Page 1: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,
Page 2: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

Production Facilities

2

Martifer was established on 21st February 1990, and

still maitains its head office in the industrial zone of

Oliveira de Frades, Portugal, where is located the main

factory of Steel Structures with 30.000 m2.

The factory is supplying the Portuguese, Spanish,

Western Europe and North African Market.

During the first quarter of 2002, it began the

construction of a new plant in Benavente, Portugal.

The main goal of this was to engage in the

construction of the new EURO 2004 football stadiums

and to supply the Spanish market at the time.

The area occupied by this factory has a total value of

24.000 m2.

MARTIFER CONSTRUÇÕESOliveira de Frades | Portugal

MARTIFER BENAVENTEBenavente | Portugal

Page 3: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

Production Facilities

Located in Gliwice, Poland, the production unit of

Martifer started operating in August 2004.

This unit has a nominal annual capacity of 10.000

tons of steel structure and is possible to per-form shot

blasting, painting and coating. It is equipped with

state of the art CNC cut and dril-ling equipment for

plates and profiles, as well as cutting and bending of

thin plate in the fini-shing sector.

MARTIFER POLSKAGliwice | Polska

In the summer of 2008 it started production the unit

of Martifer Constructii in Calarasi, Romania. This

facility comprehends 25.000 m2 of industrial

pavilions with an installed capacity of 10.000

tons/year.

MARTIFER CONSTRUCTIICalarasi | Romania

Page 4: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

Production Facilities

Projected to supply the Central and South African market the factory will start production in September 2009

equipped with a line for cutting and drilling profiles, oxicut machine with plasma, guillotine, plate bending

machine, plate drilling machine and automatic shoot blasting chamber.

MARTIFER CONSTRUÇÕESLuanda | Angola

4

AREA OF PRODUCTION 12 000

M2

N. Workers 160

Production Capacity – 1st

Year

150

ton/Week

Start Production September - 2009

Page 5: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

International Projects Experience

Page 6: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

DRAGÃO STADIUM . Oporto

2800 tons of steel in the roof; 1000 tons of steel for

support of production. 42.000sqm application of

polycarbonate. Assembly: 7 months

PROJECT EXPERIENCE

Page 7: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

Dragão Stadium| Oporto

2800 tons of steel in the roof; 1000 tons of steel for support of production. 42.000sqm application of polycarbonate.Assembly: 7 months

Martifer Construction

Page 8: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

BENFICA STADIUM . Lisbon

The structure is composed by 4 tube arcs with 2000x40mm, main

trusses with girders and tubular sections, struts/ties that connect

the tubes and trusses, that sustain the roof purlins. Assembly: 8

months

PROJECT EXPERIENCE

Page 9: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

Benfica Stadium| Lisbon

The structure is composed by 4 tube arcs with 2000x40mm, main trusses with girders and tubular sections, struts/ties that connect the tubes and trusses, that sustain the roof purlins. Assembly: 8 months

Martifer Construction

Page 10: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

ALVALADE STADIUM . Lisbon

Roof constituted by a three-dimensional truss sustained on 16 ties

connected to 4 masts. The main girders are perpendicular to the

interior ring and are sustained on it. Assembly: 8 months.

PROJECT EXPERIENCE

Page 11: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

Alvalade Stadium| Lisbon

Roof constituted by a three-dimensional truss sustained on 16 ties connected to 4 masts. The main girders are perpendicular to the interior ring and are sustained on it. Assembly: 8 months.

Martifer Construction | Martifer Inox

Page 12: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

CAJA MAGICA | Spain

Steel coverage: 4.250 Ton divided by three stadiums The stadium has a movable coverage.

Martifer Construction

Page 13: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

CAJA MAGICA | Spain

Steel coverage: 4.250 Ton divided by three stadiums The stadium has a movable coverage.

Martifer Construction

Page 14: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

14

ASSEMBLY PROCEDURES

Page 15: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

15

BUSINESS MEETING

LEISURE CENTER – LAS ARENAS

Restructuring of an ancient bull Square In a Shopping Centre

Location: Spain – Barcelona / Spain Square

Weight Of Steel Structure Construction – 2.000Ton

Page 16: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

16

BUSINESS MEETING

LEISURE CENTER – LAS ARENAS

“Plateia” Assembly Procedure

Phase IPré – Montagem Plateia“Plateia” Pré-Assembly

Phase IIElevação Plateia

“Plateia” Erection

Page 17: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

17

BUSINESS MEETING

LEISURE CENTER – LAS ARENAS

Caracteristics and Conditionings

Caracteristics

-Plateia:120 Ton

-Diameter: 25 m

-Erection Hight: 30 m

Conditionings

-Limited Space

-The existent Cranes in building site

has a restricted Capacity

Page 18: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

18

BUSINESS MEETING

LEISURE CENTER – LAS ARENAS

“Plateia” Pré – Assembly

Assembly Erection Tower

Erection (Erection Mechanism)

3 2

1

1

2

3

Page 19: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

19

BUSINESS MEETING

LEISURE CENTER – LAS ARENAS

“Plateia” Pré – Assembly

Assembly Erection Tower

Erection (Erection Mechanism)

1

2

3

Page 20: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

20

BUSINESS MEETING

LEISURE CENTER – LAS ARENAS

“Plateia” Pré – Assembly

Assembly Erection Tower

Erection (Erection Mechanism)

1

2

3

Page 21: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

21

BUSINESS MEETING

LEISURE CENTER – LAS ARENAS

“Plateia” Pré – Assembly

Assembly Erection Tower

Erection (Erection Mechanism)

1

2

3

Page 22: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

22

BUSINESS MEETING

LEISURE CENTER – LAS ARENAS

Erection

Page 23: Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

23

BUSINESS MEETING

LEISURE CENTER – LAS ARENAS

Other Works…

Plateia

Disco

Columns