beam and Top Slab Formwork 10.00 13-Nov-15 25-Nov-15 0% -50.88

MIP2-6-13170 Steel Bar 5.00 21-Nov-15 27-Nov-15 0% -50.88

MIP2-6-13180 Concrete 3.00 27-Nov-15 30-Nov-15 0% -50.88

Zone G,H & IZone G,H & I 20.00 02-Jan-16 26-Jan-16 0% -99.63

MIP2-6-13190 Column Formwork 3.00 02-Jan-16 06-Jan-16 0% -99.63

MIP2-6-13200 Steel Bar 2.00 04-Jan-16 06-Jan-16 0% -99.63

MIP2-6-13210 Concrete 2.00 06-Jan-16 08-Jan-16 0% -99.63

MIP2-6-13220 Beam and Top Slab Formwork 10.00 08-Jan-16 19-Jan-16 0% -99.63

MIP2-6-13230 Steel Bar 5.00 16-Jan-16 21-Jan-16 0% -99.63

MIP2-6-13240 Concrete 3.00 21-Jan-16 26-Jan-16 0% -99.63

Lift CoreLift Core 77.75 18-Aug-15 21-Nov-15 0% 82.38

EA4EA4 6.00 01-Sep-15 08-Sep-15 0% 142.50

MIP2-6-13250 Formwork 3.00 01-Sep-15 04-Sep-15 0% 142.50

MIP2-6-13260 Steel Bar 3.00 03-Sep-15 07-Sep-15 0% 142.50

MIP2-6-13270 Concrete 1.00 07-Sep-15 08-Sep-15 0% 142.50

ED4ED4 6.00 18-Aug-15 25-Aug-15 0% 153.13

MIP2-6-13280 Formwork 3.00 18-Aug-15 21-Aug-15 0% 153.13

MIP2-6-13290 Steel Bar 3.00 20-Aug-15 24-Aug-15 0% 153.13

J A J A JJA J A JA J A JJA

14 2015 2016 2017

14-Nov-15, Lift Core

01-Sep-15, EA3

18-Aug-15, ED3

14-Nov-15, EG3

03-Nov-15, EH3

14-Jan-16, Staircase

29-Oct-15, SA3

20-Nov-15, SD3

14-Jan-16, SG3

14-Jan-16, SH3

19-Jan-16, Ramp

03-Nov-15, RA3

19-Jan-16, RI3

16-Feb-16, 3rd Floor

12-Dec-15, Zone A, B & C

30-Nov-15, Zone D, E & F

26-Jan-16, Zone G,H &

21-Nov-15, Lift Core

08-Sep-15, EA4

25-Aug-15, ED4

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 21 of 33 TASK filter: All Activities

© Oracle Corporation

Page 22: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-13300 Concrete 1.00 24-Aug-15 25-Aug-15 0% 153.13

EG4EG4 6.00 16-Nov-15 21-Nov-15 0% 82.38

MIP2-6-13310 Formwork 3.00 16-Nov-15 18-Nov-15 0% 82.38

MIP2-6-13320 Steel Bar 3.00 18-Nov-15 20-Nov-15 0% 82.38

MIP2-6-13330 Concrete 1.00 21-Nov-15 21-Nov-15 0% 82.38

EH4EH4 6.00 03-Nov-15 10-Nov-15 0% 91.88

MIP2-6-13340 Formwork 3.00 03-Nov-15 06-Nov-15 0% 91.88

MIP2-6-13350 Steel Bar 3.00 05-Nov-15 09-Nov-15 0% 91.88

MIP2-6-13360 Concrete 1.00 09-Nov-15 10-Nov-15 0% 91.88

StaircaseStaircase 75.00 09-Nov-15 11-Feb-16 0% -1.63

SA4SA4 11.00 09-Nov-15 21-Nov-15 0% 62.38

MIP2-6-13370 Formwork 7.00 09-Nov-15 17-Nov-15 0% 62.38

MIP2-6-13380 Steel Bar 3.00 18-Nov-15 20-Nov-15 0% 62.38

MIP2-6-13390 Concrete 1.00 21-Nov-15 21-Nov-15 0% 62.38

SD4SD4 11.00 01-Dec-15 12-Dec-15 0% 44.13

MIP2-6-13400 Formwork 7.00 01-Dec-15 08-Dec-15 0% 44.13

MIP2-6-13410 Steel Bar 3.00 08-Dec-15 11-Dec-15 0% 44.13

MIP2-6-13420 Concrete 1.00 11-Dec-15 12-Dec-15 0% 44.13

SG4SG4 11.00 26-Jan-16 11-Feb-16 0% -1.63

MIP2-6-13430 Formwork 7.00 26-Jan-16 04-Feb-16 0% -1.63

MIP2-6-13440 Steel Bar 3.00 04-Feb-16 10-Feb-16 0% -1.63

MIP2-6-13450 Concrete 1.00 10-Feb-16 11-Feb-16 0% -1.63

SH4SH4 11.00 26-Jan-16 11-Feb-16 0% -1.63

MIP2-6-13460 Formwork 7.00 26-Jan-16 04-Feb-16 0% -1.63

MIP2-6-13470 Steel Bar 3.00 04-Feb-16 10-Feb-16 0% -1.63

MIP2-6-13480 Concrete 1.00 10-Feb-16 11-Feb-16 0% -1.63

RampRamp 79.00 09-Nov-15 16-Feb-16 0% 49.50

RA4RA4 15.00 09-Nov-15 26-Nov-15 0% 113.50

MIP2-6-13490 Formwork 10.00 09-Nov-15 20-Nov-15 0% 113.50

MIP2-6-13500 Steel Bar 3.00 21-Nov-15 24-Nov-15 0% 113.50

MIP2-6-13510 Concrete 2.00 24-Nov-15 26-Nov-15 0% 113.50

RI4RI4 15.00 26-Jan-16 16-Feb-16 0% 49.50

MIP2-6-13520 Formwork 10.00 26-Jan-16 10-Feb-16 0% 49.50

MIP2-6-13530 Steel Bar 3.00 10-Feb-16 13-Feb-16 0% 49.50

MIP2-6-13540 Concrete 2.00 13-Feb-16 16-Feb-16 0% 49.50

4th Floor4th Floor 159.75 25-Aug-15 10-Mar-16 0% 44.50

Zone A, B & CZone A, B & C 20.00 09-Nov-15 02-Dec-15 0% -66.38

MIP2-6-13550 Column Formwork 3.00 09-Nov-15 13-Nov-15 0% -66.38

MIP2-6-13560 Steel Bar 2.00 10-Nov-15 13-Nov-15 0% -66.38

MIP2-6-13570 Concrete 2.00 13-Nov-15 14-Nov-15 0% -66.38

MIP2-6-13580 Beam and Slab Formwork 10.00 16-Nov-15 26-Nov-15 0% -66.38

MIP2-6-13590 Steel Bar 5.00 23-Nov-15 28-Nov-15 0% -66.38

MIP2-6-13600 Concrete 3.00 28-Nov-15 02-Dec-15 0% -66.38

Zone D, E & FZone D, E & F 20.00 01-Dec-15 23-Dec-15 0% -50.88

MIP2-6-13610 Column Formwork 3.00 01-Dec-15 03-Dec-15 0% -50.88

MIP2-6-13620 Steel Bar 2.00 02-Dec-15 03-Dec-15 0% -50.88

MIP2-6-13630 Concrete 2.00 04-Dec-15 05-Dec-15 0% -50.88

MIP2-6-13640 Beam and Slab Formwork 10.00 05-Dec-15 17-Dec-15 0% -50.88

MIP2-6-13650 Steel Bar 5.00 14-Dec-15 19-Dec-15 0% -50.88

MIP2-6-13660 Concrete 3.00 19-Dec-15 23-Dec-15 0% -50.88

Zone G,H & IZone G,H & I 20.00 26-Jan-16 22-Feb-16 0% -99.63

MIP2-6-13670 Column Formwork 3.00 26-Jan-16 29-Jan-16 0% -99.63

MIP2-6-13680 Steel Bar 2.00 27-Jan-16 29-Jan-16 0% -99.63

MIP2-6-13690 Concrete 2.00 29-Jan-16 01-Feb-16 0% -99.63

MIP2-6-13700 Beam and Slab Formwork 10.00 01-Feb-16 16-Feb-16 0% -99.63

MIP2-6-13710 Steel Bar 5.00 12-Feb-16 18-Feb-16 0% -99.63

MIP2-6-13720 Concrete 3.00 18-Feb-16 22-Feb-16 0% -99.63

Lift CoreLift Core 77.75 25-Aug-15 28-Nov-15 0% 82.38

EA5EA5 7.00 08-Sep-15 15-Sep-15 0% 142.50

MIP2-6-13730 Formwork 3.00 08-Sep-15 11-Sep-15 0% 142.50

MIP2-6-13740 Steel Bar 3.00 11-Sep-15 14-Sep-15 0% 142.50

MIP2-6-13750 Concrete 1.00 15-Sep-15 15-Sep-15 0% 142.50

ED5ED5 6.00 25-Aug-15 03-Sep-15 0% 153.13

MIP2-6-13760 Formwork 3.00 25-Aug-15 29-Aug-15 0% 153.13

MIP2-6-13770 Steel Bar 3.00 28-Aug-15 02-Sep-15 0% 153.13

MIP2-6-13780 Concrete 1.00 02-Sep-15 03-Sep-15 0% 153.13

EG5EG5 6.00 21-Nov-15 28-Nov-15 0% 82.38

MIP2-6-13790 Formwork 3.00 21-Nov-15 25-Nov-15 0% 82.38

MIP2-6-13800 Steel Bar 3.00 24-Nov-15 27-Nov-15 0% 82.38

MIP2-6-13810 Concrete 1.00 27-Nov-15 28-Nov-15 0% 82.38

EH5EH5 6.00 10-Nov-15 18-Nov-15 0% 91.88

MIP2-6-13820 Formwork 3.00 10-Nov-15 14-Nov-15 0% 91.88

MIP2-6-13830 Steel Bar 3.00 13-Nov-15 17-Nov-15 0% 91.88

MIP2-6-13840 Concrete 1.00 17-Nov-15 18-Nov-15 0% 91.88

StaircaseStaircase 75.00 02-Dec-15 05-Mar-16 0% -10.63

SA5SA5 11.00 02-Dec-15 15-Dec-15 0% 53.38

MIP2-6-13850 Formwork 7.00 02-Dec-15 10-Dec-15 0% 53.38

MIP2-6-13860 Steel Bar 3.00 10-Dec-15 14-Dec-15 0% 53.38

MIP2-6-13870 Concrete 1.00 14-Dec-15 15-Dec-15 0% 53.38

J A J A JJA J A JA J A JJA

14 2015 2016 2017

21-Nov-15, EG4

10-Nov-15, EH4

11-Feb-16, Staircase

21-Nov-15, SA4

12-Dec-15, SD4

11-Feb-16, SG4

11-Feb-16, SH4

16-Feb-16, Ramp

26-Nov-15, RA4

16-Feb-16, RI4

10-Mar-16, 4th Floor

02-Dec-15, Zone A, B & C

23-Dec-15, Zone D, E & F

22-Feb-16, Zone G,H

28-Nov-15, Lift Core

15-Sep-15, EA5

03-Sep-15, ED5

28-Nov-15, EG5

18-Nov-15, EH5

05-Mar-16, Staircase

15-Dec-15, SA5

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 22 of 33 TASK filter: All Activities

© Oracle Corporation

Page 23: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

SD5SD5 11.00 23-Dec-15 08-Jan-16 0% 35.13

MIP2-6-13880 Formwork 7.00 23-Dec-15 04-Jan-16 0% 35.13

MIP2-6-13890 Steel Bar 3.00 04-Jan-16 07-Jan-16 0% 35.13

MIP2-6-13900 Concrete 1.00 07-Jan-16 08-Jan-16 0% 35.13

SG5SG5 11.00 22-Feb-16 05-Mar-16 0% -10.63

MIP2-6-13910 Formwork 7.00 22-Feb-16 01-Mar-16 0% -10.63

MIP2-6-13920 Steel Bar 3.00 01-Mar-16 04-Mar-16 0% -10.63

MIP2-6-13930 Concrete 1.00 04-Mar-16 05-Mar-16 0% -10.63

SH5SH5 11.00 22-Feb-16 05-Mar-16 0% -10.63

MIP2-6-13940 Formwork 7.00 22-Feb-16 01-Mar-16 0% -10.63

MIP2-6-13950 Steel Bar 3.00 01-Mar-16 04-Mar-16 0% -10.63

MIP2-6-13960 Concrete 1.00 04-Mar-16 05-Mar-16 0% -10.63

RampRamp 79.00 02-Dec-15 10-Mar-16 0% 44.50

RA5RA5 15.00 02-Dec-15 19-Dec-15 0% 108.50

MIP2-6-13970 Formwork 10.00 02-Dec-15 14-Dec-15 0% 108.50

MIP2-6-13980 Steel Bar 3.00 14-Dec-15 17-Dec-15 0% 108.50

MIP2-6-13990 Concrete 2.00 17-Dec-15 19-Dec-15 0% 108.50

RI5RI5 15.00 22-Feb-16 10-Mar-16 0% 44.50

MIP2-6-14000 Formwork 10.00 22-Feb-16 04-Mar-16 0% 44.50

MIP2-6-14010 Steel Bar 3.00 04-Mar-16 08-Mar-16 0% 44.50

MIP2-6-14020 Concrete 2.00 08-Mar-16 10-Mar-16 0% 44.50

5th Floor5th Floor 176.75 03-Sep-15 05-Apr-16 0% 36.50

Zone A, B & CZone A, B & C 20.00 02-Dec-15 28-Dec-15 0% -66.38

MIP2-6-14030 Column Formwork 3.00 02-Dec-15 05-Dec-15 0% -66.38

MIP2-6-14040 Steel Bar 2.00 03-Dec-15 05-Dec-15 0% -66.38

MIP2-6-14050 Concrete 2.00 05-Dec-15 08-Dec-15 0% -66.38

MIP2-6-14060 Beam and Slab Formwork 10.00 08-Dec-15 19-Dec-15 0% -66.38

MIP2-6-14070 Steel Bar 5.00 16-Dec-15 22-Dec-15 0% -66.38

MIP2-6-14080 Concrete 3.00 22-Dec-15 28-Dec-15 0% -66.38

Zone D, E & FZone D, E & F 23.00 23-Dec-15 22-Jan-16 0% -50.88

MIP2-6-14090 Column Formwork 3.00 23-Dec-15 29-Dec-15 0% -50.88

MIP2-6-14100 Steel Bar 2.00 26-Dec-15 29-Dec-15 0% -50.88

MIP2-6-14110 Concrete 2.00 29-Dec-15 31-Dec-15 0% -50.88

MIP2-6-14120 Beam and Slab Formwork 10.00 31-Dec-15 13-Jan-16 0% -50.88

MIP2-6-14130 Steel Bar 5.00 13-Jan-16 19-Jan-16 0% -50.88

MIP2-6-14140 Concrete 3.00 19-Jan-16 22-Jan-16 0% -50.88

Zone G,H & IZone G,H & I 23.00 22-Feb-16 18-Mar-16 0% -99.63

MIP2-6-14150 Column Formwork 3.00 22-Feb-16 25-Feb-16 0% -99.63

MIP2-6-14160 Steel Bar 2.00 23-Feb-16 25-Feb-16 0% -99.63

MIP2-6-14170 Concrete 2.00 25-Feb-16 27-Feb-16 0% -99.63

MIP2-6-14180 Beam and Slab Formwork 10.00 27-Feb-16 10-Mar-16 0% -99.63

MIP2-6-14190 Steel Bar 5.00 10-Mar-16 15-Mar-16 0% -99.63

MIP2-6-14200 Concrete 3.00 16-Mar-16 18-Mar-16 0% -99.63

Lift CoreLift Core 77.75 03-Sep-15 05-Dec-15 0% 82.38

EA6EA6 7.00 17-Sep-15 25-Sep-15 0% 142.50

MIP2-6-14210 Formwork 3.00 17-Sep-15 19-Sep-15 0% 142.50

MIP2-6-14220 Steel Bar 3.00 19-Sep-15 23-Sep-15 0% 142.50

MIP2-6-14230 Concrete 1.00 23-Sep-15 25-Sep-15 0% 142.50

ED6ED6 7.00 03-Sep-15 11-Sep-15 0% 153.13

MIP2-6-14240 Formwork 3.00 03-Sep-15 07-Sep-15 0% 153.13

MIP2-6-14250 Steel Bar 3.00 07-Sep-15 10-Sep-15 0% 153.13

MIP2-6-14260 Concrete 1.00 10-Sep-15 11-Sep-15 0% 153.13

EG6EG6 6.00 28-Nov-15 05-Dec-15 0% 82.38

MIP2-6-14270 Formwork 3.00 28-Nov-15 02-Dec-15 0% 82.38

MIP2-6-14280 Steel Bar 3.00 01-Dec-15 04-Dec-15 0% 82.38

MIP2-6-14290 Concrete 1.00 04-Dec-15 05-Dec-15 0% 82.38

EH6EH6 6.00 18-Nov-15 25-Nov-15 0% 91.88

MIP2-6-14300 Formwork 3.00 18-Nov-15 21-Nov-15 0% 91.88

MIP2-6-14310 Steel Bar 3.00 20-Nov-15 24-Nov-15 0% 91.88

MIP2-6-14320 Concrete 1.00 24-Nov-15 25-Nov-15 0% 91.88

StaircaseStaircase 78.00 28-Dec-15 31-Mar-16 0% -22.63

SA6SA6 11.00 28-Dec-15 09-Jan-16 0% 44.38

MIP2-6-14330 Formwork 7.00 28-Dec-15 06-Jan-16 0% 44.38

MIP2-6-14340 Steel Bar 3.00 06-Jan-16 09-Jan-16 0% 44.38

MIP2-6-14350 Concrete 1.00 09-Jan-16 09-Jan-16 0% 44.38

SD6SD6 11.00 22-Jan-16 05-Feb-16 0% 23.13

MIP2-6-14360 Formwork 7.00 22-Jan-16 30-Jan-16 0% 23.13

MIP2-6-14370 Steel Bar 3.00 01-Feb-16 04-Feb-16 0% 23.13

MIP2-6-14380 Concrete 1.00 05-Feb-16 05-Feb-16 0% 23.13

SG6SG6 11.00 19-Mar-16 31-Mar-16 0% -22.63

MIP2-6-14390 Formwork 7.00 19-Mar-16 26-Mar-16 0% -22.63

MIP2-6-14400 Steel Bar 3.00 26-Mar-16 30-Mar-16 0% -22.63

MIP2-6-14410 Concrete 1.00 30-Mar-16 31-Mar-16 0% -22.63

SH6SH6 11.00 19-Mar-16 31-Mar-16 0% -22.63

MIP2-6-14420 Formwork 7.00 19-Mar-16 26-Mar-16 0% -22.63

MIP2-6-14430 Steel Bar 3.00 26-Mar-16 30-Mar-16 0% -22.63

MIP2-6-14440 Concrete 1.00 30-Mar-16 31-Mar-16 0% -22.63

RampRamp 82.00 28-Dec-15 05-Apr-16 0% 36.50

RA6RA6 15.00 28-Dec-15 14-Jan-16 0% 103.50

J A J A JJA J A JA J A JJA

14 2015 2016 2017

08-Jan-16, SD5

05-Mar-16, SG5

05-Mar-16, SH5

10-Mar-16, Ramp

19-Dec-15, RA5

10-Mar-16, RI5

05-Apr-16, 5th Floor

28-Dec-15, Zone A, B & C

22-Jan-16, Zone D, E &

18-Mar-16, Zone G,H

05-Dec-15, Lift Core

25-Sep-15, EA6

11-Sep-15, ED6

05-Dec-15, EG6

25-Nov-15, EH6

31-Mar-16, Staircase

09-Jan-16, SA6

05-Feb-16, SD6

31-Mar-16, SG6

31-Mar-16, SH6

05-Apr-16, Ramp

14-Jan-16, RA6

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 23 of 33 TASK filter: All Activities

© Oracle Corporation

Page 24: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-14450 Formwork 10.00 28-Dec-15 09-Jan-16 0% 103.50

MIP2-6-14460 Steel Bar 3.00 09-Jan-16 12-Jan-16 0% 103.50

MIP2-6-14470 Concrete 2.00 13-Jan-16 14-Jan-16 0% 103.50

RI6RI6 15.00 19-Mar-16 05-Apr-16 0% 36.50

MIP2-6-14480 Formwork 10.00 19-Mar-16 30-Mar-16 0% 36.50

MIP2-6-14490 Steel Bar 3.00 30-Mar-16 02-Apr-16 0% 36.50

MIP2-6-14500 Concrete 2.00 02-Apr-16 05-Apr-16 0% 36.50

6th Floor6th Floor 189.75 11-Sep-15 28-Apr-16 0% 31.50

Zone A, B & CZone A, B & C 20.00 28-Dec-15 20-Jan-16 0% -66.38

MIP2-6-14510 Column Formwork 3.00 28-Dec-15 31-Dec-15 0% -66.38

MIP2-6-14520 Steel Bar 2.00 29-Dec-15 31-Dec-15 0% -66.38

MIP2-6-14530 Concrete 2.00 31-Dec-15 04-Jan-16 0% -66.38

MIP2-6-14540 Beam and Slab Formwork 10.00 04-Jan-16 14-Jan-16 0% -66.38

MIP2-6-14550 Steel Bar 5.00 12-Jan-16 16-Jan-16 0% -66.38

MIP2-6-14560 Concrete 3.00 16-Jan-16 20-Jan-16 0% -66.38

Zone D, E & FZone D, E & F 20.00 22-Jan-16 18-Feb-16 0% -50.88

MIP2-6-14570 Column Formwork 3.00 22-Jan-16 27-Jan-16 0% -50.88

MIP2-6-14580 Steel Bar 2.00 25-Jan-16 27-Jan-16 0% -50.88

MIP2-6-14590 Concrete 2.00 27-Jan-16 29-Jan-16 0% -50.88

MIP2-6-14600 Beam and Slab Formwork 10.00 29-Jan-16 12-Feb-16 0% -50.88

MIP2-6-14610 Steel Bar 5.00 06-Feb-16 15-Feb-16 0% -50.88

MIP2-6-14620 Concrete 3.00 15-Feb-16 18-Feb-16 0% -50.88

Zone G,H & IZone G,H & I 20.00 19-Mar-16 11-Apr-16 0% -99.63

MIP2-6-14630 Column Formwork 3.00 19-Mar-16 22-Mar-16 0% -99.63

MIP2-6-14640 Steel Bar 2.00 19-Mar-16 22-Mar-16 0% -99.63

MIP2-6-14650 Concrete 2.00 22-Mar-16 24-Mar-16 0% -99.63

MIP2-6-14660 Beam and Slab Formwork 10.00 24-Mar-16 05-Apr-16 0% -99.63

MIP2-6-14670 Steel Bar 5.00 01-Apr-16 07-Apr-16 0% -99.63

MIP2-6-14680 Concrete 3.00 07-Apr-16 11-Apr-16 0% -99.63

Lift CoreLift Core 76.75 11-Sep-15 12-Dec-15 0% 82.38

EA7EA7 6.00 25-Sep-15 02-Oct-15 0% 142.50

MIP2-6-14690 Formwork 3.00 25-Sep-15 29-Sep-15 0% 142.50

MIP2-6-14700 Steel Bar 3.00 28-Sep-15 01-Oct-15 0% 142.50

MIP2-6-14710 Concrete 1.00 01-Oct-15 02-Oct-15 0% 142.50

ED7ED7 6.00 11-Sep-15 19-Sep-15 0% 153.13

MIP2-6-14720 Formwork 3.00 11-Sep-15 15-Sep-15 0% 153.13

MIP2-6-14730 Steel Bar 3.00 14-Sep-15 18-Sep-15 0% 153.13

MIP2-6-14740 Concrete 1.00 18-Sep-15 19-Sep-15 0% 153.13

EG7EG7 6.00 05-Dec-15 12-Dec-15 0% 82.38

MIP2-6-14750 Formwork 3.00 05-Dec-15 09-Dec-15 0% 82.38

MIP2-6-14760 Steel Bar 3.00 08-Dec-15 11-Dec-15 0% 82.38

MIP2-6-14770 Concrete 1.00 11-Dec-15 12-Dec-15 0% 82.38

EH7EH7 6.00 25-Nov-15 02-Dec-15 0% 91.88

MIP2-6-14780 Formwork 3.00 25-Nov-15 28-Nov-15 0% 91.88

MIP2-6-14790 Steel Bar 3.00 27-Nov-15 01-Dec-15 0% 91.88

MIP2-6-14800 Concrete 1.00 01-Dec-15 02-Dec-15 0% 91.88

StaircaseStaircase 78.00 20-Jan-16 23-Apr-16 0% -31.63

SA7SA7 11.00 20-Jan-16 04-Feb-16 0% 35.38

MIP2-6-14810 Formwork 7.00 20-Jan-16 29-Jan-16 0% 35.38

MIP2-6-14820 Steel Bar 3.00 29-Jan-16 03-Feb-16 0% 35.38

MIP2-6-14830 Concrete 1.00 03-Feb-16 04-Feb-16 0% 35.38

SD7SD7 11.00 18-Feb-16 02-Mar-16 0% 14.13

MIP2-6-14840 Formwork 7.00 18-Feb-16 26-Feb-16 0% 14.13

MIP2-6-14850 Steel Bar 3.00 26-Feb-16 01-Mar-16 0% 14.13

MIP2-6-14860 Concrete 1.00 01-Mar-16 02-Mar-16 0% 14.13

SG7SG7 11.00 11-Apr-16 23-Apr-16 0% -31.63

MIP2-6-14870 Formwork 7.00 11-Apr-16 19-Apr-16 0% -31.63

MIP2-6-14880 Steel Bar 3.00 19-Apr-16 22-Apr-16 0% -31.63

MIP2-6-14890 Concrete 1.00 22-Apr-16 23-Apr-16 0% -31.63

SH7SH7 11.00 11-Apr-16 23-Apr-16 0% -31.63

MIP2-6-14900 Formwork 7.00 11-Apr-16 19-Apr-16 0% -31.63

MIP2-6-14910 Steel Bar 3.00 19-Apr-16 22-Apr-16 0% -31.63

MIP2-6-14920 Concrete 1.00 22-Apr-16 23-Apr-16 0% -31.63

RampRamp 82.00 20-Jan-16 28-Apr-16 0% 31.50

RA7RA7 15.00 20-Jan-16 11-Feb-16 0% 98.50

MIP2-6-14930 Formwork 10.00 20-Jan-16 03-Feb-16 0% 98.50

MIP2-6-14940 Steel Bar 3.00 03-Feb-16 06-Feb-16 0% 98.50

MIP2-6-14950 Concrete 2.00 06-Feb-16 11-Feb-16 0% 98.50

RI7RI7 15.00 11-Apr-16 28-Apr-16 0% 31.50

MIP2-6-14960 Formwork 10.00 11-Apr-16 22-Apr-16 0% 31.50

MIP2-6-14970 Steel Bar 3.00 22-Apr-16 26-Apr-16 0% 31.50

MIP2-6-14980 Concrete 2.00 26-Apr-16 28-Apr-16 0% 31.50

7th Floor7th Floor 206.75 19-Sep-15 26-May-16 0% 23.50

Zone A, B & CZone A, B & C 20.00 20-Jan-16 17-Feb-16 0% -66.38

MIP2-6-14990 Column Formwork 3.00 20-Jan-16 25-Jan-16 0% -66.38

MIP2-6-15000 Steel Bar 2.00 21-Jan-16 25-Jan-16 0% -66.38

MIP2-6-15010 Concrete 2.00 25-Jan-16 27-Jan-16 0% -66.38

MIP2-6-15020 Beam and Slab Formwork 10.00 27-Jan-16 11-Feb-16 0% -66.38

MIP2-6-15030 Steel Bar 5.00 05-Feb-16 13-Feb-16 0% -66.38

J A J A JJA J A JA J A JJA

14 2015 2016 2017

05-Apr-16, RI6

28-Apr-16, 6th Floo

20-Jan-16, Zone A, B & C

18-Feb-16, Zone D, E

11-Apr-16, Zone G,H

12-Dec-15, Lift Core

02-Oct-15, EA7

19-Sep-15, ED7

12-Dec-15, EG7

02-Dec-15, EH7

23-Apr-16, Staircase

04-Feb-16, SA7

02-Mar-16, SD7

23-Apr-16, SG7

23-Apr-16, SH7

28-Apr-16, Ramp

11-Feb-16, RA7

28-Apr-16, RI7

26-May-16, 7th Flo

17-Feb-16, Zone A, B &

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 24 of 33 TASK filter: All Activities

© Oracle Corporation

Page 25: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-15040 Concrete 3.00 13-Feb-16 17-Feb-16 0% -66.38

Zone D, E & FZone D, E & F 20.00 18-Feb-16 12-Mar-16 0% -50.88

MIP2-6-15050 Column Formwork 3.00 18-Feb-16 22-Feb-16 0% -50.88

MIP2-6-15060 Steel Bar 2.00 19-Feb-16 22-Feb-16 0% -50.88

MIP2-6-15070 Concrete 2.00 22-Feb-16 24-Feb-16 0% -50.88

MIP2-6-15080 Beam and Slab Formwork 10.00 24-Feb-16 07-Mar-16 0% -50.88

MIP2-6-15090 Steel Bar 5.00 03-Mar-16 09-Mar-16 0% -50.88

MIP2-6-15100 Concrete 3.00 09-Mar-16 12-Mar-16 0% -50.88

Zone G,H & IZone G,H & I 20.00 14-Apr-16 07-May-16 0% -99.63

MIP2-6-15110 Column Formwork 3.00 14-Apr-16 18-Apr-16 0% -99.63

MIP2-6-15120 Steel Bar 2.00 15-Apr-16 18-Apr-16 0% -99.63

MIP2-6-15130 Concrete 2.00 18-Apr-16 20-Apr-16 0% -99.63

MIP2-6-15140 Beam and Slab Formwork 10.00 20-Apr-16 03-May-16 0% -99.63

MIP2-6-15150 Steel Bar 5.00 28-Apr-16 05-May-16 0% -99.63

MIP2-6-15160 Concrete 3.00 05-May-16 07-May-16 0% -99.63

Lift CoreLift Core 76.75 19-Sep-15 19-Dec-15 0% 82.38

EA8EA8 6.00 02-Oct-15 09-Oct-15 0% 142.50

MIP2-6-15170 Formwork 3.00 02-Oct-15 06-Oct-15 0% 142.50

MIP2-6-15180 Steel Bar 3.00 05-Oct-15 08-Oct-15 0% 142.50

MIP2-6-15190 Concrete 1.00 08-Oct-15 09-Oct-15 0% 142.50

ED8ED8 6.00 19-Sep-15 28-Sep-15 0% 153.13

MIP2-6-15200 Formwork 3.00 19-Sep-15 23-Sep-15 0% 153.13

MIP2-6-15210 Steel Bar 3.00 22-Sep-15 26-Sep-15 0% 153.13

MIP2-6-15220 Concrete 1.00 26-Sep-15 28-Sep-15 0% 153.13

EG8EG8 6.00 12-Dec-15 19-Dec-15 0% 82.38

MIP2-6-15230 Formwork 3.00 12-Dec-15 16-Dec-15 0% 82.38

MIP2-6-15240 Steel Bar 3.00 15-Dec-15 18-Dec-15 0% 82.38

MIP2-6-15250 Concrete 1.00 18-Dec-15 19-Dec-15 0% 82.38

EH8EH8 6.00 02-Dec-15 09-Dec-15 0% 91.88

MIP2-6-15260 Formwork 3.00 02-Dec-15 05-Dec-15 0% 91.88

MIP2-6-15270 Steel Bar 3.00 04-Dec-15 08-Dec-15 0% 91.88

MIP2-6-15280 Concrete 1.00 08-Dec-15 09-Dec-15 0% 91.88

StaircaseStaircase 81.00 17-Feb-16 20-May-16 0% -43.63

SA8SA8 11.00 17-Feb-16 01-Mar-16 0% 26.38

MIP2-6-15290 Formwork 7.00 17-Feb-16 25-Feb-16 0% 26.38

MIP2-6-15300 Steel Bar 3.00 25-Feb-16 29-Feb-16 0% 26.38

MIP2-6-15310 Concrete 1.00 29-Feb-16 01-Mar-16 0% 26.38

SD8SD8 11.00 12-Mar-16 25-Mar-16 0% 5.13

MIP2-6-15320 Formwork 7.00 12-Mar-16 21-Mar-16 0% 5.13

MIP2-6-15330 Steel Bar 3.00 21-Mar-16 24-Mar-16 0% 5.13

MIP2-6-15340 Concrete 1.00 24-Mar-16 25-Mar-16 0% 5.13

SG8SG8 11.00 09-May-16 20-May-16 0% -43.63

MIP2-6-15350 Formwork 7.00 09-May-16 16-May-16 0% -43.63

MIP2-6-15360 Steel Bar 3.00 16-May-16 19-May-16 0% -43.63

MIP2-6-15370 Concrete 1.00 19-May-16 20-May-16 0% -43.63

SH8SH8 11.00 09-May-16 20-May-16 0% -43.63

MIP2-6-15380 Formwork 7.00 09-May-16 16-May-16 0% -43.63

MIP2-6-15390 Steel Bar 3.00 16-May-16 19-May-16 0% -43.63

MIP2-6-15400 Concrete 1.00 19-May-16 20-May-16 0% -43.63

RampRamp 85.00 17-Feb-16 26-May-16 0% 23.50

RA8RA8 15.00 17-Feb-16 05-Mar-16 0% 93.50

MIP2-6-15410 Formwork 10.00 17-Feb-16 29-Feb-16 0% 93.50

MIP2-6-15420 Steel Bar 3.00 29-Feb-16 03-Mar-16 0% 93.50

MIP2-6-15430 Concrete 2.00 03-Mar-16 05-Mar-16 0% 93.50

RI8RI8 15.00 09-May-16 26-May-16 0% 23.50

MIP2-6-15440 Formwork 10.00 09-May-16 19-May-16 0% 23.50

MIP2-6-15450 Steel Bar 3.00 19-May-16 24-May-16 0% 23.50

MIP2-6-15460 Concrete 2.00 24-May-16 26-May-16 0% 23.50

RoofRoof 40.00 09-May-16 27-Jun-16 0% -7.63

MIP2-6-15470 Lift Motor Room 10.00 09-May-16 19-May-16 0% -99.63

MIP2-6-15480 Beam and Slab 20.00 19-May-16 14-Jun-16 0% -99.63

MIP2-6-15490 Water Tank 10.00 14-Jun-16 27-Jun-16 0% -7.63

ABWF WORKSABWF WORKS 347.13 05-Aug-15 30-Sep-16 0% -77.50

ARCHITECTURALARCHITECTURAL 347.13 05-Aug-15 30-Sep-16 0% -77.50

LEVEL LGLEVEL LG 128.13 05-Aug-15 09-Jan-16 0% 50.25

MIP2-6-15500 Wall Painting 20.00 21-Nov-15 14-Dec-15 0% -68.50

MIP2-6-15510 Floor Screeding 20.00 14-Dec-15 09-Jan-16 0% -68.50

Brick WorkBrick Work 74.13 05-Aug-15 04-Nov-15 0% -8.38

MIP2-6-15520 Zone A, B & C 30.00 05-Aug-15 11-Sep-15 0% -79.38

MIP2-6-15530 Zone D, E & F 12.00 26-Aug-15 11-Sep-15 0% 35.38

MIP2-6-15540 Zone G,H & I 12.00 21-Oct-15 04-Nov-15 0% -68.50

Plastering WorkPlastering Work 71.13 17-Aug-15 13-Nov-15 0% 84.63

MIP2-6-15550 Zone A, B & C 7.00 17-Aug-15 25-Aug-15 0% -79.38

MIP2-6-15580 Zone D, E & F 7.00 11-Sep-15 21-Sep-15 0% 128.38

MIP2-6-15590 Zone G,H & I 7.00 04-Nov-15 13-Nov-15 0% -68.50

TNB SubstationTNB Substation 43.00 13-Aug-15 06-Oct-15 0% -79.38

MIP2-6-15600 Brick Work 15.00 13-Aug-15 12-Sep-15 0% -79.38

MIP2-6-15610 Plastering Work 15.00 02-Sep-15 02-Oct-15 0% -79.38

MIP2-6-15620 Floor Screeding 3.00 02-Oct-15 06-Oct-15 0% -79.38

J A J A JJA J A JA J A JJA

14 2015 2016 2017

12-Mar-16, Zone D, E

07-May-16, Zone G

19-Dec-15, Lift Core

09-Oct-15, EA8

28-Sep-15, ED8

19-Dec-15, EG8

09-Dec-15, EH8

20-May-16, Stairca

01-Mar-16, SA8

25-Mar-16, SD8

20-May-16, SG8

20-May-16, SH8

26-May-16, Ramp

05-Mar-16, RA8

26-May-16, RI8

27-Jun-16, Roof

30-Sep-16, A

30-Sep-16, A

09-Jan-16, LEVEL LG

04-Nov-15, Brick Work

13-Nov-15, Plastering Work

06-Oct-15, TNB Substation

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 25 of 33 TASK filter: All Activities

© Oracle Corporation

Page 26: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

Ceiling FinishesCeiling Finishes 66.13 25-Aug-15 14-Nov-15 0% 86.25

MIP2-6-15630 Zone A 2.00 25-Aug-15 28-Aug-15 0% 147.00

MIP2-6-15640 Zone D 2.00 21-Sep-15 23-Sep-15 0% 128.38

MIP2-6-15650 Zone G 2.00 13-Nov-15 14-Nov-15 0% 86.25

MIP2-6-15660 Zone H 2.00 13-Nov-15 14-Nov-15 0% -68.50

TilingTiling 69.13 28-Aug-15 20-Nov-15 0% 88.25

MIP2-6-15670 Zone A 5.00 28-Aug-15 03-Sep-15 0% 147.00

MIP2-6-15680 Zone D 5.00 23-Sep-15 30-Sep-15 0% 128.38

MIP2-6-15690 Zone G 5.00 16-Nov-15 20-Nov-15 0% 86.25

MIP2-6-15700 Zone H 5.00 16-Nov-15 20-Nov-15 0% 88.25

Internal & ExterInternal & External Door & Window 68.38 04-Sep-15 25-Nov-15 0% 86.25

MIP2-6-15710 Zone A+D 2.00 04-Sep-15 05-Sep-15 0% 147.00

MIP2-6-15720 Zone B+C 2.00 30-Sep-15 01-Oct-15 0% 128.38

MIP2-6-15730 Zone F+G 2.00 21-Nov-15 23-Nov-15 0% 86.25

MIP2-6-15740 Zone H 2.00 23-Nov-15 25-Nov-15 0% 86.25

LEVEL GLEVEL G 152.00 28-Aug-15 03-Mar-16 0% 9.88

MIP2-6-15750 Wall Painting 10.00 16-Dec-15 30-Dec-15 0% -60.50

MIP2-6-15760 Floor Screeding 20.00 09-Jan-16 03-Feb-16 0% -68.50

Brick WorkBrick Work 69.00 28-Aug-15 20-Nov-15 0% 62.25

MIP2-6-15770 Zone A, B & C 6.00 28-Aug-15 05-Sep-15 0% 30.38

MIP2-6-15780 Zone D, E & F 6.00 22-Sep-15 30-Sep-15 0% 106.00

MIP2-6-15790 Zone G,H & I 6.00 14-Nov-15 20-Nov-15 0% -60.50

System EquipmSystem Equipment Room 60.00 17-Dec-15 03-Mar-16 0% -99.69

MIP2-6-15800 Brick Work 30.00 17-Dec-15 20-Jan-16 0% -99.69

MIP2-6-15810 Plastering Work 20.00 20-Jan-16 15-Feb-16 0% -99.69

MIP2-6-15820 Floor Screeding 15.00 15-Feb-16 03-Mar-16 0% -99.69

Plastering WorkPlastering Work 78.00 05-Sep-15 08-Dec-15 0% 62.25

MIP2-6-15830 Zone A, B & C 15.00 05-Sep-15 23-Sep-15 0% 122.25

MIP2-6-15840 Zone D, E & F 15.00 30-Sep-15 17-Oct-15 0% 106.00

MIP2-6-15850 Zone G,H & I 15.00 21-Nov-15 08-Dec-15 0% -60.50

Ceiling FinishesCeiling Finishes 65.00 25-Sep-15 10-Dec-15 0% 65.25

MIP2-6-15860 Zone A 2.00 25-Sep-15 26-Sep-15 0% 122.25

MIP2-6-15870 Zone D 2.00 17-Oct-15 20-Oct-15 0% 106.00

MIP2-6-15880 Zone G 2.00 08-Dec-15 10-Dec-15 0% 65.25

MIP2-6-15890 Zone H 2.00 08-Dec-15 10-Dec-15 0% -60.50

TilingTiling 68.00 26-Sep-15 16-Dec-15 0% 68.25

MIP2-6-15900 Zone A 5.00 26-Sep-15 02-Oct-15 0% 122.25

MIP2-6-15910 Zone D 5.00 20-Oct-15 26-Oct-15 0% 106.00

MIP2-6-15920 Zone G 5.00 10-Dec-15 16-Dec-15 0% 65.25

MIP2-6-15930 Zone H 5.00 10-Dec-15 16-Dec-15 0% 68.25

Internal & ExterInternal & External Door & Window 69.00 02-Oct-15 23-Dec-15 0% 65.25

MIP2-6-15940 Zone A 3.00 02-Oct-15 06-Oct-15 0% 122.25

MIP2-6-15950 Zone D 3.00 26-Oct-15 29-Oct-15 0% 106.00

MIP2-6-15960 Zone G 3.00 16-Dec-15 19-Dec-15 0% 65.25

MIP2-6-15970 Zone H 3.00 19-Dec-15 23-Dec-15 0% 65.25

LEVEL 1LEVEL 1 133.00 22-Sep-15 03-Mar-16 0% 13.25

MIP2-6-15980 Wall Painting 20.00 13-Jan-16 06-Feb-16 0% -71.50

MIP2-6-15990 Floor Screeding 20.00 06-Feb-16 03-Mar-16 0% -71.50

Brick WorkBrick Work 71.00 22-Sep-15 15-Dec-15 0% 44.25

MIP2-6-16000 Zone A, B & C 7.00 22-Sep-15 30-Sep-15 0% 29.38

MIP2-6-16010 Zone D, E & F 7.00 16-Oct-15 24-Oct-15 0% 88.00

MIP2-6-16020 Zone G,H & I 7.00 07-Dec-15 15-Dec-15 0% -71.50

Plastering WorkPlastering Work 79.00 30-Sep-15 05-Jan-16 0% 44.25

MIP2-6-16030 Zone A, B & C 15.00 30-Sep-15 19-Oct-15 0% 29.38

MIP2-6-16040 Zone D, E & F 15.00 24-Oct-15 12-Nov-15 0% 88.00

MIP2-6-16050 Zone G,H & I 15.00 15-Dec-15 05-Jan-16 0% -71.50

Ceiling FinishesCeiling Finishes 66.00 19-Oct-15 07-Jan-16 0% 47.25

MIP2-6-16060 Zone A 2.00 19-Oct-15 21-Oct-15 0% 105.25

MIP2-6-16070 Zone D 2.00 12-Nov-15 14-Nov-15 0% 88.00

MIP2-6-16080 Zone G 2.00 05-Jan-16 07-Jan-16 0% 47.25

MIP2-6-16090 Zone H 2.00 05-Jan-16 07-Jan-16 0% -71.50

TilingTiling 69.00 21-Oct-15 12-Jan-16 0% 50.25

MIP2-6-16100 Zone A 5.00 21-Oct-15 27-Oct-15 0% 105.25

MIP2-6-16110 Zone D 5.00 14-Nov-15 20-Nov-15 0% 88.00

MIP2-6-16120 Zone G 5.00 07-Jan-16 12-Jan-16 0% 47.25

MIP2-6-16130 Zone H 5.00 07-Jan-16 12-Jan-16 0% 50.25

Internal & ExterInternal & External Door & Window 70.00 27-Oct-15 19-Jan-16 0% 47.25

MIP2-6-16140 Zone A 3.00 27-Oct-15 30-Oct-15 0% 105.25

MIP2-6-16150 Zone F 3.00 20-Nov-15 24-Nov-15 0% 88.00

MIP2-6-16160 Zone G 3.00 13-Jan-16 15-Jan-16 0% 47.25

MIP2-6-16170 Zone H 3.00 16-Jan-16 19-Jan-16 0% 47.25

LEVEL 2LEVEL 2 133.00 16-Oct-15 25-Mar-16 0% -3.75

MIP2-6-16180 Wall Painting 20.00 06-Feb-16 03-Mar-16 0% -71.50

MIP2-6-16190 Floor Screeding 20.00 03-Mar-16 25-Mar-16 0% -71.50

Brick WorkBrick Work 71.00 16-Oct-15 09-Jan-16 0% 27.25

MIP2-6-16200 Zone A, B & C 7.00 16-Oct-15 24-Oct-15 0% 88.25

MIP2-6-16210 Zone D, E & F 7.00 06-Nov-15 16-Nov-15 0% 73.00

MIP2-6-16220 Zone G,H & I 7.00 02-Jan-16 09-Jan-16 0% -71.50

J A J A JJA J A JA J A JJA

14 2015 2016 2017

14-Nov-15, Ceiling Finishes

20-Nov-15, Tiling

25-Nov-15, Internal & Exte

03-Mar-16, LEVEL G

20-Nov-15, Brick Work

03-Mar-16, System Eq

08-Dec-15, Plastering Wor

10-Dec-15, Ceiling Finishe

16-Dec-15, Tiling

23-Dec-15, Internal & Exte

03-Mar-16, LEVEL 1

15-Dec-15, Brick Work

05-Jan-16, Plastering Wo

07-Jan-16, Ceiling Finishe

12-Jan-16, Tiling

19-Jan-16, Internal & Ex

25-Mar-16, LEVEL 2

09-Jan-16, Brick Work

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 26 of 33 TASK filter: All Activities

© Oracle Corporation

Page 27: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

Plastering WorkPlastering Work 79.00 24-Oct-15 28-Jan-16 0% 27.25

MIP2-6-16230 Zone A, B & C 15.00 24-Oct-15 12-Nov-15 0% 88.25

MIP2-6-16240 Zone D, E & F 15.00 16-Nov-15 02-Dec-15 0% 73.00

MIP2-6-16250 Zone G,H & I 15.00 11-Jan-16 28-Jan-16 0% -71.50

Ceiling FinishesCeiling Finishes 66.00 12-Nov-15 30-Jan-16 0% 30.25

MIP2-6-16260 Zone A 2.00 12-Nov-15 14-Nov-15 0% 88.25

MIP2-6-16270 Zone D 2.00 03-Dec-15 04-Dec-15 0% 73.00

MIP2-6-16280 Zone G 2.00 28-Jan-16 30-Jan-16 0% 30.25

MIP2-6-16290 Zone H 2.00 28-Jan-16 30-Jan-16 0% -71.50

TilingTiling 69.00 14-Nov-15 06-Feb-16 0% 33.25

MIP2-6-16300 Zone A 5.00 14-Nov-15 19-Nov-15 0% 88.25

MIP2-6-16310 Zone D 5.00 05-Dec-15 10-Dec-15 0% 73.00

MIP2-6-16320 Zone G 5.00 30-Jan-16 06-Feb-16 0% 30.25

MIP2-6-16330 Zone H 5.00 30-Jan-16 06-Feb-16 0% 33.25

Internal & ExterInternal & External Door & Window 70.00 20-Nov-15 16-Feb-16 0% 30.25

MIP2-6-16340 Zone A 3.00 20-Nov-15 23-Nov-15 0% 88.25

MIP2-6-16350 Zone F 3.00 10-Dec-15 14-Dec-15 0% 73.00

MIP2-6-16360 Zone G 3.00 06-Feb-16 12-Feb-16 0% 30.25

MIP2-6-16370 Zone H 3.00 12-Feb-16 16-Feb-16 0% 30.25

LEVEL 3LEVEL 3 114.75 01-Dec-15 18-Apr-16 0% -20.75

MIP2-6-16380 Wall Painting 20.00 03-Mar-16 25-Mar-16 0% -71.50

MIP2-6-16390 Floor Screeding 20.00 25-Mar-16 18-Apr-16 0% -71.50

Brick WorkBrick Work 52.75 01-Dec-15 04-Feb-16 0% 10.25

MIP2-6-16410 Zone D, E & F 7.00 01-Dec-15 08-Dec-15 0% 56.00

MIP2-6-16400 Zone A, B & C 7.00 12-Dec-15 21-Dec-15 0% -24.63

MIP2-6-16420 Zone G,H & I 7.00 26-Jan-16 04-Feb-16 0% -71.50

Plastering WorkPlastering Work 60.75 08-Dec-15 24-Feb-16 0% 10.25

MIP2-6-16440 Zone D, E & F 15.00 08-Dec-15 28-Dec-15 0% 56.00

MIP2-6-16430 Zone A, B & C 15.00 21-Dec-15 09-Jan-16 0% 42.25

MIP2-6-16450 Zone G,H & I 15.00 04-Feb-16 24-Feb-16 0% -71.50

Ceiling FinishesCeiling Finishes 47.75 28-Dec-15 26-Feb-16 0% 13.25

MIP2-6-16470 Zone D 2.00 28-Dec-15 30-Dec-15 0% 56.00

MIP2-6-16460 Zone A 2.00 11-Jan-16 12-Jan-16 0% 42.25

MIP2-6-16480 Zone G 2.00 24-Feb-16 26-Feb-16 0% 13.25

MIP2-6-16490 Zone H 2.00 24-Feb-16 26-Feb-16 0% -71.50

TilingTiling 50.75 30-Dec-15 03-Mar-16 0% 16.25

MIP2-6-16510 Zone D 5.00 30-Dec-15 06-Jan-16 0% 56.00

MIP2-6-16500 Zone A 5.00 13-Jan-16 18-Jan-16 0% 42.25

MIP2-6-16520 Zone G 5.00 26-Feb-16 03-Mar-16 0% 13.25

MIP2-6-16530 Zone H 5.00 26-Feb-16 03-Mar-16 0% 16.25

Internal & ExterInternal & External Door & Window 41.00 18-Jan-16 10-Mar-16 0% 13.25

MIP2-6-16540 Zone A 3.00 18-Jan-16 21-Jan-16 0% 42.25

MIP2-6-16550 Zone F 3.00 21-Jan-16 26-Jan-16 0% 42.25

MIP2-6-16560 Zone G 3.00 03-Mar-16 07-Mar-16 0% 13.25

MIP2-6-16570 Zone H 3.00 07-Mar-16 10-Mar-16 0% 13.25

LEVEL 4LEVEL 4 133.00 02-Dec-15 11-May-16 0% -37.75

MIP2-6-16580 Wall Painting 20.00 25-Mar-16 18-Apr-16 0% -71.50

MIP2-6-16590 Floor Screeding 20.00 18-Apr-16 11-May-16 0% -71.50

Brick WorkBrick Work 71.00 02-Dec-15 01-Mar-16 0% -6.75

MIP2-6-16600 Zone A, B & C 7.00 02-Dec-15 10-Dec-15 0% -15.63

MIP2-6-16610 Zone D, E & F 7.00 23-Dec-15 04-Jan-16 0% 39.00

MIP2-6-16620 Zone G,H & I 7.00 22-Feb-16 01-Mar-16 0% -71.50

Plastering WorkPlastering Work 79.00 10-Dec-15 17-Mar-16 0% -6.75

MIP2-6-16630 Zone A, B & C 15.00 10-Dec-15 30-Dec-15 0% 54.25

MIP2-6-16640 Zone D, E & F 15.00 04-Jan-16 21-Jan-16 0% 39.00

MIP2-6-16650 Zone G,H & I 15.00 01-Mar-16 17-Mar-16 0% -71.50

Ceiling FinishesCeiling Finishes 66.00 30-Dec-15 19-Mar-16 0% -3.75

MIP2-6-16660 Zone A 2.00 30-Dec-15 02-Jan-16 0% 54.25

MIP2-6-16670 Zone D 2.00 21-Jan-16 25-Jan-16 0% 39.00

MIP2-6-16680 Zone G 2.00 18-Mar-16 19-Mar-16 0% -3.75

MIP2-6-16690 Zone H 2.00 18-Mar-16 19-Mar-16 0% -71.50

TilingTiling 69.00 02-Jan-16 25-Mar-16 0% -0.75

MIP2-6-16700 Zone A 5.00 02-Jan-16 08-Jan-16 0% 54.25

MIP2-6-16710 Zone D 5.00 25-Jan-16 30-Jan-16 0% 39.00

MIP2-6-16720 Zone G 5.00 19-Mar-16 25-Mar-16 0% -3.75

MIP2-6-16730 Zone H 5.00 19-Mar-16 25-Mar-16 0% -0.75

Internal & ExterInternal & External Door & Window 70.00 08-Jan-16 01-Apr-16 0% -3.75

MIP2-6-16740 Zone A 3.00 08-Jan-16 11-Jan-16 0% 54.25

MIP2-6-16750 Zone F 3.00 30-Jan-16 03-Feb-16 0% 39.00

MIP2-6-16760 Zone G 3.00 25-Mar-16 29-Mar-16 0% -3.75

MIP2-6-16770 Zone H 3.00 29-Mar-16 01-Apr-16 0% -3.75

LEVEL 5LEVEL 5 136.00 28-Dec-15 09-Jun-16 0% -57.75

MIP2-6-16780 Wall Painting 20.00 21-Apr-16 14-May-16 0% -74.50

MIP2-6-16790 Floor Screeding 20.00 14-May-16 09-Jun-16 0% -74.50

Brick WorkBrick Work 74.00 28-Dec-15 26-Mar-16 0% -26.75

MIP2-6-16800 Zone A, B & C 7.00 28-Dec-15 06-Jan-16 0% -5.63

MIP2-6-16810 Zone D, E & F 7.00 22-Jan-16 30-Jan-16 0% 19.00

MIP2-6-16820 Zone G,H & I 7.00 19-Mar-16 26-Mar-16 0% -92.50

J A J A JJA J A JA J A JJA

14 2015 2016 2017

28-Jan-16, Plastering W

30-Jan-16, Ceiling Finish

06-Feb-16, Tiling

16-Feb-16, Internal & E

18-Apr-16, LEVEL 3

04-Feb-16, Brick Work

24-Feb-16, Plastering W

26-Feb-16, Ceiling Fini

03-Mar-16, Tiling

10-Mar-16, Internal &

11-May-16, LEVEL

01-Mar-16, Brick Work

17-Mar-16, Plastering

19-Mar-16, Ceiling Fin

25-Mar-16, Tiling

01-Apr-16, Internal &

09-Jun-16, LEVEL

26-Mar-16, Brick Wor

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 27 of 33 TASK filter: All Activities

© Oracle Corporation

Page 28: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

Plastering WorkPlastering Work 82.00 06-Jan-16 13-Apr-16 0% -26.75

MIP2-6-16830 Zone A, B & C 15.00 06-Jan-16 22-Jan-16 0% 37.25

MIP2-6-16840 Zone D, E & F 15.00 01-Feb-16 20-Feb-16 0% 19.00

MIP2-6-16850 Zone G,H & I 15.00 26-Mar-16 13-Apr-16 0% -74.50

Ceiling FinishesCeiling Finishes 69.00 22-Jan-16 15-Apr-16 0% -23.75

MIP2-6-16860 Zone A 2.00 22-Jan-16 26-Jan-16 0% 37.25

MIP2-6-16870 Zone D 2.00 20-Feb-16 23-Feb-16 0% 19.00

MIP2-6-16880 Zone G 2.00 13-Apr-16 15-Apr-16 0% -23.75

MIP2-6-16890 Zone H 2.00 13-Apr-16 15-Apr-16 0% -74.50

TilingTiling 72.00 26-Jan-16 21-Apr-16 0% -20.75

MIP2-6-16900 Zone A 5.00 26-Jan-16 01-Feb-16 0% 37.25

MIP2-6-16910 Zone D 5.00 23-Feb-16 29-Feb-16 0% 19.00

MIP2-6-16920 Zone G 5.00 15-Apr-16 21-Apr-16 0% -23.75

MIP2-6-16930 Zone H 5.00 15-Apr-16 21-Apr-16 0% -20.75

Internal & ExterInternal & External Door & Window 73.00 01-Feb-16 28-Apr-16 0% -23.75

MIP2-6-16940 Zone A 3.00 01-Feb-16 05-Feb-16 0% 37.25

MIP2-6-16950 Zone F 3.00 29-Feb-16 03-Mar-16 0% 19.00

MIP2-6-16960 Zone G 3.00 21-Apr-16 25-Apr-16 0% -23.75

MIP2-6-16970 Zone H 3.00 25-Apr-16 28-Apr-16 0% -23.75

LEVEL 6LEVEL 6 136.00 20-Jan-16 04-Jul-16 0% -74.50

MIP2-6-16980 Wall Painting 20.00 14-May-16 09-Jun-16 0% -74.50

MIP2-6-16990 Floor Screeding 20.00 09-Jun-16 04-Jul-16 0% -74.50

Brick WorkBrick Work 74.00 20-Jan-16 19-Apr-16 0% -43.75

MIP2-6-17000 Zone A, B & C 7.00 20-Jan-16 29-Jan-16 0% -25.63

MIP2-6-17010 Zone D, E & F 7.00 18-Feb-16 26-Feb-16 0% 2.00

MIP2-6-17020 Zone G,H & I 7.00 11-Apr-16 19-Apr-16 0% -74.50

Plastering WorkPlastering Work 82.00 29-Jan-16 07-May-16 0% -43.75

MIP2-6-17030 Zone A, B & C 15.00 29-Jan-16 19-Feb-16 0% 20.25

MIP2-6-17040 Zone D, E & F 15.00 26-Feb-16 15-Mar-16 0% 2.00

MIP2-6-17050 Zone G,H & I 15.00 19-Apr-16 07-May-16 0% -74.50

Ceiling FinishesCeiling Finishes 69.00 19-Feb-16 09-May-16 0% -40.75

MIP2-6-17060 Zone A 2.00 19-Feb-16 22-Feb-16 0% 20.25

MIP2-6-17070 Zone D 2.00 15-Mar-16 17-Mar-16 0% 2.00

MIP2-6-17080 Zone G 2.00 07-May-16 09-May-16 0% -40.75

MIP2-6-17090 Zone H 2.00 07-May-16 09-May-16 0% -74.50

TilingTiling 72.00 22-Feb-16 14-May-16 0% -37.75

MIP2-6-17100 Zone A 5.00 22-Feb-16 27-Feb-16 0% 20.25

MIP2-6-17110 Zone D 5.00 17-Mar-16 23-Mar-16 0% 2.00

MIP2-6-17120 Zone G 5.00 10-May-16 14-May-16 0% -40.75

MIP2-6-17130 Zone H 5.00 10-May-16 14-May-16 0% -37.75

Internal & ExterInternal & External Door & Window 73.00 27-Feb-16 23-May-16 0% -40.75

MIP2-6-17140 Zone A 3.00 27-Feb-16 02-Mar-16 0% 20.25

MIP2-6-17150 Zone F 3.00 23-Mar-16 26-Mar-16 0% 2.00

MIP2-6-17160 Zone G 3.00 14-May-16 18-May-16 0% -40.75

MIP2-6-17170 Zone H 3.00 18-May-16 23-May-16 0% -40.75

LEVEL 7LEVEL 7 139.00 17-Feb-16 01-Aug-16 0% -77.50

MIP2-6-17180 Wall Painting 20.00 13-Jun-16 09-Jul-16 0% -77.50

MIP2-6-17190 Floor Screeding 20.00 09-Jul-16 01-Aug-16 0% -77.50

Brick WorkBrick Work 77.00 17-Feb-16 16-May-16 0% -63.75

MIP2-6-17200 Zone A, B & C 7.00 17-Feb-16 25-Feb-16 0% -66.38

MIP2-6-17210 Zone D, E & F 7.00 12-Mar-16 21-Mar-16 0% -15.00

MIP2-6-17220 Zone G,H & I 7.00 09-May-16 16-May-16 0% -84.63

Plastering WorkPlastering Work 85.00 25-Feb-16 03-Jun-16 0% -63.75

MIP2-6-17230 Zone A, B & C 15.00 25-Feb-16 12-Mar-16 0% 3.25

MIP2-6-17240 Zone D, E & F 15.00 21-Mar-16 06-Apr-16 0% -15.00

MIP2-6-17250 Zone G,H & I 15.00 16-May-16 03-Jun-16 0% -77.50

Ceiling FinishesCeiling Finishes 72.00 14-Mar-16 07-Jun-16 0% -60.75

MIP2-6-17260 Zone A 2.00 14-Mar-16 15-Mar-16 0% 3.25

MIP2-6-17270 Zone D 2.00 06-Apr-16 08-Apr-16 0% -15.00

MIP2-6-17280 Zone G 2.00 03-Jun-16 07-Jun-16 0% -60.75

MIP2-6-17290 Zone H 2.00 03-Jun-16 07-Jun-16 0% -77.50

TilingTiling 75.00 16-Mar-16 13-Jun-16 0% -57.75

MIP2-6-17300 Zone A 5.00 16-Mar-16 21-Mar-16 0% 3.25

MIP2-6-17310 Zone D 5.00 08-Apr-16 14-Apr-16 0% -15.00

MIP2-6-17320 Zone G 5.00 07-Jun-16 13-Jun-16 0% -60.75

MIP2-6-17330 Zone H 5.00 07-Jun-16 13-Jun-16 0% -57.75

Internal & ExterInternal & External Door & Window 76.00 21-Mar-16 20-Jun-16 0% -60.75

MIP2-6-17340 Zone A 3.00 21-Mar-16 24-Mar-16 0% 3.25

MIP2-6-17350 Zone F 3.00 14-Apr-16 18-Apr-16 0% -15.00

MIP2-6-17360 Zone G 3.00 13-Jun-16 16-Jun-16 0% -60.75

MIP2-6-17370 Zone H 3.00 16-Jun-16 20-Jun-16 0% -60.75

ROOF LEVELROOF LEVEL 59.00 14-Jun-16 24-Aug-16 0% -77.50

MIP2-6-17380 Brick Work 5.00 14-Jun-16 20-Jun-16 0% -99.63

MIP2-6-17390 Plastering Work 15.00 20-Jun-16 11-Jul-16 0% -67.63

MIP2-6-17420 Internal & External Door & Window 3.00 20-Jun-16 24-Jun-16 0% -60.75

MIP2-6-17430 Wall Painting 7.00 25-Jun-16 04-Jul-16 0% -60.75

MIP2-6-17400 Ceiling Finishes 5.00 11-Jul-16 16-Jul-16 0% -63.50

MIP2-6-17410 Floor Screeding 20.00 01-Aug-16 24-Aug-16 0% -77.50

J A J A JJA J A JA J A JJA

14 2015 2016 2017

13-Apr-16, Plastering

15-Apr-16, Ceiling F

21-Apr-16, Tiling

28-Apr-16, Internal

04-Jul-16, LEVEL

19-Apr-16, Brick Wo

07-May-16, Plasteri

09-May-16, Ceiling

14-May-16, Tiling

23-May-16, Interna

01-Aug-16, LEV

16-May-16, Brick W

03-Jun-16, Plaster

07-Jun-16, Ceiling

13-Jun-16, Tiling

20-Jun-16, Intern

24-Aug-16, RO

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 28 of 33 TASK filter: All Activities

© Oracle Corporation

Page 29: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

Floor CoatingFloor Coating 30.00 24-Aug-16 30-Sep-16 0% -77.50

MIP2-6-17450 LEVEL LG 3.00 24-Aug-16 27-Aug-16 0% -77.50

MIP2-6-17460 LEVEL G 3.00 27-Aug-16 01-Sep-16 0% -77.50

MIP2-6-17470 LEVEL 1 3.00 01-Sep-16 05-Sep-16 0% -77.50

MIP2-6-17480 LEVEL 2 3.00 05-Sep-16 08-Sep-16 0% -77.50

MIP2-6-17490 LEVEL 3 3.00 08-Sep-16 10-Sep-16 0% -77.50

MIP2-6-17500 LEVEL 4 3.00 12-Sep-16 15-Sep-16 0% -77.50

MIP2-6-17510 LEVEL 5 3.00 17-Sep-16 20-Sep-16 0% -77.50

MIP2-6-17520 LEVEL 6 3.00 20-Sep-16 23-Sep-16 0% -77.50

MIP2-6-17530 LEVEL 7 3.00 23-Sep-16 27-Sep-16 0% -77.50

MIP2-6-17440 ROOF LEVEL 3.00 27-Sep-16 30-Sep-16 0% -77.50

BWFBWF 432.00 14-May-15 19-Oct-16 0% -92.50

BUILDING SERVIBUILDING SERVICES 432.00 14-May-15 19-Oct-16 0% -92.50

ElectricalElectrical 325.00 05-Sep-15 05-Oct-16 0% -99.63

LEVEL LGLEVEL LG 261.25 08-Sep-15 22-Jul-16 0% -48.25

MIP2-6-17540 Services Riser Ready 5.00 08-Sep-15 14-Sep-15 0% -48.25

STANBY GENESTANBY GENERATOR 30.00 14-Sep-15 21-Oct-15 0% -48.25

MIP2-6-17550 Trunking 10.00 14-Sep-15 28-Sep-15 0% -48.25

MIP2-6-17560 Cabling 10.00 28-Sep-15 09-Oct-15 0% -48.25

MIP2-6-17570 Installation 250kVA Diesel Generator Set 10.00 09-Oct-15 21-Oct-15 0% -48.25

INCOMING SEINCOMING SERVICES 51.50 21-Oct-15 21-Dec-15 0% -48.25

MIP2-6-17580 Trunking 30.38 21-Oct-15 21-Nov-15 0% -48.25

MIP2-6-17590 Installation of Main Switchboard (MSB) 15.00 10-Nov-15 27-Nov-15 0% -48.25

MIP2-6-17600 Cable Termination 20.00 27-Nov-15 21-Dec-15 0% -48.25

MAIN DISTRIBMAIN DISTRIBUTION 207.63 13-Nov-15 22-Jul-16 0% -48.25

MIP2-6-17610 Trunking 30.00 21-Dec-15 21-Jan-16 0% -48.25

MIP2-6-17620 DB Room Cabling 15.00 21-Jan-16 12-Feb-16 0% -3.25

MIP2-6-17630 Fitting 30.00 12-Feb-16 17-Mar-16 0% -3.25

CablingCabling 150.00 21-Jan-16 22-Jul-16 0% -48.25

MIP2-6-17640 LEVEL LG 15.00 21-Jan-16 12-Feb-16 0% -48.25

MIP2-6-17650 LEVEL G 15.00 12-Feb-16 29-Feb-16 0% -48.25

MIP2-6-17660 LEVEL 1 15.00 29-Feb-16 17-Mar-16 0% -48.25

MIP2-6-17670 LEVEL 2 15.00 17-Mar-16 04-Apr-16 0% -48.25

MIP2-6-17680 LEVEL 3 15.00 04-Apr-16 20-Apr-16 0% -48.25

MIP2-6-17690 LEVEL 4 15.00 21-Apr-16 09-May-16 0% -48.25

MIP2-6-17700 LEVEL 5 15.00 09-May-16 27-May-16 0% -48.25

MIP2-6-17710 LEVEL 6 15.00 27-May-16 15-Jun-16 0% -48.25

MIP2-6-17720 LEVEL 7 15.00 15-Jun-16 02-Jul-16 0% -48.25

MIP2-6-17730 ROOF LEVEL 15.00 02-Jul-16 22-Jul-16 0% -48.25

Installation oInstallation of Sub Switchboard (SSB) 207.00 13-Nov-15 21-Jul-16 0% -47.63

MIP2-6-17740 LEVEL LG 10.00 13-Nov-15 24-Nov-15 0% 19.38

MIP2-6-17750 LEVEL G 10.00 08-Dec-15 19-Dec-15 0% 7.38

MIP2-6-17760 LEVEL 1 10.00 05-Jan-16 15-Jan-16 0% 36.38

MIP2-6-17770 LEVEL 2 10.00 28-Jan-16 12-Feb-16 0% 26.38

MIP2-6-17780 LEVEL 3 10.00 24-Feb-16 07-Mar-16 0% 16.38

MIP2-6-17790 LEVEL 4 10.00 18-Mar-16 29-Mar-16 0% 6.38

MIP2-6-17800 LEVEL 5 10.00 13-Apr-16 25-Apr-16 0% -6.63

MIP2-6-17810 LEVEL 6 10.00 07-May-16 18-May-16 0% -16.63

MIP2-6-17820 LEVEL 7 10.00 03-Jun-16 16-Jun-16 0% -29.63

MIP2-6-17830 ROOF LEVEL 10.00 11-Jul-16 21-Jul-16 0% -47.63

LIGHTING & PLIGHTING & POWER 60.00 04-Nov-15 15-Jan-16 0% 20.88

MIP2-6-17840 Cabling 30.00 04-Nov-15 09-Dec-15 0% 20.88

MIP2-6-17850 Fitting & Accessories 30.00 09-Dec-15 15-Jan-16 0% 20.88

LEVEL GLEVEL G 125.00 05-Sep-15 05-Feb-16 0% 60.38

MIP2-6-17860 Services Riser Ready 5.00 05-Sep-15 11-Sep-15 0% 30.38

MAIN DISTRIBMAIN DISTRIBUTION 120.00 11-Sep-15 05-Feb-16 0% 30.38

MIP2-6-17870 Trunking 30.00 11-Sep-15 19-Oct-15 0% 30.38

MIP2-6-17880 Cabling 30.00 19-Oct-15 23-Nov-15 0% 30.38

MIP2-6-17890 Installation of Sub Switchboard (SSB) 30.00 23-Nov-15 30-Dec-15 0% 30.38

MIP2-6-17900 Fitting 30.00 30-Dec-15 05-Feb-16 0% 30.38

LIGHTING & PLIGHTING & POWER 60.00 21-Nov-15 03-Feb-16 0% 62.38

MIP2-6-17910 Cabling 30.00 21-Nov-15 28-Dec-15 0% 62.38

MIP2-6-17920 Fitting & Accessories 30.00 28-Dec-15 03-Feb-16 0% 62.38

LEVEL 1LEVEL 1 121.00 19-Oct-15 14-Mar-16 0% 29.38

MIP2-6-17930 Services Riser Ready 1.00 19-Oct-15 20-Oct-15 0% 29.38

MAIN DISTRIBMAIN DISTRIBUTION 120.00 20-Oct-15 14-Mar-16 0% 29.38

MIP2-6-17940 Trunking 30.00 20-Oct-15 24-Nov-15 0% 29.38

MIP2-6-17950 Cabling 30.00 24-Nov-15 31-Dec-15 0% 29.38

MIP2-6-17960 Installation of Sub Switchboard (SSB) 30.00 31-Dec-15 06-Feb-16 0% 29.38

MIP2-6-17970 Fitting 30.00 06-Feb-16 14-Mar-16 0% 29.38

LIGHTING & PLIGHTING & POWER 60.00 15-Dec-15 01-Mar-16 0% 15.88

MIP2-6-17980 Cabling 30.00 15-Dec-15 21-Jan-16 0% 15.88

MIP2-6-17990 Fitting & Accessories 30.00 21-Jan-16 01-Mar-16 0% 15.88

LEVEL 2LEVEL 2 143.00 11-Jan-16 01-Jul-16 0% -31.63

MIP2-6-18000 Services Riser Ready 1.00 06-Feb-16 10-Feb-16 0% -61.63

MAIN DISTRIBMAIN DISTRIBUTION 120.00 10-Feb-16 01-Jul-16 0% -61.63

MIP2-6-18010 Trunking 30.00 10-Feb-16 15-Mar-16 0% -61.63

MIP2-6-18020 Cabling 30.00 16-Mar-16 19-Apr-16 0% -61.63

J A J A JJA J A JA J A JJA

14 2015 2016 2017

30-Sep-16, F

19-Oct-16,

19-Oct-16,

05-Oct-16, E

22-Jul-16, LEVE

21-Oct-15, STANBY GENER

21-Dec-15, INCOMING S

22-Jul-16, MAIN

22-Jul-16, Cabli

21-Jul-16, Instal

15-Jan-16, LIGHTING &

05-Feb-16, LEVEL G

05-Feb-16, MAIN DIST

03-Feb-16, LIGHTING

14-Mar-16, LEVEL 1

14-Mar-16, MAIN DIS

01-Mar-16, LIGHTING

01-Jul-16, LEVEL

01-Jul-16, MAIN

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 29 of 33 TASK filter: All Activities

© Oracle Corporation

Page 30: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-18030 Installation of Sub Switchboard (SSB) 30.00 19-Apr-16 25-May-16 0% -61.63

MIP2-6-18040 Fitting 30.00 25-May-16 01-Jul-16 0% -61.63

LIGHTING & PLIGHTING & POWER 60.00 11-Jan-16 23-Mar-16 0% 51.38

MIP2-6-18050 Cabling 30.00 11-Jan-16 18-Feb-16 0% 51.38

MIP2-6-18060 Fitting & Accessories 30.00 18-Feb-16 23-Mar-16 0% 51.38

LEVEL 3LEVEL 3 121.00 21-Dec-15 16-May-16 0% -20.13

MIP2-6-18070 Services Riser Ready 1.00 21-Dec-15 22-Dec-15 0% -24.63

MAIN DISTRIBMAIN DISTRIBUTION 120.00 22-Dec-15 16-May-16 0% -24.63

MIP2-6-18080 Trunking 30.00 22-Dec-15 29-Jan-16 0% -24.63

MIP2-6-18090 Cabling 30.00 29-Jan-16 08-Mar-16 0% -24.63

MIP2-6-18100 Installation of Sub Switchboard (SSB) 30.00 08-Mar-16 11-Apr-16 0% -24.63

MIP2-6-18110 Fitting 30.00 11-Apr-16 16-May-16 0% -24.63

LIGHTING & PLIGHTING & POWER 60.00 04-Feb-16 15-Apr-16 0% 5.88

MIP2-6-18120 Cabling 30.00 04-Feb-16 12-Mar-16 0% 5.88

MIP2-6-18130 Fitting & Accessories 30.00 12-Mar-16 15-Apr-16 0% 5.88

LEVEL 4LEVEL 4 124.00 10-Dec-15 09-May-16 0% 11.38

MIP2-6-18140 Services Riser Ready 1.00 10-Dec-15 11-Dec-15 0% -15.63

MAIN DISTRIBMAIN DISTRIBUTION 120.00 11-Dec-15 06-May-16 0% -15.63

MIP2-6-18150 Trunking 30.00 11-Dec-15 18-Jan-16 0% -15.63

MIP2-6-18160 Cabling 30.00 18-Jan-16 26-Feb-16 0% -15.63

MIP2-6-18170 Installation of Sub Switchboard (SSB) 30.00 26-Feb-16 31-Mar-16 0% -15.63

MIP2-6-18180 Fitting 30.00 31-Mar-16 06-May-16 0% -15.63

LIGHTING & PLIGHTING & POWER 60.00 01-Mar-16 09-May-16 0% 11.38

MIP2-6-18190 Cabling 30.00 01-Mar-16 04-Apr-16 0% 11.38

MIP2-6-18200 Fitting & Accessories 30.00 04-Apr-16 09-May-16 0% 11.38

LEVEL 5LEVEL 5 124.38 06-Jan-16 30-May-16 0% -5.63

MIP2-6-18210 Services Riser Ready 1.00 06-Jan-16 07-Jan-16 0% -5.63

MAIN DISTRIBMAIN DISTRIBUTION 120.00 07-Jan-16 30-May-16 0% -5.63

MIP2-6-18220 Trunking 30.00 07-Jan-16 15-Feb-16 0% -5.63

MIP2-6-18230 Cabling 30.00 15-Feb-16 19-Mar-16 0% -5.63

MIP2-6-18240 Installation of Sub Switchboard (SSB) 30.00 19-Mar-16 23-Apr-16 0% -5.63

MIP2-6-18250 Fitting 30.00 23-Apr-16 30-May-16 0% -5.63

LIGHTING & PLIGHTING & POWER 57.38 26-Mar-16 28-May-16 0% -4.50

MIP2-6-18260 Cabling 30.00 26-Mar-16 27-Apr-16 0% -4.50

MIP2-6-18270 Fitting & Accessories 30.00 27-Apr-16 28-May-16 0% -4.50

LEVEL 6LEVEL 6 147.00 29-Jan-16 26-Jul-16 0% -51.63

MIP2-6-18280 Services Riser Ready 1.00 29-Jan-16 30-Jan-16 0% -25.63

MAIN DISTRIBMAIN DISTRIBUTION 120.00 30-Jan-16 24-Jun-16 0% -25.63

MIP2-6-18290 Trunking 30.00 30-Jan-16 09-Mar-16 0% -25.63

MIP2-6-18300 Cabling Floor By Floor 30.00 09-Mar-16 12-Apr-16 0% -25.63

MIP2-6-18310 Installation of Sub Switchboard (SSB) 30.00 12-Apr-16 17-May-16 0% -25.63

MIP2-6-18320 Fitting 30.00 17-May-16 24-Jun-16 0% -25.63

LIGHTING & PLIGHTING & POWER 80.00 19-Apr-16 26-Jul-16 0% -51.63

MIP2-6-18330 G.I. Conduit 30.00 19-Apr-16 25-May-16 0% -51.63

MIP2-6-18340 Cabling 20.00 25-May-16 18-Jun-16 0% -51.63

MIP2-6-18350 Fitting & Accessories 30.00 18-Jun-16 26-Jul-16 0% -51.63

LEVEL 7LEVEL 7 137.00 25-Feb-16 06-Aug-16 0% -61.63

MIP2-6-18360 Services Riser Ready 1.00 25-Feb-16 26-Feb-16 0% -45.63

MAIN DISTRIBMAIN DISTRIBUTION 136.00 26-Feb-16 06-Aug-16 0% -61.63

MIP2-6-18370 Trunking 30.00 26-Feb-16 31-Mar-16 0% -45.63

MIP2-6-18380 Cabling Floor By Floor 30.00 31-Mar-16 06-May-16 0% -45.63

MIP2-6-18390 Installation of Sub Switchboard (SSB) 30.00 06-May-16 11-Jun-16 0% -45.63

MIP2-6-18400 Fitting 30.00 01-Jul-16 06-Aug-16 0% -61.63

LIGHTING & PLIGHTING & POWER 60.00 16-May-16 29-Jul-16 0% -54.63

MIP2-6-18410 Cabling 30.00 16-May-16 23-Jun-16 0% -54.63

MIP2-6-18420 Fitting & Accessories 30.00 23-Jun-16 29-Jul-16 0% -54.63

ROOF LEVELROOF LEVEL 87.00 20-Jun-16 05-Oct-16 0% -99.63

MIP2-6-18430 Services Riser Ready 1.00 20-Jun-16 21-Jun-16 0% -49.63

MIP2-6-18440 System Testing & Commissioning 10.00 22-Sep-16 05-Oct-16 0% -99.63

MAIN DISTRIBMAIN DISTRIBUTION 26.00 21-Jun-16 23-Jul-16 0% -49.63

MIP2-6-18450 Trunking 5.00 21-Jun-16 28-Jun-16 0% -49.63

MIP2-6-18460 Cabling 7.00 28-Jun-16 06-Jul-16 0% -49.63

MIP2-6-18470 Installation of Sub Switchboard (SSB) 7.00 06-Jul-16 16-Jul-16 0% -49.63

MIP2-6-18480 Fitting 7.00 16-Jul-16 23-Jul-16 0% -49.63

EARTHING & LEARTHING & LIGTHING PROTECTION SYSTEM 77.00 20-Jun-16 22-Sep-16 0% -99.63

MIP2-6-18490 Conduit 20.00 08-Aug-16 01-Sep-16 0% -99.63

MIP2-6-18500 Configuration 20.00 19-Aug-16 12-Sep-16 0% -99.63

MIP2-6-18510 Earthling 7.00 14-Sep-16 22-Sep-16 0% -99.63

Copper TapeCopper Tape 40.00 20-Jun-16 08-Aug-16 0% -99.63

MIP2-6-18520 Connecting Surround Roof Area 30.00 20-Jun-16 27-Jul-16 0% -99.63

MIP2-6-18530 Connection to Lower Ground Earth Chamber 10.00 27-Jul-16 08-Aug-16 0% -99.63

LIGHTING & PLIGHTING & POWER 60.00 20-Jun-16 01-Sep-16 0% -82.63

MIP2-6-18540 Cabling 30.00 20-Jun-16 27-Jul-16 0% -82.63

MIP2-6-18550 Fitting & Accessories 30.00 27-Jul-16 01-Sep-16 0% -82.63

MECHANICALMECHANICAL 432.00 14-May-15 19-Oct-16 0% -92.50

Auto Waste CoAuto Waste Collection System (AWCS) 383.00 14-May-15 19-Aug-16 0% -73.50

Lower GroundLower Ground 60.00 14-May-15 25-Jul-15 0% 249.50

MIP2-6-18560 1500mm x1500mm Maintain ace Service Pit 30.00 14-May-15 18-Jun-15 0% 249.50

MIP2-6-18570 400mm Diameter AWCS API 5 L Grade B Mild Steel Pipe 30.00 18-Jun-15 25-Jul-15 0% 249.50

J A J A JJA J A JA J A JJA

14 2015 2016 2017

23-Mar-16, LIGHTING

16-May-16, LEVEL

16-May-16, MAIN D

15-Apr-16, LIGHTIN

09-May-16, LEVEL

06-May-16, MAIN D

09-May-16, LIGHT

30-May-16, LEVEL

30-May-16, MAIN

28-May-16, LIGHT

26-Jul-16, LEVE

24-Jun-16, MAIN

26-Jul-16, LIGH

06-Aug-16, LEV

06-Aug-16, MA

29-Jul-16, LIGH

05-Oct-16, R

23-Jul-16, MAIN

22-Sep-16, E

08-Aug-16, Co

01-Sep-16, LI

19-Oct-16,

19-Aug-16, Au

25-Jul-15, Lower Ground

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 30 of 33 TASK filter: All Activities

© Oracle Corporation

Page 31: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

500mm Diame500mm Diameter AWCS Pipe Floor to Floor (by Other) 50.00 20-Jun-16 19-Aug-16 0% -73.50

MIP2-6-18580 ROOF LEVEL 5.00 20-Jun-16 27-Jun-16 0% -73.50

MIP2-6-18590 LEVEL 7 5.00 27-Jun-16 02-Jul-16 0% -73.50

MIP2-6-18600 LEVEL 6 5.00 02-Jul-16 11-Jul-16 0% -73.50

MIP2-6-18610 LEVEL 5 5.00 11-Jul-16 16-Jul-16 0% -73.50

MIP2-6-18620 LEVEL 4 5.00 16-Jul-16 21-Jul-16 0% -73.50

MIP2-6-18630 LEVEL 3 5.00 22-Jul-16 27-Jul-16 0% -73.50

MIP2-6-18640 LEVEL 2 5.00 27-Jul-16 02-Aug-16 0% -73.50

MIP2-6-18650 LEVEL 1 5.00 02-Aug-16 08-Aug-16 0% -73.50

MIP2-6-18660 LEVEL G 5.00 08-Aug-16 13-Aug-16 0% -73.50

MIP2-6-18670 LEVEL LG 5.00 13-Aug-16 19-Aug-16 0% -73.50

SOIL, WASTE &SOIL, WASTE & VENT PIPE SYSTEM 95.50 14-May-15 05-Sep-15 0% 120.88

MIP2-6-18680 Underground Pipe & Accessories 20.00 14-May-15 05-Jun-15 0% -79.38

MIP2-6-18690 Drainage Sump Pit 20.00 05-Jun-15 02-Jul-15 0% -79.38

MIP2-6-18700 Exposed Building Pipe for Sanitary Piping 30.00 02-Jul-15 08-Aug-15 0% 120.88

MIP2-6-18710 Installation of Pump Set 23.00 08-Aug-15 05-Sep-15 0% 120.88

COLD WATER ICOLD WATER INSTALLATION 216.00 04-Nov-15 23-Jul-16 0% -29.63

MIP2-6-18720 Installation of FRP Storage Water Tank (880gal) 10.00 29-Jun-16 13-Jul-16 0% -29.63

MIP2-6-18730 Installation of Booster Pump 10.00 11-Jul-16 21-Jul-16 0% -67.63

MIP2-6-18740 Pressure Test 10.00 13-Jul-16 23-Jul-16 0% -29.63

Cold Water BuCold Water Building Pipeline 196.00 04-Nov-15 29-Jun-16 0% -29.63

MIP2-6-18750 LEVEL LG 15.00 04-Nov-15 21-Nov-15 0% 72.38

MIP2-6-18760 LEVEL G 15.00 21-Nov-15 09-Dec-15 0% 72.38

MIP2-6-18770 LEVEL 1 7.00 15-Dec-15 23-Dec-15 0% 67.38

MIP2-6-18780 LEVEL 2 7.00 11-Jan-16 18-Jan-16 0% 54.38

MIP2-6-18790 LEVEL 3 7.00 04-Feb-16 15-Feb-16 0% 41.38

MIP2-6-18800 LEVEL 4 7.00 01-Mar-16 09-Mar-16 0% 28.38

MIP2-6-18810 LEVEL 5 15.00 26-Mar-16 13-Apr-16 0% 12.38

MIP2-6-18820 LEVEL 6 7.00 19-Apr-16 27-Apr-16 0% 7.38

MIP2-6-18830 LEVEL 7 7.00 16-May-16 25-May-16 0% -8.63

MIP2-6-18840 ROOF LEVEL 7.00 20-Jun-16 29-Jun-16 0% -29.63

ENVIRONMENTENVIRONMENTAL CONTROL SYSTEM 288.00 04-Nov-15 19-Oct-16 0% -92.50

VENTILATION VENTILATION SYSTEM 254.00 04-Nov-15 07-Sep-16 0% -88.50

MIP2-6-18850 Installation of Fire Damper 20.00 11-Jul-16 02-Aug-16 0% -58.50

MIP2-6-18860 Trunking 20.00 11-Jul-16 02-Aug-16 0% -88.50

MIP2-6-18870 Cable 20.00 22-Jul-16 13-Aug-16 0% -88.50

MIP2-6-18880 Fitting & Accessories 20.00 13-Aug-16 07-Sep-16 0% -88.50

Installation oInstallation of Vent Ducting at Staircase 204.00 04-Nov-15 11-Jul-16 0% -58.50

MIP2-6-18890 LEVEL LG 30.00 04-Nov-15 09-Dec-15 0% 115.50

MIP2-6-18900 LEVEL G 30.00 08-Dec-15 14-Jan-16 0% 86.50

MIP2-6-18910 LEVEL 1 10.00 05-Jan-16 15-Jan-16 0% 85.50

MIP2-6-18920 LEVEL 2 10.00 11-Jan-16 21-Jan-16 0% 80.50

MIP2-6-18930 LEVEL 3 10.00 04-Feb-16 18-Feb-16 0% 60.50

MIP2-6-18940 LEVEL 4 10.00 01-Mar-16 12-Mar-16 0% 40.50

MIP2-6-18950 LEVEL 5 30.00 26-Mar-16 30-Apr-16 0% -2.50

MIP2-6-18960 LEVEL 6 10.00 19-Apr-16 30-Apr-16 0% -2.50

MIP2-6-18970 LEVEL 7 10.00 16-May-16 28-May-16 0% -25.50

MIP2-6-18980 ROOF LEVEL 15.00 20-Jun-16 11-Jul-16 0% -88.50

AIR CONDITIOAIR CONDITIONING SYSTEM 239.00 04-Nov-15 19-Aug-16 0% -52.63

MIP2-6-18990 Installation of FCU Split Unit 30.00 02-Jul-16 08-Aug-16 0% -52.63

MIP2-6-19000 Fitting & Accessories 10.00 08-Aug-16 19-Aug-16 0% -52.63

Copper Pipe &Copper Pipe & Conduit 199.00 04-Nov-15 02-Jul-16 0% -33.50

MIP2-6-19010 LEVEL LG 20.00 04-Nov-15 27-Nov-15 0% 145.50

MIP2-6-19020 LEVEL G 20.00 21-Nov-15 14-Dec-15 0% 131.50

MIP2-6-19030 LEVEL 1 20.00 15-Dec-15 09-Jan-16 0% 110.50

MIP2-6-19040 LEVEL 2 10.00 11-Jan-16 21-Jan-16 0% 100.50

MIP2-6-19050 LEVEL 3 10.00 04-Feb-16 18-Feb-16 0% 80.50

MIP2-6-19060 LEVEL 4 10.00 01-Mar-16 12-Mar-16 0% 60.50

MIP2-6-19070 LEVEL 5 30.00 26-Mar-16 30-Apr-16 0% 17.50

MIP2-6-19080 LEVEL 6 10.00 19-Apr-16 30-Apr-16 0% 17.50

MIP2-6-19090 LEVEL 7 10.00 16-May-16 28-May-16 0% -5.50

MIP2-6-19100 ROOF LEVEL 10.00 20-Jun-16 02-Jul-16 0% -52.63

CablingCabling 199.00 04-Nov-15 01-Jul-16 0% -22.13

MIP2-6-19110 LEVEL LG 20.00 04-Nov-15 27-Nov-15 0% 25.50

MIP2-6-19120 LEVEL G 20.00 21-Nov-15 14-Dec-15 0% 11.50

MIP2-6-19130 LEVEL 1 20.00 15-Dec-15 09-Jan-16 0% -9.50

MIP2-6-19140 LEVEL 2 10.00 11-Jan-16 21-Jan-16 0% -19.50

MIP2-6-19150 LEVEL 3 10.00 04-Feb-16 18-Feb-16 0% -39.50

MIP2-6-19160 LEVEL 4 10.00 01-Mar-16 12-Mar-16 0% -59.50

MIP2-6-19170 LEVEL 5 20.00 26-Mar-16 19-Apr-16 0% -92.50

MIP2-6-19180 LEVEL 6 10.00 19-Apr-16 30-Apr-16 0% 28.38

MIP2-6-19190 LEVEL 7 10.00 16-May-16 28-May-16 0% 5.38

MIP2-6-19200 ROOF LEVEL 10.00 20-Jun-16 01-Jul-16 0% -52.13

CONTROL SYSCONTROL SYSTEM: ELECTRICAL 120.00 19-Apr-16 10-Sep-16 0% -92.50

MIP2-6-19210 Trunking 30.00 19-Apr-16 25-May-16 0% -92.50

MIP2-6-19220 Installation of Control Panel 30.00 13-May-16 18-Jun-16 0% -92.50

MIP2-6-19230 Installation of Starter Panel 30.00 07-Jun-16 15-Jul-16 0% -92.50

MIP2-6-19240 Cable 30.00 01-Jul-16 06-Aug-16 0% -92.50

J A J A JJA J A JA J A JJA

14 2015 2016 2017

19-Aug-16, 50

05-Sep-15, SOIL, WASTE & V

23-Jul-16, COLD

29-Jun-16, Cold

19-Oct-16,

07-Sep-16, VE

11-Jul-16, Install

19-Aug-16, AIR

02-Jul-16, Coppe

01-Jul-16, Cablin

10-Sep-16, C

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 31 of 33 TASK filter: All Activities

© Oracle Corporation

Page 32: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-19250 Fitting & Accessories 30.00 06-Aug-16 10-Sep-16 0% -92.50

TESTING & COTESTING & COMMISSIONING 30.00 12-Sep-16 19-Oct-16 0% -92.50

MIP2-6-19260 Testing & Commissioning 30.00 12-Sep-16 19-Oct-16 0% -92.50

FIRE PROTECTFIRE PROTECTION & DETECTION SYSTEM 246.63 04-Nov-15 27-Aug-16 0% -66.38

WET RISER SYWET RISER SYSTEM (GL,L1,L2,L3,L4,L5,L6) 150.00 25-Feb-16 17-Aug-16 0% -66.38

MIP2-6-19270 Piping (c/w Automatic Air Vent) 30.00 25-Feb-16 30-Mar-16 0% -66.38

MIP2-6-19280 Installation of Breeching Inlet (2 ways) 30.00 30-Mar-16 05-May-16 0% -66.38

MIP2-6-19290 Fitting & Accessories 30.00 05-May-16 10-Jun-16 0% -66.38

MIP2-6-19300 Earthing 30.00 10-Jun-16 18-Jul-16 0% -66.38

MIP2-6-19310 Installation of Fire Hydrant 30.00 19-Jul-16 17-Aug-16 0% -66.38

HOSE REEL SYHOSE REEL SYSTEM (GL,L1,L2,L3,L4,L5,L6) 208.00 04-Nov-15 15-Jul-16 0% -37.75

MIP2-6-19320 External Piping Work 15.00 13-Apr-16 30-Apr-16 0% -81.63

MIP2-6-19330 Hose Reel Pump Set 15.00 30-Apr-16 18-May-16 0% -81.63

MIP2-6-19340 Hose Reel Tank 15.00 18-May-16 07-Jun-16 0% -81.63

MIP2-6-19350 Hose Reel Set 15.00 07-Jun-16 25-Jun-16 0% -81.63

MIP2-6-19360 Fitting & Accessories 15.00 25-Jun-16 15-Jul-16 0% -81.63

Piping WorkPiping Work 204.00 04-Nov-15 11-Jul-16 0% -33.75

MIP2-6-19370 LEVEL LG 15.00 04-Nov-15 21-Nov-15 0% 155.25

MIP2-6-19380 LEVEL G 15.00 21-Nov-15 08-Dec-15 0% 141.25

MIP2-6-19390 LEVEL 1 15.00 15-Dec-15 05-Jan-16 0% 120.25

MIP2-6-19400 LEVEL 2 15.00 11-Jan-16 28-Jan-16 0% 100.25

MIP2-6-19410 LEVEL 3 15.00 04-Feb-16 24-Feb-16 0% 80.25

MIP2-6-19420 LEVEL 4 15.00 01-Mar-16 17-Mar-16 0% 60.25

MIP2-6-19430 LEVEL 5 15.00 26-Mar-16 13-Apr-16 0% -81.63

MIP2-6-19440 LEVEL 6 15.00 19-Apr-16 07-May-16 0% 17.25

MIP2-6-19450 LEVEL 7 15.00 16-May-16 03-Jun-16 0% -5.75

MIP2-6-19460 ROOF LEVEL 15.00 20-Jun-16 11-Jul-16 0% -33.75

FIRE ALARM SFIRE ALARM SYSTEM (GL,L1,L2,L3,L4,L5,L6) 50.00 26-Mar-16 25-May-16 0% 2.25

MIP2-6-19470 Conduit 15.00 26-Mar-16 13-Apr-16 0% 2.25

MIP2-6-19480 Installation of Smoke Detector 15.00 26-Mar-16 13-Apr-16 0% 17.25

MIP2-6-19490 Cable 15.00 13-Apr-16 30-Apr-16 0% 2.25

MIP2-6-19500 Fitting & Accessories 20.00 30-Apr-16 25-May-16 0% 2.25

AUTOMATIC GAUTOMATIC GAS FLOODING SYSTEM (GENSET) 50.00 16-May-16 18-Jul-16 0% -84.63

MIP2-6-19510 Conduit 15.00 16-May-16 03-Jun-16 0% -84.63

MIP2-6-19530 Installation of Control Panel (FM200) 15.00 16-May-16 03-Jun-16 0% -69.63

MIP2-6-19540 Installation of Battery & Battery Compartment 15.00 16-May-16 03-Jun-16 0% -69.63

MIP2-6-19550 Installation of BMS Interface 15.00 16-May-16 03-Jun-16 0% -69.63

MIP2-6-19520 Cable 15.00 03-Jun-16 23-Jun-16 0% -84.63

MIP2-6-19560 Fitting & Accessories 20.00 23-Jun-16 18-Jul-16 0% -84.63

PORTABLES APORTABLES APPLANCES 10.00 25-Jun-16 09-Jul-16 0% -32.75

MIP2-6-19570 Fire Extinguisher (dry powder) 10.00 25-Jun-16 09-Jul-16 0% -32.75

TESTING & COTESTING & COMMISSIONING 10.00 17-Aug-16 27-Aug-16 0% -66.38

MIP2-6-19580 System Testing & Commissioning 10.00 17-Aug-16 27-Aug-16 0% -66.38

EXTERNAL / ANCIEXTERNAL / ANCILLIARY WORKS 447.94 04-Feb-15 29-Jul-16 0% -25.56

ROAD WORKSROAD WORKS 419.88 04-Feb-15 25-Jun-16 0% 2.50

INTERNAL ROADINTERNAL ROAD 109.00 10-Dec-15 21-Apr-16 0% 55.44

MIP2-6-19590 Temporary Drain Diversion 10.00 10-Dec-15 22-Dec-15 0% -34.69

MIP2-6-19600 Import Earth 25.00 16-Jan-16 19-Feb-16 0% -34.69

MIP2-6-19610 Sub-Base 15.00 19-Feb-16 08-Mar-16 0% -34.69

MIP2-6-19620 Laying Crusher Run 10.00 08-Mar-16 19-Mar-16 0% 2.31

MIP2-6-19630 Binder Course 3.00 19-Mar-16 22-Mar-16 0% 2.31

MIP2-6-19640 Wearing Course 3.00 22-Mar-16 25-Mar-16 0% 2.31

MIP2-6-19650 Line Marking 3.00 06-Apr-16 09-Apr-16 0% 46.31

MIP2-6-19660 Signage 10.00 09-Apr-16 21-Apr-16 0% 46.31

Culvert 1.8m x 2Culvert 1.8m x 2.0m 80.00 22-Dec-15 30-Mar-16 0% 74.44

MIP2-6-19670 Within Boundary 20.00 22-Dec-15 16-Jan-16 0% -34.69

MIP2-6-19680 Outside Boundary 60.00 16-Jan-16 30-Mar-16 0% 74.44

EXISTING ROADEXISTING ROAD 407.38 04-Feb-15 10-Jun-16 0% 5.88

MIP2-6-19690 Maintain Existing Road for Construction of Retaining Wal 60.00 04-Feb-15 15-Apr-15 0% 155.25

Construct New Construct New Alignment Expansion Road Level 86.00 15-Oct-15 27-Jan-16 0% 5.88

MIP2-6-19700 Earthwork 30.00 15-Oct-15 19-Nov-15 0% 5.88

MIP2-6-19710 Subgrade 20.00 19-Nov-15 12-Dec-15 0% 5.88

MIP2-6-19720 Crusherun 20.00 12-Dec-15 07-Jan-16 0% 5.88

MIP2-6-19730 Traffic Divertion 15.00 08-Jan-16 27-Jan-16 0% 5.88

Drainage / CulvDrainage / Culvert Crossing 60.00 19-Nov-15 01-Feb-16 0% 9.88

MIP2-6-19740 Within Boundary 30.00 19-Nov-15 23-Dec-15 0% 9.88

MIP2-6-19750 Outside Boundary 30.00 23-Dec-15 01-Feb-16 0% 9.88

New AlignmentNew Alignment Road Construction 111.00 28-Jan-16 10-Jun-16 0% 5.88

MIP2-6-19760 Earthwork 30.00 28-Jan-16 05-Mar-16 0% 5.88

MIP2-6-19770 Sub-Base 25.00 12-Feb-16 11-Mar-16 0% 5.88

MIP2-6-19780 Laying Crusher Run 25.00 11-Mar-16 09-Apr-16 0% 5.88

MIP2-6-19790 Road Kerb 10.00 04-Apr-16 14-Apr-16 0% 5.88

MIP2-6-19800 Binder Course 7.00 15-Apr-16 22-Apr-16 0% 5.88

MIP2-6-19810 Wearing Course 7.00 22-Apr-16 30-Apr-16 0% 5.88

MIP2-6-19820 Line Marking 7.00 30-Apr-16 10-May-16 0% 5.88

MIP2-6-19830 Signage 10.00 28-May-16 10-Jun-16 0% 5.88

Elevated WalkwaElevated Walkway 60.00 13-Apr-16 25-Jun-16 0% -6.63

MIP2-6-19840 Prepare For Connection 30.00 13-Apr-16 18-May-16 0% -6.63

J A J A JJA J A JA J A JJA

14 2015 2016 2017

19-Oct-16,

27-Aug-16, FI

17-Aug-16, WE

15-Jul-16, HOSE

11-Jul-16, Piping

25-May-16, FIRE A

18-Jul-16, AUTO

09-Jul-16, PORT

27-Aug-16, TE

29-Jul-16, EXTE

25-Jun-16, ROAD

21-Apr-16, INTERN

30-Mar-16, Culvert 1

10-Jun-16, EXIST

27-Jan-16, Construct Ne

01-Feb-16, Drainage / C

10-Jun-16, New A

25-Jun-16, Eleva

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 32 of 33 TASK filter: All Activities

© Oracle Corporation

Page 33: Primavera Sample Project

Activity ID Activity Name OriginalDuration

Start Finish Performance % Complete

Total Float

MIP2-6-19850 Connection To 5th Floor 30.00 18-May-16 25-Jun-16 0% -6.63

SEWERAGE WORSEWERAGE WORKS 125.00 12-Nov-15 11-Apr-16 0% 64.13

MIP2-6-19860 Pipe Connection Ground Floor 20.00 17-Dec-15 12-Jan-16 0% 64.13

MIP2-6-19870 Clay Pipe under Internal Road 20.00 13-Jan-16 06-Feb-16 0% 64.13

MIP2-6-19900 Connection to Main Sewerage Line 20.00 25-Jan-16 19-Feb-16 0% 64.13

MIP2-6-19880 Connection to External Sewerage sump 10.00 06-Feb-16 20-Feb-16 0% 64.13

MIP2-6-19910 Testing & Commissioning 30.00 19-Feb-16 25-Mar-16 0% 64.13

MIP2-6-19890 Installation of Clay Pipe 20.00 20-Feb-16 02-Mar-16 0% 64.13

MIP2-6-19920 Authority Approval 1.00 09-Apr-16 11-Apr-16 0% 64.13

ManholeManhole 60.00 12-Nov-15 25-Jan-16 0% 64.13

MIP2-6-19930 No 1, 2, 3 20.00 12-Nov-15 05-Dec-15 0% 64.13

MIP2-6-19940 No 4, 5, 6 20.00 05-Dec-15 30-Dec-15 0% 64.13

MIP2-6-19950 No 7, 8, 9 20.00 30-Dec-15 25-Jan-16 0% 64.13

WATER RETICULWATER RETICULATION 120.00 08-Mar-16 29-Jul-16 0% -34.69

MIP2-6-19960 Installation of Pipeline 20.00 08-Mar-16 30-Mar-16 0% -34.69

MIP2-6-19970 Fire Hydrant 20.00 08-Mar-16 30-Mar-16 0% -34.69

MIP2-6-19980 Fitting & Accessories 30.00 30-Mar-16 05-May-16 0% -34.69

MIP2-6-19990 Installation of Marker Post 20.00 05-May-16 28-May-16 0% -34.69

MIP2-6-20000 Testing 20.00 28-May-16 23-Jun-16 0% -34.69

MIP2-6-20010 Connection to SYABAS Main Line 30.00 23-Jun-16 29-Jul-16 0% -34.69

FINALISATION WOFINALISATION WORKS 86.13 19-Jul-16 28-Oct-16 0% -99.63

MIP2-6-20020 As-Built 60.00 19-Jul-16 28-Sep-16 0% -84.63

MIP2-6-20030 Testing & Commissioning 10.00 17-Oct-16 22-Oct-16 0% -99.63

MIP2-6-20040 Hand Over 2.00 27-Oct-16 28-Oct-16 0% -99.63

J A J A JJA J A JA J A JJA

14 2015 2016 2017

11-Apr-16, SEWERA

25-Jan-16, Manhole

29-Jul-16, WAT

28-Oct-16,

MULTI STORE CAR PARK BUILDING, EXTERNAL WORKS AND OT Classic Schedule Layout 24-Feb-16 15:32

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 33 of 33 TASK filter: All Activities