PROGRESS GALLERY Advancing our projects Ongoing construction of access tunnels at the Kamoa-Kakula Copper Project’s initial high-grade Kansoko Sud mining area in D.R. Congo. November December 2016

Upload: others

Post on 09-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

PROGRESS GALLERY

Advancing our projects

Ongoing construction of access tunnels at the Kamoa-Kakula Copper

Project’s initial high-grade Kansoko Sud mining area in D.R. Congo.

November – December 2016

Page 2: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

Building our future,

today,

in Sub-Saharan Africa

Copper

40%-owned

Democratic Republic

of Congo

Platinum-group elements

& gold-nickel-copper

64%-owned

South Africa

Zinc-copper

68%-owned

D.R. Congo

KIPUSHI PLATREEF

KAMOA-KAKULA

2

Page 3: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

Kamoa-Kakula,

DRC

On October 12,

Ivanhoe announced

an independently

verified, initial

Mineral Resource

estimate for the

extremely-high-grade

Kakula Discovery on

the Tier One Kamoa-

Kakula Copper

Project in the D.R.

Congo.

Kamoa-Kakula now

ranks among

the 10 largest

copper deposits

in the world, and is

the largest copper

discovery ever

made on the African

continent. 3

Page 4: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

4

Kamoa-Kakula

Representatives from

Ivanhoe and SNEL, the

DRC state-owned electricity

company, inspecting the

newly installed 120/11 kV

mobile substation supplying

electricity from the national

grid to various sites on the

Kamoa-Kakula Project.

Page 5: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

5

Excavated rock from the twin decline tunnels under construction

at the Kansoko Sud initial mine development is hauled to the

surface along the box cut.

Kamoa-Kakula

Page 6: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

6

Construction of the conveyor roadway at the Kansoko Sud

box cut is nearing completion.

Kamoa-Kakula

Page 7: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

7

Preparing for another blast at one of the twin Kansoko Sud

decline tunnels.

Kamoa-Kakula

Page 8: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

8

Delivery of a new Dando deep-drill rig for exploration

of the Kakula Discovery area.

Kamoa-Kakula

Page 9: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

9

A portion of the Kakula area. The new road nearing completion will halve

travel time to the Kakula camp and access the site for the Kakula box cut.

Drill hole DKMC_DD997 was significant in confirming the scale of Kakula.

Kamoa-Kakula

Page 10: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

10

Geotechnical drilling for the box cut as part of mine-planning

work at the Kakula Discovery.

Construction of a box cut is the first step to provide underground

access to the Kakula Deposit via twin tunnels.

Kamoa-Kakula

Page 11: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

11

Geotechnical drilling at the planned Kakula box-cut location.

Arrow indicates approximate direction of the planned

access tunnels.

New road to Kakula

Kamoa-Kakula

Page 12: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

12

Logging Kakula

drill core.

More than

40,000 metres

have been drilled

at Kakula.

Kamoa-Kakula

Page 13: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

13

Installation of drainage culvert under the new access road

to the Kakula Discovery.

Kamoa-Kakula

Page 14: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

14

Chalcocite-rich Kakula drill core from hole DD1084.

Kamoa-Kakula

Page 15: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

15

Platreef’s Shaft 1, now down to approximately 150 metres

below surface, will provide early development access into the

Flatreef Deposit and will be utilized to fast-track production.

Platreef, South Africa

Page 16: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

16

Site visit in November

by members of Itochu

Corporation, part of

the Japanese

consortium that owns

a 10% interest in the

Platreef Project.

Platreef

Page 17: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

17

Hauling broken rock to surface during shaft-sinking

operations at Shaft 1.

Platreef

Page 18: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

18

Installation of ventilation fan system to deliver fresh air

to the bottom of Shaft 1 during sinking operations.

Platreef

Page 19: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

19

As part of the company’s safety protocols, a lamp-room

operator keeps records of safety head lamps issued to

employees and contractors for use during underground work.

Platreef

Page 20: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

20

A jumbo drill being positioned to be lowered down Shaft 1

for use in shaft-sinking operations.

Platreef

Page 21: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

21

Platreef

View of the sinking stage (an adjustable work platform

suspended on steel ropes) at Shaft 1.

Page 22: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

22

New electrical control panels at the pumping station

at the 1,200-metre level.

Kipushi, DRC

Page 23: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

23

One of the new, high-capacity Grifo pumps

on the 1,200-metre level.

Kipushi

Page 24: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

24

A new electrical subpanel for one of the winders.

Kipushi, DRC Kipushi

Page 25: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

25

Servicing of the spare

winder motor for Shaft P2.

Kipushi

Page 26: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

26

New high-volume ventilation fan installed at Kipushi’s Shaft 4

now in full operation.

Kipushi

Page 27: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

27

Mine employees monitoring gas and temperature levels

at the mine’s 850-metre level.

Kipushi

Page 28: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

28

Painting safety escape ladders and platforms at Shaft P2.

Kipushi

Page 29: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

29

Safety checks before the installation of a mine-water pump

at Shaft 5.

Kipushi

Page 30: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

30

Grifo pumps and Actom motors installed as part of upgrading

at the 1,200-metre level.

Kipushi

Page 31: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

31

Servicing Grifo pump motor at the 850-metre-level

pumping station.

Kipushi

Page 32: PROGRESS GALLERY Advancing our projects · Hauling broken rock to surface during shaft-sinking operations at Shaft 1. Platreef . 18 Installation of ventilation fan system to deliver

32

Newly paved roads at the Kipushi Project.

Kipushi