Page 1: Progress Update: RIDFT

Progress Update: RIDFT

Group 27Daniel Escobedo Chelsea ArmbristerBrian LaTulip Divyesh BhaktaLuis Sura Joseph Gwaltney

Sponsor: Advisors: Dr. Okenwa Okoli Tarik Dickens

Dr. Nicholas Bembridge Dr. Peter N. Kalu

Page 2: Progress Update: RIDFT

AgendaBackgroundIntroductionProblem StatementNeeds AssessmentProject Goals/SpecificationsMain Issues EncounteredPreconceived Automation ModelProgress Since DecemberCurrent Project StatusProject TimelineClosing ThoughtsQuestions

2

Page 3: Progress Update: RIDFT

BackgroundWhat is the Resin Infusion between Double

Flexible Tooling (RIDFT)?

3

Page 4: Progress Update: RIDFT

IntroductionHow does it work?

What is it used for?Polymeric Bound Composites

4

Page 5: Progress Update: RIDFT

Problem StatementCurrent RIDFT Process Issues:

Labor IntensiveTime ConsumingProcess Repeatability

Proposed Solutions:Semi-AutomationFiber Placement MethodologyProcess Streamlining

5

Page 6: Progress Update: RIDFT

Needs AssessmentDevelop/Implement methodology for:

Semi-Automated PlacementSafe Removal of the Top and Bottom Frames Accurate Fiber Placement

Design an Ergonomic Handling System

Minimize Operational Footprint

6

Page 7: Progress Update: RIDFT

Project Goals/SpecificationsPrimary Objectives

Reduce Overall Process DurationReduce and Enable Safe Manpower UtilizationReduce Operational Footprint

Secondary ObjectivesDesign and Implement a Method for Accurate Fiber and Mold

PlacementErgonomic Handling System

ConstraintsSingle Operator Utilization$3,000.00 - $5,000.00

7

Page 8: Progress Update: RIDFT

Main Issues EncounteredSafety

Components issues Links Gears Hydraulics

BudgetPrevious Estimated Cost≈ $13,000

New Budget ≈ $3,000 - $5,000

8

Page 9: Progress Update: RIDFT

Preconceived Automated Model

9

Page 10: Progress Update: RIDFT

Progress Since DecemberStaff Meeting (ME Staff)

Discussed issues with previous design

Staff Meeting (Advisor/Customer)Discussed:

Budget constraints Safety Issues End of Semester Goal

Reassessed Project Timeline10

Page 11: Progress Update: RIDFT

Current Project StatusTerm Objective Shift

Previously: Design and PrototypeCurrently: Detailed Design

System ReassessmentSafetyCost“Workability” – ease of operationOperational Footprint

11

Page 12: Progress Update: RIDFT

Project Timeline

12

Page 13: Progress Update: RIDFT

Closing ThoughtsShift in Project Goals

Simply DesignNo Physical Working Model

Improve Upon Previous Years DesignIncrease System Stability/SafetyEase of UsePortable Semi-Automated System

13

Page 14: Progress Update: RIDFT

Questions?