Project IntroductionVisioning

QA QA Next Steps

Slide 1

Park Visioning

Good Gateway to ArlingtonGood Gateway to ArlingtonGreat Neighborhood Park for Rosslyn

Slide 2

Park VisioningExisting Conditions

ProgramProgramConceptual Strategies

Slide 3

Park VisioningExisting Conditions

Regional SettingConnections

Georgetown

Rosslyn

Slide 4 Rosslyn Gateway ParkN

Park VisioningObservations

Urban Plazas

Local SettingConnections

Urban Plazas+

Open Space

Slide 6 Rosslyn Gateway ParkN

Park VisioningObservations

Walking Distances

Local SettingConnections

5 minute walk10 minute walk

g

Slide 7 Rosslyn Gateway ParkN

Park VisioningObservations

Local SettingConnections

State and Federal Land

Slide 8 Rosslyn Gateway ParkN

Park VisioningObservations

Local SettingConnections

Metro and Central Rosslyn

S

North Ft. Myer Drive

North Nash Street

North Moore Street

North Lynn StreetEsplanade and Corridor of Light

Central Place

Slide 9 Rosslyn Gateway Park

Cultural Center

Park VisioningObservations

Local SettingConnections

Slide 10 Rosslyn Gateway Park

Park VisioningObservations

Local SettingConnections

BIKE /PEDESTRIAN

CIRCULATION

Slide 11 Rosslyn Gateway Park

Park VisioningObservations

Local SettingConnections

FALL LINE

Slide 12 Rosslyn Gateway Park

Park VisioningObservations

Local SettingConnections

The Aqueduct Bridge

1 2 3

Slide 13 Rosslyn Gateway Park

Park VisioningObservations

Site

Potential Street Improvements

Gateway Building SiteGateway Building SiteGateway Building SiteGateway Building Site

Slide 14 Rosslyn Gateway Park

Park VisioningObservations

SiteIsland

IslandsNested Islands

Site

Connected IslandsViews

Slide 16 Rosslyn Gateway Park

Park VisioningObservations

[Ground level images plus views beyound]views beyound]

Slide 17

Park VisioningObservations

[Ground level images plus views beyound]views beyound]

Slide 18

Park VisioningObservations

Slide 19

Park VisioningObservations

Slide 20

Park VisioningObservations

Slide 21

Park VisioningObservations

Slide 22

Park VisioningObservations

Slide 23

Park VisioningObservations

Slide 24

Park VisioningObservations

[Ground level images plus views beyound]views beyound]

Slide 25

Park VisioningObservations

Slide 27 Rosslyn Gateway Park

Park VisioningObservations

[Ground level images plus views beyound]views beyound]

Slide 28

Park VisioningObservations

[Ground level images plus views beyound]views beyound]

Slide 29

Park VisioningObservations

[Ground level images plus views beyound]views beyound]

Slide 30

Park VisioningObservations

[Ground level images plus views beyound]views beyound]

Slide 31

Park VisioningObservations

Slide 32

Park VisioningObservations

[Ground level images plus views beyound]views beyound]

Slide 33

Park VisioningObservations

Topography

4%

Topography

81.566.0

61.063.0

4%1%

70.8685.59%

5.5%

89.577.0

61.579.5

4%

4%

Slide 35 Rosslyn Gateway ParkN

Park VisioningObservations

Significant Elements

66Air Intake

Sycamore

Significant Elements

66Air Intake

Purple HeartMemorial

Slide 36 Rosslyn Gateway Park

Air Intake Memorial

N

Park VisioningObservations

StructuralStructural

Slide 37 Rosslyn Gateway Park

Park VisioningObservationsPedestrian Traffic

C

Pedestrian Traffic

C

B

AA

Location A6:00 AM – 7:00 PM, 87% (1,802) of the 2,064 pedestrians crossed

Location B6:00 AM – 7:00 PM, 77% (894) of the 1,167 pedestrians crossed

Location C6:00 AM – 7:00 PM, 81% (1,021) of the 1,263 pedestrians crossed

this segment of Lee Highway Westbound at the street-level and 13% (262) crossed via the skywalk.

Peak crossings :8:45 and 9:45 AM (AM peak period), 12:00 and 1:00 PM (Mid-Day peak period),5:00 and 6:00 PM (PM peak period).

this segment of North Fort Myer Drive at the street-level and 23% (273) crossed via the skywalk.

Peak crossings :7:45 and 8:45 AM (AM peak period), 12:30 and 1:30 PM (Mid-Day peak period),5:15 and 6:15 PM (PM peak period).

this segment of Lee Highway Eastbound at the street-level and 19% (242) crossed via the skywalk.

Peak crossings:7:45 and 8:45 AM (AM peak period), 12:15 and 1:15 PM (Mid-Day peak period),5:15 and 6:15 PM (PM peak period).

Slide 38 Rosslyn Gateway Park

During these specific periods, the range of pedestrians at the street-level ranged from 82% (Mid-Day) to 96% (AM).

During these specific periods, the range of pedestrians at the street-level ranged from 63% (Mid-Day) to 82% (AM).

During these specific periods, the range of pedestrians at the street-level ranged from 66% (Mid-Day) to 85% (AM).

Park VisioningProgram

Slide 39

Park VisioningProgram

Current•Jazz Fest•Gateway to Fitness•Gateway to Fitness•Summer Movies

Wish List•More events•Flexible Space: Commons Area•Active Recreation/Play: Bocce, Frisbee, Ice Skating, Active Recreation/Play: Bocce, Frisbee, Ice Skating,

Volleyball, Skating•Concession/Food: Lunchtime destination•Arts: Connection to Cultural Ctr

Slide 40

•Arts: Connection to Cultural Ctr.

Park VisioningProgram

Jazz FestJazz Fest

Slide 42 Rosslyn Gateway Park

Park VisioningProgram

Summer MoviesSummer Movies

Slide 43 Rosslyn Gateway Park

Park VisioningProgram

MusicMusic

Slide 44 Rosslyn Gateway Park

Park VisioningProgram

Green SpaceGreen Space

Slide 45 Rosslyn Gateway Park

Park VisioningProgram

FoodFood

Slide 46 Rosslyn Gateway Park

Park VisioningProgram

PlayPlay

Slide 47 Rosslyn Gateway Park

Park VisioningProgram

Sustainability/Energy ExhibitsSustainability/Energy Exhibits

Slide 48 Rosslyn Gateway Park

Park VisioningProgram

WaterWater

Slide 49 Rosslyn Gateway Park

Park VisioningProgram

ArtArt

Slide 50 Rosslyn Gateway Park

Park VisioningConceptual Strategies

Gateway Building SiteGateway Building SiteGateway Building SiteGateway Building Site

Gateway Park EastGateway Park East(Phase I)(Phase I)

Gateway Park WestGateway Park WestGateway Park WestGateway Park West(Phase 2)(Phase 2)

Slide 58 Rosslyn Gateway Park

Park VisioningConceptual StrategiesCHOICES

REFINE EXISTING REDESIGN PARK

Slide 59 Rosslyn Gateway Park

Park VisioningConceptual Strategies

Bridge RemovalBridge Removal

Slide 60 Rosslyn Gateway ParkN

Park VisioningConceptual

StrategiesStrategiesRefine Existing

Retain Bridge over Ft. Meyerg y

Street Trees on LHW EastPavilion in NE Corner

Fountain along N. LynnActive RecreationActive Recreation

Open views within East ParkStage alternatives

ReplantCover walls in Green

RefurnishBridge Ceiling Treatment

Slide 65 Rosslyn Gateway Park

Park VisioningConceptual

StrategiesStrategiesRefine Existing

Tree MassingRetain Bridge over Ft. Meyerg y

Street Trees on LHW EastPavilion in NE Corner

Fountain along N. LynnActive RecreationActive Recreation

Open views within East ParkStage alternatives

ReplantCover walls in Green

RefurnishBridge Ceiling Treatment

Slide 66 Rosslyn Gateway Park

Park VisioningSchemes

Refine ExistingRefine Existing

Slide 67 Rosslyn Gateway Park

Park VisioningConceptual

StrategiesStrategiesTwo Parks Sweep

Open EdgesCentral Lawn

Urbane to NaturalCivic to Neighborhood

Remove Bridge

South Promenade

Swept PathsPromenade on LHW EastPlantings on Northern edgeImprove Visibility btw Parks

Swept PathsNegotiate Grades

Define Lawns

Gathering Area Lynn/Moore

Gathering area in NEFood Service and RestroomsCanopy ShadeFlexible Seating

PavilionShaded Flexible Seating

Active Playg

Water

Integrate Play

Slide 68 Rosslyn Gateway Park

Park VisioningConceptual

StrategiesStrategiesTwo Parks Sweep

Tree MassingOpen EdgesCentral Lawn

Urbane to NaturalCivic to Neighborhood

Remove Bridge

South Promenade

Swept PathsPromenade on LHW EastPlantings on Northern edgeImprove Visibility btw Parks

Swept PathsNegotiate Grades

Define Lawns

Gathering Area Lynn/Moore

Gathering area in NEFood Service and RestroomsCanopy ShadeFlexible Seating

PavilionShaded Flexible Seating

Active Playg

Water

Integrate Play

Slide 69 Rosslyn Gateway Park

Character

Slide 70 Rosslyn Gateway Park

Park VisioningConceptual

StrategiesStrategiesGreat Lawn/Riverine

Remove BridgeOpen Edges

One LawnSouth Promenade

North Meander

Central Lawn

Urbane to NaturalCivic to Neighborhood

Street Trees on LHW EastPlantings on Northern edgeImprove Visibility btw Parks

Gathering area in NEFood Service and RestroomsCanopy ShadeFlexible Seatingg

Integrate Play

Slide 71 Rosslyn Gateway Park

Park VisioningConceptual

StrategiesStrategiesGreat Lawn/Riverine

Tree MassingOpen Edges Remove Bridge

Central Lawn

Urbane to NaturalCivic to Neighborhood

One LawnSouth Promenade

North Meander

Promenade on LHW EastPlantings on Northern edgeImprove Visibility btw Parks

Gathering area in NEFood Service and RestroomsCanopy ShadeFlexible SeatinggWater

Integrate Play

Slide 72 Rosslyn Gateway Park

Character

Slide 73 Rosslyn Gateway Park

Character

Slide 74 Rosslyn Gateway Park

Park VisioningConceptual

StrategiesStrategiesSweep

Open EdgesRemove Bridge

One LawnSouth PromenadeNorth Wall Garden

Central Lawn

Urbane to NaturalCivic to Neighborhood

North Wall GardenStreet Trees on LHW EastPlantings on Northern edgeImprove Visibility btw Parks

Gathering area in NEFood Service and RestroomsCanopy ShadeFlexible Seatingg

Integrate Play

Slide 75 Rosslyn Gateway Park

Park VisioningConceptual

StrategiesStrategiesSweep

Tree MassingOpen EdgesCentral Lawn

Urbane to NaturalCivic to Neighborhood

Remove Bridge

One LawnSouth PromenadeNorth Wall Garden

Promenade on LHW EastPlantings on Northern edgeImprove Visibility btw Parks

North Wall Garden

Gathering area in NEFood Service and RestroomsCanopy ShadeFlexible SeatinggWater

Integrate Play

Slide 76 Rosslyn Gateway Park

Character

Slide 77 Rosslyn Gateway Park

Park VisioningConceptual Strategies

SectionSection

Slide 78 Rosslyn Gateway Park

Character

Slide 79 Rosslyn Gateway Park

Project IntroductionVisioning

QAQANext Steps

Slide 80

Project IntroductionVisioning

QA QA Next Steps

Slide 81