Dunedin Causeway Bridges
Project Development & Environment
(PD&E) Study – Update
June 12, 2018
![Page 2: Project Development & Environment (PD&E) Study Update](https://reader034.vdocuments.net/reader034/viewer/2022050611/62735b6854ff5b093a7f573c/html5/thumbnails/2.jpg)
Doing Things!
Our Vision: To Be the Standard for Public Service in America
Project Location and Limits
2
Tide Relief Bridge Main Bridge
BeginProject
EndProject
![Page 3: Project Development & Environment (PD&E) Study Update](https://reader034.vdocuments.net/reader034/viewer/2022050611/62735b6854ff5b093a7f573c/html5/thumbnails/3.jpg)
Doing Things!
Our Vision: To Be the Standard for Public Service in America
Bridge Options
3
No-Build: $4+M = 13 YearsCost includes countermeasures for both bridges
Major Rehabilitation: $31+M = 25 Years• Additional Service Life: 25 years (to 2045)• Not presented to public as a viable alternative
o Does not meet transportation/recreational needs of the community o Does not address the functionally obsolete bridge geometry
Cost includes $25.1 million for main bascule bridge and $6.2 million for the tide relief bridge
Replacement = 75 Years• Main Bridge
o High-Level Fixed = $60+M
o Mid-Level Movable = $81+M
o Low-Level Movable = $77+M
Costs include replacement of the tide relief bridge
![Page 4: Project Development & Environment (PD&E) Study Update](https://reader034.vdocuments.net/reader034/viewer/2022050611/62735b6854ff5b093a7f573c/html5/thumbnails/4.jpg)
Doing Things!
Our Vision: To Be the Standard for Public Service in America
Alternatives Cost/Service Life
4
Alternative Cost Annual O&M Service Life
No-Build $4.0 M* $303 K 13 years
Rehabilitation $31.3 M** $228 K 25 years
Replacement (Low Level Movable) $77.0 M*** $230 K 75 years
Replacement (Mid-level Movable) $81.2 M*** $231 K 75 years
Replacement (Fixed) $60.0 M*** $9.3 K 75 years
*Cost includes $4.0 million in scour countermeasures for both bridges.
** Cost includes $25.1 million for rehabilitation of Main Bascule bridge and $6.2 million for rehabilitation of the Tide Relief bridge.
***Cost includes $9.3 million for replacement of the Tide Relief bridge.
![Page 5: Project Development & Environment (PD&E) Study Update](https://reader034.vdocuments.net/reader034/viewer/2022050611/62735b6854ff5b093a7f573c/html5/thumbnails/5.jpg)
Doing Things!
Our Vision: To Be the Standard for Public Service in America
Land Use
5
• Residential: 792 Dwelling Units• Commercial: 11 Businesses (Ward Island)• Recreational/Natural: 1.5M Visitors Annually
($113M economic impact) o Attracts a variety of enthusiasts such as:
kayakers, bird-watchers, beachgoers, hikers, fishermen, etc.
![Page 6: Project Development & Environment (PD&E) Study Update](https://reader034.vdocuments.net/reader034/viewer/2022050611/62735b6854ff5b093a7f573c/html5/thumbnails/6.jpg)
Doing Things!
Our Vision: To Be the Standard for Public Service in America
Existing Conditions
6
![Page 7: Project Development & Environment (PD&E) Study Update](https://reader034.vdocuments.net/reader034/viewer/2022050611/62735b6854ff5b093a7f573c/html5/thumbnails/7.jpg)
Doing Things!
Our Vision: To Be the Standard for Public Service in America
Land Use Impact: 1 Foot SLR
7
0% 20% 40% 60% 80% 100%
Natural
Recreational
Residential
Commercial
Percent Inundated
% Inundated
NOAA Projection
Low Int. Low Int. High High
Year After 2100 2063 2039 2029
![Page 8: Project Development & Environment (PD&E) Study Update](https://reader034.vdocuments.net/reader034/viewer/2022050611/62735b6854ff5b093a7f573c/html5/thumbnails/8.jpg)
Doing Things!
Our Vision: To Be the Standard for Public Service in America
Land Use Impact: 2 Feet SLR
8
0% 20% 40% 60% 80% 100%
Natural
Recreational
Residential
Commercial
Percent Inundated
% Inundated
NOAA Projection
Low Int. Low Int. High High
Year After 2100 After 2100 2063 2047
![Page 9: Project Development & Environment (PD&E) Study Update](https://reader034.vdocuments.net/reader034/viewer/2022050611/62735b6854ff5b093a7f573c/html5/thumbnails/9.jpg)
Doing Things!
Our Vision: To Be the Standard for Public Service in America
Land Use Impact: 3 Feet SLR
9
0% 20% 40% 60% 80% 100%
Natural
Recreational
Residential
Commercial
Percent Inundated
% Inundated
NOAA Projection
Low Int. Low Int. High High
Year After 2100 After 2100 2082 2061
![Page 10: Project Development & Environment (PD&E) Study Update](https://reader034.vdocuments.net/reader034/viewer/2022050611/62735b6854ff5b093a7f573c/html5/thumbnails/10.jpg)
Doing Things!
Our Vision: To Be the Standard for Public Service in America
Land Use Impact: 4 Feet SLR
10
0% 20% 40% 60% 80% 100%
Natural
Recreational
Residential
Commercial
Percent Inundated
% Inundated
NOAA Projection
Low Int. Low Int. High High
Year After 2100 After 2100 2097 2073
![Page 11: Project Development & Environment (PD&E) Study Update](https://reader034.vdocuments.net/reader034/viewer/2022050611/62735b6854ff5b093a7f573c/html5/thumbnails/11.jpg)
Doing Things!
Our Vision: To Be the Standard for Public Service in America
Land Use Impact: 5 Feet SLR
11
0% 20% 40% 60% 80% 100%
Natural
Recreational
Residential
Commercial
Percent Inundated
% Inundated
NOAA Projection
Low Int. Low Int. High High
Year After 2100 After 2100 After 2100 2084
![Page 12: Project Development & Environment (PD&E) Study Update](https://reader034.vdocuments.net/reader034/viewer/2022050611/62735b6854ff5b093a7f573c/html5/thumbnails/12.jpg)
Doing Things!
Our Vision: To Be the Standard for Public Service in America
Land Use Impact: 6 Feet SLR
12
0% 20% 40% 60% 80% 100%
Natural
Recreational
Residential
Commercial
Percent Inundated
% Inundated
NOAA Projection
Low Int. Low Int. High High
Year After 2100 After 2100 After 2100 2093
![Page 13: Project Development & Environment (PD&E) Study Update](https://reader034.vdocuments.net/reader034/viewer/2022050611/62735b6854ff5b093a7f573c/html5/thumbnails/13.jpg)
Doing Things!
Our Vision: To Be the Standard for Public Service in America
Sea Level Rise Projections Summary
13
No-Build (2033)
Rehab (2045)
Replacement (2100)
0
1
2
3
4
5
6
7
8
2020 2030 2040 2050 2060 2070 2080 2090 2100
Sea
Leve
l Ris
e (
fee
t)
Year
SLR Scenario / Year
High
Intermediate High
Intermediate Low
Low
50% Residential and Commercial Inundation (4.8’)
50% Recreational Inundation (3.7’)
50% Natural Inundation (1.9’)
![Page 14: Project Development & Environment (PD&E) Study Update](https://reader034.vdocuments.net/reader034/viewer/2022050611/62735b6854ff5b093a7f573c/html5/thumbnails/14.jpg)
Doing Things!
Our Vision: To Be the Standard for Public Service in America
Current Project Status Construction Schedule:
• Anticipate construction funding in Penny IV
Stakeholder Preferred Alternatives • Mid-Level Movable Bridge Alternative
‒ Dunedin Causeway Ad Hoc Committee
‒ Dunedin City Commission
‒ General Public
• High-Level Fixed Bridge Alternative‒ Pinellas MPO Bicycle/Pedestrian
Action Committee
Pinellas BCC work session SLR Presentation & Project Update June 12, 2018: Recommendation to finish PD&E Study with Mid-Level Movable Bridge Alternative.
14
![Page 15: Project Development & Environment (PD&E) Study Update](https://reader034.vdocuments.net/reader034/viewer/2022050611/62735b6854ff5b093a7f573c/html5/thumbnails/15.jpg)
Doing Things!
Our Vision: To Be the Standard for Public Service in America
Process for next steps
15
Consultant
Finalize and submit PD&E
Public
Public Hearing
Consultant
Finalize PD&E (DRAFT)
BCC (future meeting)
Select Preferred Alternative
No funding obligation to build preferred alternative
Inform public
Approved PD&E needed to seek grants
![Page 16: Project Development & Environment (PD&E) Study Update](https://reader034.vdocuments.net/reader034/viewer/2022050611/62735b6854ff5b093a7f573c/html5/thumbnails/16.jpg)