profibus in a marine application...agenda introduction reason for change system overview system...

14
PROFIBUS in a Marine Application Mark O’Halloran BAE Systems

Upload: others

Post on 29-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROFIBUS in a Marine Application...Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Reductions in man-power (the

PROFIBUS in a Marine Application

Mark O’HalloranBAE Systems

Page 2: PROFIBUS in a Marine Application...Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Reductions in man-power (the

Agenda

Introduction

Reason for Change

System Overview

System Requirements

Application of Profibus

Summary

Questions

2Agenda

Introduction

Reason for Change

System Overview

System Requirements

Application of Profibuso Network Architectureo Installationo Safety and System Redundancyo Realised Benefits

Summary

Any Questions

Page 3: PROFIBUS in a Marine Application...Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Reductions in man-power (the

Agenda

Introduction

Reason for Change

System Overview

System Requirements

Application of Profibus

Summary

Questions

3Introduction

BAE SYSTEM Maritime are a prime contractor for the Royal Navy’s Surface Vessels and Submarines.

BAE SYSTEMS Maritime Submarines are currently building the Astute Class Submarines and designing Future Submarines.

Over the past 20 years the control and instrumentation on-board these vessels has transitioned from hardwired controls to computerised control systems.

Page 4: PROFIBUS in a Marine Application...Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Reductions in man-power (the

Agenda

Introduction

Reason for Change

System Overview

System Requirements

Application of Profibus

Summary

Questions

Reductions in man-power (the crew).

Tendency to use well-proven bespoke systems.

Legacy systems suffering from obsolescence.

Difficult to maintain, requiring specialist engineering knowledge.

New more affordable systems, tending towards COTS solutions.

4Reason for Change

Page 5: PROFIBUS in a Marine Application...Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Reductions in man-power (the

Agenda

Introduction

Reason for Change

System Overview

System Requirements

Application of Profibus

Summary

Questions

5System Overview – Typical Architecture

Integrated Platform Management System (IPMS)Safety-Related System responsible for the control and monitoring of Propulsion, Electrical, Steering and Auxiliary systems of the vessel.Interfaces with thousands of inputs and outputs across the vessel.Provides the user interface for the operators and maintainers of the systems.

Vessel Systems and Local Controls

PropulsionAuxilieries

ElectricalSteering

Communication Network

Data Acquisition

Units

Local Operating Panel (LOP)

Operator ConsoleOperator ConsoleOperator ConsolePrinter

Printer

Inputs and Outputs(I/O)

Page 6: PROFIBUS in a Marine Application...Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Reductions in man-power (the

Agenda

Introduction

Reason for Change

System Overview

System Requirements

Application of Profibus

Summary

Questions

6System Requirements

Safety Justification and Targets:Safety Case,Safety Integrity Level assessed to be no greater than SIL 2,Redundancy and Availability Targets have been set.

Security (Information Assurance):Protectively Marked Data,Physical Security,Technical Security, e.g. Passwords and Encryption.

Transverse Engineering:Shock & Vibration, Temperature,EMC,Materials Compliance.

Physical Constraints:Data Collection Units size,Cable Management and Segregation,Integration into the vessel.

Page 7: PROFIBUS in a Marine Application...Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Reductions in man-power (the

Agenda

Introduction

Reason for Change

System Overview

System Requirements

Application of Profibus

Summary

Questions

7Application of PROFIBUS

Network ArchitectureDual Redundant Architecture.

Strategically located data acquisition units.

Diverse communications paths.

Backed-up Power Supplies

Safety Assessments, based on:o Signal Allocation,o Function Analysis,o Zonal Analysis.

Dual Redundant Profibus Network

Ethernet Ring

PLC Synchronisation Link

Page 8: PROFIBUS in a Marine Application...Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Reductions in man-power (the

Agenda

Introduction

Reason for Change

System Overview

System Requirements

Application of Profibus

Summary

Questions

8Application of PROFIBUS

InstallationData Aquisition Units and Console mounted I/O racks use copper Profibus (Supplier):

o Remote I/O making use of redundant communication modules.o Optical Link Modules used to interconnect the units.

Units interconnected via dual redundant fibre rings (Shipbuilder).o Bulkhead Penetrations/Connectorso Shared Network Cableso Network Patch Boxes

Lessons Learnt so far…o Fibre Discipline.o Education for designers, installers and end-users.o Accessibility for modifications and maintenance.

Page 9: PROFIBUS in a Marine Application...Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Reductions in man-power (the

Agenda

Introduction

Reason for Change

System Overview

System Requirements

Application of Profibus

Summary

Questions

9Application of PROFIBUS

Safety & System RedundancyNo fail-safe state,

Continuous Operation – even in degraded conditions,

Reliance on Operator – Man in the loop,

System Failure can lead directly to hazard.

Safety Assessments

Safety Argument using GSN “IPMS is tolerably safe...”,

SIL 2 Development Process (Design, Implementation & Testing),

Single Point of Failures,

HAZID and HAZOP,

RBDs and Fault Trees.

Page 10: PROFIBUS in a Marine Application...Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Reductions in man-power (the

Agenda

Introduction

Reason for Change

System Overview

System Requirements

Application of Profibus

Summary

Questions

10Application of PROFIBUS

Example Safety Argument using GSN

Page 11: PROFIBUS in a Marine Application...Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Reductions in man-power (the

Agenda

Introduction

Reason for Change

System Overview

System Requirements

Application of Profibus

Summary

Questions

Example Reliability Block Diagram Modular RBD, component parts calculated individually.

Reliability calculations developed in accordance with Manufacturer’ s Data, MIL-HDBK and IEC 61508.

Forming part of the SIL 2 Development Process.

11Application of PROFIBUS

Dual Profibus Network

(Section A)

Dual Redundant PLC

(Section A)Ethernet Ring

Dual Redundant PLCs

(Section B)

Dual Profibus Network

(Section B)

Page 12: PROFIBUS in a Marine Application...Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Reductions in man-power (the

Agenda

Introduction

Reason for Change

System Overview

System Requirements

Application of Profibus

Summary

Questions

12Application of PROFIBUS

Realised BenefitsAdaptable to change – Easy to integrate additional I/O points.

Enhanced Diagnostics for Maintainers.

Reductions in the volume of copper cabling.

Fibre Optics reduces the impact of Electromagnetic Interference.

In-service evidence to support safety justifications.

And finally - Through Life Cost savings.

Page 13: PROFIBUS in a Marine Application...Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Reductions in man-power (the

Agenda

Introduction

Reason for Change

System Overview

System Requirements

Application of Profibus

Summary

Questions

13Summary

New and innovative system for the shipbuilder – new challenges being addressed.

Regular training sessions set-up to aid boat installation, commissioning and ultimately operating the system.

Early commissioning activities have identified a number of advantages of the system, compared to previous systems.

o Enhanced, easy to access, diagnostics.o Flexibility to extend the network and I/O.

Studies currently been undertaken:o Using PROFINET,o Smart Instrumentation,o Standardising interfaces to equipment.

Page 14: PROFIBUS in a Marine Application...Agenda Introduction Reason for Change System Overview System Requirements Application of Profibus Summary Questions Reductions in man-power (the

Agenda

Introduction

Reason for Change

System Overview

System Requirements

Application of Profibus

Summary

Questions

14Questions?

Thank you…

Any Questions?

Mark O’Halloran / PROFIBUS in a Marine Application