project development
TRANSCRIPT
-
1Project preparation Niels-Erik Clausen
Ris National Laboratory
Training program in wind energy and project development
Phuket, 11-15 September 2006
Module 1.1
Wind Energy Course, Phuket, 11-15 Sept 20062
The project cycle - GovernmentProject preparation identification and formulation > ....> project proposal
document feasibility study > revised project proposal appraisal > revised project proposal project document appropriation > Government Agreement
Project implementation detailed design and construction (e.g. turn-key) monitoring and reviews
Project completion performance verification, commissioning tests and Taking-
over evaluation during liability period
-
2Wind Energy Course, Phuket, 11-15 Sept 20063
Project Development Steps
Measurements & data management Wind resource assessment Site selection Sketch design for power system analysis Feasibility study Environmental Impact Assessment (EIA) Power Purchase Agreement (PPA) EPC bidding and evaluation Construction Operation & Maintenance
Wind Energy Course, Phuket, 11-15 Sept 20064
Feasibility analysis
Needs analysis Correspondence with national plans / policy Technology and site assessment Appropriate organisation Environmental analysis Public acceptability
-
3Wind Energy Course, Phuket, 11-15 Sept 20065
Financial analysis Budget / investments Investors Stakeholder analysis National energy
policy supporting wind power
Market analysis (the open power market)
Power purchase agreement (PPA)
Economic / financial analysis
Internal rate of return (IRR)
Cost Investments
Land, wind turbine, foundation, grid connection
Operation & maintenance Main overhauls Dismounting
Benefit Production (kWh)
Wind climate, siting, wind turbines performance
Power sales price ($/kWh) Subsidies
Wind Energy Course, Phuket, 11-15 Sept 20066
Example: wind power economy
Wind turbine: Rated power: 600 kW Rotor diameter: 43 m Hub height: 50 m
Wind statistics: Height: 50 m Roughness length: 0,055
m A = 7,9 m/s, k = 2,0 Air density: 1,225 kg/m3
Production: Annual energy output:
1,5 GWh
Investment: Wind turbine: USD 450 000 Installation: 30% of USD 450000
= USD135 000 Lifetime: 20 years Interest rate: 5 %
Maintenance (annually): 1,5% of 450000 = USD 6750
Land lease + insurance USD 7000 Electricity cost: 4,1 USc/kWh Income (annually): 1,5GWh @
0,05USD = USD 75 000 Profit USD 14000
-
4Wind Energy Course, Phuket, 11-15 Sept 20067
Technical analysis
Need for the power Wind resources Land available and
accessible Wind power adaptable
into the power system Sketch design
Number of wind turbines
Size of wind turbines Wind farm layout Grid connection
Needs Energy / services needs Power demand
development Alternatives
Energy conservation Energy efficiency Alternative generation
Thermal power plants Nuclear power
generation Hydro power
Wind Energy Course, Phuket, 11-15 Sept 20068
Pre-project activities
Carry out feasibility / financial / technical analysis
Set up appropriate organisation Get legal project acceptance Ensure necessary capital (investors) Acquire land necessary Prepare tender documents Negotiate (turn key) supplier contract Supervise installation Take over the project
-
5Wind Energy Course, Phuket, 11-15 Sept 20069
(Turn key) supply
Tender documents Contractual
conditions Technical
specifications Climate conditions Design wind
conditions Grid connection
requirements Power control
requirements etc
Contract (turn key) Civil works Foundation Equipment supply Erection Grid connection Warranty period Performance