project management influences on systems …...2003/02/11  · project management by: 1. aligning...

15
Project Management Influences Project Management Influences on Systems Engineering on Systems Engineering Presented to the NASA Masters Forum Presented to the NASA Masters Forum February 11, 2003 February 11, 2003 L. Dale Thomas, Ph.D., P.E. L. Dale Thomas, Ph.D., P.E. Director of Systems Management Director of Systems Management Marshall Space Flight Center Marshall Space Flight Center

Upload: others

Post on 15-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Management Influences on Systems …...2003/02/11  · project management by: 1. Aligning the WBS, the PBS, & the Organization Chart 2. Creating realistic customer & stakeholder

Project Management Influences Project Management Influences on Systems Engineeringon Systems Engineering

Presented to the NASA Masters ForumPresented to the NASA Masters ForumFebruary 11, 2003February 11, 2003

L. Dale Thomas, Ph.D., P.E.L. Dale Thomas, Ph.D., P.E.Director of Systems ManagementDirector of Systems Management

Marshall Space Flight CenterMarshall Space Flight Center

Page 2: Project Management Influences on Systems …...2003/02/11  · project management by: 1. Aligning the WBS, the PBS, & the Organization Chart 2. Creating realistic customer & stakeholder

February 11, 2003 VS01/Thomas 2

IntroductionIntroduction

♦ Project management can positively influence systems engineering by:

1. Aligning the WBS, the PBS, & the Organization Chart

2. Creating realistic customer & stakeholder expectations early in the development cycle

3. Managing systems engineering as a project

Page 3: Project Management Influences on Systems …...2003/02/11  · project management by: 1. Aligning the WBS, the PBS, & the Organization Chart 2. Creating realistic customer & stakeholder

February 11, 2003 VS01/Thomas 3

Organizational & PBS/WBS RelationshipsOrganizational & PBS/WBS Relationships

Source: Project Management, 6th Edition, Kerzner, p. 547

PROJECT

System BSystem A

Subsystem A Subsystem B

ComponentA

1.2.2.2Rear Doors

ComponentC

Company

EngineeringMFG Test

Design

ElectricalDesign

MechanicalDesign

ThermalDesign

ControlAccount

ControlAccount

ControlAccount

ControlAccount

ControlAccount

ControlAccount

Control Account

Work Packages

Functional Organization

Level 4

Level 3

Level 2

Level 1WHATWHATWHOWHO

WhenWhenHow Much How Much $$

Page 4: Project Management Influences on Systems …...2003/02/11  · project management by: 1. Aligning the WBS, the PBS, & the Organization Chart 2. Creating realistic customer & stakeholder

February 11, 2003 VS01/Thomas 4

Consequences of Poor AlignmentConsequences of Poor Alignment

♦ For a given project, a poorly aligned WBS, PBS, & project organization will manifest itself as:

– Project management• Increased quantity of control accounts• Increased management complexity

– Systems Engineering• Increased quantity of interfaces• Increased complexity of interfaces

Page 5: Project Management Influences on Systems …...2003/02/11  · project management by: 1. Aligning the WBS, the PBS, & the Organization Chart 2. Creating realistic customer & stakeholder

February 11, 2003 VS01/Thomas 5

Hubble vs. ChandraHubble vs. Chandra

♦ Both systems – Have performed in an outstanding manner– Included international participation– Involved significant technical challenges

♦ However, consider– Cost & schedule performance during system

development

Page 6: Project Management Influences on Systems …...2003/02/11  · project management by: 1. Aligning the WBS, the PBS, & the Organization Chart 2. Creating realistic customer & stakeholder

February 11, 2003 VS01/Thomas 6

Chandra XChandra X--Ray Telescope ArchitectureRay Telescope Architecture

Prop

Data

Power

Pointing

Structure R/F

HRMA OBA

SSA

Grating 1 Grating 2

ACIS

HRC

SIM

Spacecraft

Telescope

ISIM

Page 7: Project Management Influences on Systems …...2003/02/11  · project management by: 1. Aligning the WBS, the PBS, & the Organization Chart 2. Creating realistic customer & stakeholder

February 11, 2003 VS01/Thomas 7

Hubble Space Telescope ArchitectureHubble Space Telescope Architecture

THERMAL

FINE GUIDANCESENS

OPTICALCONTROLSTRUCTURES

OPTICS

OTA

SI

STRUCT/MECH

POINTING CTRL

C&DH ELECTRICAL

THERMAL

SSM

FAINT OBJSPECTROM

HIGH RESOLSPECTROM

WIDE FIELD/PLAN CAM

HIGH SPEEDPHOTOM

SI C&DH

FAINT OBJCAMERA

ELECTRICALPWR

Page 8: Project Management Influences on Systems …...2003/02/11  · project management by: 1. Aligning the WBS, the PBS, & the Organization Chart 2. Creating realistic customer & stakeholder

February 11, 2003 VS01/Thomas 8

Customer & Stakeholder ExpectationsCustomer & Stakeholder Expectations

RiskCont

ent (

Wha

t)Schedule (W

hen)

Resources (How Much)Work exhaustively & continuously with customers & stakeholders to create clear, cogent, mutual & hopefully stable understanding of project content, schedule, & resources.

Page 9: Project Management Influences on Systems …...2003/02/11  · project management by: 1. Aligning the WBS, the PBS, & the Organization Chart 2. Creating realistic customer & stakeholder

February 11, 2003 VS01/Thomas 9

Systems Engineering HierarchySystems Engineering Hierarchy

Configuration Item (CI) Requirements

Element/Component Requirements

System Requirements

Originating Requirements

MissionRequirements

Operational Concept Document

Design Reference Missions

Measures of Effectiveness

Top-Level RequirementsDocument(s)

Systems RequirementsDocument

Systems Specificationetc.

Customer andStakeholder Focus

Design TeamFocus

• Instability at the top propagates downward.

Page 10: Project Management Influences on Systems …...2003/02/11  · project management by: 1. Aligning the WBS, the PBS, & the Organization Chart 2. Creating realistic customer & stakeholder

February 11, 2003 VS01/Thomas 10

ChallengesChallenges

♦ When the customers &/or stakeholders change, expectations will change

♦ Likelihood of Customer &/or stakeholder change grows as a function of project scope & duration

♦ Hence, large &/or long-duration projects are stability challenged– 2nd Generation Reusable Launch Vehicle vs. Mars

Rover

Page 11: Project Management Influences on Systems …...2003/02/11  · project management by: 1. Aligning the WBS, the PBS, & the Organization Chart 2. Creating realistic customer & stakeholder

February 11, 2003 VS01/Thomas 11

Systems Engineering as a ProjectSystems Engineering as a Project

♦ Systems engineering needs to plan just as any other project– A Systems Engineering Management Plan should

include:• Milestones• Deliverables• Process(es)• Risks• Budget

Page 12: Project Management Influences on Systems …...2003/02/11  · project management by: 1. Aligning the WBS, the PBS, & the Organization Chart 2. Creating realistic customer & stakeholder

February 11, 2003 VS01/Thomas 12

2GRLV SEMP Extract2GRLV SEMP Extract

Table 3.2.1.1-1. SYSTEMS DEFINITION OFFICE FUNCTIONS AND PRODUCTS TABLE

OFFICE FUNCTION INPUT(S) PROVIDER(S) PROCESS

PRODUCT(S) CUSTOMER(S)

• Operations Concept Definition

• Level 1 Requirements Generation and Revision Control

• Design Reference Mission (DRM) Generation and Revision Control

• Mission Figures of Merit (FOM) Generation and Revision Control

• Stakeholder Level 1 Requirements Input

• Legacy Documentation (STAS, NRA 8-27, L1R 8/99)

• Contractor Input

• HQ

• Space Transportation Council

• NASA Centers

• DoD Agencies

• HQ

• Architecture Contractors

Document/Plan Generation and Revision Control Process

• Operations Concept Document

• Level I Requirements Document

• DRM Document

• FOM Document

• Architecture Contractors

2nd Gen RLV Offices

• Project Manager

• Technology Project Managers

• SE&IO Manager

• TIRM

Systems Engineering Process Definition and Planning

Document/Plan Generation and Revision Control Process

• Systems Engineering Management Plan

• 2nd Gen RLV Architecture Operations Concept (OCD) Document

• Integrated Trade Study Plan and Process

• V&V Plan and Process

• L1R

• FOMs

• DRMs

• Technology Updates

• Contractor Trade Studies

• SDO

• Technology Projects

• SAO - LSEs

Architectural Evaluation

• Integrated Trade Tree

• Program Manager

• Contractors

• HQ

• TIRM

Page 13: Project Management Influences on Systems …...2003/02/11  · project management by: 1. Aligning the WBS, the PBS, & the Organization Chart 2. Creating realistic customer & stakeholder

February 11, 2003 VS01/Thomas 13

International Space StationInternational Space Station

Page 14: Project Management Influences on Systems …...2003/02/11  · project management by: 1. Aligning the WBS, the PBS, & the Organization Chart 2. Creating realistic customer & stakeholder

February 11, 2003 VS01/Thomas 14

ISS Incremental Design Review (IDR) ISS Incremental Design Review (IDR) Approach to SE PlanningApproach to SE Planning

INCREMENTAL DESIGN REVIEW Product Reviews:

SRR SDR PDR CDR TRR FCA PCA CoFR

SRR SDR PDR CDR TRR FCA PCA CoFR

SRR SDR PDR CDR TRR FCA PCA CoFR

PROCESS for Element 3

Program Integration Activities:INTEGRATED RISK ASSESSMENTS

Readinessto

Proceed

PROCESS for Element 2

PROCESS for Element 1

FLIGHT REVIEWSSAFETY REVIEW PANELS

DESIGN ANALYSIS CYCLES

The IDR content is tailored to the product/integration maturity required to achieve the launch schedule -- a “lead-time away” based review.

Page 15: Project Management Influences on Systems …...2003/02/11  · project management by: 1. Aligning the WBS, the PBS, & the Organization Chart 2. Creating realistic customer & stakeholder

February 11, 2003 VS01/Thomas 15

Closing RemarksClosing Remarks

♦ Systems engineering can positively influence project management by:

1. Aligning the WBS, the PBS, & the Organization Chart

2. Creating realistic customer & stakeholder expectations early in the development cycle

3. Managing systems engineering as a project