proposed rezoning of the site from “other specified uses

44
Proposed Rezoning of the Site from “Other Specified Uses” annotated “Tunnel Ventilation Shaft” and “Government, Institution or Community” to “Commercial (9)” Zone at Nos. 3-5 San Ma Tau Street, Ma Tau Kok, Kowloon Task Force on Kai Tak Harbourfront Development | 29032018 Project Architect: Ronald Lu and Partners (Hong Kong) Ltd. Planning Consultant: Kenneth To & Associates Ltd. Traffic Consultant: MVA Hong Kong Ltd. Environmental Consultant: Ove Arup & Partners (Hong Kong) Ltd. Air Ventilation and Sewerage Consultant: Ramboll Environ Hong Kong Ltd. Structural Consultant: WSP

Upload: others

Post on 29-Apr-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Proposed Rezoning of the Site from “Other Specified Uses

Proposed Rezoning of the Site from “Other Specified Uses” annotated “Tunnel Ventilation Shaft” and

“Government, Institution or Community” to “Commercial (9)” Zone at Nos. 3-5 San Ma Tau Street, Ma Tau Kok, Kowloon

Task Force on Kai Tak Harbourfront Development | 29032018

Project Architect: Ronald Lu and Partners (Hong Kong) Ltd. Planning Consultant: Kenneth To & Associates Ltd.

Traffic Consultant: MVA Hong Kong Ltd. Environmental Consultant: Ove Arup & Partners (Hong Kong) Ltd.

Air Ventilation and Sewerage Consultant: Ramboll Environ Hong Kong Ltd. Structural Consultant: WSP

Page 2: Proposed Rezoning of the Site from “Other Specified Uses

2 Task Force on Kai Tak Harbourfront Development

1.0 The Site

2.0 From a Wider Context

3.0 Proposed Commercial / Office Development Scheme

4.0 Design Merits

5.0 Compliance with Harbourfront Planning Principles

Agenda

Page 3: Proposed Rezoning of the Site from “Other Specified Uses

3

1.0 The Site

2.0 From a Wider Context

3.0 Proposed Commercial / Office Development Scheme

4.0 Design Merits

5.0 Compliance with Harbourfront Planning Principles

Agenda

Task Force on Kai Tak Harbourfront Development

Page 4: Proposed Rezoning of the Site from “Other Specified Uses

Site Location

4 Task Force on Kai Tak Harbourfront Development

The Site

Source: Draft Kai Tak OZP No. S/K22/5

Page 5: Proposed Rezoning of the Site from “Other Specified Uses

Site Location & Existing Condition

5 Task Force on Kai Tak Harbourfront Development

1

2

1

2 Lucky Building

Kapok Industrial Building

Page 6: Proposed Rezoning of the Site from “Other Specified Uses

Surrounding Context

6 Task Force on Kai Tak Harbourfront Development

The Site

Grand Waterfront

Wyler Gardens

Cattle Depot Artists Village

Kowloon City Ferry Pier Bus Terminus

Gas Works of China Gas Company

“Thirteen Street”

Page 7: Proposed Rezoning of the Site from “Other Specified Uses

Zoning Context

7 Task Force on Kai Tak Harbourfront Development

• “G/IC” zone - due to discrepancy between zoning and lot boundaries

• Alignment of Central Kowloon Route (“CKR”)

underneath the Site

• Latest Central Kowloon Route (“CKR”) Design - Tunnel Ventilation Shaft no longer required at this location

• Metro Planning Committee Meeting of

Town Planning Board on 7 April 2017 - “Long term planning of the Site to be further reviewed.”

The Site

Source: Draft Kai Tak OZP No. S/K22/5

Zoning: “Other Specified Uses” annotated “Tunnel Ventilation Shaft” (Mainly) and “Government, Institution or Community” (thin strip along NE & SE) Zones

Page 8: Proposed Rezoning of the Site from “Other Specified Uses

8 Task Force on Kai Tak Harbourfront Development

1.0 The Site

2.0 From a Wider Context

3.0 Proposed Commercial / Office Development Scheme

4.0 Design Merits

5.0 Compliance with Harbourfront Planning Principles

Agenda

Page 9: Proposed Rezoning of the Site from “Other Specified Uses

Kai Tak Development

9 Task Force on Kai Tak Harbourfront Development

The Site

Source: Draft Kai Tak OZP No. S/K22/5 Urban Design Framework

Page 10: Proposed Rezoning of the Site from “Other Specified Uses

Waterfront Enhancement Proposal in Urban Renewal Plan for Kowloon City

10 Task Force on Kai Tak Harbourfront Development

The Site

• Kowloon City Ferry Pier – i) revitalize part of the pier as viewing point; ii) introducing commercial and dining service activities

• Two existing industrial buildings adjacent to

Kowloon City Public Transport Interchange (“PTI”) – planned for other uses to optimize land resources

• Comprehensive review of the PTI and two industrial building by taking into account the waterfront enhancement proposal by the CKR project

• The area can be planned for mixed residential and commercial uses

Source: Urban Renewal Plan for Kowloon City

Page 11: Proposed Rezoning of the Site from “Other Specified Uses

11 Task Force on Kai Tak Harbourfront Development

The Site Landscape Deck by CKR

Beautification Proposal for Ma Tau Kok Waterfront

Source: Highways Department

Landscape Deck and Beautification Proposal for Ma Tau Kok Waterfront by CKR Project

Page 12: Proposed Rezoning of the Site from “Other Specified Uses

12 Task Force on Kai Tak Harbourfront Development

1.0 The Site

2.0 From a Wider Context

3.0 Proposed Commercial / Office Development Scheme

4.0 Design Merits

5.0 Compliance with Harbourfront Planning Principles

Agenda

Page 13: Proposed Rezoning of the Site from “Other Specified Uses

Proposed Commercial / Office Development Scheme

13 Task Force on Kai Tak Harbourfront Development

Key Parameters

Site Area 2,038.09 m2

Plot Ratio 12.0

Maximum GFA (Non-

domestic)

Retail / Eating Place

Office

Not more than 24,457.08 m2

Not more than 5,978.49 m2

Not more than 18,478.59 m2

No. of Storey 23 storeys (including G/F) and

2 levels of basement

Building Height at Main Roof 100mPD

Maximum Site Coverage Not more than 62.5% (15m or

above)

No. of Block 1

Open Space Not less than 1,600 m2

Carparking Spaces

Private Car

Motorcycle

Loading/Unloading Bays

118 nos.

11 nos.

8 nos. (LGV)

4 nos. (HGV)

Landscape Master Plan

Master Layout Plan

Page 14: Proposed Rezoning of the Site from “Other Specified Uses

Ground Floor Plan

14 Task Force on Kai Tak Harbourfront Development

Page 15: Proposed Rezoning of the Site from “Other Specified Uses

Basement Plans

15 Task Force on Kai Tak Harbourfront Development

B2/F B1/F

Page 16: Proposed Rezoning of the Site from “Other Specified Uses

First Floor Plan

16 Task Force on Kai Tak Harbourfront Development

Page 17: Proposed Rezoning of the Site from “Other Specified Uses

Second Floor Plan

17 Task Force on Kai Tak Harbourfront Development

Possible connection point to future landscape deck under CKR

Page 18: Proposed Rezoning of the Site from “Other Specified Uses

Third Floor Plan

18 Task Force on Kai Tak Harbourfront Development

Page 19: Proposed Rezoning of the Site from “Other Specified Uses

Fourth to Sixteenth Floor Plan

19 Task Force on Kai Tak Harbourfront Development

Page 20: Proposed Rezoning of the Site from “Other Specified Uses

Seventeenth to Eighteenth Floor Plan

20 Task Force on Kai Tak Harbourfront Development

Page 21: Proposed Rezoning of the Site from “Other Specified Uses

Nineteenth to Twenty-Third Floor Plan

21 Task Force on Kai Tak Harbourfront Development

Page 22: Proposed Rezoning of the Site from “Other Specified Uses

Roof Floor Plan

22 Task Force on Kai Tak Harbourfront Development

Page 23: Proposed Rezoning of the Site from “Other Specified Uses

Section

23 Task Force on Kai Tak Harbourfront Development

Terraced Podium

Design

Page 24: Proposed Rezoning of the Site from “Other Specified Uses

Pedestrian Connection

24 Task Force on Kai Tak Harbourfront Development

San Ma Tau Street

Staircase at G/F connect to 2/F Podium Deck

Escalator connect to 1/F

G/F

Page 25: Proposed Rezoning of the Site from “Other Specified Uses

25 Task Force on Kai Tak Harbourfront Development

San Ma Tau Street

Staircase at G/F connect to 2/F Podium Deck

1/F

Pedestrian Connection

Escalator connect to 2/F

Page 26: Proposed Rezoning of the Site from “Other Specified Uses

26 Task Force on Kai Tak Harbourfront Development

San Ma Tau Street

Escalator connect to 1/F

Staircase at 2/F connect to 3/F Podium Deck

Staircase at G/F connect to 2/F Podium Deck

Potential Connection To PTI Landscape Deck

2/F

Pedestrian Connection

Page 27: Proposed Rezoning of the Site from “Other Specified Uses

27 Task Force on Kai Tak Harbourfront Development

San Ma Tau Street

Staircase at 2/F connect to 3/F Podium Deck

Staircase at G/F connect to 2/F Podium Deck

3/F

Pedestrian Connection

Page 28: Proposed Rezoning of the Site from “Other Specified Uses

28 Task Force on Kai Tak Harbourfront Development

1.0 The Site

2.0 From a Wider Context

3.0 Proposed Commercial / Office Development Scheme

4.0 Design Merits

5.0 Compliance with Harbourfront Planning Principles

Agenda

Page 29: Proposed Rezoning of the Site from “Other Specified Uses

Design Merits: Widening of Existing Informal Pedestrian Footpath

29 Task Force on Kai Tak Harbourfront Development

Existing Condition

Photo 1: Existing Informal Pedestrian Alley sandwiched between Lucky Building and the LCSD Planter

Photo 2: Existing Formal Public Access with steps for Pedestrian

LCSD Planter

Lucky Building

Photo 3: Existing Footpath Along San Ma Tau Street

Page 30: Proposed Rezoning of the Site from “Other Specified Uses

Design Merits: Provision of Setback along the Southeastern Boundary

30 Task Force on Kai Tak Harbourfront Development

• Widening of existing informal pedestrian alley from 1m to 2.5m wide

Page 31: Proposed Rezoning of the Site from “Other Specified Uses

Design Merits: Provision of Setback along the Southwestern Boundary

31 Task Force on Kai Tak Harbourfront Development

• Widening of existing footpath along San Ma Tau Street to cater for possible additional pedestrian flow (from 3.5m to 4.5m wide)

Page 32: Proposed Rezoning of the Site from “Other Specified Uses

Design Merits: Possible Connection Point to Future Landscape Deck under CKR Project (Option 1)

32 Task Force on Kai Tak Harbourfront Development

POTENTIAL CONNECTION TO PTI LANDSCAPE DECK

LANDSCAPE DECK OF FUTURE PTI by CKR

Grand Waterfront

Wyler Gardens

Kowloon City Ferry Pier

Subject Site

Page 33: Proposed Rezoning of the Site from “Other Specified Uses

33 Task Force on Kai Tak Harbourfront Development

POTENTIAL CONNECTION TO PTI LANDSCAPE DECK

LANDSCAPE DECK OF FUTURE PTI by CKR

Grand Waterfront

Wyler Gardens

Kowloon City Ferry Pier

Subject Site

Design Merits: Possible Connection Point to Future Landscape Deck under CKR Project (Option 2)

Page 34: Proposed Rezoning of the Site from “Other Specified Uses

Design Merits: Provision of Quality Activity Space for the Public

34 Task Force on Kai Tak Harbourfront Development

Shrub Planting

Outdoor Dining Area

Activity Lawn Area

Page 35: Proposed Rezoning of the Site from “Other Specified Uses

Design Merits: Potential of Becoming a Signature Tower in the Area

35 Task Force on Kai Tak Harbourfront Development

Upon Redevelopment

• Special architectural articulations • Distinctive roof features • Terraced podium design

Page 36: Proposed Rezoning of the Site from “Other Specified Uses

36

Grand Waterfront

Wyler Gardens

Task Force on Kai Tak Harbourfront Development

Existing Lucky Building

Enhanced Visual and Air Permeability (Existing Industrial Building)

Page 37: Proposed Rezoning of the Site from “Other Specified Uses

37

Tower

Podium

Task Force on Kai Tak Harbourfront Development

Enhanced Visual and Air Permeability (with Proposed Development)

Grand Waterfront

Wyler Gardens

Page 38: Proposed Rezoning of the Site from “Other Specified Uses

38 Task Force on Kai Tak Harbourfront Development

1.0 The Site

2.0 From a Wider Context

3.0 Proposed Commercial / Office Development Scheme

4.0 Design Merits

5.0 Compliance with Harbourfront Planning Principles

Agenda

Page 39: Proposed Rezoning of the Site from “Other Specified Uses

a/ Preserving Victoria Harbour

39 Task Force on Kai Tak Harbourfront Development

Upon Redevelopment

Existing Condition

View from Kai Tak Cruise Terminal

Page 40: Proposed Rezoning of the Site from “Other Specified Uses

a/ Preserving Victoria Harbour

40 Task Force on Kai Tak Harbourfront Development

Existing Condition

Upon Redevelopment View from Quarry Bay Park

Page 41: Proposed Rezoning of the Site from “Other Specified Uses

b/ Sustainable Development and Integrated Planning

41 Task Force on Kai Tak Harbourfront Development

• Retail, dining facilities and office uses - help to achieve a balanced mix of land uses and provide local job opportunities

• Landscape viewing deck – public space for recreational and leisure uses for enjoyment of the public

• Technical Assessments – Proposed scheme is technically feasible

• Linkage with Landscape Deck under CKR – Integration of proposed development with waterfront promenade and future commercial and dining service node at Kowloon City Ferry Pier

Page 42: Proposed Rezoning of the Site from “Other Specified Uses

c/ Vibrant Harbour and Public Enjoyment

42 Task Force on Kai Tak Harbourfront Development

Existing Condition

Upon Redevelopment

Upon Redevelopment

Page 43: Proposed Rezoning of the Site from “Other Specified Uses

43 Task Force on Kai Tak Harbourfront Development

Subject Site

LANDSCAPE DECK OF FUTURE PTI UNDER CKR

POTENTIAL CONNECTION TO LANDSCAPE DECK BY CKR

d/ Accessible Harbour (with Improved Connectivity)

MA TAU KOK WATERFRONT BEAUTIFICATION PROPOSAL

Page 44: Proposed Rezoning of the Site from “Other Specified Uses

44 Task Force on Kai Tak Harbourfront Development

Members are kindly invited to express your views / valuable advice on the Project

Thank You!