PROYECTO ALCANTARILLA L=10.10 M FECHA Oct-12 HECHO VARGAS GRANDEZ L= 10.1 ITEM DESCRIPCION ANCHO LARGO ALTO METRADO UND. m m m PARCIAL TOTAL ESTRUCTURAS 01.00 TRABAJOS PRELIMINARES 01.01.00 LIMPIEZA DE TERRENO MANUAL 4.27 12.64 53.95 M2 01.02.00 TRAZO , NIVELES Y REPLANTEO 4.27 12.64 53.95 M2 02.00.00 MOVIMIENTO DE TIERRAS EN CORTE A-A AUMENTAR .5m A CADA LADO PARA ENCOFRAR PAREDES LATERALES 02.01.00 EXCAVACIÓN MANUAL 49.02 M3 ALCANTARILLA ALAS 0.60 2.12 0.60 4.00 3.05 CABEZAL 1.27 1.27 0.60 4.00 1.93 1.20 1.27 0.60 2.00 1.83 SECCION CUADRADA 2.60 10.10 1.60 1.00 42.02 UÑAS DE ALCANTARILLA DE CONCRETO ARMADO 0.20 1.20 0.40 2.00 0.19 03.00 CONCRETO SIMPLE 03.01.00 SOLADOS CONCRETO FC=100 KG/CM2 H=2" 16.16 M2 EN ALCANTARILLA CUADRARA 1.60 10.10 1.00 16.16 04.00 CONCRETO ARMADO 04.01.00 ALCANTARILLA 04.01.01 ACERO ESTRUCTURAL TRABAJADO PARA ALCANTARILLA 578.84 KG ACERO EN LOSA INFERIOR Y MUROS 578.84 04.01.02 CONCRETO PARA LOSA INFERIOR Y UÑAS F'C=175 KG/CM2, 5.39 M3 LOSA 1.60 10.10 0.20 1.00 3.23 UÑAS 0.20 1.60 0.40 2.00 0.26 SARDINEL ENTRADA Y SALIDA DE CABEZAL 1.27 1.27 0.20 4.00 1.29 1.20 1.27 0.20 2.00 0.61 04.02.03 ENCOFRADO MUROS LATERALES 48.48 M2 10.10 1.20 4.00 48.48 04.02.04 CONCRETO PARA MUROS LATERALES F'C=175 KG/CM2, 4.85 M3 0.20 10.10 1.20 2.00 4.85 04.02.05 DESENCOFRADO MUROS LATERALES 48.48 M2 10.10 1.20 4.00 48.48 04.02.06 ENCOFRADO DE LOSA SUPERIOR Y SARDINELES 16.41 M2 LOSA SUPERIOR 1.20 10.10 1.00 12.12 SARDINELES PARA ENTRADA Y SALIDA DE CABEZALES 3.73 0.2 2.00 1.492 EN LA PARTE SUPERIOR DE CABEZAL EXTERIOR 1.6 0.5 2.00 1.6 INTERIOR 1.2 0.5 2.00 1.2 04.02.07 ACERO EN LOSA SUPERIOR Y SARDINELES 290.71 290.71 KG 04.02.08 CONCRETO EN LOSA SUPERIOR Y SARDINELES LOSA SUPERIOR 1.60 10.10 0.20 1.00 3.23 3.55 M3 1.60 0.20 0.50 2.00 0.32 VECES

Upload: franck-alvarado

Post on 28-Jan-2016

226 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Programacion - Vargas Grandez

PROYECTO ALCANTARILLA L=10.10 M

FECHA Oct-12 HECHO VARGAS GRANDEZ L= 10.1

ITEM DESCRIPCIONANCHO LARGO ALTO METRADO

UND.m m m PARCIAL TOTAL

ESTRUCTURAS

01.00 TRABAJOS PRELIMINARES01.01.00 LIMPIEZA DE TERRENO MANUAL 4.27 12.64 53.95 M2

01.02.00 TRAZO , NIVELES Y REPLANTEO 4.27 12.64 53.95 M2

02.00.00 MOVIMIENTO DE TIERRASEN CORTE A-A AUMENTAR .5m A CADA LADO PARA ENCOFRAR PAREDES LATERALES

02.01.00 EXCAVACIÓN MANUAL 49.02 M3ALCANTARILLA

ALAS 0.60 2.12 0.60 4.00 3.05CABEZAL 1.27 1.27 0.60 4.00 1.93

1.20 1.27 0.60 2.00 1.83

SECCION CUADRADA 2.60 10.10 1.60 1.00 42.02UÑAS DE ALCANTARILLA DE CONCRETO ARMADO 0.20 1.20 0.40 2.00 0.19

03.00 CONCRETO SIMPLE03.01.00 SOLADOS CONCRETO FC=100 KG/CM2 H=2" 16.16 M2

EN ALCANTARILLA CUADRARA 1.60 10.10 1.00 16.16

04.00 CONCRETO ARMADO04.01.00 ALCANTARILLA04.01.01 ACERO ESTRUCTURAL TRABAJADO PARA ALCANTARILLA 578.84 KG

ACERO EN LOSA INFERIOR Y MUROS 578.84

04.01.02 CONCRETO PARA LOSA INFERIOR Y UÑAS F'C=175 KG/CM2, 5.39 M3

LOSA 1.60 10.10 0.20 1.00 3.23UÑAS 0.20 1.60 0.40 2.00 0.26SARDINEL ENTRADA Y SALIDA DE CABEZAL 1.27 1.27 0.20 4.00 1.29

1.20 1.27 0.20 2.00 0.61

04.02.03 ENCOFRADO MUROS LATERALES 48.48 M210.10 1.20 4.00 48.48

04.02.04 CONCRETO PARA MUROS LATERALES F'C=175 KG/CM2, 4.85 M3

0.20 10.10 1.20 2.00 4.85

04.02.05 DESENCOFRADO MUROS LATERALES 48.48 M210.10 1.20 4.00 48.48

04.02.06 ENCOFRADO DE LOSA SUPERIOR Y SARDINELES 16.41 M2LOSA SUPERIOR 1.20 10.10 1.00 12.12

SARDINELESPARA ENTRADA Y SALIDA DE CABEZALES 3.73 0.2 2.00 1.492

EN LA PARTE SUPERIOR DE CABEZALEXTERIOR 1.6 0.5 2.00 1.6INTERIOR 1.2 0.5 2.00 1.2

04.02.07 ACERO EN LOSA SUPERIOR Y SARDINELES 290.71 290.71 KG

04.02.08 CONCRETO EN LOSA SUPERIOR Y SARDINELESLOSA SUPERIOR 1.60 10.10 0.20 1.00 3.23 3.55 M3

1.60 0.20 0.50 2.00 0.32

Nº VECES

E21
PONCE: VER CORTE B-B .2+.4
G22
PONCE: VER PLANTA TRIANGULO DE 1.27X1.27
G23
PONCE: MAS CUADRADO DE 1.2*1.27
Page 2: Programacion - Vargas Grandez

PROYECTO ALCANTARILLA L=10.10 M

FECHA Oct-12 HECHO VARGAS GRANDEZ L= 10.1

ITEM DESCRIPCIONANCHO LARGO ALTO METRADO

UND.m m m PARCIAL TOTALNº

VECES

04.02.09 DESENCOFRADO DE LOSA SUPERIOR Y SARDINELES LATERALES 16.41 M2

LOSA SUPERIOR 1.20 10.10 1.00 12.12

SARDINELESPARA ENTRADA Y SALIDA DE CABEZALES 3.73 0.2 2.00 1.492

GUARDA RUEDAS (EN LA PARTE SUPERIOR DE CABEZALEXTERIOR 1.6 0.5 2.00 1.6INTERIOR 1.2 0.5 2.00 1.2

05.00.00 CONCRETO SIMPLE

05.01 CONCRETO EN FALZAS ZAPATAS DE ALAS 0.51 M30.6 2.12 0.2 4 0.51

05.02 CONCRETO EN CIMIENTO DE ALAS 0.6 2.12 0.4 4 1.02 1.02 M3

05.03 ENCOFRADO DE ALASVER DETALLE DE CABEZAL

24.304 M2TRIANGULO (PARTE EXTERNA 2.12 0.7 4 2.968

RECTÁNGULO (PARTE EXTERNA) 2.12 1.2 4 10.176

TRIANGULO (PARTE INTERNA) 1.8 0.7 4 2.52

RECTÁNGULO (PARTE EXTERNA) 1.8 1.2 4 8.64

05.04 CONCRETO EN ALASTRIÁNGULO 6.94 M3

CAPA INTERIOR (e=.2) 0.2 1.76 0.7 4 0.4928CAPA EXTERIOR (e=.4) 0.4 1.92 0.7 4 1.0752

RECTÁNGULOCAPA INTERIOR (e=.2) 0.2 1.76 1.2 4 1.6896CAPA EXTERIOR (e=.4) 0.4 1.92 1.2 4 3.6864

05.05 DESENCOFRADO DE ALAS 24.304 M2

05.06 CONCRETO EN LOSA DE ENTRADA Y SALIDA DE AGUAS PLUVIALES 2.15 M3LOSAS 1.27 1.27 0.20 4.00 0.64

1.20 1.27 0.20 2.00 0.61UÑAS 0.20 3.73 0.40 3.00 0.90

06.00 MOVIMIENTO DE TIERRAS FINAL

06.01 RELLENOS CON MATERIAL PROPIO MANUAL 32.32 M3EN MUROS LATERALES DE ALCANTARILLA

1.00 10.10 1.60 2.00 32.32

06.02 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA 24.26 M3Factor de Esponjamiento: 1.3 EXCAVACIÓN: 49.02Factor de Compactación: 0.8 V. ESPONJADO 63.7227

V. COMPACTADO 50.9782V. EXCEDENTE 18.66

C127
PONCE: VER RELLENO 1.6+1… RELLENAMOS ESE METRO DE ANCHO EXCEDENTE
Page 3: Programacion - Vargas Grandez

PROYECTO ALCANTARILLA

PLANILLA DE METRADOSALC

FECHA: HECHO POR: VARGAS GRANDEZ

N° DESCRIPCION fNro. DE Nro. CAPAS LON P/PE LONG. PESO PESO

ELEMENT. ELEMENT ( M ) TOTAL KG/ML TOTAL

04.01.00 ACERO EN ALCANTARILLA

LOSA INFERIOR

ACERO TRANSVERSAL

TRASLAPE 0.30 0.30 3/8 41 2 2.12 174.18 0.56 97.54

1.52

ACERO LONGITUDINAL

10.02 3/8 7 2 10.52 148.96 0.56 83.42

0.25 0.25

PATAS

SEGÚN PLANO

MUROS LATERALES

ACERO VERTICAL

0.3TRASLAPE

1.52

1/2 41 2 2.12 174.18 1.02 177.66

0.3TRASLAPE

ACERO LONGITUDINAL

1/2 7 2 10.02 141.88 1.02 144.72

10.02

TOTAL ( Kg ) 578.84

Page 4: Programacion - Vargas Grandez

PROYECTO ALCANTARILLA

PLANILLA DE METRADOSALCANTARILLA

FECHA: HECHO POR: VARGAS GRANDEZ

N° DESCRIPCION f Nro. DE Nro. CAPAS LON P/PE LONG. PESO PESO

ELEMENT. ELEMENT ( M ) TOTAL KG/ML TOTAL

04.01.00 ACERO EN ALCANTARILLA

LOSA SUPERIOR

ACERO TRANSVERSAL

INFERIOR

TRASLAPE 0.16 0.16 1/2 41 2 1.84 151.17 1.02 154.20

1.52

ACERO LONGITUDINAL

10.02 3/8 7 2 11.26 159.44 0.56 89.29

0.62 0.62

GUARDARUEDAS (PARTE SUPERIOR CABEZAL)

ACERO TRANSVERSAL

1.52 1/2 3 2 1.52 9.12 1.02 9.30

LONG

TOTAL ( Kg ) 290.71

Page 5: Programacion - Vargas Grandez

HECHO POR VARGAS GRANDEZDIAGRAMAS DE BARRAS GANTT

ID PATIDA DESCRIPCION UND.METRADO

REND. TIEMPO Nº CUAD. TIEMPO TIEMPO SECUENCIA DURACION EN DIAS

1 UNIT. (Tu) (f) REAL (Tr) PROG. (Tp) LOGICA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

2 1.00 TRABAJOS PRELIMINARES

3 1.01 LIMPIEZA DE TERRENO MANUAL M2 53.95 200 0.27 1 0.27 ### 1

4 1.02 TRAZO , NIVELES Y REPLANTEO M2 53.95 200 0.27 1 0.27 ### 2

5 2.00 MOVIMIENTO DE TIERRAS

6 2.01 EXCAVACIÓN MANUAL M3 49.02 3 16.34 5 3.27 ### 3

7 3.00 CONCRETO SIMPLE

8 3.01 SOLADOS CONCRETO FC=100 KG/CM2 H=2" M2 16.16 30 0.54 1 0.54 ### 4

9 4.00 CONCRETO ARMADO

10 4.01.00 ALCANTARILLA

11 4.01.01 ACERO EN LOSA INFERIOR Y MUROS KG 578.84 250 2.32 1 2.32 ### 5

12 4.01.02 CONCRETO PARA LOSA INFERIOR Y UÑAS F'C=175 KG/CM2, M3 5.39 10 0.54 1 0.54 ### 6

13 4.02.03 ENCOFRADO MUROS LATERALES M2 48.48 20 2.42 2 1.21 ### 7

14 4.02.04 CONCRETO PARA MUROS LATERALES F'C=175 KG/CM2, M3 4.85 10 0.48 1 0.48 ### 8

15 4.02.05 DESENCOFRADO MUROS LATERALES M2 48.48 50 0.97 1 0.97 ### 11

16 4.02.06 ENCOFRADO DE LOSA SUPERIOR Y SARDINELES M2 16.41 20 0.82 1 0.82 ### 12

17 4.02.07 ACERO EN LOSA SUPERIOR Y SARDINELES KG 290.71 250 1.16 1 1.16 ### 13

18 4.02.08 CONCRETO EN LOSA SUPERIOR Y SARDINELES M3 3.55 10 0.36 1 0.36 ### 14

19 4.02.09 DESENCOFRADO DE LOSA SUPERIOR Y SARDINELES LATERALES M2 16.41 10 1.64 2 0.82 ### 15

20 5.00 CONCRETO SIMPLE

21 05.01 CONCRETO EN FALZAS ZAPATAS DE ALAS M3 0.51 10 0.05 1 0.05 0.5 8

22 05.02 CONCRETO EN CIMIENTO DE ALAS M3 1.02 10 0.10 1 0.10 0.5 8

23 05.03 ENCOFRADO DE ALAS M2 24.30 20 1.22 1 1.22 ### 9

24 05.04 CONCRETO EN ALAS M3 6.94 10 0.69 1 0.69 ### 10

25 05.05 DESENCOFRADO DE ALAS M2 24.30 50 0.49 1 0.49 ### 13

26 05.06 CONCRETO EN LOSA DE ENTRADA Y SALIDA DE AGUAS PLUVIALES M3 2.15 10 0.21 1 0.21 0.5 15

27 06.00 MOVIMIENTO DE TIERRAS FINAL

28 06.01 RELLENOS CON MATERIAL PROPIO MANUAL M3 32.32 3 10.77 5 2.15 ### 16

29 06.02 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA M3 24.26 5 4.85 4 1.21 ### 17

HECHO POR VARGAS GRANDEZ

F10
PONCE: DATO
Page 6: Programacion - Vargas Grandez

DURACION EN DIAS

27 28 29

Page 7: Programacion - Vargas Grandez

30 0.5 0.5

0 0 0.5 HECHO POR VARGAS GRANDEZ

3CC + 0.5

40.5 0.5 10.5 0 1 13CC+ 1 14 14CC+ 0.5

8 0.5 8.54CC+ 0.5 8 0 8.5

12CC+ 0.56 12 13 13CC+ 1 21 21CC+ 0.5 23 23CC+ 1 24 24FC+

1 3.5 4.5 6.5 0.5 7 7 1 8 8 0.5 8.5 8.5 1 9.5 9.5 0.5 101 0 4.5 6.5 0 7 7 0 8 8 0 8.5 8.5 0 9.5 9.5 0 10

6CC+ 3.5 11CC+ 1.5 13CC+ 1 228 0.5 8.5

8 11 8 0 8.5 22CC+ 0.54.5 0.5 5 5 2.5 7.54.5 0 5 5 0 7.5

8CC+ 0.5

HECHO POR VARGAS GRANDEZ

Page 8: Programacion - Vargas Grandez

16CC+ 1 17 17CC+ 1 19 19CC+ 0.524 1 25 25.5 1 26.524 0 25 25.5 0 26.5

18CC+ 0.524FC+ 12 15 15CC+ 1 16 18 28 28CC+

22 1 23 23 1 24 25 0.5 25.5 26 2 2822 0 23 23 0 24 25 0 25.5 26 0 28

18CC+ 0.525 26

24 0.5 24.5 25.5 0.5 2624.5 0 24.5 25.5 0 26

16CC+ 1 25FC+ 0.5 26CC+ 0.5

Page 9: Programacion - Vargas Grandez

2 2928 1 2928 0 29

Page 10: Programacion - Vargas Grandez

PATIDA DESCRIPCION UND. METRADO REND. TIEMPO Nº CUAD. TIEMPO TIEMPO SIMBOLOGÍA

UNIT. (Tu) (f) REAL (Tr) PROG. (Tp)

1.00 TRABAJOS PRELIMINARES

1.01 LIMPIEZA DE TERRENO MANUAL M2 53.95 200 0.27 1 0.27 #ADDIN? A

1.02 TRAZO , NIVELES Y REPLANTEO M2 53.95 200 0.27 1 0.27 #ADDIN? B

2.00 MOVIMIENTO DE TIERRAS

2.01 EXCAVACIÓN MANUAL M3 49.02 3 16.34 5 3.27 #ADDIN? C

3.00 CONCRETO SIMPLE

3.01 SOLADOS CONCRETO FC=100 KG/CM2 H=2" M2 16.16 30 0.54 1 0.54 #ADDIN? D

4.00 CONCRETO ARMADO

4.01.00 ALCANTARILLA

4.01.01 ACERO EN LOSA INFERIOR Y MUROS KG 578.84 250 2.32 1 2.32 #ADDIN? E

4.01.02 CONCRETO PARA LOSA INFERIOR Y UÑAS F'C=175 KG/CM2, M3 5.39 10 0.54 1 0.54 #ADDIN? F

4.02.03 ENCOFRADO MUROS LATERALES M2 48.48 20 2.42 2 1.21 #ADDIN? G

4.02.04 CONCRETO PARA MUROS LATERALES F'C=175 KG/CM2, M3 4.85 10 0.48 1 0.48 #ADDIN? H

4.02.05 DESENCOFRADO MUROS LATERALES M2 48.48 50 0.97 1 0.97 #ADDIN? I

4.02.06 ENCOFRADO DE LOSA SUPERIOR Y SARDINELES M2 16.41 20 0.82 1 0.82 #ADDIN? J

4.02.07 ACERO EN LOSA SUPERIOR Y SARDINELES KG 290.71 250 1.16 1 1.16 #ADDIN? K

4.02.08 CONCRETO EN LOSA SUPERIOR Y SARDINELES M3 3.55 10 0.36 1 0.36 #ADDIN? L

4.02.09 DESENCOFRADO DE LOSA SUPERIOR Y SARDINELES LATERALES M2 16.41 10 1.64 2 0.82 #ADDIN? M

5.00 CONCRETO SIMPLE

05.01 CONCRETO EN FALZAS ZAPATAS DE ALAS M3 0.51 10 0.05 1 0.05 0.5 N

05.02 CONCRETO EN CIMIENTO DE ALAS M3 1.02 10 0.10 1 0.10 0.5 Ñ

05.03 ENCOFRADO DE ALAS M2 24.30 20 1.22 1 1.22 #ADDIN? O

05.04 CONCRETO EN ALAS M3 6.94 10 0.69 1 0.69 #ADDIN? P

05.05 DESENCOFRADO DE ALAS M2 24.30 50 0.49 1 0.49 #ADDIN? Q

05.06 CONCRETO EN LOSA DE ENTRADA Y SALIDA DE AGUAS PLUVIALES M3 2.15 10 0.21 1 0.21 0.5 R

06.00 MOVIMIENTO DE TIERRAS FINAL

06.01 RELLENOS CON MATERIAL PROPIO MANUAL M3 32.32 3 10.77 5 2.15 #ADDIN? S

06.02 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA M3 24.26 5 4.85 4 1.21 #ADDIN? T

E1
PONCE: DATO
Page 11: Programacion - Vargas Grandez

DIAGRAMAS DE BARRAS GANTT

PATIDA DESCRIPCION UND.METRADO

REND. TIEMPO Nº CUAD. TIEMPO TIEMPO SECUENCIA DURACION EN DIAS

UNIT. (Tu) (f) REAL (Tr) PROG. (Tp) LOGICA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

1.00 TRABAJOS PRELIMINARES

1.01 LIMPIEZA DE TERRENO MANUAL M2 53.95 200 0.27 1 0.27 ### 1

1.02 TRAZO , NIVELES Y REPLANTEO M2 53.95 200 0.27 1 0.27 ### 2

2.00 MOVIMIENTO DE TIERRAS

2.01 EXCAVACIÓN MANUAL M3 49.02 3 16.34 5 3.27 ### 3

3.00 CONCRETO SIMPLE

3.01 SOLADOS CONCRETO FC=100 KG/CM2 H=2" M2 16.16 30 0.54 1 0.54 ### 4

4.00 CONCRETO ARMADO

4.01.00 ALCANTARILLA

4.01.01 ACERO EN LOSA INFERIOR Y MUROS KG 578.84 250 2.32 1 2.32 ### 5

4.01.02 CONCRETO PARA LOSA INFERIOR Y UÑAS F'C=175 KG/CM2, M3 5.39 10 0.54 1 0.54 ### 6

4.02.03 ENCOFRADO MUROS LATERALES M2 48.48 20 2.42 2 1.21 ### 7

4.02.04 CONCRETO PARA MUROS LATERALES F'C=175 KG/CM2, M3 4.85 10 0.48 1 0.48 ### 8

4.02.05 DESENCOFRADO MUROS LATERALES M2 48.48 50 0.97 1 0.97 ### 11

4.02.06 ENCOFRADO DE LOSA SUPERIOR Y SARDINELES M2 16.41 20 0.82 1 0.82 ### 12

4.02.07 ACERO EN LOSA SUPERIOR Y SARDINELES KG 290.71 250 1.16 1 1.16 ### 13

4.02.08 CONCRETO EN LOSA SUPERIOR Y SARDINELES M3 3.55 10 0.36 1 0.36 ### 14

4.02.09 DESENCOFRADO DE LOSA SUPERIOR Y SARDINELES LATERALES M2 16.41 10 1.64 2 0.82 ### 15

5.00 CONCRETO SIMPLE

05.01 CONCRETO EN FALZAS ZAPATAS DE ALAS M3 0.51 10 0.05 1 0.05 0.5 8

05.02 CONCRETO EN CIMIENTO DE ALAS M3 1.02 10 0.10 1 0.10 0.5 8

05.03 ENCOFRADO DE ALAS M2 24.30 20 1.22 1 1.22 ### 9

05.04 CONCRETO EN ALAS M3 6.94 10 0.69 1 0.69 ### 10

05.05 DESENCOFRADO DE ALAS M2 24.30 50 0.49 1 0.49 ### 13

05.06 CONCRETO EN LOSA DE ENTRADA Y SALIDA DE AGUAS PLUVIALES M3 2.15 10 0.21 1 0.21 0.5 15

06.00 MOVIMIENTO DE TIERRAS FINAL

06.01 RELLENOS CON MATERIAL PROPIO MANUAL M3 32.32 3 10.77 5 2.15 ### 16

06.02 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA M3 24.26 5 4.85 4 1.21 ### 17

E10
PONCE: DATO
Page 12: Programacion - Vargas Grandez

DURACION EN DIAS

27 28 29

Page 13: Programacion - Vargas Grandez

CÓDIGO DESCRIPCIONSIMBOLOGÍA DURACIÓN ENDÍAS PRECEDENCIAS

i - j

TRABAJOS PRELIMINARES

0 -- 1 LIMPIEZA DE TERRENO MANUAL A #ADDIN? -

1 -- 2 TRAZO , NIVELES Y REPLANTEO B #ADDIN? A

2 -- 3 MOVIMIENTO DE TIERRAS

3 -- 4 EXCAVACIÓN MANUAL C #ADDIN? B

CONCRETO SIMPLE

4 -- 5 SOLADOS CONCRETO FC=100 KG/CM2 H=2" D #ADDIN? C

CONCRETO ARMADO

ALCANTARILLA

5 -- 6 ACERO EN LOSA INFERIOR Y MUROS E #ADDIN? D

6 -- 7 CONCRETO PARA LOSA INFERIOR Y UÑAS F'C=175 KG/CM2, F #ADDIN? E

7 -- 8 ENCOFRADO MUROS LATERALES G #ADDIN? F

8 -- 9 CONCRETO PARA MUROS LATERALES F'C=175 KG/CM2, H #ADDIN? G

8 -- 11 DESENCOFRADO MUROS LATERALES M #ADDIN? H

11 -- 13 ENCOFRADO DE LOSA SUPERIOR Y SARDINELES N #ADDIN? M

13 -- 15 ACERO EN LOSA SUPERIOR Y SARDINELES Ñ #ADDIN? N,L

15 -- 17 CONCRETO EN LOSA SUPERIOR Y SARDINELES O #ADDIN? Ñ

17 -- 18 DESENCOFRADO DE LOSA SUPERIOR Y SARDINELES LATERALES R #ADDIN? O,Q

CONCRETO SIMPLE

7 -- 9 CONCRETO EN FALZAS ZAPATAS DE ALAS I 0.5 G

7 -- 10 CONCRETO EN CIMIENTO DE ALAS J 0.5 G

9 -- 12 ENCOFRADO DE ALAS K #ADDIN? I

12 -- 14 CONCRETO EN ALAS L #ADDIN? K,J

13 -- 16 DESENCOFRADO DE ALAS P #ADDIN? N,L

15 -- 18 CONCRETO EN LOSA DE ENTRADA Y SALIDA DE AGUAS PLUVIALES Q 0.5 Ñ

MOVIMIENTO DE TIERRAS FINAL

18 -- 19 RELLENOS CON MATERIAL PROPIO MANUAL S #ADDIN? R

19 -- 20 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA T #ADDIN? S

Page 14: Programacion - Vargas Grandez

H #ADDIN?

0 #ADDIN? 1 #ADDIN? 2 #ADDIN? 3 #ADDIN? 4 #ADDIN? 5 #ADDIN? 6 #ADDIN? 7 0.5

0 ### A ### ### B ### ### C ### ### D ### ### E ### ### F ### ### G ### ### I

0.5

J

Page 15: Programacion - Vargas Grandez

18

### ###

Q

0.5

15 #ADDIN? 17 #ADDIN? 18 #ADDIN? 19 #ADDIN? 20

### ### O ### ### R ### ### S ### ### T ### ###

Ñ

#ADDIN?

8 #ADDIN? 11 #ADDIN? 13

### ### M ### ### N ### ###

#ADDIN?

P

9 #ADDIN? 12 #ADDIN? 14 16

### ### K ### ### L ### ### ### ###

10

### ###

Page 16: Programacion - Vargas Grandez

DIAGRAMAS DE BARRAS GANTT

ID PATIDA DESCRIPCION UND.METRADO

REND. TIEMPO Nº CUAD. TIEMPO TIEMPO SECUENCIA

1 UNIT. (Tu) (f) REAL (Tr) PROG. (Tp) LOGICA

2 1.00 TRABAJOS PRELIMINARES

3 1.01 LIMPIEZA DE TERRENO MANUAL M2 53.95 200 0.27 1 0.27 ### 1

4 1.02 TRAZO , NIVELES Y REPLANTEO M2 53.95 200 0.27 1 0.27 ### 2

5 2.00 MOVIMIENTO DE TIERRAS

6 2.01 EXCAVACIÓN MANUAL M3 49.02 3 16.34 5 3.27 ### 3

7 3.00 CONCRETO SIMPLE

8 3.01 SOLADOS CONCRETO FC=100 KG/CM2 H=2" M2 16.16 30 0.54 1 0.54 ### 4

9 4.00 CONCRETO ARMADO

10 4.01.00 ALCANTARILLA

11 4.01.01 ACERO EN LOSA INFERIOR Y MUROS KG 578.84 250 2.32 1 2.32 ### 5

12 4.01.02 CONCRETO PARA LOSA INFERIOR Y UÑAS F'C=175 KG/CM2, M3 5.39 10 0.54 1 0.54 ### 6

13 4.02.03 ENCOFRADO MUROS LATERALES M2 48.48 20 2.42 2 1.21 ### 7

14 4.02.04 CONCRETO PARA MUROS LATERALES F'C=175 KG/CM2, M3 4.85 10 0.48 1 0.48 ### 8

15 4.02.05 DESENCOFRADO MUROS LATERALES M2 48.48 50 0.97 1 0.97 ### 11

16 4.02.06 ENCOFRADO DE LOSA SUPERIOR Y SARDINELES M2 16.41 20 0.82 1 0.82 ### 12

17 4.02.07 ACERO EN LOSA SUPERIOR Y SARDINELES KG 290.71 250 1.16 1 1.16 ### 13

18 4.02.08 CONCRETO EN LOSA SUPERIOR Y SARDINELES M3 3.55 10 0.36 1 0.36 ### 14

19 4.02.09 DESENCOFRADO DE LOSA SUPERIOR Y SARDINELES LATERALES M2 16.41 10 1.64 2 0.82 ### 15

20 5.00 CONCRETO SIMPLE

21 05.01 CONCRETO EN FALZAS ZAPATAS DE ALAS M3 0.51 10 0.05 1 0.05 0.5 8

22 05.02 CONCRETO EN CIMIENTO DE ALAS M3 1.02 10 0.10 1 0.10 0.5 8

23 05.03 ENCOFRADO DE ALAS M2 24.30 20 1.22 1 1.22 ### 9

24 05.04 CONCRETO EN ALAS M3 6.94 10 0.69 1 0.69 ### 10

25 05.05 DESENCOFRADO DE ALAS M2 24.30 50 0.49 1 0.49 ### 13

26 05.06 CONCRETO EN LOSA DE ENTRADA Y SALIDA DE AGUAS PLUVIALES M3 2.15 10 0.21 1 0.21 0.5 15

27 06.00 MOVIMIENTO DE TIERRAS FINAL

28 06.01 RELLENOS CON MATERIAL PROPIO MANUAL M3 32.32 3 10.77 5 2.15 ### 16

29 06.02 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA M3 24.26 5 4.85 4 1.21 ### 17

F10