ENKA is one of the UK’s leading Management company, with a pedigree stretching back to 1983. The company’s founder, Directors M. Oguzberk and A. Carey worked extensively on Motorway, Airport, railway and Irrigation projects in Iraq and Europe. ENKA ’s first contract inside of the UK were undertaken in the 1990s. Total Contract ( Last 20 years ) : 800 million Dollars Employment ( Last 20 years) : 3000
Gonca Oguzberk
Managing Director Metin Oguzberk Company Director Bob Lloyds Company Director Andy Carey Company Director Tony Coart Company Director Gbola Oba Company Director Glorıa Acabundu Company Secretary Diane Cullen Company Director Gonca Donmez Financial Manager Dave Salter Training Director Kuma Kanamalage Design Manager Gulay Basgu Architect Nigel Henham
"Changing the world's infrastructure”
Bob Lloyds Tony Cort Andy Carry
Princess Gloria Akabundu
Gbola Oba
Diane Cullen
ENKA specialises in the provision of planning, design and management services for infrastructure development worldwide. We place considerable emphasis on developing our capabilities in line with the needs of our clients by placing them at the centre of our operations ‐ by taking an extra step and trying to behave as if we are stakeholders in their business. To enhance the way we deliver our projects, we invest heavily in the systems to support our clients, and are committed to staff training, quality, and developing appropriate IT infrastructure. The extensive pool of experience within our building structures team ensures that our designs respond to market needs and evolving construction technology whilst continually challenging the boundaries of what can be done to gain the best commercial outcome for the client. Our team has been responsible for prestigious development of: hospitals; airport terminals; shopping malls; offices; housing; community centres; sport centres and schools. Our internal infrastructure enables us to develop project teams to precisely match the needs of our clients. With an integrated approach, we are able to draw from the pool of skills and experience throughout the whole company and benefit from the flow of knowledge and people around the business.
About
ENKA is a leading national provider of consultancy And specialist contracting services for Construction, Infrastructure & the Environment. We are committed to providing a first class service, to recruiting the best personnel in the field and to building long term client relationships. An incomparable in‐house team of the most highly qualified and experienced personnel in a wide range of disciplines enables us to meet the challenges of the most demanding project and still exceed our clients’ expectations.
Understanding Problems Outstanding Solutions
Building Services Design
personnel have a proven track record in the design and project management of sustainable building services which balance both environmental and commercial considerations. The role of the building services engineer as a key part of the construction team is therefore more important than ever before. We provide creative solutions that are focused on meeting the brief within predictable cost and time and can offer invaluable experience in the design and project management of building services in the following sectors: commercial, defence, education, healthcare, historic buildings, hotels, industrial, infrastructure and transport, interiors and fit‐out, residential and retail.
Head Office Branch Office Branch Office Branch Office Branch Office Branch Office E-mail Tel Web
: 3 Charnwood Court , Newport Street, Swindon, United Kingdom : NIGERIA :TURKEY : USA : Highworth,UK : Canary Wharf,UK : info @ enka.co.uk : 01793 526633 : www.enka.com.ng – w ww.enkaconstruction.com- www.enka.co.uk
Contact
UK PROJECTS
Great Western Hospital. Ministry Of Defence JSCSC Project Churchill Squire Shopping Mall St Annes Collage St Gregorys School Bath spa Hotel Surrey University Green Park Marlow Fire Station M4 Motorway National Trust Power Station Bloxham School New Bus Depot Pembroke Dock A 50 Blythe Bridge One New Change HQ1, HQ2 Building
Swindon Swindon Brighton Abingdon Oxford Bath Surrey Reading Wiltshire Wiltshire Swindon Didcot Banbury Swindon Dyfed Stoke-on –Trent London Canary Warf London
M3 Motorway (53 miles) Toyota Engine Factory Toyota Body Factory Honda Wildstream Cinema M C C Cricket Ground Bristol Rugby Club Hotel and Public House 4x Hotel & Public House Mercedes & Audi Dealership 531000 sq ft Distribution Centre Europe Greenest Distribution Cent. Cardiff City Football stadium Thamesdown double Carriage Way South Devon Collage Riviera Shopping Mall Sheltered Housing Building
M3 Chester Derby Swindon Bristol Cardiff Bristol Plymouth Wales Bristol Barnsley Northampton Cardiff Swindon Torquay Torquay Dover
Swindon Hospital
M4 Motorway
St Greogary School
JSCSC MOD project (Shrivenham )
Green Park Reading
Green Park Reading
St Anne's College Oxford
University of Surrey School of Management.
Jean Nouvel’s One New Change. The colossal mixed-use facility offers 340,000 sq ft of office space and 220,000 sq ft of retail and restaurant facilities in the historic Cheapside district in London’s city centre.
One New Change London
Contract Manager Bob Lloyds
One New Change London One New Change London
Contract Manager Bob Lloyds
One New Change London One New Change London
Canary Wharf HQ2 Value £25million – 33 storey Peri ACS jumpform
Contract Manager Bob Lloyds
Canary Wharf HQ1, HQ2 London
Canary Wharf HQ1, HQ2 London
Bob Lloyds
Anatolian Motorway Expedition Centre Conference Centre Telecommunication line for 30000 houses Desalination Plant Concrete Batching Plants Saqlawia 3 Irrigation Project (10874 Hectare)
Turkey Madrid Istanbul Germany Pursion Gulf Kenya Iraq
International Projects
Irrigation Projects Included •Motorway •Double Carriageway •Railway •Bridges •Box and Pipe Culverts •Field Road •Field Drain •Land Levelling •Field Channel •Precast Channel
International Projects
IRAQ
Irrigation project
Field-to-Finish Infrastructure Design
A powerful and versatile solution for infrastructure design, ENKA offers 3D parametric modelling and an innovative approach to designing civil components in the context of the whole project. ENKA is widely used for roads and highways, railways, and public works projects as well as commercial, industrial, and environmental land development. Our software provides a greater level of design sophistication than standard tools through the ability to apply design rules. ENKA Engineers able to work in multiple views and dimensions. For roads and highways, and provides an all-in-one visual tool for 3D parametric design of the complete road corridor. This and other fully developed capabilities result in impressive improvements in the areas of design productivity and project accuracy.
ENKA enables users to create intelligent models containing not only terrain data but also roadway or site features. Features are visually distinguished by structure, appearance, and symbology. The software uses triangulated surfaces to represent terrain – for both existing ground and proposed design. Intelligent digital terrain modelling (DTM) lets users incorporate features such as roadway centrelines, pavement edges, or ditches in the surface model. These can be random features for non-uniformly occurring points, or break lines that represent features connected in linear segments – as in the case of ridges, edges of pavement, and curbs.
Our Designer’s smart, in-context 3D design capabilities are the state-of-the-art in roadway design automation.
Interior voids or holes represent building footprints, lakes, and so on. Exterior-boundary features can be placed around surface areas to maintain cut-and-fill lines in proposed designs. In addition, other topography features are represented in the 3D model, including utilities (both above and below ground), buildings/pads, or any topological data collected.
ENKA certification is provided by CQS, an organisation that works with businesses to provide ISO 9000 and ISO 14001 assessment and certification. CQS assess the ENKA UK Ltd to ensure it meets ISO9001 quality assurance standards.
Enka is the number one college in the UK for site engineers with over 4,000 successful graduates. Our courses provide all the practical and theoretical skills needed to work on a construction site. The College was founded in 1998 and quickly established itself as a respected training centre. From the outset, Enka has remained focussed on teaching the fundamentals of the setting out process, leading to a steady stream of qualified site engineers.
60% of UK site engineers are ENKA trained
Civil Engineering College
Enka identified a skills gap within the construction industry and developed intensive training courses which give candidates a solid understanding of principles and practical skills that would normal take years of site experience to acquire. With half of all Chartered Civil Engineers reaching retirement age there has never been a better time to train.
The demand for ENKA qualified site engineers
Enka students on the course learning how to use a GPS Total station.
Civil Engineering College
ENKA has trained More than 4000 engineers
Has successfully completed Site Engineering Course and has passed a practical examination of professional competence
awarded on
We hereby certify that
General Manager Metin Oguzberk
Head of Registry Sandra Gibbs
Registered College to Department for Innovation Universities & Skills in United Kingdom
Diploma No 1101-00-2
In
Construction Site Engineer
Generator Gland Seal Oil Supply Unit and Water Supply Unit
3D MODELING INTEGRATION ENKA can design gland seal, which use pressurized oil to seal rotor shafts where they protrude from a hydrogen-cooled turbine generator.
Innivation in Oil and gas
• The Challenge of the deisohexanization Block project was to increase the octane number of benzine and improve production safety.
Sulphur Recovery Unit
• The primary goal of this multidisciplinary project is to provide arrangement of the natural gas deposits.
Didcot Power Station
This project involved the design of several connected facilities – process site, Industrial zone , administrative and common buildings, and engineering facilities, Specialist from many difficult disciplines took part in the design, including surveyors, technologists, architects, sanitary engineers and electrical engineers.
Booster Pump Station With Preliminary Water Discharge facility
Enka Substation delivers intelligent infrastructure for substations by supporting all of the key components and requirements of an electric substation-from physical layout to electrical schematics for protection and control, grounding grid, lightning Protection, panel layout, and control house and lighting design.
Enka Introduced a software product for intelligent electrical and physical substation design, To build and operate the intelligent infrastructure that will be the foundation of the Smart Grid. This highly productive software speeds project delivery and reduces costs by providing.
Intelligent substation Design
Retaining Wall
Churchill Square Shopping Centre Brighton
Swindon Bus Depot
Lining and trimming Canal
Abuja, Nigeria (FCTA)
Abuja, Nigeria (FCTA)
Abuja, Nigeria (FCTA)
• TUNNEL FORM • CLIMBTRAC FORM
FORMWORK from
Tunnel form Tunnel form is a formwork system that allows the contractor to cast walls and slabs in one operation in a daily cycle. It combines the speed, quality and accuracy of factory/off-site production with the flexibility and economy of in-situ construction and is recognised as a modern method of construction (MMC). The result is a cellular reinforced structure, the surfaces of which are sufficiently high quality to require only minimal finishing for direct decoration, while the end walls and facades are easily completed with thermally insulated units that can be clad as required. The system creates an efficient load-bearing structure for use in a wide variety of applications. It is particularly effective in projects suited to repetitive cellular construction such as residential blocks, hotels, student accommodation, barracks and prisons. Benefits
FORMWORK from
Cost Tunnel form systems are able to provide cost-effective, high quality construction, generating significant savings in time and costs over alternative methods without compromising on design. The system is now one of the most preferred methods of cellular construction with architects, engineers and contractors throughout the world, whilst client appreciate tunnel form’s ability to deliver projects to budget and on time. Building The formwork is specially adapted for each project. The repetitive nature of the system and the use of prefabricated forms and reinforcing mats/cages simplifies the whole construction process, producing a smooth and fast operation. The techniques used are already familiar to the industry, but with tunnel form construction there is less reliance on skilled labour. Quality Quality is enhanced despite the speed of construction. The precise, even steel face of the formwork creates a smooth, high quality finish capable of receiving direct decoration with the minimum of preparation (a skim coat may be required). This reduces the requirement for following trades, thus providing additional cost savings and speeding the entire process.
FORMWORK from
Design The large bays constructed using tunnel form provide exceptional flexibility in the design and layout of the building and allow a high degree of freedom in the final appearance. Safety Tunnel form has integral working platforms and edge protection systems. In addition, the repetitive, predictable nature of the tasks involved encourages familiarity with operations, and, once training is complete, productivity improves as construction progresses. The minimal requirement for tools and equipment when moving the tunnel form further reduces the risk of accidents on site. Sustainability The insitu casting of units on site and the local availability of ready-mixed concrete supplies reduce transportation impacts. Just-in-time deliveries and near zero wastage produce an overall tidier site with associated cost savings and safety benefits. Concrete’s thermal mass coupled with correct insulation and boiler design minimises heating costs and can even reduce air-conditioning requirements.
FORMWORK from FORMWORK from
Tunnel Form System from
Tunnel Form System from
Head Office Branch Office Branch Office Branch Office Branch Office E-mail Tel Web
: 3 Charnwood Court, Newport Street, Swindon, UK :Canary Wharf,UK : Highworth,UK : TURKEY : Nigeria : info @ enka.co.uk : 01793 526633 : +44 1793 526633 : www.enka.construction.com
Head Office Branch Office Branch Office Branch Office Branch Office E-mail Tel International Web
: 3 Charnwood Court, Newport Street, Swindon, UK :Canary Wharf,UK : Highworth,UK : TURKEY : NIGERIA : info @ enka.co.uk : 01793 526633 : +44 1793 526633 : www.enka.construction.com