    OUTLINEOUTLINEI. INTRODUCTION

    Mindanao River Basin Maps

    II. FLOODS TOWARDS THE CREATION OF THETASK FORCE

    Aerial Survey 2008 Photos of Flooded Areas Summary of the three (3) Executive Orders creating the Task

    Force

    Aerial Survey 2009

    III. IMMEDIATE CAUSES OF FLOODING

    IV.DAMAGES

    V.EVACUEES

    VI.RECOMMENDATIONS

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    2/124

    Republic of the PhilippinesRESIDENTIAL TASK FORCEindanao River Basinehabilitation andDevelopment

    . Executive Order No 753 A

    -ASK FORCE MRBRD-ASK FORCE MRBRDonsolidated Reportonsolidated Reportnd Recommendationsnd Recommendations

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    3/124

    . INTRODUCTIONINTRODUCTION

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    4/124

    GUSANiverBasin

    INDANAOiverBasin

    MINDANAO RIVER BASINMINDANAO RIVER BASIN

    RIVER BASIN IN THE PHILIPPINES

    = , .Basin Area 23 170 Sqkm

    .323 km.323 km

    engthengthiversiversPulangiPulangi

    Alala indanao Rindanao R .100 km.100 km.120 km.120 km

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    5/124

    The Major Rivers within the Basin are:

    1. Ala River

    2. Banga River traversing Ala Valley in the South

    3. Pulangi River with head water from Bukidnon,traversing Ligawasan Marsh

    4. Mindanao River, Simuay River , and Tamontaka

    River in the Lower Cotabato areawhich are the major egress of all river-flows inthe whole Mindanao River basin towards Illanabay

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    6/124

    6

    MINDANAO RIVER BASINMINDANAO RIVER BASIN

    LA VALLEY

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    7/124

    . ,LEV 1 500. .IGUA R

    .ANUTO R.ULAMAN R

    .ABACAN R .LANG R

    .A LA SI LA R.LIP R

    A KE B UL UA N .ANGA R

    .HEAD WATER ALA R

    .LEV 1600 M

    A K E S E B U

    .EPAKA R

    AGANOY RALARIVER

    LIGAWASAMARSH BULUAN R

    B P A N A NM A R S HI B U N G A NM A R S H

    A LI TU BO G R.A LA DU GA O R

    ULETA R.ARAMAG RA TA YL AN R

    A NU PA LI RAWAGA R

    MINDANAOR

    PAGALUNGANPIKIT

    .LLAH R CROSSING A TU P IA NG

    I BU NG AN R

    IMUAY RAMONTAKARIVER

    P U L AN G I

    R I V E R

    OTABATO CITYBRIDGE

    :LEGEND

    Rivers-xisting CutffChannel

    arsh Area

    SCHEMATIC RIVER FLOW

    O W E R O T A B A T OI V E R B AS INiver FlowDirection

    The Mindanao (Cotabato) River BasinThe Mindanao (Cotabato) River Basin.EAD WATER PULANGI R

    7

    Courtesy of RDC 12, FRANK_2008 presentation

    N

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    8/124

    . I FLOODS I FLOODSOWARDS THEOWARDS THEREATION OF THEREATION OF THE

    ASK FORCEASK FORCE

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    9/124

    Aerial survey taken after typhoons Frank and

    Cosme last year (2008)

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    10/124 10

    , ,a li m b a o ar ea S u l t a n K ud a r a tM a g u i n d a n a o

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    11/124 11

    Delta Bridge

    Photos taken in2008

    o l u m e o fa t e r y a c i n t hf t e r t h ey p h o o n sr a n k a n do s m e i n 2 0 0 8

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    12/124

    olume of wateryacinth underuirino bridge

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    13/124

    Quirino Bridge

    DeltaBridge

    M t

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    14/124

    MatampayBridge

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    15/124 15

    ,ND VILLAGE AREA Cotabato City

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    16/124

    ( )Notre Dame Avenue in front of Notre Dame University

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    17/124

    Creation of the Task Force

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    18/124

    EO # Title Date

    Executive Order# 743

    Creating a Task Force onCotabato Flood Control

    July 24, 2008

    Executive Order

    # 753

    Creating a Presidential Task

    Force for the Mindanao RiverBasin Rehabilitation

    September 29,

    2008

    Executive Order# 753-A

    Amending EO No. 753, series of2008, which created the

    Presidential Task Force onMindanao River Basin

    Rehabilitation and Development

    January 5, 2009

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    19/124

    ASK FORCE OFFICERSASK FORCE OFFICERSND MEMBERSND MEMBERS

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    20/124

    Chairman:Archbishop Orlando B. Quevedo, OMI, DD

    Co-Chairman:ARMM Governor Datu Zaldy Uy Ampatuan, AlHaj

    (the Chairman of RDCC-ARMM)

    Three Vice- ChairmenUndersecretaries of DPWH and DENR and Chairman of RDCC XII

    Usec. Bashir Rasuman - DPWHUsec. Demetrio Ignacio DENR

    PNP XII Director P/C Supt. Josefino Catalua - RDCCExecutive Secretary of the Task Force

    Executive Director of the Task Force Secretariat/Support Office:

    Solomon D. Badoy

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    21/124

    MEMBERSRegional Directors/Head of Office of DPWH, CARBDP, DSWD, DOH,

    DepEd, DILG, DENR, NEDA, RPDO, DAR, DA, BFAR, OCD andNIA of Regions XII and ARMM, AFP-Engineering Brigade/Philippine

    Navy and PNP

    and the

    Local Government Chief Executives of the4 Provinces in Region XII:

    Sultan Kudarat, South Cotabato, Sarangani, and Cotabatoand 1 Province in ARMM: Maguindanao

    Cotabato City & Gen. Santos City

    and the

    Municipalities of: Lambayong in Sultan KudaratPigcawayan and Midsayap in CotabatoSultan Kudarat in Maguindanao

    Sultan Sa Barongis in MaguindanaoDatu Montawal in Maguindanao

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    22/124

    PTF MRBRDTECHNICAL WORKING GROUP

    REHABILITATION and LONG-TERM DEVELOPMENT MEMBERS

    RehabilitationChairperson

    Regional Director Hadja Sinaolan Macarambon, DPWH 12

    Co-Chair

    Regional Secretary Razul K. Abpi, DPWH ARMM

    Long-Term Development

    Chairperson

    OIC-Director Teresita Socorro C. Ramos, NEDA 12

    Co-ChairExecutive Director Diamadel E. Dumagay, RPDO ARMM

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    23/124

    Aerial Survey 2009

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    24/124

    OLANDANG BRIDGE connectingMidsayap and Datu Piang

    Damaged portionof the bridge

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    25/124

    Bridge 1

    Bridge 3

    Bridge 2

    Olandang Bridge

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    26/124

    Site Inspection at Olandang Bridge

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    27/124

    27

    CONVERGINGPOINT

    ALA RIVER

    BANGA RIVER

    Kapingkong River

    Ala River

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    28/124

    Project Site

    Repair/Rehab of Ala River Flood Control at Lambayong, Sultan Kudarat

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    29/124

    LambayongMunicipalit

    y

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    30/124

    Lambayong Municipality

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    31/124

    31

    ALA RIVERR OJ EC T S IT E

    LA RIVER

    UL TA N S A B AR ON GIS

    LAMBAYONG

    ,ns t a l l e d g a b i o n s m a t tr e s s e s a n d t i m b e r

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    32/124

    , -i l es A l a R i v e r L a m b a y o n g Pr oj e c t,h a se I ( , )s of Ap ri l 1 3 2 009

    As of June 20, 2009, (Monitoring/Site Inspection by TWG)

    After the typhoon Jolina

    Projectsite

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    33/124

    LIGAWASAN MARSH

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    34/124

    Pagalungan Bridge

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    35/124

    Tunggol Bridge

    Montawal

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    36/124

    Montawal

    Tunggol Bridge

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    37/124

    Tunggol Bridge

    T nggol Bridge

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    38/124

    Tunggol Bridge

    Tunggol Bridge (Slope Protection collapsed)

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    39/124

    Tunggol Bridge (Slope Protection collapsed)

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    40/124

    In Libungantwo spans of Grebona Bridge linking Libungan, Alamada and Banisilan collapsed and swepaway

    Grebona Bridge

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    41/124

    g

    . ,id eo co u rt es y of Fr D av i d Pr oc a ll a DC C o c ia l A c t io n D ir e c t or of t h er ch di oc es e o f C ot ab at o

    Denuded Mountains in Alamada

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    42/124

    Denuded Mountains in Alamada

    Simuay FloodControl Project

    Timber piles at the suspected breachduring heavy rains last September 2008

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    43/124

    .Phase I 2 65 kms:Accomplishment

    . % = . .54 63 1 45 kms

    Control Project( )Emergency works

    Phase II

    ,during heavy rains last September 2008-the breach opened at around 50 60 m

    ,width and during the typhoon Jolina the-breach became huge with around 150 200 m

    .and 1 5 m depth

    LOCATION PLAN

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    44/124

    LOCATION PLAN (Courtesy of Sir Flores)

    THIS SITE

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    45/124

    IMUAY RIVER

    MBAL RIVER

    :POINT OF CONVERGENCE

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    46/124

    COURTESY : TO THEHOUSE OF BARANGAY

    CHAIRMAN

    SHORT MAPPING & BRIEFINGAT

    AMBAL BRIDGE,BARANGAY ARATUC,

    BULDON MUNICIPALITY

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    47/124

    APPROACHINGTHE

    CONVERGENCE

    OFTWO RIVERS

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    48/124

    HE SIDE AMBAL RIVER

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    49/124

    HE SIDE SIMUAY RIVER

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    50/124

    WO RIVERS TO SULTAN KUDARAT& OTABATO CITY AREA

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    51/124

    VOLUME OF WATER FLOWING TO SULTAN KUDARAT& COTABATO CITY

    SIMUAY RIVER AMBAL RIVER

    O SULTAN KUDARAT

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    52/124

    /BSERVATIONS COMPARISONS

    IMUAY RIVER AMBAL

    OLOR OF WATER OF AMBAL IS CLEARER COMPAREDO SIMUAY :ANDY FOR AMBAL MUDDY FOR SIMUAY

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    53/124

    AMBAL

    SIMUAY

    HE BEHAVIOR OF FLOW OF THE TWO RIVERS OLUME OF WATER

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    54/124

    A CLOSER LOOK OF AMBAL RIVER

    RIVER BANK

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    55/124

    E S I D E N T SO I N GO M E A U N D R Y

    BOUT 20 ETERS HEIGHTF THE ERODED RIVERANK

    .PPROX0meters

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    56/124

    IMUAY RIVER

    THE STILLNESS OF SIMUAY RIVER FLOW COMPARED TO AMBAL

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    57/124

    AMBAL RIVER SIMUAY RIVER

    UPSTREAMS OF THE TWO RIVERS

    .PPROX0meters

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    58/124

    he sites areormed by narrow-shape valley and-nderlain by in-lace sandstonehale rock/AVORABLE STABLE-or Slit Sediment-torage Gateless.ams

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    59/124

    59

    SIMUAY RIVER( ,u g u s t 2 2 0 0 9 - )TF MRB RD AE RI AL S UR VEY

    LD ROUTE REACHEDPORTION

    IMUAY RIVERUpstream

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    60/124

    60

    2008 ,ugust 17 2009

    Simuay Flood Control Project ( Timber Piles )

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    61/124

    61

    Ground View( August 17, 2009 ocular inspection)

    W

    ( )stimated width W of Breached Portionis -50 200 ( .)eters Ave

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    62/124

    62

    imuay River Old CourseBreached Portion

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    63/124

    Agricultural lands in

    Sultan Kudarat,Maguindanao

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    64/124

    64

    SULTAN KUDARAT, MAGUINDANAO

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    65/124

    65

    Interior part of Sultan Kudarat, Maguindanao

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    66/124

    Dredging Operation by Vic Lao

    Constructionh o t o t ak e n

    , ,h o t o t a k en A u g u s t 2 2 0 0 9e ri al s ur ve yHeavy siltation at Bucana area

    Bucana area

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    67/124

    Mouth of Bucana

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    68/124

    Damayan Dredger

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    69/124

    ( )Rio Grande Quirino Bridge site( )Rio Grande Matampay Bridge site

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    70/124

    Matampay Bridge

    Delta Bridge and Quirino Bridge

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    71/124

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    72/124

    .II IMMEDIATEII IMMEDIATEAUSES OFAUSES OFFLOODINGLOODING

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    73/124

    q o n t i n uo u s h e a v y r a i n o v e r, , , ,u k i d n o n A g u s a n D a v a o L a n a o, ,o u t h C o t a b a t o N o r t h C o t a b a t o,u l t a n K u d a r a t M a g u i n d a n a oq u c h h e a v y d o w n p o u r d i s l o d g e de c t a r e s o f g r a s s a n d w a t e ry a c i n t h c o v e r i n g l a r g e p o r t i o n s

    f t h e M i n d a n a o R i v e r B a s i n a n du s h e d t h e m d o w n r i v e r

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    74/124

    qLong standing siltation of all the

    rivers to and from the Mindanao RiverBasin itself, a problem compounded bya long period of inactivity in the SimuayRiver project and the dredging of RioGrande.

    qFlood waters damaged the initialengineering projects done at the SimuayRiver and Ala River

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    75/124

    q Silt and other debris that have clogged

    the Mindanao River channels

    qThe accumulation of sand, mud, and sediments brought about by water flowing from various parts in the areafurther worsened by the accumulation ofwater hyacinth (water lilies)

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    76/124

    qThe large-scale transformation of the

    original vegetation of the basins foreststo non-forestry purposes

    q

    qInappropriate land use practicesqq

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    77/124

    IVV . DAMAGESDAMAGES

    Cotabato Province

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    78/124

    Cotabato ov ceIn Pigcawayan provincial, Barangay Roads and dikes damaged;

    Libungan two spans of Grebona Bridge linking Libungan, Alamada andBanisilan collapsed and swept away;

    Montawal the Tunggol bridge is at risk

    Maguindanao

    Sultan Kudarat The SimuayRiver flooding completely swept away thetimber piles done by FFJJ Construction (Simuay River Flood Control

    Project Phase I); and a third breach was opened.Cotabato City

    High siltation level of Rio Grande and the volume of water hyacinth withheavy rainfall caused flooding of all the low lying areas of CotabatoCity; siltation at the Bucana is increasingly undoing the work that Vic

    Lao Construction did.Sultan Kudarat Province

    Flood waters damaged the engineering work done at the Ala River,Lambayong area.

    Areas declared under state of calamity

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    79/124

    u lt an Ku d a ra t Pr ov in c eo tabat o Pr ovi nce

    o u th C ot a ba to Pr o vi n cea ran ga ni P rov inc e

    o ta b at o C it y ,u lt an Ku d a r at

    Flood Affected Infrastructure along National Roads

    ,DC XII RPMC Field Monitoring Activity August- ,8 19 2009

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    80/124

    Flood-Affected Infrastructure along National RoadsProvinces of South Cotabato and Sarangani

    San Felipe Bridge- , , .along Midsayap Marbel Road Tantangan So

    Cotabato

    -Saravia Section along Marbel Gen, ,Santos National Road SaraviaKoronadal City

    -

    Pangyan Bridge along Sarangani Davao, ,del Sur Road Glan Sarangani

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    81/124

    Koronadal City

    - ,Lun Padidu Bridge along Sarangani Davao del Sur Road,Malapatan Sarangani

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    82/124

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    83/124

    Tambilil Bridge. + .Km 1739 236 60 iguilBridge. + .Km 1675 247 46

    Gabion

    : / " "Damage Scoured Damaged Approach A: . .stimated cost P10 0M : / " "Damage Scoured Damaged Approach A-Damaged Flood Control Structure Gabion

    : . .stimated cost P10 0M

    umatil Bridgeumaba Bridge: / " "Damage Scoured Damaged Approach A

    : , .stimated cost P500 000 00: / " "Damage Scoured Damaged Approach A

    : , .stimated cost P500 000 00

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    84/124

    ARMMRMM,arakan Bridge in Matanog Maguindanao

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    85/124

    ( -TIL Bridge Approaches Cotabato- )alabang Lanao del Norte Road

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    86/124

    ( - -urakan Box Culvert Cotabato Malabang)anao del Norte Road

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    87/124

    ( - -anuan Box Culvert Cotabato Malabang)anao del Norte Road

    alabagan Section

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    88/124

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    89/124

    ( - )andslides Marawi Malabang Road

    NORTHNORTH MM n BBg

    AFFECTED AREAS as of August 20, 2009

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    90/124

    ULTANKUDARAT

    ( )ORTHCOTABATO

    OUTHCOTABATO

    MAGUINDANAO

    SARANGANI .en SantosCity

    SULTANSULTANKUDARATKUDARAT

    Mun.Mun. Bgy.Bgy.66 2020

    NORTHNORTHCOTABATOCOTABATO

    Mun.Mun. Bgy.Bgy.77 134134

    COTABATO CITYCOTABATO CITY Bgy.Bgy.

    3131

    SARANGANISARANGANIPROVINCEPROVINCE

    Mun.Mun. Bgy.Bgy.66 3333

    SOUTHSOUTH

    COTABATOCOTABATO

    Mun.Mun. Bgy.Bgy.

    44 4242

    GEN. SANTOS CITYGEN. SANTOS CITY Bgy.Bgy.22

    MAGUINDANAOMAGUINDANAO Mun.Mun. Bgy.Bgy.1414 8989

    otal Cost of Damages

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    91/124

    ,n Infrastructure as of August 20 2009( )egion XII and ARMMhP 383.3 M

    Estimated cost of damages to infrastructure (national roads and bridges) based on the reports from DPWH field offices

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    92/124

    based o t e epo ts o W e d o ces

    Province/City Cost of Damage

    Cotabato Province P 216.5 M

    Cotabato City P 10 M

    South Cotabato Province P 4.3 M

    Sultan Kudarat Province P 25 M

    Sarangani Province P 102.9 M

    ARMM (Maguindanao & Lanao) P 24.6 M

    GRAND TOTAL P 383.3 M

    otal Cost of Damages

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    93/124

    &n Agriculture Livestock as of August,0 2009hP 824 million

    otal Cost of Damages

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    94/124

    ,n Infrastructure&gricultureLivestock .h P 1 2 B

    as of August 20, 2009 (Region XII and ARMM)

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    95/124

    ctions done regardingInfrastructure1. Deployment of DPWH teams (Region XII,ARMM, and Sub-district Engineering Office),Cotabato City Engineering Office and of the

    Watermaster to clear the Delta, Quirino, andMatampay bridges on a daily basis

    2 Instructions from Task Force Region 12 DPWH

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    96/124

    2. Instructions from Task Force, Region 12 DPWHDirector and Secretary Ebdane to fast track:

    The building of a temporary detour for heavy vehicles,bypassing Grebona bridge, to connect Alamada and Libungan,as well as to make Grebona Bridge passable soonest;Improvement and opening of NIA Road to Nicaan bridge for

    light vehicles.The soonest temporary closure of the Simuay River 3rd

    breach(estimate two to three weeks) through which flood waters

    passed towards Salimbao and Bulalo and at the same time therechanelling of the Simuay River Flood Control Project PhaseII towards the sea (estimate about three months); the newcontractor is committing about 20 heavy equipment for this

    purposes and 60 million pesos are allocated for this project.

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    97/124

    The preparation of plans to re-do the Ala RiverProject;

    The deployment of a second Watermaster to the RioGrande (It will finally arrive in Cotabato City on August26, 2009);

    The availability of funds to operate the Damayan on acontinuous basis;

    The awarding of contract to continue the dredging oftheRio Grande River, including the updating of hydrotopographic survey;

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    98/124

    Approval of other priority projects Tunggol Bridge,

    Olandang, Bridge and three bridges in Lambayong,construction of drainage canal at Buluan creek, andimprovement/rehabilitation of Malu-ao to Guigekendrainage in Pigcawayan. (At the present moment, theapproach A of Tunggol bridge going to Davao is

    under repair because of the collapse of slopeprotection)

    Construction or upgrading of access roads on both

    endsof Delta Bridge.

    Water Master Classic III

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    99/124

    I

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    100/124

    Wate

    rMaster

    Clas

    sicIII

    Clearing of water hyacinths and grasses under the Quirino bridge

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    101/124

    a a o y g o ve rn m en a c o e c e ar ng o w a er y a c nt Ma ta m p ay b ri d ge

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    102/124

    Clearing of water hyacinth at Matampay bridge

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    103/124

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    104/124

    . EVACUEES EVACUEES

    INDIVIDUALS

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    105/124

    Province/City No. of Families No. of Individuals

    Cotabato Province 26,538 137,029

    Cotabato City 31,462 131,201

    South Cotabato Province 886 4,271

    Maguindanao Province 25,096 126,014

    Sultan Kudarat Province 8,428 42,140

    Sarangani Province 3,449 13,320

    Gen. Santos City 130 517

    TOTAL 95,989 454,492

    Damaged Houses 457 Totally 359 Partially

    Casualties 24 dead 6 injured

    In Sultan Kudarat Municipality

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    106/124

    In Sultan Kudarat Municipality.flood waters still in Brgys

    , , , ,Katuli Banubo Bulalo Calsada, .Limbo Salimbao and Gang Floodwaters mixed with mud from Simuay

    River slowly moving towards Rio. ,Grande 1 498 IDP families are

    still staying in various.evacuation centers But a total of

    , .12 910 families were affected

    Vehicles transporting affected families and

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    107/124

    Vehicles transporting affected families andindividuals

    Evacuees moving to the nearby evacuationcenters

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    108/124

    Military trucks were used to transport Internally Displaced Persons( )IDPs

    Cotabato City

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    109/124

    Cotabato Citypayloader

    CTIONS DONE FOR EVACUEES.1 The following agencies mobilized themselves the soonest possible time to:tend to the needs of evacuees

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    110/124

    . /N G O s L o c a l N G O sv World Food ProgramvUNICEF

    vJICA

    v Supreme Masterv Operation Blessing 700 Clubv , .Canari Motorcycle Club Incv GMA Kapuso Foundationv ABS CBN Central Mindanaov KALASAG Foundation

    v Mindanao Tulong Bakwet

    v and othersv. ,US I N E S S E S T A B L I S H M E N TS a n d. ON CE R N E D I N D I V I DU A L S w ho x te nd ed f in an ci al,s s i s t a n c e r ,l i e f g o o d s u s e d, .l o t h in g s e t c G O O D N U M B E R O F S CH OO L S E R V E D A S E V A C U A T I ON C E N T E R S

    !H A N K Y O U

    . :G U sv o c a l G o v er n m e n t U n it s o f R e g io n X I I a n d R M M a nd t h e i r C hi e f E x e c u t i v e s a n d o f f i c i a l s. O VE RN ME NT A GE NC IE Sv / / / /a ti on al R eg io na l P ro vi nc ia l C it y u ni ci pa l D is as te r C oo rd in at in g C ou nc il s

    v , ,P W H XI I an d A R M M D S W D X II D S W D A RM M n d D S WD L o c a l O ff i c esv & , ,O H X II D O H A R M M I P HO an d R H Usv o t a b at o Re g i o n a l a nd M e d i c a l C e n t e rvP N R Cv -A F A R M Mv E S D A X I Iv i li t a r y a n d P o l i ce O f f i c e r s a n dP e r s o n n e l. I V IC A ND RE LIG IO US ORGA N IZAT ION SvKaranchov RVM of Cotabato City and Davao Cityv Notre Dame Hospital

    v Immaculate Conception Cathedralv ,Social Action Center Archdiocese ofCotabatov ,Piso Serbisyo Archdiocese of Cotabatov Mobilization by parishesv &Donations from Notre Dame CEAP

    schools

    . - :2 Action taken by the above named agencies

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    111/124

    deployment of teams to rescue evacuees trapped by floods

    and/or to bring them to safer areas; the use of dump trucks,payloaders, military trucks, freight trucks, patrolboats of Task Force Tugis, etc.

    setting up of evacuations centers in public buildings(schools, gyms, etc) and church buildings (chapels, gyms,

    parish halls, etc);

    establishment of disaster operation centers;

    immediate supply of bread and drinking water;

    donation and distribution of relief goods, rice and

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    112/124

    other food supplies, medicines, clothes, blankets,etc.; World Food Program donated severalthousands of sacks of rice;

    medical missions by DOH ARMM, SALA'AM

    37th IB with MDCC, RHU, IPHO and DOHARMM; referral os sick people to CRMC;

    setting up of community kitchens, providing hotmeals;

    provision of generators, water tanks.

    oordination with different line agencies for quickesponse

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    113/124

    Situation of children at the evacuationcenters

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    114/124

    Emergency Stations at theCathedral

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    115/124

    Relief distribution byconcerned agencies

    Emergency Stations near crossingSalimbao and Bulalo

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    116/124

    .I RECOMMENDATIONSI RECOMMENDATIONS

    For the Office of the President to fast-track the following projects intheir order of priority:

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    117/124

    Channelization and Bank Protection with

    Sluice gate for Emergency Project at SimuayRiver and closure of the breach.

    P

    60,000,000.00

    2. Immediate Deployment of One or TwoWatermaster for Task Force Deployment.

    P -

    3. Simultaneous dredging of Rio Grande deMindanao from Bucana to Quirino Bridge

    (7 kms)

    P 250,000,000.00

    4. Tunggol Bridge II, Bank Protection,Channelization Phase 1 and Phase 2, Datu

    Montawal, Maguindanao (very critical), bridgelinking Davao City and Cotabato City

    P 70,000,000.00

    their order of priority:

    5. Repair of Olandang Bridge whichcollapsed one year ago during

    P 49,000,000.00

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    118/124

    6. Repair/ Rehabilitation of Ala River FloodControl, Channelization at Punol, Sigayan,

    Panabungan, Papakan Section, Lambayong, SK

    P 100,000,000.00

    7. Repair/Rehabilitation of Ala River FloodControl & Bank Protection along Punol, Sigayan,

    Papakan Section Lambayong, SK

    P 100,000,000.00

    8. Proposed Upgrading/Concreting of QuirinoDelta Bridge Access Road at Barangay Salimbao,Sultan Kudarat, Maguindanao

    P 33,488,500.00

    collapsed one year ago duringtyphoon Frank and Cosme

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    119/124

    10. Construction of Pingiuaman Bridge ILambayong , Sultan Kudarat

    P 40,000,000.00

    11. Construction of Pinguiaman Bridge IILambayong, Sultan Kudarat

    P 20,000,000.00

    12. Construction of Sadsalan Bridge IILambayong, Sultan Kudarat

    P 80,000,000.00

    9. Repair and Rehabilitation of Ala River FloodControl, Channelization and Bank Protection

    Sultan sa Barongis, Maguindanao

    P 50,000,000.00

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    120/124

    13. Construction of Drainage Canal at Brgy.Buluan Creek, Phase V, Brgy. Buluan,

    Pigcawayan, CotabatoP

    5,000,000.00

    14. Improvement/Rehabilitation ofMalu-ao - Guigeken Drainage Canal,

    Pigcawayan, Cotabato (Phase 1)

    P

    20,000,000.00

    15. Protection Dike and Extension of Cut-offChannel of Libungan River, Phase 1 (NIA) P

    15,000,000.00

    16 R i /R h bili i f G b B id P 35 000 000 00

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    121/124

    16. Repair/Rehabilitation of Grebona Bridge atBanisilan, Alamada

    P 35,000,000.00

    17. Replacement of Quirino Bridge P 203,060,000.00

    P 50,000,000.00

    TOTAL P 1,180,548,500.00

    18. Preparation of Master Plan for

    the Mindanao River Basin

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    122/124

    Commendation

    I commend all the government agencies( , ,and officials regional provincial

    , ),municipal and city including the,military and police in their quick

    mobilization of equipment and personnelto assist the thousands of evacuees in, .Cotabato City Region 12 and ARMM When

    ,crisis comes the assistance is

    .thankfully fast and expeditious

  • 8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009

    123/124

    ,ense of Urgency Drive forActionI pray that our action on documentation

    ,for the release of funds deployment of

    , personnel and equipment would be

    similarly fast and expeditious withregard to the implementation of the

    ( . ., , , ) projects e g Rio Grande Simuay Ala

    .that help prevent crises We all need a

    sense of urgency and a drive for.immediate action