PROGRESS GALLERY Advancing our projects Platreef mine development project, South Africa. Jumbo drill rigs helped advance the sinking of Shaft 1 to a depth of more than 200 metres below surface during January 2017. January February 2017

Upload: others

Post on 09-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

PROGRESS GALLERY Advancing our projects

Platreef mine development project, South Africa. Jumbo drill rigs helped advance

the sinking of Shaft 1 to a depth of more than 200 metres below surface during

January 2017.

January – February 2017

Page 2: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

Building our future,

today,

in Sub-Saharan Africa Copper

39.6%-owned

Democratic Republic

of Congo

Platinum-group elements

& gold-nickel-copper

64%-owned

South Africa

Zinc-copper

68%-owned

D.R. Congo

KIPUSHI PLATREEF

KAMOA-KAKULA

2

Page 3: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

3

Surface box cut showing entrance to the twin declines being constructed

to provide underground mining access to the Kamoa-Kakula Copper Project's

initial high-grade Kansoko Mine.

The tunnels now have advanced more than 550 metres, more than half-way to the

start of the high-grade copper mineralization, and are expected to intercept the

deposit early in the second quarter this year.

Kamoa-Kakula, DRC

Page 4: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

4

Twin-boom drill rig (left) and utility vehicle (right) used to develop

and construct the declines.

Kamoa-Kakula

Page 5: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

5

Truck being loaded with excavated rock inside one of the Kansoko Mine’s

two decline tunnels.

Kamoa-Kakula

Page 6: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

6

Excavated rock from the declines being hauled to the surface and tipped.

Kamoa-Kakula

Page 7: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

7

Kamoa-Kakula

Training for new machinery operators.

Page 8: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

8

Installation of 11-kilowatt power line serving the Kamoa-Kakula Project.

Kamoa-Kakula

Page 9: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

9

Kamoa-Kakula

Dando 2 rig drilling DD1102, the first hole of 2017.

Page 10: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

10

High-grade copper drill core

from the Kakula Discovery

at the Kamoa-Kakula core shed.

Kamoa-Kakula

Page 11: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

11

Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock

from shaft sinking being removed from site. Shaft 1 had been sunk to a depth of 204

metres below surface on January 30, 2017.

Platreef, South Africa

Page 12: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

12

Shaft-sinking crews preparing a jumbo drill rig to be lowered underground.

Platreef

Page 13: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

13

Shaft workers drilling holes for installation of sidewall support units in Shaft 1.

Platreef

Page 14: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

14

Worker preparing for support-hole drilling in Shaft 1.

Platreef

Page 15: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

15

Drilling and shaft-sinking support work in Shaft 1.

Platreef

Page 16: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

16

Shaft workers carrying out cleaning operations at a depth of approximately

200 metres below surface.

The remotely-operated cactus grab is used to remove broken rock.

Platreef

Page 17: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

17

Worker supervising the re-entry of the kibble bucket

used to remove broken rock underground.

Platreef

Page 18: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

18

Rock-hoisting winder − critical for the redevelopment of the mine.

The rock winder, which will have an annual hoisting capacity

of 1.8 million tonnes, is being upgraded and is expected

to be fully operational in late 2017.

Kipushi, DRC

Page 19: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

19

Underground infrastructure being prepared for resumption of production.

Kipushi

Page 20: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

20

Re-commissioning of the main pumping station at Shaft 5.

Kipushi

Page 21: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

21

New lighting installed at 1,200-metre level.

Kipushi

Page 22: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

22

Installing reinforcing steel for the concrete slab to support Shaft 4’s

new ventilation fan.

Kipushi

Page 23: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

23

Core shed at the Kipushi Zinc-Copper Mine.

Kipushi

Page 24: PROGRESS GALLERY January February 2017 Advancing our projects · Platreef Project’s Shaft 1 head gear and infrastructure, showing excavated rock from shaft sinking being removed

24

High-grade core samples being inspected near Shaft 5.

Kipushi