project watch – kuwait * energy ventures business 11 watch... · resized advert ogn.pdf 1...

1
*Sources: DMS Projects EP: Engineering & Procurement PROJECT FACILITY BUDGET ($M) STATUS KGOC - Al Khafji Gas and Condensate Export Pipeline Gas 2,000 Construction KGOC - Wafra Central Gas Utilization Project Gas Processing 1,000 EPC ITB KGOC - Wafra Main Gathering Center Gas Gathering Centre 200 Shelved KNPC - Mina Abdulla Refinery Sulphur Recovery Units Sulphur Recovery 1,000 Shelved KNPC - Al Zour LNG Import and Regasification Terminal Liquefied Natural Gas (LNG) 3,330 E & P KNPC - Al Zour New Refinery - Overview Petroleum Oil Refinery 15,500 Construction KNPC - Al Zour New Refinery - Package 1 (Main Process Plant) Petroleum Oil Refinery 3,000 Construction KNPC - Al Zour New Refinery - Package 2 (Support Process Plant) Petroleum Oil Refinery 3,000 Construction KNPC - Al Zour New Refinery - Package 3 (Utilities and Offsites) Offsites & Utilities 3,000 Construction KNPC - Al Zour New Refinery - Package 4 (Tankage) Oil Storage Tanks 3,000 Construction KNPC - Al Zour New Refinery - Package 5 (Marine Facilities) Petroleum Oil Refinery 850 Construction KNPC - Clean Fuels Project - Mina Abdulla Refinery - Phase 1 Petroleum Oil Refinery 4,000 Construction KNPC - Clean Fuels Project - Mina Abdulla Refinery - Phase 2 Petroleum Oil Refinery 4,000 Construction KNPC - Clean Fuels Project - Mina Abdulla Refinery Oil Processing Units Petroleum Oil Refinery 550 Construction KNPC - Clean Fuels Project - Mina Al Ahmadi Refinery - Phase 3 Petroleum Oil Refinery 5,000 Construction KNPC - Clean Fuels Project - Mina Al Ahmadi Refinery Substation Upgrades Substations 71.8 Construction KNPC - Discharge of Treated Effluent Pipeline 100 On Hold KNPC - Expansion of Ahmadi Depot Oil Storage Tanks 250 Construction KNPC - Kuwait Clean Fuels Project - Overview Petroleum Oil Refinery 13,000 Construction KNPC - Matlaa New Depot Oil Storage Tanks 500 EPC ITB KNPC - Mina Abdulla Debottlenecking of Coke Unit 20 Petroleum Oil Refinery 100 EPC ITB KNPC - Mina Abdulla Refinery Flare Gas Recovery Unit Petroleum Oil Refinery 100 Construction KNPC - Mina Al Ahmadi Refinery Fifth Gas Train Gas Production 2,000 Construction KNPC - Mina Al Ahmadi Refinery High Integrated Pressure Protection for Gas Units Gas Processing 150 Shelved KNPC - Mina Al Ahmadi Refinery Sulphur Recovery Units Sulphur Recovery 50 Shelved KNPC - Mina Al Ahmadi Sulphur Handling Facilities Sulphur Recovery 100 EPC ITB KNPC - Mutla Ridge Project Oil Storage Tanks 1,000 Shelved KOC - Wara Pressure Maintenance Contract Oil Field Development 500 Shelved KOC - Ahmadi Marine Small Boat Harbour Ship Yard 500, Construction KOC - Al Zour New Refinery Crude Oil Pipeline Oil 800 EPC ITB KOC - Exxon Mobil Corporation - Ratqa Lower Fars Heavy Oil Handling Facilities - Drilling Package Oil Field Development 500 Construction KOC - Jurassic Production Facilities Off-Plot Works Oil Field Development 300 EPC ITB KOC - Kuwait Bay and Divided Zone Offshore Exploration Exploration 900 E & P KOC - Kuwait Environmental Remediation Program (KERP) - North Package Oil & Gas Field 100 Construction KOC - Kuwait Environmental Remediation Program (KERP) - Overview Oil & Gas Field 300 Construction KOC - North Kuwait Gathering Center (GC) 32 Gas Gathering Centre 2,000 EPC ITB KOC - North Kuwait High Pressure Flowlines for Jurassic Wells Flowlines 230 Construction PROJECT WATCH – KUWAIT * *

Upload: ngonhu

Post on 28-Jul-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT WATCH – KUWAIT * Energy Ventures Business 11 watch... · resized advert OGN.pdf 1 8/31/2016 10:36:54 AM INDEPENDENT private equity firm Energy Ventures has earmarked $200

11Business

*Sources: DMS ProjectsEP: Engineering & Procurement

COMPANY NEWS

November 14 - 20, 2016

PROJECT FACILITY BUDGET ($M) STATUSKGOC - Al Khafji Gas and Condensate Export Pipeline Gas 2,000 ConstructionKGOC - Wafra Central Gas Utilization Project Gas Processing 1,000 EPC ITBKGOC - Wafra Main Gathering Center Gas Gathering Centre 200 ShelvedKNPC - Mina Abdulla Refinery Sulphur Recovery Units Sulphur Recovery 1,000 ShelvedKNPC - Al Zour LNG Import and Regasification Terminal Liquefied Natural Gas (LNG) 3,330 E & PKNPC - Al Zour New Refinery - Overview Petroleum Oil Refinery 15,500 ConstructionKNPC - Al Zour New Refinery - Package 1 (Main Process Plant) Petroleum Oil Refinery 3,000 ConstructionKNPC - Al Zour New Refinery - Package 2 (Support Process Plant) Petroleum Oil Refinery 3,000 ConstructionKNPC - Al Zour New Refinery - Package 3 (Utilities and Offsites) Offsites & Utilities 3,000 ConstructionKNPC - Al Zour New Refinery - Package 4 (Tankage) Oil Storage Tanks 3,000 ConstructionKNPC - Al Zour New Refinery - Package 5 (Marine Facilities) Petroleum Oil Refinery 850 ConstructionKNPC - Clean Fuels Project - Mina Abdulla Refinery - Phase 1 Petroleum Oil Refinery 4,000 ConstructionKNPC - Clean Fuels Project - Mina Abdulla Refinery - Phase 2 Petroleum Oil Refinery 4,000 ConstructionKNPC - Clean Fuels Project - Mina Abdulla Refinery Oil Processing Units Petroleum Oil Refinery 550 ConstructionKNPC - Clean Fuels Project - Mina Al Ahmadi Refinery - Phase 3 Petroleum Oil Refinery 5,000 ConstructionKNPC - Clean Fuels Project - Mina Al Ahmadi Refinery Substation Upgrades Substations 71.8 ConstructionKNPC - Discharge of Treated Effluent Pipeline 100 On HoldKNPC - Expansion of Ahmadi Depot Oil Storage Tanks 250 ConstructionKNPC - Kuwait Clean Fuels Project - Overview Petroleum Oil Refinery 13,000 ConstructionKNPC - Matlaa New Depot Oil Storage Tanks 500 EPC ITBKNPC - Mina Abdulla Debottlenecking of Coke Unit 20 Petroleum Oil Refinery 100 EPC ITBKNPC - Mina Abdulla Refinery Flare Gas Recovery Unit Petroleum Oil Refinery 100 ConstructionKNPC - Mina Al Ahmadi Refinery Fifth Gas Train Gas Production 2,000 ConstructionKNPC - Mina Al Ahmadi Refinery High Integrated Pressure Protection for Gas Units Gas Processing 150 ShelvedKNPC - Mina Al Ahmadi Refinery Sulphur Recovery Units Sulphur Recovery 50 ShelvedKNPC - Mina Al Ahmadi Sulphur Handling Facilities Sulphur Recovery 100 EPC ITBKNPC - Mutla Ridge Project Oil Storage Tanks 1,000 ShelvedKOC - Wara Pressure Maintenance Contract Oil Field Development 500 ShelvedKOC - Ahmadi Marine Small Boat Harbour Ship Yard 500, ConstructionKOC - Al Zour New Refinery Crude Oil Pipeline Oil 800 EPC ITBKOC - Exxon Mobil Corporation - Ratqa Lower Fars Heavy Oil Handling Facilities - Drilling Package Oil Field Development 500 ConstructionKOC - Jurassic Production Facilities Off-Plot Works Oil Field Development 300 EPC ITBKOC - Kuwait Bay and Divided Zone Offshore Exploration Exploration 900 E & PKOC - Kuwait Environmental Remediation Program (KERP) - North Package Oil & Gas Field 100 ConstructionKOC - Kuwait Environmental Remediation Program (KERP) - Overview Oil & Gas Field 300 ConstructionKOC - North Kuwait Gathering Center (GC) 32 Gas Gathering Centre 2,000 EPC ITBKOC - North Kuwait High Pressure Flowlines for Jurassic Wells Flowlines 230 Construction

PROJECT WATCH – KUWAIT *

KOC – North Kuwait Manifold Gathering System*

Fertilizer

IndustrialInfrastructure

MiningConstruction

Gas

Refining

Oil

Pipeline

Petrochemicals

Renewables

Power

Offshore

Water

SECTORS COVERED

SUBSCRIBE TODAY

• Tel: +973 1740 5590 • [email protected]• www.dmsprojects.net

Contact us for further information A Division of

REGIONS COVERED

• China• Europe

• India• Asia Pacific

• Latin America• Middle East

• East Africa• North Africa• West Africa

• Central America• North America

• Russia & CIS

resized advert OGN.pdf 1 8/31/2016 10:36:54 AM

INDEPENDENT private equity firm Energy Ventures has earmarked $200 million to help boost North Sea businesses during challenging times for the oil and gas industry.

The organisation is looking to invest in companies which need access to finance to stabilise their company or to help with continued growth.

Tomas Hvamb, Energy Ventures’ Aberdeen-based investment direc-tor, said: “Energy Ventures is one of the few oil and gas private equity funds investing at this time. In the past 20 months we have made three platform investments in the North Sea and a total of 11 investments including add-ons in the same period.

“The additional funding of $200 million which we have set aside is testament to the commitment we have to the area. We believe in the North Sea and the opportunities it continues to offer for domestic and international growth.

“We look to partner with talented management teams in service and technology companies with high growth potential and seek to invest between $10m-$40m in each company.

“Energy Ventures will invest in proven companies where we can see where our capital can provide a strong capital base to support the company and management in their next growth phase. At a time when activity levels in the industry have been down, many companies are under pressure from the banks to de-lever their balance sheet and we can assist in this.

“By providing additional working capital and by working in partner-ship with them, we can help them move forward positively, while in-vesting in their future.”

Energy Ventures is an independent private equity firm actively seek-ing investment in companies that deliver a marketable, proprietary product or service with potential in the upstream sector.

From initial investment to exit, the firm partners with portfolio com-panies to ensure the effective use of capital and expertise.

Greg Herrera, one of the firm’s partners, said: “Energy Ventures has a proven track record of investing in high growth companies.”

Energy Ventures to invest $200m

Name of Client : KOC - Kuwait Oil CompanyBudget : $2,5 billionFacility type : Gas Gathering CentreSector : GasStatus : ConstructionLocation : Northern KuwaitFeed : AMECPMC : AMECMain Contractor : Dodsal, Petrofac, L&T – Larsen & ToubroBackground

Kuwait’s oil fields are connected to 26 gathering centers, which serve as a collection location for crude produced at several wells connected by flowlines, pro-viding initial treatment through the separation of asso-ciated gas and removing salt. The three new gathering centres are needed as part of KOC’s long-term strategy to develop the oil fields of North Kuwait. Project status

October 2016:The overall construction works have reached 40 per cent completed. The work on three Gathering Centers are still on schedule to be complet-ed by December 2017. Project scope

The scope of the project involves the construction of 3 gathering centers. Each GC will be designed to handle up-to 100 BPD and up-to 240 MBWPD of wa-ter and 60 MMSCFD of associated gas. Each of the

gathering centers has to be able to meet the following criteria: • Produce oil at 100bpd • Handle water up to a rate of 240MBWPD • Handle gas from wet fluids at upto 60MMSCFD • Oil product must meet the Kuwait exports crude re-quirement • Export water to the central injection pumping facili-ties or disposal • Export gas to lower pressure to BS131 and or BS132 for compression Each of the facilities will be divided into 6 main pro-cess systems: • Gas / Liquid Separation • Oil / Water Separation • Dehydration and desalting • Tank gas compression and gas handling • Crude oil storage and transfer • Effluent water treatment and handling Project financeThe Kuwait Oil Company (KOC) is the client.

Project schedule Feasibility Study Q1-2011EPC ITB Q1-2014Engineering & Procurement Q3-2014Construction Q4-2015Completion Q4-2017