EL-TC 27.4.2005. 1. Overview 2. Photos of old installation 3. Outline of new project 4. Budget 5. Conclusions. Proposal for Renovation Project b. 151. K. KAHLE, TS-EL. 1. Project Overview. b. 151. PS Test (2006). ME6. 3 MeV (2006). LEIR (2005). LINAC 4 (2008). b. 152. b. 150. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Proposal for Renovation Project b. 151

Proposal for Renovation Project b. 151

K. KAHLE, TS-EL

EL-TC 27.4.2005

1. Overview

2. Photos of old installation

3. Outline of new project

4. Budget

5. Conclusions

Page 2: Proposal for Renovation Project b. 151

1. Project Overview

b. 151

b. 152b. 150

LEIR(2005)

3 MeV(2006)

PS Test(2006)

LINAC 4(2008)

ME6

Page 3: Proposal for Renovation Project b. 151

1. Overview

Hall 151:

-Test of PS magnets

- Test of RF equipment

Page 4: Proposal for Renovation Project b. 151

2. Old installation

EBD13*SHC - obsolete

Page 5: Proposal for Renovation Project b. 151

2. Old installation

EBD11*SHC - obsolete

Page 6: Proposal for Renovation Project b. 151

2. Old installation

EBD30 and EBD31*SHC - obsolete

Page 7: Proposal for Renovation Project b. 151

2. Old installation

Disconnected OIL CABLE in the cable duct

Page 8: Proposal for Renovation Project b. 151

2. Old installation

Old switchboard, disconnected

Page 9: Proposal for Renovation Project b. 151

2. Old installation

Spaghetti Bolognese

Page 10: Proposal for Renovation Project b. 151

2. Old installation

The purple snake

Page 11: Proposal for Renovation Project b. 151

2. Old installation

Socket box - obsolete

Page 12: Proposal for Renovation Project b. 151

3. Outline of new project

- dismantle obsolete switchboards (ERD30*SHC, ERD31*SHC, EBD11*SHC, EBD13*SHC, EBD14*SHC)

- NEW: one single switchboard 1000A (type EBD)- existing incoming cables remain (200m x 11 PVC 240 Cu from b.264)- this would free feeders from s/st ME6

-OPTION: -one large switchboard ERD + one switchboard EBD for Gen. Serv.

- clean all cable ducts, dismantle unused cables- replace all outgoing cables from the new switchboard - remove all oil cables in the zone

Page 13: Proposal for Renovation Project b. 151

4. Budget

Work kCHF

Dismantling of old switchboards 10

New single switchboard EBD, incl. installation 30

Support structure for new switchboard or false floor 7

Dismantling of oil cables 20

Dismantling of old and unused cables in the cable ducts 10

Adaptation of 11 incoming feeder cables (extensions, joints, terminations)

5

New cabling (outgoing feeders) 18

New cable ladders, where necessary 3

Documentation 5

Contingency for “bad surprises” (will certainly be needed!) 10

Total 118

Page 14: Proposal for Renovation Project b. 151

5. Conclusion

- Project is necessary: Safety Reasons

- Project Duration 6 months

- no manpower available

- Project is defined now

- START depending on available manpower + budget

Page 15: Proposal for Renovation Project b. 151

Questions ?

Thank you.