proposed 11kv submarine cables replacement … 11kv submarine cables replacement connecting liu ko...

13
The world’s leading sustainability consultancy Proposed 11kV Submarine Cables Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O 20 th White-bellied Sea Eagle Impact Monitoring Survey Report 13 June 2016 Environmental Resources Management 16/F Berkshire House 25 Westlands Road Quarry Bay, Hong Kong Telephone 2271 3000 Facsimile 2723 5660 www.erm.com REPORT

Upload: ngodien

Post on 22-Apr-2018

221 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Proposed 11kV Submarine Cables Replacement … 11kV Submarine Cables Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O 20th White-bellied Sea Eagles Impact Monitoring

The world’s leading sustainability consultancy

Proposed 11kV Submarine Cables

Replacement Connecting Liu Ko Ngam

and Pak Sha Tau Tsui at Kat O

20th White-bellied Sea Eagle Impact Monitoring Survey Report

13 June 2016 Environmental Resources Management 16/F Berkshire House

25 Westlands Road

Quarry Bay, Hong Kong

Telephone 2271 3000

Facsimile 2723 5660

www.erm.com

REPORT

Page 2: Proposed 11kV Submarine Cables Replacement … 11kV Submarine Cables Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O 20th White-bellied Sea Eagles Impact Monitoring

Proposed 11kV Submarine Cables

Replacement Connecting Liu Ko

Ngam and Pak Sha Tau Tsui at Kat O

20th White-bellied Sea Eagles Impact Monitoring Survey Report

Document Code: 0259952 _20th WBSE impact monitoring_v0.doc

Environmental Resources

Management

16/F Berkshire House

25 Westlands Road

Quarry Bay, Hong Kong

Telephone: (852) 2271 3000

Facsimile: (852) 2723 5660

E-mail: [email protected]

http://www.erm.com

Client:

CLP Power Hong Kong Limited (CLP)

Project No:

0259952

Summary: Date:

13 June 2016

This document presents the 20th impact monitoring for White-

bellied Sea Eagles for the proposed 11kV Submarine Cables

Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at

Kat O.

Approved by:

Terence Fong

Partner

v0 20th White-bellied Sea Eagles Impact Monitoring Survey Report EL FZ TF 13/6/16

Revision Description By Checked Approved Date

This report has been prepared by Environmental Resources Management the trading name of ‘ERM Hong-Kong, Limited’, with all reasonable skill, care and diligence within the terms of the Contract with the client, incorporating our General Terms and Conditions of Business and taking account of the resources devoted to it by agreement with the client.

We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above.

This report is confidential to the client and we accept no responsibility of whatsoever nature to third parties to whom this report, or any part thereof, is made known. Any such party relies on the report at their own risk.

Distribution

Internal

Public

Confidential

Page 3: Proposed 11kV Submarine Cables Replacement … 11kV Submarine Cables Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O 20th White-bellied Sea Eagles Impact Monitoring

Proposed 11kV Submarine Cables Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O - Environmental Monitoring & Audit

Environmental Certification Sheet

EP-461/2013

Reference Document/Plan

Document/Plan to be Certified/ Verified: Twentieth Weekly White-bellied Sea Eagle Impact Monitoring Survey Report

Date of Report: 13 June 2016

Date prepared by Environmental Team: 13 June 2016

Date received by IC: 13 June 2016

Reference EP Requirement

EP Condition: Condition No. 2.3 Content: White-bellied Sea Eagle Monitoring

2.3 A monitoring programme on the White-bellies Sea Eagles shall be submitted to the Director for approval no later

than 3 months before commencement of the Project. The applicant shall confirm that no breeding or nesting

activities of WBSE at or in the vicinity of the cable landing sites and locations of the proposed electricity poles

before commencement of works. During the works period, the monitoring works shall be continued to address

and minimize any disturbance impacts found.

IC Verification

I hereby verify that the above referenced document/plan complies with the above referenced condition of EP-461/2013.

Terence Fong,

Independent Checker

Date: 13 June 2016

Page 4: Proposed 11kV Submarine Cables Replacement … 11kV Submarine Cables Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O 20th White-bellied Sea Eagles Impact Monitoring

CONTENTS

1 INTRODUCTION 1

1.1 BACKGROUND 1 1.2 WHITE-BELLIED SEA EAGLE MONITORING REQUIREMENTS OF THE PROJECT 1 1.3 PURPOSE OF THE 20TH IMPACT MONITORING SURVEY REPORT FOR THE WBSE 2

2 WBSE MONITORING METHODOLOGY 3

3 FINDINGS OF THE IMPACT MONITORING 4

Page 5: Proposed 11kV Submarine Cables Replacement … 11kV Submarine Cables Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O 20th White-bellied Sea Eagles Impact Monitoring

ENVIRONMENTAL RESOURCES MANAGEMENT CLP POWER

0259952_20TH WBSE IMPACT MONITORING_V0.DOC 13 JUNE2016

1

1 INTRODUCTION

1.1 BACKGROUND

CLP Power Hong Kong Limited (CLP) is planning to enhance the security of

power supply to Kat O Island (Crooked Island). At present, there is only one

set of 11 kV submarine cable circuit connecting between Liu Ko Ngam and Kat

O. The existing 11 kV submarine cable is, however, more than 30 years old

and deteriorating. This will consequently limit the continuous supply of the

electricity in the future to Kat O Island. CLP is therefore planning to replace

the existing 11 kV submarine cable connecting Liu Ko Ngam to Pak Sha Tau

Tsui, Kat O, to ensure continuous electricity supply on the island (Figure 1.1).

The Project involves the installation of an 11kV cable circuit consisting of two

individual cables, with an intended burial depth up to 5 m for the submarine

cable section and about 1 m for the land section. The two submarine cables

(except the shore end sections which will be of only about 1 m separation and

joining into a single cable trench at each landing site) will be 30 m away from

each other and running parallel along the alignment. In areas (especially

near the landing site) where the cable burial depth does not meet the

requirements due to seabed geotechnical constraints, a protective cover such

as a concrete slab will be adopted. The total length of the proposed cable

alignment is approximately 880 m.

The cable laying process will only require minor works within the marine

environment. Only small scale construction works are required onshore at

each of the cable landing sites, i.e. Liu Ko Ngam and Pak Sha Tau Tsui, for

connecting the submarine cable with existing overhead land cable systems.

1.2 WHITE-BELLIED SEA EAGLE MONITORING REQUIREMENTS OF THE PROJECT

Environmental assessment has been carried out as part of the Project Profile

required under the Environmental Impact Assessment Ordinance (EIAO). An

Environmental Permit (EP) was issued by Environmental Protection

Department (EPD) on 27th August 2013 for the Project (EP-461/2013) (1) , which

links directly to the Environmental Monitoring and Audit (EM&A)

programme as well as the mitigation measures set out and agreed in the

approved Project Profile (PP-489/2013) (2).

According to Agriculture, Fisheries and Conservation Department (AFCD),

there was one pair of White-bellies Sea Eagles (WBSE) and a nesting site

recorded at the south-western side of Yeung Chau, in the vicinity of the

Project Site, in 2008/9 (Hong Kong Biodiversity Issue No. 18 February 2010) as

(1) Environmental Permit No. EP-461/2013. Available at :

http://www.epd.gov.hk/eia/register/permit/latest/ep4612013.htm

(2) ERM (2013) Replacement of the Existing 11KV Submarine Cable Circuit Connecting Liu Ko Ngam and Pak Sha

Tau Tsui at Kat O – Project Profile submitted for Applications for Permission to Apply Directly for an

Environmental Permit (PP-489/2013). Available at

http://www.epd.gov.hk/eia/register/profile/latest/dir229/dir229.pdf

Page 6: Proposed 11kV Submarine Cables Replacement … 11kV Submarine Cables Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O 20th White-bellied Sea Eagles Impact Monitoring

EnvironmentalResourcesManagement

Alignment of the Proposed 11kV Submarine Cable Circuit from Liu Ko Ngam to Pak Sha Tau Tsui

Figure 1.1

File: T:\GIS\CONTRACT\0259952\Mxd\0259952_Proposed_Cable_Alignment.mxdDate: 24/11/2014

´0 200100

Metres

CROOKED ISLAND(KAT O)

CROOKED HARBOUR(KAT O HOI)

TSINGCHAULEK

TSINGCHAU

Sai LauKong

LIU KONGAM

PAK SHATAU TSUI

connect to Sai Lau Kong

Existing Pipelines Identified by Marine Magnetic Survey

Key

Existing Submarine Water Main (As Built)

Proposed 11kV Submarine Cable Circuit

Existing 11kV Submarine Cable (As built)

Proposed Overhead Line

Existing 11kV Electric Pole and Overhead Line

Proposed 11kV Electric Pole and Underground Cable

Page 7: Proposed 11kV Submarine Cables Replacement … 11kV Submarine Cables Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O 20th White-bellied Sea Eagles Impact Monitoring

ENVIRONMENTAL RESOURCES MANAGEMENT CLP POWER

0259952_20TH WBSE IMPACT MONITORING_V0.DOC 13 JUNE2016

2

well as in 2011/12 and 2012/13 (AFCD comments on Project Profile, dated 6

and 11 June 2013) and a recent study showed this species has a long post-

fledging period (up to about May) and a wide flight range.

EP Condition 2.3 states “A monitoring programme on the White-bellies Sea Eagles

shall be submitted to the Director for approval no later than 3 months before

commencement of the Project. The applicant shall confirm that no breeding or

nesting activities of WBSE at or in the vicinity of the cable landing sites and locations

of the proposed electricity poles before commencement of works. During the works

period, the monitoring works shall be continued to address and minimize any

disturbance impacts found.”

The Monitoring Programme for White-bellied Sea Eagles (“Monitoring

Programme”) was submitted and approved by the Director of Environmental

Protection (DEP) on 12 August 2015. The baseline monitoring conducted on

7th November 2014, 13th, 26th March 2015, 28th and 30th October 2015 confirmed

there were no breeding or nesting activities of WBSE at, or in the vicinity of,

the cable landing sites and locations of the proposed electricity poles. A

WBSE was however observed flying above Cheung Pai Tau in November

2014, another one flying at the north of Pak Sha Tau in March 2015 and two

WBSEs flying above Wong Kok Tau in October 2015, as recorded in the

Monitoring Programme. As proposed in the Monitoring Programme, WBSE

impact monitoring would be conducted weekly after commencement of

works.

1.3 PURPOSE OF THE 20TH IMPACT MONITORING SURVEY REPORT FOR THE WBSE

This Impact Monitoring Survey Report for the WBSE is prepared in

accordance with the EP Condition 2.3 (EP-461/2013) presents the findings of

the WBSE monitoring during the reporting period from 30th May to 5th June

2016. This is the last Impact Monitoring Survey Report for the WBSE as all

land works were confirmed to be completed on 8th June 2016.

Page 8: Proposed 11kV Submarine Cables Replacement … 11kV Submarine Cables Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O 20th White-bellied Sea Eagles Impact Monitoring

ENVIRONMENTAL RESOURCES MANAGEMENT CLP POWER

0259952_20TH WBSE IMPACT MONITORING_V0.DOC 13 JUNE2016

3

2 WBSE MONITORING METHODOLOGY

The 20th WBSE impact monitoring survey was conducted on 3rd June 2016.

The monitoring survey was conducted along transects by observation on

vessel at the two landing sites and on land at Liu Ko Ngam and Pak Sha Tau

Tsui. Equipment used for the monitoring included binoculars with 10x

magnification. All the activities of the White-bellied Sea Eagles, including

breeding, incubation, feeding, perching/ roosting, preening, soaring, flying

and territorial guarding, observed within the Monitoring Area and along the

transects (Figures 2.1-2.3) were recorded, including time spent for each of the

activities. Active search of nest of WBSE at the two landing sites was

conducted during the survey. The flying paths and locations of any WBSE

observed were recorded.

Page 9: Proposed 11kV Submarine Cables Replacement … 11kV Submarine Cables Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O 20th White-bellied Sea Eagles Impact Monitoring

PAK SHA TAU TSUI

LIU KO NGAM

CROOKED ISLAND(KAT O)

O PUI TONG

TSING CHAU

KAT O HOI

AP CHAU HOI

AP CHAU

SAI LAU KONG

Connect toSai Lau Kong

TSING CHAU LEK

Existing Pipelines Identified by Marine Magnetic Survey

YEUNG CHAU

CHEUNGPAI TAU

EnvironmentalResourcesManagement

WBSE Monitoring Area for the Proposed 11kV Submarine Cable Circuit from Liu Ko Ngam to Pak Sha Tau Tsui

Figure 2.1

File: T:\GIS\CONTRACT\0259952\Mxd\0259952_WBSE_Monitoring_Area.mxdDate: 21/7/2015

Legend

Existing Submarine Water Main (As Built)

Proposed 11kV Submarine Cable

Proposed 11kV Electric Pole and Underground Cable

Proposed Overhead Line

Existing 11kV Submarine Cable (As built)

Existing 11kV Electric Pole and Overhead Line

Marine Route Survey Transect

500m WBSE Monitoring Area 0 1,000500Meters´

Page 10: Proposed 11kV Submarine Cables Replacement … 11kV Submarine Cables Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O 20th White-bellied Sea Eagles Impact Monitoring

20

20

40

40

60

80

60

40

40

20

60

80

80

60

40

20

20

20

40

20

20

40

20

G

G

G

G

Flat Rock

Flat Rock

HW

M

Flat

Rock

HW

M

Flat Rock

Fla

t Rock

Flat R

ock

FlatRock

Flat R

ock

Flat R

ock

Flat Rock

Flat Rock

86.3

79.9

87.8

73.5

78.6

19.5

17.1

17.7

27.1

37.8

41.1

E

E

E

E

E

E

E

E

E

E

E

E

20

HWM

Flat Rock

24.1

13.1

E

E

E

Liu Ko Ngam

EnvironmentalResourcesManagementFile: T:\GIS\CONTRACT\0259952\Mxd\0259952_Habitat_Liu_Ko_Ngam.mxd

Date: 7/6/2016

Coastal Vegetation

Shrubby Grassland

Young Woodland

Current Conditions of the Landing Site at Liu Ko Ngam (Photo captured in June 2016)

WBSE Monitoring Area at Liu Ko Ngam Landing Point

Figure 2.2

Legend

Existing Submarine Water Main (As Built)

Proposed 11kV Submarine Cable

Survey Transect

Proposed 11kV Electric Pole and Underground Cable

Proposed Overhead Line

Existing 11kV Submarine Cable (As built)

Existing 11kV Electric Pole and Overhead Line

500m WBSE Monitoring Area

Habitat

Coastal Vegetation

Shrubby Grassland

Young Woodland 0 200100Meters

´

Page 11: Proposed 11kV Submarine Cables Replacement … 11kV Submarine Cables Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O 20th White-bellied Sea Eagles Impact Monitoring

20

4

6

10

Flat Rock

HWM

Flat

Rock

5.2

4.3

11.67.910.4

2.4

E

20

20

40

40

60

20

40

60

80

100

80100

60

40

20

40

60

40

40

6

40

20

20

G

G

G

G

G

G

Flat Rock

Flat Rock

HW

M

Flat

Roc

k

HWM

Fla

t R

ock

Flat

Rock

52.4

50.6

37.5

68.0

66.1

119.8

57.6

60.4

57.6

45.4

23.8

E

Pak Sha Tau Tsui

EnvironmentalResourcesManagement

WBSE Monitoring Area at Pak Sha Tau Tsui Landing Point

Figure 2.3

File: T:\GIS\CONTRACT\0259952\Mxd\0259952_Habitat_Pak_Sha_Tau_Tsui.mxdDate: 7/6/2016

Coastal Vegetation

Shrubland0 200100

Meters´

Legend

Existing Submarine Water Main (As Built)

Proposed 11kV Submarine Cable

Proposed 11kV Electric Pole and Underground Cable

Proposed Overhead Line

Existing 11kV Submarine Cable (As built)

Survey Transect

Existing 11kV Electric Pole and Overhead Line

500m WBSE Monitoring Area

Habitat

Coastal Vegetation

Shrubland

Current Conditions of the Landing Site at Pak Sha Tau Tsui(Photo captured in June 2016)

Page 12: Proposed 11kV Submarine Cables Replacement … 11kV Submarine Cables Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O 20th White-bellied Sea Eagles Impact Monitoring

ENVIRONMENTAL RESOURCES MANAGEMENT CLP POWER

0259952_20TH WBSE IMPACT MONITORING_V0.DOC 13 JUNE2016

4

3 FINDINGS OF THE IMPACT MONITORING

The 20th WBSE impact monitoring survey was conducted on 3rd June 2016.

The findings are presented below:

It is confirmed that there is no breeding or nesting activities of WBSE at

or in the vicinity of the cable landing sites and locations of the proposed

electricity poles; and

No WBSE was observed within the Monitoring Area or along the

transects on 3rd June 2016.

Page 13: Proposed 11kV Submarine Cables Replacement … 11kV Submarine Cables Replacement Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O 20th White-bellied Sea Eagles Impact Monitoring

ERM consulting services worldwide www.erm.com

ERM has over 100 offices

Across the following

countries worldwide

Argentina Malaysia Australia Mexico Azerbaijan The Netherlands Belgium Peru Brazil Poland Canada Portugal Chile Puerto Rico China Russia Colombia Singapore Ecuador South Africa France Spain Germany Sweden Hong Kong Taiwan Hungary Thailand India UK Indonesia US Ireland Vietnam Italy Venezuela Japan Kazakhstan Korea

ERM’s Hong Kong Office 16/F, Berkshire House 25 Westlands Road Quarry Bay, Hong Kong T: 2271 3000 F: 2723 5660 www.erm.com