project phasing - dontburythelibrary.weebly.com › uploads › 1 › 2 › 6 › 7 ›...

4
CONCEPTUAL LAYOUT DIAGRAM MAY 28, 2019 SANTA CRUZ LIVE OAK LIBRARY ANNEX SANTA CRUZ PUBLIC LIBRARIES & COUNTY PARKS DEPARTMENT N DESIGN CONCEPT EXISTING COMMUNITY CENTER ROOMS UPGRADED AND LIBRARY ADDITION AT FRONT OF BUILDING FLEX MULTI- PURPOSE ROOMS POOL LOCKERS POOL STAFF (W) ELEC. ELEC. KITCHEN STOR. SERVICE 1 2 5 7 3 ROCK CLIMBING WALL (NON MEASURE S FUNDED) COVERED OUTDOOR SPACE DROP OFF RECEPTION BOOK LOCKERS & SHELVING KIDS’ CORNER INTERIOR COMFORTABLE SEATING LAPTOP BAR PUBLIC COMPUTERS FRIENDS STORE 1 2 3 4 5 6 7 BOYS & GIRLS CLUB LOW FENCING FLEXIBLE MULTI-PURPOSE ROOMS : CLASSROOM SMALL MEETING FITNESS CLASS SMALL EVENT TRAINING DANCE CLASS COOKING CLASS OPEN SEMINARS ACTIVE LEARNING ROOM : CLASSROOM SMALL MEETING WRITING GROUP MAKER SPACE CRAFT PROGRAMS SEWING CLASSES GROUP STUDY & CO-WORKING ACTIVE LEARNING ROOM (20-30) GS OUTDOOR PLAY LIBRARY LEARNING CENTER RENOVATION FOR TEACHING FORMAT (NON MEASURE S FUNDED) 20 - 40 SEATS GROUP GATHERING (2-4) STOR. RIPARIAN BUFFER TO POOL TO FOREST GALLERY WALL STORAGE FLEXIBLE OUTDOOR PROGRAM AREA GS (2-4) GS (6-10) LOCATION FOR CONCESSION STAND / KIOSK IMPROVED PATH BETWEEN B&G CLUB AND SIMPKINS CHILD CARE (NON MEASURE S FUNDED) STORAGE PLAZA AND FLEXIBLE EVENT SPACE ENTRY STOR 6 4 ACOUSTIC SCREENING PROJECT PHASING FUTURE PHASES CURRENT PHASE

Upload: others

Post on 03-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT PHASING - dontburythelibrary.weebly.com › uploads › 1 › 2 › 6 › 7 › 126754… · santa cruz public libraries & county parks department n design concept existing

CONCEPTUAL LAYOUT DIAGRAMMAY 28, 2019

SANTA CRUZ LIVE OAK LIBRARY ANNEX

SANTA CRUZ PUBLIC LIBRARIES & COUNTY PARKS DEPARTMENT

N

DESIGN CONCEPT

EXISTING COMMUNITY CENTER ROOMS UPGRADED AND LIBRARY ADDITION AT FRONT OF BUILDING

FLEX MULTI-PURPOSE ROOMS

POOL LOCKERS

POOL STAFF

(W)

ELEC.

ELEC.KITCHEN

STOR.

SERVICE

1

2

5

73

ROCK CLIMBING WALL (NON MEASURE S FUNDED)

COVERED OUTDOOR SPACE

DROP OFF

RECEPTION

BOOK LOCKERS & SHELVING

KIDS’ CORNER

INTERIOR COMFORTABLE SEATING

LAPTOP BAR

PUBLIC COMPUTERS

FRIENDS STORE

1

2

3

4

5

6

7

BOYS & GIRLS CLUB

LOW FENCING

FLEXIBLE MULTI-PURPOSE ROOMS :

• CLASSROOM • SMALL MEETING• FITNESS CLASS• SMALL EVENT• TRAINING• DANCE CLASS• COOKING CLASS• OPEN SEMINARS

ACTIVE LEARNING ROOM :

• CLASSROOM• SMALL MEETING • WRITING GROUP• MAKER SPACE• CRAFT PROGRAMS• SEWING CLASSES

GROUP STUDY & CO-WORKING

ACTIVE LEARNING ROOM(20-30)

GS

OUTDOOR PLAY

LIBRARY LEARNING CENTER

RENOVATION FOR TEACHING FORMAT(NON MEASURE S FUNDED)

20 - 40 SEATS

GROUP GATHERING

(2-4)

STOR.

RIPARIAN BUFFER

TO POOL TO FOREST

GALLERY WALL

STORAGE

FLEXIBLE OUTDOOR PROGRAM AREA

GS(2-4)

GS(6-10)

LOCATION FOR CONCESSION STAND / KIOSK

IMPROVED PATH BETWEEN B&G CLUB AND SIMPKINS

CHILD CARE(NON MEASURE S FUNDED)

STORAGE

PLAZA AND FLEXIBLE EVENT SPACE

ENTRY

STOR

6 4

ACOUSTIC SCREENING

PROJECT PHASING

FUTURE PHASES

CURRENT PHASE

Page 2: PROJECT PHASING - dontburythelibrary.weebly.com › uploads › 1 › 2 › 6 › 7 › 126754… · santa cruz public libraries & county parks department n design concept existing

CONCEPTUAL LAYOUT DIAGRAMMAY 28, 2019

SANTA CRUZ LIVE OAK LIBRARY ANNEX

SANTA CRUZ PUBLIC LIBRARIES & COUNTY PARKS DEPARTMENT

N

DESIGN CONCEPT

ENTRY

POOL LOCKERS

POOL STAFF

(W)

ELEC.

ELEC.KITCHEN

STOR.

SERVICE

1

2

73

ROCK CLIMBING WALL (NON MEASURE S FUNDED)

COVERED OUTDOOR SPACE

DROP OFF

RECEPTION

BOOK LOCKERS & SHELVING

KIDS’ CORNER

INTERIOR COMFORTABLE SEATING

LAPTOP BAR

PUBLIC COMPUTERS

FRIENDS STORE

1

2

3

4

5

6

7

BOYS & GIRLS CLUB

LOW FENCING

GROUP STUDY & CO-WORKING

ACTIVE LEARNING ROOM(20-30)

GS

OUTDOOR PLAY

RENOVATION FOR TEACHING FORMAT(NON MEASURE S FUNDED)

GROUP GATHERING

(2-4)

STOR.

RIPARIAN BUFFER

TO POOL TO FOREST

GALLERY WALL

STORAGE

FLEXIBLE OUTDOOR PROGRAM AREA

GS(2-4)

GS(6-10)

LOCATION FOR CONCESSION STAND / KIOSK

IMPROVED PATH BETWEEN B&G CLUB AND SIMPKINS

CHILD CARE(NON MEASURE S FUNDED)

80-120 SEATS

FLEXIBLE MULTI-PURPOSE ROOMS :

• COMMUNITY MEETING• VOTING PRECINCT• BANQUET• ART SHOW

PLAZA AND FLEXIBLE EVENT SPACE

STORAGE

STOR

ACOUSTIC SCREENING

EXISTING COMMUNITY CENTER ROOMS UPGRADED AND LIBRARY ADDITION AT FRONT OF BUILDING

6 4

CURRENT PHASE

FUTURE PHASES

PROJECT PHASING

LIBRARY LEARNING CENTER

Page 3: PROJECT PHASING - dontburythelibrary.weebly.com › uploads › 1 › 2 › 6 › 7 › 126754… · santa cruz public libraries & county parks department n design concept existing

CONCEPTUAL LAYOUT DIAGRAMMAY 28, 2019

SANTA CRUZ LIVE OAK LIBRARY ANNEX

SANTA CRUZ PUBLIC LIBRARIES & COUNTY PARKS DEPARTMENT

N

DESIGN CONCEPT

POOL LOCKERS

POOL STAFF

(W)

ELEC.

ELEC.KITCHEN

STOR.

SERVICE

1

2

73

ROCK CLIMBING WALL (NON MEASURE S FUNDED)

COVERED OUTDOOR SPACE

DROP OFF

RECEPTION

BOOK LOCKERS & SHELVING

KIDS’ CORNER

INTERIOR COMFORTABLE SEATING

LAPTOP BAR

PUBLIC COMPUTERS

FRIENDS STORE

1

2

3

4

5

6

7

BOYS & GIRLS CLUB

LOW FENCING

PLAZA AND FLEXIBLE EVENT SPACE

GROUP STUDY & CO-WORKING

ACTIVE LEARNING ROOM(20-30)

GS

OUTDOOR PLAY

RENOVATION FOR TEACHING FORMAT(NON MEASURE S FUNDED)

GROUP GATHERING

ACOUSTIC SCREENING

(2-4)

STOR.

RIPARIAN BUFFER

TO POOL TO FOREST

GALLERY WALL

PRESENTATION WALL

FLEXIBLE OUTDOOR PROGRAM AREA

GS(2-4)

GS(6-10)

LOCATION FOR CONCESSION STAND / KIOSK

IMPROVED PATH BETWEEN B&G CLUB AND SIMPKINS

CHILD CARE(NON MEASURE S FUNDED)

100-150 SEATS

FLEXIBLE MULTI-PURPOSE ROOMS :

• CONFERENCE• PERFORMANCE• LARGE GROUP TRAINING• MOVIE NIGHT

ENTRY

STORAGE

STOR

EXISTING COMMUNITY CENTER ROOMS UPGRADED AND LIBRARY ADDITION AT FRONT OF BUILDING

6 4

CURRENT PHASE

FUTURE PHASES

PROJECT PHASING

LIBRARY LEARNING CENTER

Page 4: PROJECT PHASING - dontburythelibrary.weebly.com › uploads › 1 › 2 › 6 › 7 › 126754… · santa cruz public libraries & county parks department n design concept existing

CONCEPTUAL LAYOUT DIAGRAMMAY 28, 2019

SANTA CRUZ LIVE OAK LIBRARY ANNEX

SANTA CRUZ PUBLIC LIBRARIES & COUNTY PARKS DEPARTMENT

N

PROJECT PHASING

EXISTING COMMUNITY CENTER ROOMS UPGRADED AND LIBRARY ADDITION AT FRONT OF BUILDING

POOL LOCKERS

POOL STAFF

(W)

ELEC.

SERVICE

BOYS & GIRLS CLUB

CURRENT PHASE :

•LIBRARY ADDITION•NORTH PLAZA AND ENTRY•UPGRADING EXISTING COMMUNITY ROOMS•ACTIVE LEARNING ROOM•IMPROVED CONNECTION TO B&G CLUB•SECONDSTORYWINDOWS/ROOFMONITOR

FUTURE PHASE :

•LANDSCAPE@SOUTHEND•CHILD CARE•OUTDOOR STORY TIME & PLAY•LOBBY IMPROVEMENTS•ROCK CLIMBING WALL•TRASH ENCLOSURE DEMOLITION•KITCHEN RENOVATION

LIBRARY LEARNING CENTER1850 SF

STOR.

RIPARIAN BUFFER

TO POOL TO FOREST

FUTURE PHASE

(M)

CURRENT PHASE

EXISTING INTERIOR

RENOVATION3540 SF

PLAZA AND FLEXIBLE

EVENT SPACE13200 SF

LOBBY1200 SF

CHILD CARE510 SF

KITCHEN + STORAGE

660 SFSOUTH PLAZA

7100 SF