proposed rules changes to address industry connections activities john d’ambrosia, delldavid law,...
TRANSCRIPT
![Page 1: Proposed Rules Changes to Address Industry Connections Activities John D’Ambrosia, DellDavid Law, HP July 13, 2015](https://reader035.vdocuments.net/reader035/viewer/2022072016/56649ee55503460f94bf4f76/html5/thumbnails/1.jpg)
Proposed Rules Changes to Address Industry
Connections Activities
John D’Ambrosia, Dell David Law, HP
July 13, 2015
![Page 2: Proposed Rules Changes to Address Industry Connections Activities John D’Ambrosia, DellDavid Law, HP July 13, 2015](https://reader035.vdocuments.net/reader035/viewer/2022072016/56649ee55503460f94bf4f76/html5/thumbnails/2.jpg)
• ICCOM (http://standards.ieee.org/about/sasb/iccom/120814mins.pdf) • New Activities are required to use the baseline P&Ps, with modifications allowed
by the baseline. Don’t allow Activities to follow the P&Ps of the Sponsoring Committee unless the Sponsor P&P specifically calls out IC activities
• Current 802 P&P does not mention IC Activities• Previous IC activities approved by methodology similar to study groups.• Only two mentions of study groups in P&P (7.11, 7.12)• Therefore, make the change on the following page.
![Page 3: Proposed Rules Changes to Address Industry Connections Activities John D’Ambrosia, DellDavid Law, HP July 13, 2015](https://reader035.vdocuments.net/reader035/viewer/2022072016/56649ee55503460f94bf4f76/html5/thumbnails/3.jpg)
7.1.1 Actions Requiring Approval by a Majority Vote This clause shall not be modified except to include additional voting actions. Items in 7.1.1 may be moved to 7.1.2 if desired. The following actions require approval by a majority vote
a) Approval of minutes.b) To request IEEE 802 Executive Committee approval of creation of a study
group or an industry connections activity.