public disclosure authorized - world...
TRANSCRIPT
LKR USD
1 2 3 4 5 6 7
Desktop Computers 5 0.500 0.0043
Laptop Computers 3 0.450 0.0039
Flash drives 7 0.035 0.0003
Desk Top Computers 90 9.000 0.0783
Printers - Normal 90 4.500 0.0391
Printers (Duplex) 2 0.300 0.0026
Printers (Color)) 3 0.270 0.0023
UPS 90 0.630 0.0055
Laptop Computers 20 3.500 0.0304
Flatbed Scanners 11 0.165 0.0014
Fax Machines 1 0.050 0.0004
Photocopy Machine (heavy duty) 1 0.600 0.0052
Binding Machine 1 0.020 0.0002
Multi Media Projector with Accessories 1 0.100 0.0009
Two drawers woorden almira 2 0.060 0.0005
Four drawers File Curbed 2 0.036 0.0003
Digital Cameras 12 0.300 0.0026
Voice Recorder 4 0.060 0.0005
PROCUREMENT PLAN FOR GOODS
Country/Borrower: Government of Sri Lanka
Project Name:North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the North and
East Province )Implementing Agency: Ministry of Economic Development
GPN # and Date Published:
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
Update as of : (date) 31st July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
*** Indicate extensions/modifications etc.
Ser
ial N
o.
Pac
kag
e N
o.
Des
crip
tio
n
Met
ho
d o
f P
rocu
rem
ent*
Qu
anti
ty (
Nu
mb
er)
Estimated Cost (Million)
1 MED/NELSIP/G/PCU/001 NS
2 MED/NELSIP/G/PCU/ 002 NCB
3 MED/NELSIP/G/PCU/003 NS
4 MED/NELSIP/G/PCU/004 NS
5 MED/NELSIP/G/PCU/007 Internet Dongle - Stage i DC 2 0.010 0.0001
6 MED/NELSIP/G/PCU/008 Internet Dongle - Stage ii DC 2 0.010 0.0001
7 MED/NELSIP/G/PCU/009 Flash Drive Stage 11 NS 5 0.030 0.0003
8 MED/NELSIP/G/PCU/010 Cup & Sources/Spoon/Trays/Jogs etc NS Package 0.010 0.0001
9 MEID/NELSIP/G/PCU/011 Stationeries PCU - Stage i NS Package 0.282 0.0025
10 MED/NELSIP/G/PCU/012 NS
11 MED/NELSIP/G/PCU/013Printing of Manuals
(PIP/LAPIM/FM/PGL) NS 400 0.4 0.0035
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Network Equipments -
Network Swich 1 0.010 0.0000
Construction Machineries & Gabage
Compactor
Gabage Compactors 7 52.500 0.5250
Vibrating Rollers 11 82.500 0.8250
Motor Graders 5 50.000 0.5000
Backoloders 3 30.000 0.3000
Tractor with Trilors (4W) 2 3.000 0.0300
12 MED/NELSIP/G/PCU/014 NS
Power Cord /Adepter Etc 5 0.020 0.0000
13 MEID/NELSIP/G/PCU/015 Television with DVD PLAYER NS 1 0.175 0.0015
14 MEID/NELSIP/G/PCU/016 Telephone (CDMA) Stage 1 DC 2 0.012 0.0001
15 MEID/NELSIP/G/PCU/017 Telephone (CDMA) Stage ii DC 1 0.006 0.0001
16 MED/NELSIP/G/PCU/022 ICB
17 MED/NELSIP/G/PCU/023 Stationeries PCU - Stage ii NS Package 0.150 0.0013
18 MED/NELSIP/G/PCU/024 Printer Toners -Stage I NS 3 0.054 0.0005
19 MED/NELSIP/G/PCU/025 Photocopy Toners - Stage I DC 2 0.010 0.0001
20 MED/NELSIP/G/PCU/026 Fax toner - Stage I DC 2 0.008 0.0001
21 MED/NELSIP/G/PCU/027 Stationeries PCU - Stage iii NS Package 0.150 0.0013
22 MED/NELSIP/G/PCU/028 Laptop Computers NS 3 0.525 0.0046
23 MED/NELSIP/G/PCU/029 Printer Toners -Stage II NS 3 0.054 0.0005
24 MED/NELSIP/G/PCU/030 Photocopy Toners - Stage I I DC 3 0.015 0.0001
25 MED/NELSIP/G/PCU/031 Fax toner - Stage I I DC 2 0.008 0.0001
26 MED/NELSIP/G/PCU/032 Photocopy Toners - Stage III DC 2 0.010 0.0001
27 MED/NELSIP/G/PCU/034 Photocopy Toners - Stage IV DC 2 0.010 0.0001
28 MED/NELSIP/G/PCU/035 Printer Toners -Stage III NS 3 0.054 0.0005
29 MED/NELSIP/G/PCU/037 Stationeries PCU - Stage iv NS Package 0.150 0.0013
30 MED/NELSIP/G/PCU/038 Printer Toners -Stage IV NS 3 0.054 0.0005
31 MED/NELSIP/G/PCU/039 Fax toner/Cardrige/Roll - Stage iii DC 2 0.008 0.0001
32 MED/NELSIP/G/PCU/040 Stationeries PCU - Stage v NS Package 0.150 0.0013
33 MED/NELSIP/G/PCU/041 Training Tool Kit NS Package 0.010 0.0001
34 MED/NELSIP/G/PCU/042 Telephone (CDMA) Stage iii DC 1 0.006 0.0001
35 MED/NELSIP/G/PCU/043 Printing of leafret NS 600 0.024 0.0002
Printers (Color)) 1 0.100 0.0009
Printers (heavy duty) 2 0.400 0.0035
Laptop Computers 10 1.750 0.0152
Flatbed Scanners 2 0.050 0.0004
NS 45 2.5 0.0218
Fax Machines 6 0.300
Photocopy Machine (heavy duty) 6 3.600
Multi Media Projector with Accessories 1 0.1000.0009
Two drawers Iron almira 6 0.120 0.0010
Office Table steel 40 0.320 0.0028
Chair 40 0.120 0.0010
Four drawers File Curbed 40 0.240 0.0021
36 MED/NELSIP/G/PCU/044 Purchasing of Virusgard for Computers NS 6 0.009 0.0001
37 MED/NELSIP/G/PCU/045 Printing of Manuals - Stage ii NS 1310 0.400 0.0040
38 MED/NELSIP/G/PCU/046 NS
39MED?NELSIP/G/PCU/047 Purchasing of Pettycach box
NS 1 0.010 0.0001
40 MED/NELSIP/G/PCU/048 Internet Dongle - Stage iii DC 3 0.010 0.0001
41 MED/NELSIP/G/PCU/049 Purchasing of Printers and UPS NS 7 0.210 0.0018
42 MED/NELSIP/G/PCU/050 Purchasing of Scaner (Leagle) NS 1 0.075 0.0007
43 MED/NELSIP/G/PCU/051 Purchasing of Telephon NS 1 0.030 0.0003
44 MED/NELSIP/G/PCU/052Purchasing of Toner Cardridge (Color -
Stage i)NS 1 Set 0.030 0.0003
45 MED/NELSIP/G/PCU/053Purchasing of Digital Camara -Stage
iii)NS 6 0.150 0.0013
46 NELSIP/G/NP/PMU/001 Flash drives NS 80 0.3200.0028
47 NELSIP/G/NP/PMU/ 002 Scaner
48 NELSIP/G/NP/PMU/003 NS0.0026
49 NELSIP/G/NP/PMU/004 NS
50 NELSIP/G/NP/PMU/005 Internet Dongle - Stage i DC* 40 0.16 0.0014
51 NELSIP/G/NP/PMU/006 Cup & Sources/Spoon/Trays/Jogs etc NS Package 0.06 0.0005
52 NELSIP/G/PMU/007 Stationeries PMU - Stage i NS Package 0.72 0.0063
53 NELSIP/G/NP/PMU/008 Printer Toners -Stage I NS 40 0.72 0.0063
54 NELSIP/G/NP/PMU/009 Photocopy Toners - Stage I DC* 6 0.03 0.0003
55 NELSIP/G/NP/PMU/010 Stationeries PCU - Stage ii NS Package 0.72 0.0063
56 NELSIP/G/NP/PMU/011 Training Tool Kit NS Package 0.06 0.0005
57 NELSIP/G/NP/PMU/013 Internet Dongle DC* 1 0.005 0.0000
58 NELSIP/G/NP/PMU/014 Destop Computer with UPS NS 18 1.62 0.0141
59 NELSIP/G/NP/PMU/015 Printer NS 18 0.36 0.0030
60 NELSIP/G/NP/PMU/016 Laptop Computer NS 22 2.64 0.0230
61 NELSIP/G/NP/PMU/017 Destop Computer with UPS NS 29 3.42 0.0297
62 NELSIP/G/NP/PMU/018 Printer NS 12 0.24 0.0021
63 NELSIP/G/NP/PMU/019 Laptop Computer NS 34 4.08 0.0355
64 NELSIP/G/NP/PMU/020 Photocoppiya-heavy duty NS 8 4 0.0348
65 NELSIP/G/NP/PMU/021 Photocoppiya NS 36 5 0.0435
66 NELSIP/G/NP/PMU/022 Hard Disk-External NS 44 0.7 0.0061
67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS 10 1.25 0.0109
68 NELSIP/G/NP/PMU/024 Internet Dongle DC* 3 0.015 0.0001
69 NELSIP/G/NP/PMU/025Vedio Camera with DVD Recoding
FacilitiesNS 4 0.8 0.0070
70 NELSIP/G/NP/PMU/026 Digital Camera NS 3 0.12 0.0010
71 NELSIP/G/NP/PMU/027 Voice Recoder NS 10 0.2 0.0017
72 NELSIP/G/NP/PMU/028 Levelling Instuments NS 44 3.08 0.0268
73 NELSIP/G/NP/PMU/029 Statineries NS Items 1.8 0.0157
74 NELSIP/G/NP/PMU/030 Global Positioning System NS 10 1.5 0.0130
75 NELSIP/G/NP/PMU/031 Measuring Wheel NS 45 0.45 0.3947
60& 20
76 NELSIP/G/NP/PMU/033
Furnituries 10 nos office table with
chairs,01no.Conference
table,03nos.Steel Almara,
NS Items 0.45 0.3947
77 NELSIP/G/NP/PMU/035 Cup & Sources NS 1 0.1 0.0877
78 NELSIP/G/NP/PMU/036Cube Mould&Concrete Compacting
BarNS 0.005 0.0044
79 NELSIP/G/NP/PMU/038Slump cone TestSet Stainless Steel
ConeNS 20&20 0.24 0.2105
80 NELSIP/G/NP/PMU/040 Furnituries for LAA NS 40set 2.00 0.0148
81 NELSIP/G/NP/PMU/041Office Equipments for CLG
office,ACLG office as 1 packsNS 3set 3.00 0.0261
82 NELSIP/G/NP/PMU/042
Desktop Computers-5 Nos,Lap top -1
No,Air condition-1 No for Provincial
Audit Department as 1 No Package
NS 1set 0.55 0.4825
83 NELSIP/G/NP/PMU/043 Laboratory Testing Item NS 2 10 0.1000
84 NELSIP/G/NP/PMU/044 Library Cabinet NS 3 0.045 0.0045
85 NELSIP/G/NP/RACLG/VA/001 Internet Dongle DC* 1 0.005 0.0000
86 NELSIP/G/NP/RACLG/MA/002 Internet Dongle DC* 1 0.005 0.0000
87 NELSIP/G/NP/RACLG/KI/003 Internet Dongle DC* 1 0.005 0.0000
88 NELSIP//NP/J/JAMC/G/1 Bitumin for reconstruction of roads in LA DC* 3150 L 0.315 0.0027
89 NELSIP//NP/J/JAMC/G/2 Bitumin for reconstruction of roads in LA DC* 27630L 2.65 0.0230
90 NELSIP/NP/J/ChUC/G/1Bitumin for reconstruction of roads in
LADC* 32656 L 3.265
0.0286
91 NELSIP/NP/J/ChUC/G/2Bitumin for reconstruction of roads in
LADC* 11586 1.112
0.0097
92 NELSIP/NP/J/ChPS/G/1Bitumin for reconstruction of roads in
LADC* 27000L 2.700
0.0236
93 NELSIP/NP/J/ChPS/G/2Bitumin for reconstruction of roads in
LADC* 19800 1.900
0.0166
94 NELSIP/NP/J/PPPS/G/1Bitumin for reconstruction of roads in
LADC* 19080L 2.067
0.0181
94 NELSIP/NP/J/PPPS/G/1Bitumin for reconstruction of roads in
LADC* 19080L 2.067
0.0181
95 NELSIP/NP/J/PPPS/G/2Bitumin for reconstruction of roads in
LADC* 40275 4.200
0.0368
96NELSIP/NP/J/VdSWPS/G
/1
Bitumin for reconstruction of roads in
LADC* 22950 2.525
0.0221
97NELSIP/NP/J/VdSWPS/G
/2
Bitumin for reconstruction of roads in
LADC* 19605 2.078
0.0182
98 NELSIP/NP/J/VSPS/G/1Bitumin for reconstruction of roads in
LADC* 26820 L 2.608
0.0228
99 NELSIP/NP/J/VSPS/G/2Bitumin for reconstruction of roads in
LADC* 27270L 2.542
0.0223
100 NELSIP/NP/J/VEPS/G/1Bitumin for reconstruction of roads in
LADC* 47250L 4.128
0.0361
101 NELSIP/NP/J/VEPS/G/2Bitumin for reconstruction of roads in
LADC* 13500L 1.300
0.0114
102 NELSIP/NP/J/VWPS/G/1Bitumin for reconstruction of roads in
LADC* 25200L 2.572
0.0225
103 NELSIP/NP/J/VWPS/G/2Bitumin for reconstruction of roads in
LADC* 20250L 1.986
0.0174
104 NELSIP/NP/J/VNPS/G/1Bitumin for reconstruction of roads in
LADC* 16830L 1.730
0.0151
105 NELSIP/NP/J/VNPS/G/2Bitumin for reconstruction of roads in
LADC* 33030L 3.263
0.0286
106NELSIP/NP/J/VSWPS/G/
1
Bitumin for reconstruction of roads in
LADC* 48860L 4.986
0.0437
107NELSIP/NP/J/VSWPS/G/
2
Bitumin for reconstruction of roads in
LADC* 10373L 0.996
0.0087
108 NELSIP/NP/J/VLPS/G/1Bitumin for reconstruction of roads in
LADC* 29700L 3.267
0.0286
109 NELSIP/NP/J/DELPS/G/1Bitumin for reconstruction of roads in
LADC* 38700L 4.644
0.0407
110 NELSIP/NP/J/DELPS/G/2Bitumin for reconstruction of roads in
LADC* 43200L 5.184
0.0454
111 NELSIP/NP/J/KRPS/G/1Bitumin for reconstruction of roads in
LADC* 13500 L 1.418
0.0124
112 NELSIP/NP/J/KRPS/G/2Bitumin for reconstruction of roads in
LADC* 27000L 2.997
0.0262
113 NELSIP/NP/J/KYPS/G/1Bitumin for reconstruction of roads in
LADC* 14490L 1.521
0.0133
114 NELSIP/NP/J/KYPS/G/2Bitumin for reconstruction of roads in
LADC* 30915L 3.121
0.0273
0.0007134
NELSIP/G/EP/PMU/08 Purchase of Colour Printer
NS 1 0.085
0.0010133
NELSIP/G/EP/PMU/09 Supply & Fixing of Air Condition
NS 1 0.110
0.0008132NELSIP/G/EP/PMU/07 Purchase of Flash Drive
NS 10 0.094
0.0027131
NELSIP/G/EP/PMU/05 Purchase of Furniture (Items)
NS 16 0.310
0.0031130
NELSIP/G/EP/PMU/04 Purchase of Stationery - Stage 1
NS Package 0.360
0.0005129NELSIP/G/EP/PMU/03 Purchase of External Hard Disk
NS 5 0.057
0.0003128NELSIP/G//EP/PMU/02 Purchase of Internet Dongle
NS 8 0.040
114 NELSIP/NP/J/KYPS/G/2Bitumin for reconstruction of roads in
LADC* 30915L 3.121
0.0273
115NELSIP/NP/VU/VSTPS/
G/1
Bitumin for reconstruction of roads in
LADC* 48900L 4.366
0.0380
116NELSIP/NP/J/VVTUC/G/
1
Bitumin for reconstruction of roads in
LADC* 25127L 3.040
0.0260
117NELSIP/NP/MN/MNPS/
G/1
Bitumin for reconstruction of roads in
LADC* 9000L 0.864
0.0070
118NELSIP/NP/MN/MUPS/
G/1
Bitumin for reconstruction of roads in
LADC* 16514L 1.750
0.0150
119NELSIP/NP/MN/NAPS/G
/1
Bitumin for reconstruction of roads in
LADC* 85446L 8.202
0.0710
120NELSIP/NP/MN/MWPS/
G/1
Bitumin for reconstruction of roads in
LADC* 29400L 2.821
0.0240
121 NELSIP/NP/KI/POPS/G/1Bitumin for reconstruction of roads in
LADC* 31860L 3.053
0.0270
122 NELSIP/NP/KI/PAPS/G/1Bitumin for reconstruction of roads in
LADC* 46710L 4.623
0.0402
123NELSIP/NP/KI/KAPS/G/
1
Bitumin for reconstruction of roads in
LADC* 41625L 4.115
0.0360
124NELSIP/NP/MU/KTPS/G
/1
Bitumin for reconstruction of roads in
LADC* 40477L 3.876
0.0340
125NELSIP/NP/MU/PUPS/G/
1
Bitumin for reconstruction of roads in
LADC* 36000L 3.672
0.0320
126NELSIP/NP/MU/TUPS/G
/1
Bitumin for reconstruction of roads in
LADC* 45000L 4.590
0.0400
127NELSIP/NP/MU/MEPS/G
/1
Bitumin for reconstruction of roads in
LADC* 49200L 5.020
0.0440
NELSIP/G/EP/PMU/15Purchase of soil testing
Equepments & tools (3 District)NCB Items
0.400 0.0035159 NELSIP/G/EP/BT/EPPS/01IT Equepment Eraur pattu PS
NS Items
158 NELSIPG//EP/BT/KPPS/01IT Equepment Koralai Pattu PS
NS Items 0.400 0.0035
157 NELSIP/G/EP/TR/RACLG/01IT Equepment Assiatant
Commisstioner of Local NS Items 0.400 0.0035
0.400 0.0035156 NELSIP/G/EP/TR/PSPS/01IT Equepment Padavi Sri Pura
PSNS Items
155 NELSIP/G/EP/TR/MUPS/01IT Equepment Muthur PS
NS Items 0.400 0.0035
154 NELSIP/G/EP/TR/THPS//01IT Equepment Thambalagam
PSNS Items 0.400 0.0035
0.400 0.0035153 NELSIP/G/EP/TR/KIPS/01IT Equepment Kinniya PS
NS Items
152 NELSIP/G/EP/TR/KUPS/01IT Equepment Kuchchaweli PS
NS Items 0.400 0.0035
151 NELSIP/G/EP/TR/MOPS/01IT Equepment Morawewa PS
NS Items 0.400 0.0035
0.400 0.0035150 NELSIP/G/EP/TR/GOPS//01IT Equepment
Gomarankadawala PSNS Items
149 NELSIP/G/EP/TR/SEPS//01IT Equepment Seruvila PS
NS Items 0.400 0.0035
148 NELSIP/G/EP/TR/VEPS/01IT Equepment Verugal PS
NS Items 0.400 0.0035
0.400 0.0035147 NELSIP/G/EP/TR/KAPS/01IT Equepment Kantale PS
NS Items
146 NELSIP/G/EP/TR/TGPS/01IT Equepment Toun and Gravel
PSNS Items 0.400 0.0035
145 NELSIP/G/EP/TR/ KIUC/ 01IT Equepment Kinniya UC
NS Items 0.400 0.0035
0.400 0.0035144 NELSIP/G/EP/TR/TRUC/01IT Equepment Trinco UC
NS Items
143 NELSIP/G/EP/PMU/22 Interpretation System Equipment NS System unit 2.000 0.0174
142 NELSIP/G/EP/PMU/21 Audit Department IT Equipment NS 14 0.085 0.0007
2.500 0.0217141 NELSIP/G/EP/PMU/20 Lavelling Instrument NS 50
140 NELSIP/G/EP/PMU/19 Purchase of Laptop Computer NS 7 8.200 0.0713
139 NELSIP/G/EP/PMU/18 Purchase of UPS NS 3 0.210 0.0018
0.070 0.0006138 NELSIP/G/EP/PMU/17 Purchase of Laser Printers NS 2
137 NELSIP/G/EP/PMU/16 Purchase of Desk top computers NS 3 0.200 0.0017
136 15.000 0.1304
0.0013135 NELSIP/G/EP/PMU/10 Purchase of Photocopier NS 1 0.150
0.0007134
NELSIP/G/EP/PMU/08 Purchase of Colour Printer
NS 1 0.085
184 NELSIP/G//EP/AM/RACLG/01IT Equepment Assistnat
Commisser of Local NS Items 0.400 0.0035
0.400 0.0035183 NELSIP/G/EP/AM/KMC/01IT Equepment Kalmuni MC
NS Items
182 NELSIP/G/EP/AM/AKMC/01IT Equepment Akkaraipattu
MCNS Items 0.400 0.0035
181 NELSIP/G/EP/AM/AMUC/01IT Equepment Ampara UC
NS Items 0.400 0.0035
0.400 0.0035180 NELSIP/G/EP/AM/NIPS/01IT Equepment Ninthavur PS
NS Items
179 NELSIP/G/EP/AM/UHPS/01IT Equepment Uhana PS
NS Items 0.400 0.0035
178 NELSIPG//EP/AM/LAPS/01IT Equepment Lahugala PS
NS Items 0.400 0.0035
0.400 0.0035177 ENELSIP/G//P/AM/AKPS/01IT Equepment Akkaraipattu PS
NS Items
176 NELSIP/G/EP/AM/POPS/01IT Equepment Pottuvil PS
NS Items 0.400 0.0035
175 NELSIPG//EP/AM/KTPS//1IT Equepment Karaitivu PS
NS Items 0.400 0.0035
0.400 0.0035174 NELSIP/G/EP/AM/ALPS/01IT Equepment Alayadivembu
PSNS Items
173 NELSIP/G/EP/AM/ADPS/01IT Equepment Addalachchenai
PSNS Items 0.400 0.0035
172 NELSIP/G/EP/AM/DEPS/ 01IT Equepment Dehiattakandiya
PSNS Items 0.400 0.0035
0.400 0.0035171 NELSIP/G/EP/AMP/NVPS/01IT Equepment Navithanveli PS
NS Items
170 NELSIP/G/EP/AM/THPS/1IT Equepment Thirukkovil PS
NS Items 0.400 0.0035
169 NELSIP/G/EP/BT/RACLG/01IT Equepment Commisioner of
Local Government BatticaloNS Items 0.400 0.0035
0.400 0.0035168 NELSIP/G/EP/BT/MC/01IT Equepment Batticalo MC
NS Items
167 NELSIP/G/EP/BT/EUC/01IT Equepment Eravur UC
NS Items 0.400 0.0035
166 NELSIPG//EP/BT/PPPS/01IT Equepment Poraitivupattu
PSNS Items 0.400 0.0035
0.400 0.0035165 NELSIP/G/EP/BT/MWPS/01IT Equepmen tManmunai West
PSNS Items
164 NELSIP/G/EP/BT/KPWPS/O1IT Equepment Koralaipattu
West PSNS Items 0.400 0.0035
163 NELSIP/G/EP/BT/MPPS/01IT Equepment Manmunaipattu
PSNS Items 0.400 0.0035
0.400 0.0035162 NELSIP/G/EP/BT/KUC/O1IT Equepment Kattankudi UC
NS Items
161 NELSIP/G/EP/BT/MS&EPPS/01IT Equepment Manmunai south
& Eruvil Pattu NS Items 0.400 0.0035
160NELSIP/G/EP/BT/MSWPS/W/0
1
IT Equepment Manmunai
South West PSNS Items 0.400 0.0035
Date
Cu
rren
cy Amount (LKR)
8 9 10 11 12 13 14 15 16
489,700.00
-
Actual 20-May-10 28-Jul-10 37,632.00
Actual 25-Jan-11 07-Mar.-11 30-Mar.-11 10-June.-11 N/A
Actual 12-Dec-11 18-Jan-12 89,000.00
Planned 07-Sep-11 07-Oct-11
Actual
Planned 17-May-10 26-May-10
Actual 10-Aug-10 11-Aug.-10
Planned 27-Jul-11 03-Aug-11
Actual 10-Aug-11 16-Aug-11
Planned 26-Jul-11 25-Aug-11
Actual
Planned 21-Nov-11 05-Dec-11
Actual
Planned 17-Jun-10 02-Jul-10
Actual 27.July-10 05-Aug.-10
Planned 07-Feb-11 21-Feb-11
Actual 01-Feb.-11 23-Mar.-11
Planned 14-Feb-11 28-Feb-11
Actual 2-Feb.-11 25-Mar.-11
PROCUREMENT PLAN FOR GOODS
Government of Sri LankaNorth East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the North and
East Province )Credit/#: 4728LK
Ministry of Economic Development
5th April 2010
31st July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
*** Indicate extensions/modifications etc.
Pri
or/
Po
st R
evie
w b
y B
ank*
*
Stage
Su
bm
it D
BD
wit
h IF
B f
or
Ban
k's
N/O
Pu
blis
h IF
B in
Nat
ion
al n
ewsp
aper
s an
d
UN
DB
Dea
dlin
e fo
r su
bm
issi
on
of
bid
s
Su
bm
it B
ER
fo
r B
ank'
s N
/O
Signing of contract
Post ReviewPlanned
N/A N/A17-May-10
N/A1-Jul-10
LKR
Prior Review Planned 15-Nov-10 22-Nov-10 15-Dec-10 14-Jan-11 21-Jan-11
LKR -
Post Review
Planned
N/A N/A
28-Oct-11
N/A
18-Nov-11
LKR
73,808.00
Post Review N/A N/A N/A LKR
Post Review N/A N/A N/A LKR 10,980.00
Post Review N/A N/A N/A LKR 5,922.00
Post Review N/A N/A N/A LKR -
Post Review N/A N/A N/A LKR -
Post Review N/A N/A N/A LKR 139,818.00
Post Review N/A N/A N/A LKR 298,180.00
Post Review N/A N/A N/A LKR 158,223.00
6,300.00
Actual 12-Aug.-10 17-Aug.-10 4,250.00
Planned 11-Jan-12 25-Jan-12
Actual
Planned 07-Jun-10 14-Jun-10
Actual 06-Aug.-10 06-Aug.10
Planned 07-Dec-10 14-Dec-10
Actual 28-Dec.-10 28-Dec.-10
Actual 30-May-12
Planned 15-Nov-10 25-Nov-10
Actual 16-Dec.-10 23-Dec.-11
Planned N/A N/A 18-Aug-10 25-Aug-10
Actual 25-Aug.-10 26-Aug.-10
Planned N/A N/A 18-Aug-10 N/A 25-Aug-10
Actual 07-Sep.-10 08-Sep.-10
Planned 18-Aug-10 N/A 25-Aug-10
Actual 14-Oct.-11 15-Oct.-11
Planned 04-Jun-11 14-Jun-11
Actual 24-Oct-11 01-Nov-11
Planned 12-Oct-10 11-Nov-10
Actual 27-Oct.10 15-Nov.-10
Planned N/A N/A 27-Jan-11 03-Feb-11
Actual 03-Feb.-11 09-Feb.-11
Planned 09-Dec-10 16-Dec-10
Actual 03-Dec.-10 07-Dec.-10
Planned N/A N/A 08-Dec-11 15-Dec-11
Actual 13-Feb-12 10-Feb-12
Planned N/A N/A 10-Feb-11 18-Feb-11
Actual 03-Feb.-11 09-Feb.-11
Planned N/A N/A 08-Dec-11 15-Dec-11
Actual 23-Jan-12 23-Jan-12
Planned N/A N/A 06-May-10 13-May-10
Actual 25-Oct-10 25-Oct-10
Planned 03-Jan-12 13-Jan-12
Actual
Planned 04-Jan-12 11-Jan-12
Actual
Planned 05-Mar-12 12-Mar-12
Actual
Planned 28-Mar-11 06-Apr-11
Actual
Planned 28-Nov-11 08-Dec-11
Actual
Planned 08-Dec-11 19-Dec-11
Actual
Planned 05-Aug-11 12-Aug-11
Actual 08-Aug-11 08-Aug-11
Post ReviewPlanned
N/A N/A04-Aug-10
LKR28-Jul-10
N/A
Post Review N/A N/A N/A LKR -
Post Review N/A N/A N/A LKR 11,500.00
Post Review N/A N/A N/A LKR 4,610.00
Prior Rewew
Planned21-Nov-11 28-Nov-11 10-Jan-12 21-Feb-12 19-Apr-12
LKR -
Post Review N/A N/A N/A LKR 57,802.00
Post Review N/A LKR 26,109.60
Post Review LKR 9,184.00
Post Review N/A N/A LKR 10,752.00
Post Review N/A N/A N/A LKR 57,244.16
Post Review N/A N/A N/A LKR 447,000.00
Post Review N/A LKR 37,948.00
Post Review N/A N/A N/A LKR 13,776.00
Post Review N/A LKR 12,768.00
Post Review N/A LKR 9,499.00
Post Review N/A LKR 9,184.00
Post Review N/A LKR 16,170.00
Post Review N/A N/A N/A LKR
Post Review N/A N/A N/A LKR -
Post Review N/A N/A N/A LKR -
Post Review N/A N/A N/A LKR
Post Review N/A N/A N/A LKR
Post Review N/A N/A N/A LKR
Post Review N/A N/A N/A LKR 14,000.00
Planned 15-Aug-11 22-Aug-11
Actual 24-Aug-11 24-Aug-11
Planned 09-Sep-11 19-Sep-11
Actual 19-Sep-11 22-Sep-11
Actual 18-Oct-11 22-Nov-11
Planned 15-Dec-11 22-Dec-11
Actual
Planned 15-Dec-11 22-Dec-11
Actual 14-Dec-11 14-Dec-11
Planned 14-Jun-12 21-Jun-12
Actual 24-Jul-12 02-Aug-12
Planned 14-Mar-12 21-Mar-12
Actual
Planned 14-Jun-12 21-Jun-12
Actual
Planned 14-Jun-12 21-Jun-12
Actual 27-Jun-12 02-Jul-12
Planned 14-Jun-12 21-Jun-12
Actual
Planned 25-Aug-11 30-Aug-11
Actual 31-Jan-12 9-Mar-12
Post Review Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR
Actual
Actual 16-Mar-12 30-Mar-12
Actual
Planned N/A N/A 15-Aug-10 N/A 24-Aug-10 LKR
Actual
Planned N/A N/A 15-Aug-11 N/A 29-Aug-11 LKR
Actual
Planned N/A N/A 15-Aug-11 N/A 30-Aug-11 LKR
Actual 04-Aug-11 09-Aug-11
Planned N/A N/A 18-Aug-11 N/A 25-Aug-11 LKR
Actual 10-Aug-11 15-Aug-11
Planned N/A N/A 18-Aug-10 N/A 25-Aug-10 LKR
Actual 05-Aug-11 05-Aug-11
Planned N/A N/A 05-Dec-11 N/A 15-Dec-11 LKR
Actual
Planned N/A N/A 26-Aug-11 N/A 05-Sep-11 LKR
Actual
Post Review N/A N/A N/A LKR 6,100.00
Post Review N/A N/A N/A LKR 278,790.00
Post ReviewPlanned
N/A N/A30-Sep-11
N/A14-Oct-11
LKR 2,023,550.00
Post Review N/A N/A N/A LKR
Post Review N/A N/A N/A LKR 8,883.00
Post Review N/A N/A N/A LKR
Post Review N/A N/A N/A LKR
Post Review N/A N/A N/A LKR
Post Review N/A N/A N/A LKR 16,500.00
Post Review N/A N/A N/A LKR
Post Review N/A N/A N/A LKR 19,800.00
Post Review
Planned
N/A N/A
26-Aug-11 N/A 16-Sep-11
LKR 262,080.00
Post ReviewPlanned
N/A N/A26-Aug-11
N/A12-Sep-11
LKR
Post Review
Post Review
Post Review 393,188.00
Post Review 109,400.00
Post Review 58,100.00
Post Review
Post Review
Planned N/A N/A 10-Feb-11 N/A 18-Feb-11 LKR
Actual 15-Feb-11 18-Feb-11
Planned N/A N/A 21-Sep-11 N/A 28-Sep-11
Actual 08-Nov-11 07-Dec-11
Planned N/A 21-Sep-11 N/A 28-Sep-11
Actual 08-Nov-11 07-Dec-11
Planned N/A N/A 21-Sep-11 N/A 28-Sep-11
Actual 08-Nov-11 01-Dec-11
Planned N/A N/A 19-Oct-11 N/A 31-Oct-11 LKR
Actual
Planned N/A N/A 10-Feb-11 N/A 18-Feb-11 LKR
Actual 15-Feb-11 18-Feb-11
Planned N/A N/A 21-Sep-11 N/A 28-Sep-11
Actual 08-Nov-11 07-Dec-11
Planned N/A N/A 19-Oct-11 N/A 31-Oct-11
Actual 08-Nov-01 22-Dec-11
Planned N/A N/A 19-Oct-11 N/A 31-Oct-11 LKR
Actual 11-Jan-11 23-Jan-12
Planned N/A N/A 17-Oct-11 N/A 31-Oct-11
Actual 31-Jan-12 9-Mar-12
Planned N/A N/A 17-Oct-11 N/A 31-Oct-11
Actual 15-Feb-12 09-Mar-12
Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR
Actual 11/15/2011 11/22/2011
Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR
Actual 17-Apr-12 30-Apr-12
Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR
Actual 17-Feb-11 05-Mar-12
Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR
Actual
Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR
Actual 09-Jan-11 23-Jan-12
Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR
Actual 09-Jan-11 23-Jan-12
Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR
Actual
Planned 17-Oct-11 31-Oct-11
Actual
Post Review 5,990.00
Post Review LKR 1,654,000.00
Post Review N/A LKR 358,200.00
Post Review LKR 1,749,000.00
Post Review
Post Review 5,990.00
Post Review LKR 1,654,000.00
Post Review LKR 1,835,814.00
Post Review 1,128,000.00
Post Review LKR 462,000.00
Post Review LKR 1,318,400.00
Post Review 10,980.00
Post Review 2,278,080.00
Post Review 148,500.00
Post Review
Post Review 1,320,000.00
Post Review 1,230,000.00
Post Review
Post Review N/A N/A N/A LKR
Planned 17-Oct-11 31-Oct-11
Actual
Planned 17-Oct-11 31-Oct-11
Actual
Planned 24-Apr-12 11-May-12
Actual
Planned 24-Apr-12 11-May-12
Actual
Planned 24-Apr-12 11-May-12
Actual
Planned 24-Apr-12 11-May-12
Actual
Planned 24-Apr-12 11-May-12
Actual
Planned 01-Jun-12 30-Jun-12
Actual
Planned 04-Apr-12 05-Apr-12
Actual 06-Apr-12 13-Apr-12
Planned 01-Feb-11 08-Feb-11
Actual 07-Feb-11 11-Feb-11
Planned 10-Feb-11 18-Feb-11
Actual 21-Feb-11 24-Feb-11
Planned 10-Feb-11 18-Feb-11
Actual 23-Feb-10 28-Feb-11
Planned 12-May-11 19-May-11
Actual 19-Jul-11 25-Jul-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 N/A 19-May-11
Actual 30-Jun-11 7-Jul-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 N/A 19-May-11
Actual 26-Jul-11 3-Aug-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 N/A 19-May-11
Post Review N/A N/A N/A LKR
Post Review N/A N/A N/A LKR
Post Review N/A N/A N/A LKR
Post Review N/A N/A N/A LKR
Post Review N/A N/A N/A LKR
Post Review N/A N/A N/A LKR
Post Review N/A N/A LKR
Post Review N/A N/A LKR
Post Review N/A N/A LKR 0.04
Post Review N/A N/A N/A LKR 5,990.00
Post Review N/A N/A N/A LKR 5,990.00
Post Review N/A N/A N/A LKR 5,990.00
Post Review N/A N/A N/A LKR 252,000.00
Post Review N/A N/A LKR
Post Review N/A N/A LKR 2,612,520.00
Post Review N/A N/A LKR
Post Review N/A N/A LKR 2,160,000.00
Post Review N/A N/A LKR
Post Review N/A N/A LKR 1,526,400.00
Actual 27-Jul-11 4-Aug-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 N/A 19-May-11 LKR
Actual 18-Jul-11 25-Jul-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 N/A 19-May-11
Actual 21-Jul-11 28-Jul-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 N/A 19-May-11
Actual 20-Jun-11 27-Jun-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 N/A 19-May-11
Actual 5-Jul-11 13-Jul-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 N/A 19-May-11
Actual 10-Jun-11 17-Jun-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 N/A 19-May-11
Actual 4-Jul-11 12-Jul-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 N/A 19-May-11
Actual 20-Jul-11 28-Jul-11
Planned 12-May-11 N/A 19-May-11
Actual 25-Jul-11 3-Jul-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 N/A 19-May-11
Actual 5-Jul-11 13-Jul-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 N/A 19-May-11
Actual 16-Jun-11 23-Jun-11
Planned 01-Nov-11 N/A 08-Nov-11
Post Review N/A N/A LKR 1,526,400.00
Post Review N/A N/A LKR
Post Review N/A N/A 6,616,800.00
Post Review N/A N/A LKR
Post Review N/A N/A LKR 2,145,600.00
Post Review N/A N/A LKR
Post Review N/A N/A LKR 3,780,000.00
Post Review N/A N/A LKR
Post Review N/A N/A LKR 2,016,000.00
Post Review N/A N/A LKR
Post Review N/A N/A LKR 1,346,400.00
Post Review N/A N/A LKR
Post Review N/A N/A LKR 3,988,800.00
Post Review N/A N/A LKR
Post Review N/A N/A LKR 2,497,110.00
Post Review N/A N/A LKR 3,168,000.00
Post Review N/A N/A LKR
Post Review N/A N/A LKR 1,080,000.00
Post Review N/A N/A LKR
Post Review N/A N/A LKR 1,123,200.00
Post Review N/A N/A LKR
Actual
Planned 12-May-11 N/A 19-May-11
Actual 6-Sep-11 15-Sep-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 20-Jun-11 30-Jun-11
Actual 25-Jun-11 30-Jun-11
Planned 3-Aug-11 17-Aug-11
Actual 3-Aug-11 17-Aug-11
Planned 24-Mar-11 28-Mar-11
Actual 21-Apr-11 4-May-11
Planned 3-Aug-11 6-Aug-11
Actual 5-Aug-11 6-Aug-11
Planned 3-Aug-11 24-Aug-11
Actual
Planned 3-Aug-11 20-Jul-11
Actual 30-Jun-11 24-Aug-11
Planned 3-Aug-11 24-Aug-11
32,000.00 Post Review N/A N/A N/A LKR
102,900.00 Post Review N/A N/A N/A LKR
27,750.00 Post Review N/A N/A N/A LKR
136,086.02 Post Review N/A N/A N/A LKR
61,865.00 Post Review N/A N/A N/A LKR
57,500.00 Post Review N/A N/A N/A LKR
42,720.00 Post Review N/A N/A N/A LKR
Post Review N/A N/A LKR
Post Review N/A N/A LKR 3,916,800.00
Post Review N/A N/A LKR
Post Review N/A N/A LKR
Post Review N/A N/A LKR
Post Review N/A N/A LKR
Post Review N/A N/A LKR
Post Review N/A N/A LKR
Post Review N/A N/A LKR
Post Review N/A N/A LKR
Post Review N/A N/A LKR
Post Review N/A N/A LKR
Post Review N/A N/A LKR
Post Review N/A N/A LKR
Actual 2/12/2011 4-Jan-12
Planned 7-Oct-11 21-Oct-11
Actual 2/12/2011 4-Jan-12
Planned 22-Sep-11 30-Sep-11 24-Oct-11 7-Nov-11 21-Nov-11
Actual
Planned 7-Oct-11 21-Oct-11
Actual 2/12/2011 4-Jan-12
Planned 7-Oct-11 21-Oct-11
Actual 2/12/2011 4-Jan-12
Planned 7-Oct-11 21-Oct-11
Actual 2/12/2011 4-Jan-12
Planned 7-Oct-11 21-Oct-11
Actual 2/12/2011 4-Jan-12
Planned 30-Apr-12 14-May-12
Actual
Planned 30-Apr-12 14-May-12
Actual
Planned 18-May-12 1-Jun-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
ActualLKRPost Review N/A N/A N/A
Post Review N/A N/A N/A LKR
N/A N/A LKRPost Review N/A
LKRPost Review N/A N/A N/A
Post Review N/A N/A N/A LKR
N/A N/A LKRPost Review N/A
LKRPost Review N/A N/A N/A
Post Review N/A N/A N/A LKR
N/A N/A LKRPost Review N/A
LKRPost Review N/A N/A N/A
Post Review N/A N/A N/A LKR
N/A N/A LKRPost Review N/A
LKRPost Review N/A N/A N/A
Post Review N/A N/A N/A LKR
N/A N/A LKRPost Review N/A
LKRPost Review N/A N/A N/A
Post Review N/A N/A N/A LKR
N/A N/A LKRPost Review N/A
LKR 2,330,000.00 Post Review N/A N/A N/A
Post Review N/A N/A N/A LKR 703,500.00
N/A N/A LKR 12,000.00 Post Review N/A
LKR 60,000.00 Post Review N/A N/A N/A
Post Review N/A N/A N/A LKR 276,000.00
Prior Rewew LKR
105,000.00 Post Review N/A N/A N/A LKR
32,000.00 Post Review N/A N/A N/A LKR
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
Actual
Planned 16-Apr-12 30-May-12
ActualN/A N/A LKRPost Review N/A
LKRPost Review N/A N/A N/A
Post Review N/A N/A N/A LKR
N/A N/A LKRPost Review N/A
LKRPost Review N/A N/A N/A
Post Review N/A N/A N/A LKR
N/A N/A LKRPost Review N/A
LKRPost Review N/A N/A N/A
Post Review N/A N/A N/A LKR
N/A N/A LKRPost Review N/A
LKRPost Review N/A N/A N/A
Post Review N/A N/A N/A LKR
N/A N/A LKRPost Review N/A
LKRPost Review N/A N/A N/A
Post Review N/A N/A N/A LKR
N/A N/A LKRPost Review N/A
LKRPost Review N/A N/A N/A
Post Review N/A N/A N/A LKR
N/A N/A LKRPost Review N/A
LKRPost Review N/A N/A N/A
Post Review N/A N/A N/A LKR
N/A N/A LKRPost Review N/A
LKRPost Review N/A N/A N/A
Post Review N/A N/A N/A LKR
N/A N/A LKRPost Review N/A
17 18 19 20 21.00 22
15-Oct-10
N/A N/A
John Keels 30-Jan-12
06-Nov-11
05-Jun-10
16-Aug.-10
13-Aug-11
15-Sep-11
08-Sep-11
15-Dec-11
12-Jul-10
16-Aug.-10
07-Mar-11
25-Mar.-11
14-Mar-11
PROCUREMENT PLAN FOR GOODS
Government of Sri Lanka
Credit/#: 4728LK
Ministry of Economic Development
5th April 2010
31st July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
*** Indicate extensions/modifications etc.
Nam
e o
f C
on
trac
tor/
nat
ion
alit
y
Su
bm
it s
ign
ed c
on
trac
t co
py
to B
ank
Pu
blis
h c
on
trac
t aw
ard
no
tice
in U
ND
B
& N
atio
nal
new
spap
ers
Co
mp
leti
on
of
con
trac
t
Exp
end
itu
re in
curr
ed t
o d
ate
(LK
R)
Sta
tus/
Rem
arks
***
Archi Tech &
Metropolitan
N/A N/A15-Jul-10
527,332.00
-21-Jan-11
N/A21-Feb-11
-
Re
invi
te a
s ne
w p
acka
ges
CBA Pvt Ltd
N/A N/A
18-Dec-11
162,808.00
Ph
and
Fax
not
purc
hase
d du
e to
reci
pt o
f goo
ds
from
oth
er s
ours
e
N/A N/A
Furniture were
recive d From
Ministry
Dialog Pvt Ltd N/A N/A 10,980.00
Dialog Pvt Ltd N/A N/A 5,922.00 -
N/A N/A - -
N/A N/A - -
Lakvin, Pilot,
Leader, NarahN/A N/A 139,818.00
Seadlers Pvt
LtdN/A N/A 298,180.00 -
Printed only
FMMN/A 158,223.00
Softwave, Pvt
LtdN/A
13-Sep-10
04-Feb-12
19-Jun-10
06-Aug.-10
19-Dec-10
30-Dec.10
05-Dec-10
7-Jan-11
01-Sep-10
30-Aug.-10
01-Sep-10
17-Sep.11
01-Sep-10
21-Oct.-10
24-Jun-11
08-Nov-11
11-Dec-10
23-Nov.-10
10-Feb-11
31-Mar.11
23-Dec-10
13-Dec.10
22-Dec-11
12-Mar-12
25-Feb-11
22-Dec-11
20-May-10
23-Jan-12
18-Jan-12
19-Mar-12
16-Apr-11
18-Dec-11
29-Dec-11
15-Aug-11
10-Aug-11
Net work
witch -ABC
Computers
Adepter from
Technocity
N/A N/A18-Aug-10
10,550.00 -
- N/A N/A - -
SLT Pvt Ltd N/A N/A 11,500.00 -
SLT Pvt Ltd N/A N/A 4,610.00 -
-21-Apr-12 21-Apr-12 03-Jun-12
-
Pilot, Narah,
Leader
statineries
N/A N/A 57,802.00
Office
Network Pvt
Ltd
N/A N/A 26,109.60 -
Metropolitan
Pvt LtdN/A N/A 9,184.00 -
Metropolitan
Pvt LtdN/A N/A 10,752.00 -
Sealine
Trading Pvt
Ltd and Narah
N/A N/A 57,244.16
Metropolitan N/A N/A 447,000.00
Ewis Pvt Ltd
Office
Network Pvt
N/A N/A 37,948.00 -
Metropolitan N/A N/A 13,776.00 -
Office
Network Pvt
Ltd
N/A N/A 12,768.00 -
John Keels N/A N/A 9,499.00 -
Metropolitan
Offcie Pvt LtdN/A N/A 9,184.00 -
Office
Network Pvt
Ltd
N/A N/A 16,170.00 -
N/A N/A
- N/A N/A - -
- N/A N/A - -
N/A N/A
N/A N/A
N/A N/A
Ygen
Advertising
solution
N/A N/A 14,000.00
29-Aug-11
02-Sep-11
29-Sep-11
05-Mar-12
29-Dec-11
29-Dec-11
22-Dec-11
28-Jun-12
28-Mar-12
28-Jun-12
28-Jun-12
11-Jul-12
05-Jul-12
7-Sep-11
19-Mar-12
N/A N/A 07-Nov-11
N/A N/A 03-Sep-10
26-Aug.-10
N/A N/A 08-Sep-11
N/A N/A 09-Sep-11
N/A N/A 01-Sep-11
N/A N/A 01-Sep-10 58,100.00
N/A N/A 25-Dec-11 -
N/A N/A 15-Sep-11 -
Techno Form
Pvt LtdN/A N/A 6,100.00
Ygen
Advertising
solution
N/A N/A 247,051.00
Metropolitan
Computers/E
wis
information/A
bans
N/A N/A28-Oct-11
N/A N/A
Dialog Pvt Ltd N/A N/A 8,883.00
N/A N/A
N/A N/A
N/A N/A
Office
Network Pvt
Ltd
N/A N/A 16,500.00
N/A N/A
Jhon Kells
officeN/A N/A 19,800.00
Jhon Keels
Office
Automation
N/A N/A
16-Oct-11
N/A N/A12-Oct-11
STC Genaral
Trading PVT 393,188.00
PC house Pvt
Ltd 109,400.00
Jhon Kells
(Toshoba)
N/A N/A 25-Feb-11 5,990.00
21-Feb-11
N/A N/A 07-Oct-11
N/A N/A 07-Oct-11
358,200.00
N/A N/A 07-Oct-11 1,749,000.00
N/A N/A 14-Nov-11
N/A N/A
25-Feb-11
N/A N/A 21-Feb-11
07-Oct-11
N/A N/A 14-Nov-11 1,835,814.00
N/A N/A 14-Nov-11 1,128,000.00
N/A N/A
07-Nov-11
N/A N/A 19-Mar-12
07-Nov-11
N/A N/A 07-Nov-11
N/A N/A 14-Nov-11
N/A N/A 14-Nov-11
N/A N/A 14-Nov-11
N/A N/A 14-Nov-11
N/A N/A 14-Nov-11
N/A N/A 14-Nov-11
14-Nov-11
Dialog Pvt Ltd
Abans PVT
LTD1,654,000.00
Jhon Kells
office
Metropoliton
Dialog Pvt Ltd 5,990.00
Abans PVT
LTD1,654,000.00
Metropoliton
Jhonkeels Pvt Ltd
Jhon Kells
office462,000.00
Debug
Computer 1,318,400.00
Dialog Pvt Ltd 10,980.00
Uniwakers Pvt
Ltd
Metropoliton
Bhoomi Tech 1,320,000.00
Survey and
Labotary Pvt
Ltd
1,230,000.00
N/A N/A
14-Nov-11
14-Nov-11
10-Jue-2012
10-Jue-2012
10-Jue-2012
10-Jue-2012
10-Jue-2012
30-Jul-12
30-Apr-12
18-Apr-12
15-Feb-11 5,990.00
11-Feb-11
25-Feb-11 5,990.00
27-Feb-11
25-Feb-11 5,990.00
2/29/2011
06-Jun-11
1-Aug-11
15-Nov-11
06-Jun-11
6-Jul-11
15-Nov-11
06-Jun-11
28-Jul-11
15-Nov-11
06-Jun-11
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A
N/A
N/A N/A
N/A N/A
Mangala show
roomN/A N/A
Dialog Pvt Ltd N/A N/A
Dialog Pvt Ltd N/A N/A
Dialog Pvt Ltd N/A N/A
CPC N/A N/A 252,000.00
CPC N/A N/A
CPC N/A N/A 2,612,520.00
CPC N/A N/A
CPC N/A N/A 2,160,000.00
CPC N/A N/A
CPC N/A N/A 1,526,400.00
8-Aug-11
15-Nov-11
06-Jun-11
20-Jul-11
15-Nov-11
06-Jun-11
6-Aug-11
15-Nov-11
06-Jun-11
2-Jul-11
15-Nov-11
06-Jun-11
12-Jul-11
15-Nov-11
06-Jun-11
1-Jul-11
15-Nov-11
06-Jun-11
25-Jul-11
15-Nov-11
06-Jun-11
20-Aug-11
06-Jun-11
5-Aug-11
15-Nov-11
06-Jun-11
12-Jul-11
15-Nov-11
06-Jun-11
10-Jun-11
15-Nov-11
CPC N/A N/A 1,526,400.00
CPC N/A N/A
CPC N/A N/A 6,616,800.00
CPC N/A N/A
CPC N/A N/A 2,145,600.00
CPC N/A N/A
CPC N/A N/A 3,780,000.00
CPC N/A N/A
CPC N/A N/A 2,016,000.00
CPC N/A N/A
CPC N/A N/A 1,346,400.00
CPC N/A N/A
CPC N/A N/A 3,988,800.00
CPC N/A N/A
CPC N/A N/A 2,497,110.00
CPC N/A N/A 3,168,000.00
CPC N/A N/A
CPC N/A N/A 1,080,000.00
CPC N/A N/A
CPC N/A N/A 1,123,200.00
CPC N/A N/A
06-Jun-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11
30-Sep-11
30-Sep-11
15-Oct-11
17-Oct-11
7-Apr-11
4-May-11
25-Jul-12
18-Aug-11
3-Sep-11
21-Dec-11
5-Aug-11
15-Aug-12
16-Jan-12
Trintec N/A N/A 32,000.00
Abans Pvt Ltd N/A N/A 102,900.00
N/A N/A 27,750.00
DR Industries
Pvt LtdN/A N/A 136,086.02
Come Home
StatineriesN/A N/A 61,865.00
Trintec N/A N/A 57,500.00
Dialog Pvt Ltd N/A N/A 42,720.00
CPC N/A N/A
CPC N/A N/A 3,916,800.00
CPC N/A N/A
CPC N/A N/A
CPC N/A N/A
CPC N/A N/A
CPC N/A N/A
CPC N/A N/A
CPC N/A N/A
CPC N/A N/A
CPC N/A N/A
CPC N/A N/A
CPC N/A N/A
CPC N/A N/A
8-Feb-12
16-Jan-12
8-Feb-12
24-Nov-11 24-Nov-11
48
16-Jan-12
8-Feb-12
16-Jan-12
8-Feb-12
16-Jan-12
8-Feb-12
16-Jan-12
8-Feb-12
31-May-12
15-Jun-12
31-May-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12N/A N/A
N/A N/A
N/AN/A
N/A N/A
N/A N/A
N/AN/A
N/A N/A
N/A N/A
N/AN/A
N/A N/A
N/A N/A
N/AN/A
N/A N/A
N/A N/A
N/AN/A
N/A N/A
N/A N/A
N/A_ N/A
Bhoom Tech N/A N/A
Trintec N/A N/A 703,500.00
N/A 12,000.00 Trintec N/A
Trintec N/A N/A 60,000.00
Trintec N/A N/A 276,000.00
Trintec N/A N/A 105,000.00
Trintec N/A N/A 32,000.00
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12
30-Jun-12N/AN/A
N/A N/A
N/A N/A
N/AN/A
N/A N/A
N/A N/A
N/AN/A
N/A N/A
N/A N/A
N/AN/A
N/A N/A
N/A N/A
N/AN/A
N/A N/A
N/A N/A
N/AN/A
N/A N/A
N/A N/A
N/AN/A
N/A N/A
N/A N/A
N/AN/A
N/A N/A
N/A N/A
N/AN/A
80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80 80 80 80 80 80 80 80 80 80
80
Ser
ial N
o.
Pac
kag
e N
o.
Des
crip
tio
n
Met
ho
d o
f P
rocu
rem
ent*
Qu
anti
ty (
Nu
mb
ers)
Pri
or/
po
st r
evie
w b
y
Ban
k**
LKR USD
0.0039 Post Review8NELSIP/S/NP/RPMU/M
/001
Hiring Vehicle - RPMU
(Mulathivu)NS 1 0.450
0.0039 Post Review7NELSIP/S/NP/RPMU/K
/001
Hiring Vehicle - RPMU
(KIlinochchi)NS 1 0.450
0.0039 Post Review6NELSIP/S/NP/RPMU/M
//001
Hiring Vehicle - RPMU
(Mannar)NS 1 0.450
0.0039 Post Review5NELSIP/S/NP/RPMU/J/
001
Hiring Vehicle - RPMU
(Jaffna)NS 1 0.450
0.0052 Post Review4NELSIP/S/NP/PMU/00
1Hiring Vehicle - PMU NS 1 0.600
0.041 Post Review3MEID/NELSIP/S/PCU/0
04Hiring Vehicle - PCU Stage ii NS 3 4.720
1.000 0.009 Post Review2MEID/NELSIP/S/PCU/0
03Hiring Vehicle - PCU Stage ii NS 2
0.004 Post Review
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
*** Indicate extensions/modifications etc.
Estimated Cost (Million)
1MED/NELSIP/S/PC
U/002Translation Services DC Items 0.500
GPN # and Date Published:
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
Update as of : (date) 31st July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting
PROCUREMENT PLAN FOR NON-CONSULTANT SERVICES
Country/Borrower: Government of Sri Lanka
Project Name:North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for
the North and East Province )
Implementing Agency: Ministry of Economic Development
0.0008 Post Review25NELSIP/NP/J/V
WPS/S/2Trasport of Bitumin NS 20250L 0.081
24NELSIP/NP/J/V
WPS/S/1Trasport of Bitumin NS 25200L 0.107 0.0008 Post Review
23NELSIP/NP/J/V
EPS/S/2Trasport of Bitumin NS 13500L 0.054 0.0005 Post Review
0.162 0.0013 Post Review22NELSIP/NP/J/V
EPS/S/1Trasport of Bitumin NS 47250
0.0009 Post Review21NELSIP/NP/J/V
SPS/S/2Trasport of Bitumin NS 27270L 0.109
20NELSIP/NP/J/V
SPS/S/1Trasport of Bitumin NS 26820L 0.097 0.0003 Post Review
19NELSIP/NP/J/P
PPS/S/2Trasport of Bitumin NS 40275L 0.161 0.0014 Post Review
0.069 0.0002 Post Review18NELSIP/NP/J/P
PPS/S/1Trasport of Bitumin NS 19080
0.0007 Post Review17NELSIP/NP/J/C
hPS/S/2Trasport of Bitumin NS 19800L 0.079
16NELSIP/NP/J/C
hPS/S/1Trasport of Bitumin NS 27000L 0.099 0.0009 Post Review
15NELSIP/NP/J/NaPS/
S/2Trasport of Bitumin NS 28323L 0.113 0.0010 Post Review
0.033 0.0003 Post Review14NELSIP/NP/J/NaPS/
S/1Trasport of Bitumin NS 8775L
0.0004 Post Review13NELSIP/NP/J/ChUC/
S/2Trasport of Bitumin NS 11586L 0.046
12NELSIP/NP/J/ChUC/
S/1Trasport of Bitumin NS 32656L 0.220 0.0018 Post Review
11NELSIP//NP/J/JAM
C/S/2Trasport of Bitumin NS 27630L 0.111 0.0010 Post Review
0.012 0.0001 Post Review10NELSIP//NP/J/JAM
C/S/1Trasport of Bitumin NS 3150L
0.0039 Post Review9NELSIP/S/NP/RPMU/V
U/001
Hiring Vehicle - RPMU
(Vavuniya)NS 1 0.450
0.0017 Post Review44NELSIP/NP/MU/ME
PS/W/01Trasport of Bitumin NS 49200L 0.197
0.144 0.0013 Post Review43NELSIP/NP/MU/PU
PS/W/01Trasport of Bitumin NS 36000L
0.0014 Post Review42NELSIP/NP/MU/KT
PS/S/01Trasport of Bitumin NS 40477L 0.162
0.167 0.0015 Post Review41NELSIP/NP/KI/KAP
S/S/1Trasport of Bitumin NS 41625L
0.0016 Post Review40NELSIP/NP/KI/PPPS
/S/1Trasport of Bitumin NS 46710L 0.187
0.127 0.0011 Post Review39NELSIP/NP/KI/P0PS
/S/1Trasport of Bitumin NS 31860L
0.0010 Post Review38NELSIP/NP/MN/M
WPS/S/1Trasport of Bitumin NS 29400L 0.118
Post Review37NELSIP/NP/MN/NA
PS/S/1Trasport of Bitumin NS 85446L 0.342 0.0030
36NELSIP/NP/MN/MU
PS/S/1Trasport of Bitumin NS 16514L 0.066 0.0006 Post Review
35NELSIP/NP/MN/MN
PS/S/1Trasport of Bitumin NS 9000L 0.036 0.0003 Post Review
0.017 0.0000 Post Review34NELSIP/NP/VU
/VSTPS/S/1Trasport of Bitumin NS 48900L
0.0011 Post Review33NELSIP/NP/J/K
YPS/S/2Trasport of Bitumin NS 30915L 0.124
32NELSIP/NP/J/K
YPS/S/1Trasport of Bitumin NS 14490L 0.053 0.0006 Post Review
31NELSIP/NP/J/K
RPS/S/2Trasport of Bitumin NS 27000L 0.110 0.0010 Post Review
0.051 0.0004 Post Review30NELSIP/NP/J/K
RPS/S/1Trasport of Bitumin NS 13500L
0.0015 Post Review29NELSIP/NP/J/D
ELPS/S/2Trasport of Bitumin NS 43800L 0.173
28NELSIP/NP/J/D
ELPS/S/1Trasport of Bitumin NS 38700L 0.160 0.0013 Post Review
27NELSIP/NP/J/V
SWPS/S/2Trasport of Bitumin NS 10373L 0.041 0.0004 Post Review
0.187 0.0016 Post Review26NELSIP/NP/J/V
SWPS/S/1Trasport of Bitumin NS 49860L
0.0008 Post Review25NELSIP/NP/J/V
WPS/S/2Trasport of Bitumin NS 20250L 0.081
0.010 Post Review48NELSIP/S/EP/PMU/00
3
Hiring Vehicle - PMU (Stage
ii)NCB 1 1.200
0.0004 Post Review47NELSIP/S/EP/PMU/
02Creation of Web site NS 1 0.050
0.042 Post Review46NELSIP/S/EP/PMU/00
1
Hiring Vehicle - PMU (Stage
1)NCB 5 4.800
0.180 0.0016 Post Review45NELSIP/NP/MU/TU
PS/W/01Trasport of Bitumin NS 45000L
Credit/ #: 4728 LK
Sta
ge
Su
bm
it D
BD
wit
h IF
B f
or
Ban
k's
N/O
Pu
blis
h IF
B in
Nat
ion
al
new
spap
ers
and
UN
DB
Dea
dlin
e fo
r su
bm
issi
on
of
bid
s
Su
bm
it B
ER
fo
r B
ank'
s
N/O
Nam
e &
Nat
ion
alit
y o
f
con
trac
tor
Su
bm
it s
ign
ed c
on
trac
t
cop
y to
Ban
k
Date Currency Value
Planned 10-Feb-10 N/A 03-Mar-10
Actual
Planned 21-Jun-10 N/A 06-Jul-10
Actual 05-Jul.-10 12-Aug.-10
Planned 21-Jan-11 N/A 10-Feb-11
Actual 12-Jan-11 04-Mar.-11
Planned 01-Feb-11 18-Feb-11
Actual 14-Feb-11 01-Mar-11
Planned 01-Apr-11 18-Apr-11
Actual 29-Apr-11 01-May-11
Planned 07-Feb-11 16-Mar-11
Actual 21-Feb-11 01-Apr-11
Planned 14-Feb-11 25-Apr-11
Actual 28-Mar-11 09-May-11
Planned 28-Feb-11 18-Apr-11
Actual 11-Mar-11 02-May-11
on actual
used KM
Mr..K.
PartheepanN/AN/A N/A N/A LKR
on actual
used KM
Mr.P.Thabees
waranN/AN/A N/A N/A LKR
on actual
used KM
Mr.N.Krishna
kumarN/AN/A N/A N/A LKR
on actual
used KM
Mr.Satheesku
marN/AN/A N/A N/A LKR
on actual
used KM
Mr.S.Jeyakum
aN/AN/A N/A N/A LKR
Sakvin Tours
& rent a Car
service
N/AN/A N/A LKR
On
Actual/Monthly
base
on actual
used KM
Sakvin Tours
& rent a Car
service
N/AN/A N/A LKR
N/AN/A N/A LKR
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
*** Indicate extensions/modifications etc.
Signing of contract
5th April 2010
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting
PROCUREMENT PLAN FOR NON-CONSULTANT SERVICES
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for
the North and East Province )
Ministry of Economic Development
Planned 24-Feb-11 15-Mar-11
Actual 29-Apr-11 10-Oct-11
Planned 12-May-11 19-May-11
Actual 24-Jun-11 02-Jul-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 19-May-11
Actual 30-Jun-11 05-Jul-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 19-May-11
Actual 07-Jul-11 15-Jul-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 19-May-11
Actual 20-Jul-11 27-Jul-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 19-May-11
Actual 27-Jul-11 04-Aug-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 19-May-11
Actual 29-Jul-11 05-Aug-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 19-May-11
Actual 20-Jun-11 27-Jun-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 19-May-11
Actual 01-Jun-11 08-Jun-11
Planned 01-Nov-11 N/A 08-Nov-11
CPC N/AN/A N/A LKR
N/AN/A N/A N/A LKR 94,500.00 Kajamugan
Transport
N/A LKR CPC N/AN/A
LKR 170,625.00 AM Transport
IRUPALAIN/AN/A N/A N/A
CPC N/AN/A N/A LKR
N/AN/A N/A N/A LKR 96,850.00
Narayana
transportJaffn
a
N/A LKR CPC N/AN/A
LKR 69,069.00 AM Transport
IRUPALAIN/AN/A N/A N/A
CPC N/AN/A N/A LKR
N/AN/A N/A N/A LKR 97,500.00
Narayana
transportJaffn
a
N/A LKR CPC N/AN/A
LKR 33,075.00 Kajamugan
TransportN/AN/A N/A N/A
CPC N/AN/A N/A LKR
N/AN/A N/A N/A LKR 219,451.00 Easwaran
Traders Jaffna
N/A LKR CPC N/AN/A
LKR 11,655.00 AM Transport
IRUPALAIN/AN/A N/A N/A
on actual
used KM
Mr.k.Kirushna
kumarN/AN/A N/A N/A LKR
Actual
Planned 12-May-11 19-May-11
Actual 15-Jul-11 21-Jul-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 19-May-11
Actual 12-Jul-11 19-Jul-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 19-May-11
Actual 16-Jun-11 23-Jun-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 19-May-11
Actual 01-Jun-11 07-Jun-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 12-May-11 19-May-11
Actual 26-Jul-11 03-Aug-11
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 01-Nov-11 N/A 08-Nov-11
ActualCPC N/AN/A N/A LKR
CPC N/AN/A N/A LKR
CPC N/AN/A N/A LKR
CPC N/AN/A N/A LKR
CPC N/AN/A N/A LKR
CPC N/AN/A N/A LKR
CPC N/AN/A N/A LKR
N/AN/A N/A LKR CPC
N/A N/A LKR CPC N/A
N/A LKR CPC N/AN/A
LKR 116,960.00 JANUFIYA
TransportN/AN/A N/A N/A
CPC N/AN/A N/A LKR
N/AN/A N/A N/A LKR 52,650.00 S.T.Paramesw
aran Transport
N/A LKR CPC N/AN/A
LKR 50,625.00 Kajamugan
TransportN/AN/A N/A N/A
CPC N/AN/A N/A LKR
N/AN/A N/A N/A LKR 160,600.00 AM Transport
IRUPALAI
N/A LKR CPC N/AN/A
LKR 186,975.00 S.T.Paramesw
aran TransportN/AN/A N/A N/A
CPC N/AN/A N/A LKR
Planned 01-Nov-11 N/A 08-Nov-11
Actual
Planned 11-Feb-11 N/A 01-Mar-11
Actual 14-Feb-11 06-May-11
Planned 26-Aug-11 02-Sep-11
Actual
Planned 11-Sep-11 N/A 21-Sep-11
Actual
N/AN/A N/A LKR
N/AN/A N/A N/A LKR
Mr.Sutharas
an,K,Sivakua
mar,K.Umas
hankar,S.W.
N/AN/A N/A LKR On Actual
usage KM
CPC N/AN/A N/A LKR
Pu
blis
h c
on
trac
t aw
ard
no
tice
in U
ND
B &
Nat
ion
al
new
spap
ers
Co
mp
leti
on
of
con
trac
t
Exp
end
itu
re in
curr
ed t
o
dat
e
Sta
tus/
Rem
arks
***
21-Feb-12
02-Jan-11
7-Mar-11
10-Feb-12
06 Mar.-12
18-Aug-11
31-Aug-11
18-Oct-11
01-Nov-11
16-Sep-11
01-Mar-12
25-Oct-11
19-Nov-11
18-Oct-11
N/A 311,960.00
N/A 313,914.00
N/A 318,311.00
N/A 603,750.00
N/A 1,195,440.00
N/A 1,403,792.00
N/A 638,625.00
N/A 205,527.00
5th April 2010
PROCUREMENT PLAN FOR NON-CONSULTANT SERVICES
31-Mar-11
06-Jun-11
01-Aug-11
15-Nov-11
06-Jun-11
06-Jul-11
15-Nov-11
06-Jun-11
15-Jul-11
15-Nov-11
06-Jun-11
28-Jul-11
15-Nov-11
06-Jun-11
08-Aug-11
15-Nov-11
06-Jun-11
06-Aug-11
15-Nov-11
06-Jun-11
02-Jul-11
15-Nov-11
06-Jun-11
12-Jul-11
15-Nov-11
N/A
N/A 94,500.00
N/A
N/A 170,625.00
N/A
N/A 96,850.00
N/A
N/A 69,069.00
N/A
N/A 97,500.00
N/A
N/A 33,075.00
N/A
N/A 219,451.00
N/A
N/A 11,655.00
N/A 253,804.00
06-Jun-11
25-Jul-11
15-Nov-11
06-Jun-11
05-Aug-11
15-Nov-11
06-Jun-11
12-Jul-11
15-Nov-11
06-Jun-11
10-Jun-11
15-Nov-11
06-Jun-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11
15-Nov-11N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A 116,960.00
N/A
N/A 52,650.00
N/A
N/A 50,625.00
N/A
N/A 160,600.00
N/A
N/A 186,975.00
N/A
15-Nov-11
05-May-12
05-May-12
07-Dec-11
15-Oct-12N/A
N/A
N/A
N/A
LKR USD
1 2 3 4 5 6.00 7 8
Prior Review5 MED/NELSIP/C/PCU/008 Internal Audit LCS Lumpsum 15.00 0.1304
3.00 0.0261 Prior Review4 MED/NELSIP/C/PCU/005Consultancy service for
Training Need Assessment CQS Lumpsum
1.50 0.0130 Post Review3 MED/NELSIP/C/PCU/004 Financial Manual for LAs IC Lumpsum
0.1739 Prior Review2 MED/NELSIP/C/PCU/002
LA Survey for Northern and
Eastan Province and HH
survey for Eastern province
SS Lumpsum 20.00
0.0174 Prior Review1 MED/NELSIP/C/PCU/001Social Impact Assessment
(SIA)QCBS Lumpsum 2.00
Prio
r/p
ost
rev
iew
by
Ba
nk
**
Seria
l n
o.
RF
P N
o.
Desc
rip
tio
n
Meth
od
of
Sele
cti
on
*
Lu
mp
sum
/Tim
e B
ase
d
Estimated Cost (Million)
Update as of : (date) 31st July 2012
* QCBS-Quality & Cost Based; QBS-Quality Based; FBS-Fixed Budget; LCS-Least Cost; CQ-Consultant's Qualifications; SSS-Single Source Selection; IC-Individual Consultant; IC(S)-Sole Source IC
** For post review, fill in columns 1 to 8, 10, 12 & 13, 15, 17 to 20, and 22 to 25
*** Indicate extensions/modifications etc.
Implementing Agency: Ministry of Economic Development
GPN # and Date Published:
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
PROCUREMENT PLAN FOR CONSULTANT SERVICES
Country/Borrower: Government of Sri Lanka
Project Name:North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and
Small Twonship Development Initiative for the North and East Province )
4.10 0.0357Prior
Review12
NELSIP/C/EP/TR/GOP
S//01
Preperation of designed
and estimate of
Watersupply scheme at
Gomarankadawala Town
Area
SS Lumpsum
0.0357Prior
Review11
NELSIP/C/EP/BT/EUC/
01
Preparation of Master
Plan for Eravur UC
Area
SS Lumpsum 4.10
3.00 0.026 Prior
Review10
NELSIP/C/EP/BT/MC/0
2
Preparation of Master
Plan for Kallady Area
Drainage System
SS Lumpsum
0.0217Prior
Review9
NELSIP/EP/C/BT/MC/0
1
Preparation of Master
Plan for Iruthayapuram
Drainage System In
Batticallo area
SS Lumpsum 2.50
Prior
Review8
NELSIP/EP/C./BT/KUC
//01
Preparing Drainage
Master Plan to Entire
Kattankudy Division
SS Lumpsum 3.69 0.0321
0.0235Prior
Review7
NELSIP/C/EP/TR/KIUC
//001/
Preparation of Master
plan for storm water
drainage system for
Kinniya
SS Lumpsum 2.70
0.0174 Prior Review
Prior Review
6 MED/NELSIP/C/PCU/009Developing of Accounting
Software PakageQCBS Lumpsum 2.00
5 MED/NELSIP/C/PCU/008 Internal Audit LCS Lumpsum 15.00 0.1304
Date Currency
9 10 11 12 13 14 15 16 17 18
Planned 15-Jan-10 05-Feb-10 12-Feb-10 15-Mar-10 29-Mar-10 05-Apr-10 12-Apr-10 19-Apr-10
Actual 20-Nov.-09 28-Dec.-09 19-Jan.-10 08-Feb.-10 10-Mar.-10 10-Mar.-10 31-Mar.-10 12-May-10
Planned 27-Feb-11 09-Mar-11 08-Apr-11 08-May-11 19-May-11
Actual 02-Feb-11 05-Jul-11 04-Aug-11 15-Nov-11 10-Jan-12
Planned 10-Mar-10 24-Mar-10 N/A 23-Apr-10
Actual 11-Mar.-10 19-Mar.-10 22-Apr.-10
Planned 29-Nov-11 27-Dec-11 06-Jan-12 06-Feb-12 07-Mar-12 16-Mar-12
Actual -
Planned 29-Jul-11 28-Aug-11 07-Sep-11 07-Oct-11 06-Nov-11 15-Nov-11 25-Nov-11 06-Dec-11
LKR
N/A N/A LKR
N/A LKRN/A N/A N/A
N/A N/A N/A LKR
LKR
Su
bm
it T
ER
fo
r B
an
k's
N/O
Op
en
ing
of
fin
an
cia
l p
ro
po
sals
Su
bm
itC
ER
&in
itia
led
dra
ft
neg
oti
ate
d c
on
tra
ct
for B
an
k's
N/O Signing of Contract
Sta
ge
Pu
bli
sh N
oti
ce f
or E
OI
Su
bm
itsh
ortl
ist
an
dd
ra
ftR
FP
for
Ba
nk
's N
/O
Issu
e R
FP
to
sh
ortl
iste
d f
irm
s
Dea
dli
ne
for
sub
mis
sio
no
f
pro
po
sals
31st July 2012
* QCBS-Quality & Cost Based; QBS-Quality Based; FBS-Fixed Budget; LCS-Least Cost; CQ-Consultant's Qualifications; SSS-Single Source Selection; IC-Individual Consultant; IC(S)-Sole Source IC
** For post review, fill in columns 1 to 8, 10, 12 & 13, 15, 17 to 20, and 22 to 25
*** Indicate extensions/modifications etc.
Ministry of Economic Development
5th April 2010
PROCUREMENT PLAN FOR CONSULTANT SERVICES
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and
Small Twonship Development Initiative for the North and East Province )Credit #: 4728LK
Actual 08-Aug-11 02-Oct-11 22-Nov-11 22-Dec-11 24-Feb-12 01-Mar-12 19-Mar-12 16-Apr-12
Planned 30-May-12 13-Jun-12 23-Jun-12 23-Jul-12 12-Aug-12 20-Aug-12 27-Aug-12 03-Sep-12
Actual
Planned 30-Sep-11 10-Oct-11 09-Nov-11 09-Dec-11 19-Dec-11
Actual 19-Oct-11 13-Oct-12 11-Nov-12 30-Apr-12 02-May-12
Planned 26-Apr-12 10-May-12 9-Jun-12 21-Jun-12
Actual 08-Jun-12
Planned 26-Apr-12 10-May-12 9-Jun-12 21-Jun-12
Actual 08-Jun-12
Planned 26-Apr-12 10-May-12 9-Jun-1209-Jul-12
Actual 08-Jun-12
Planned 26-Apr-12 10-May-12 9-Jun-1209-Jul-12
Actual 08-Jun-12
Planned 23-Jul-12 06-Aug-12 05-Sep-1225-Sep-12
Actual
N/A LKRN/A N/A N/A
LKRN/A N/A N/A N/A
LKR LKRN/A N/A N/A
LKRN/A N/A N/A N/A
N/A N/A N/A N/A LKR
N/A N/A N/A LKR
LKR
LKR
Value
19 20 21 22 23 24 25
19-Apr-10 18-Jul-10
12-May-10
21-May-11 06-Oct-11
N/A 20-Sep-10 900,000
15-Sep.-10
18-Mar-12 17-May-12
Suspended
due to Works
Done by PCU
- -
06-Dec-11 N/A 05-Dec-13
4,600,000 PricewaterCoo
pers Pvt Ltd
N/A
900,000
Mr.
Balasubraman
iyam
N/A
4,737,090 IPS N/A 947,000
Contact
implimented
Only for LA
survey
(Task 2)
1,792,433 1,792,433 EML, Pvt Ltd N/A
Pu
bli
shC
on
tra
ct
Aw
ard
inU
ND
B
& N
ati
on
al
new
spa
pers
Co
ntr
act
Co
mp
leti
on
Ex
pen
dit
ure i
ncu
rred
to
da
te
Sta
tus/
Rem
ark
s *
**
Signing of Contract
Na
me/n
ati
on
ali
ty o
f th
e c
on
sult
an
t
Su
bm
itsi
gn
ed
co
ntr
act
co
py
to
Ba
nk
31st July 2012
* QCBS-Quality & Cost Based; QBS-Quality Based; FBS-Fixed Budget; LCS-Least Cost; CQ-Consultant's Qualifications; SSS-Single Source Selection; IC-Individual Consultant; IC(S)-Sole Source IC
** For post review, fill in columns 1 to 8, 10, 12 & 13, 15, 17 to 20, and 22 to 25
*** Indicate extensions/modifications etc.
Ministry of Economic Development
PROCUREMENT PLAN FOR CONSULTANT SERVICES
Government of Sri Lanka
Credit #: 4728LK
22-May-12
03-Sep-12 N/A 02-Dec-12
21-Dec-11 18-Mar-12
01-Sep-12
19-Oct-12
19-Sep-12
07-Oct-12
07-Oct-12
13-May-13
NW@DB N/A N/A
SLLRDC N/A N/A
SLLRDC N/A N/A
SLLRDC N/A N/A
SLLRDC N/A N/A
2.43 SLLRDC N/A
4,600,000 PricewaterCoo
pers Pvt Ltd
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Planned 11-Jul-11 13-Oct-11
Actual 2-Aug-11 31-Oct-11
Planned 11-Jul-11 13-Oct-11
Actual 2-Aug-11 10-Nov-11
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 24-Jan-12 17-Feb-12 27-Mar-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 24-Jan-12 17-Feb-12 26-Mar-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 24-Jan-12 17-Feb-12 27-Mar-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 24-Jan-12 17-Feb-12 26-Mar-12
7.20 0.062608696 Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 16-Jul-2012 9-Aug-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 16-Jul-2012 9-Aug-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 16-Jul-2012 9-Aug-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 16-Jul-2012 9-Aug-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 16-Jul-2012 9-Aug-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 16-Jul-2012 9-Aug-2012
N/A - 0.0435 Post Review N/A LKR
N/A -
12 NELSIP/NP/J/JAMC/W/12
Reconstruction of Water tank 1St. &
3ed. Cross road ,Sinnakkadai 4th Cross
Street & Kondady Veethy with drainge
Jaffna MC Jaffna MC
7.20
NCB 6.30
LKR
N/A LKR0.04348 Post Review
0.05 Post Review N/A11 NELSIP/NP/J/JAMC/W/11
Reconstruction of Odai Veethy
,Sivappirakasam Veethy & Bylanes
,Thalaiyali Veethy, College Lane
Jaffna MC Jaffna MC NCB
-
10 NELSIP/NP/J/JAMC/W/10
Reconstruction of Bharathy Veethy
&bylanes ,stanley lane and
perinpanayakam Road
Jaffna MC Jaffna MC NCB
0.054782609
N/A -
LKR
N/ALKR
N/A6.30
Post Review N/A
Post Review N/A9 NELSIP/NP/J/JAMC/W/09
Reconstruction of Mavadi Vairavar
kovil veethy, Kamel veethy with channel
and Drainage
Jaffna MC Jaffna MC NCB
8 NELSIP/NP/J/JAMC/W/08
Reconstruction of jinna road,Asath veethy
, kaathiapupakkar veethy , Ithuris Makka
Veethy with Drainage and culvert
Jaffna MC Jaffna MC NCB 7.20 0.06 -
LKR N/A - 7 NELSIP/NP/J/JAMC/W/07
Reconstruction of Chedyar thoddam
Veethy and Construction of Culvert and
Reconstruction of Murugesar Veethy
Jaffna MC Jaffna MC NCB Post Review N/A
N/AN/APost Review0.03626087NCB
Jaffna MC 0.04373913 Post Review N/A LKR5.03
0.035304348 N/ALKR 5.20
0.039478261 Post Review
N/APost Review
3.99
3.39
N/A
Star Construction N/A
Star Construction 2.51
5.20Shiram
Construction
4.54
Jaffna MC
NCB
NELSIP/NP/J/JAMC/W/04 Jaffna MC
NCB
NCB 4.06
6.30
NELSIP/NP/J/JAMC/W/03Reconst. Of main channel retaining wall
from Thiyoku Nursary schoolJaffna MC Jaffna MC
NELSIP/NP/J/JAMC/W/05Const. of Anjuthankulam outlet channel,
retaining wall and culvertJaffna MC
NELSIP/NP/J/JAMC/W/06
N/A
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
1.06
4.50 N/A N/A
CC
CC
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Green King
Gurunar
Community Center
N/A N/A 1.06 N/A
N/A
Post Review0.011478261 N/A
0.009217391Colombothurai
Community CenterN/A
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Jaffna MC Jaffna MC
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
2
3
4
NELSIP/NP/J/JAMC/W/01(JA
MC -2) 1.32
4.17
Jaffna MC
Jaffna MCJaffna MC
Jaffna MC
Ministry of Economic Development Implementing Agency:
Signing of contract
NELSIP/NP/J/JAMC/W/01(JA
MC -1)1 LKR 1.06 Post Review
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
5
Construction of Tar road at
Vasanthapuram 1st $ 2nd Lane at Jaffna
MC area
Reconstruction of Drainage at Sippithatai
lane at Jaffna MC area
Mettaling & Tarring Vidan's lane and By
lanes and construction & reconst. of
channel and retaining wall
Mettaling & Tarring Nallur Thurka lane
& Surrounding
6
LKR 1.32
LKR
Shiram
Construction
3.50
LKR 4.24 4.20
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 16-Jul-2012 9-Aug-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 16-Jul-2012 9-Aug-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 16-Jul-2012 9-Aug-2012
Planned 2-May-2011 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual ########## 3-Jun-11 23-Jun-11 2-Aug-11 31-Oct-12
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 3-Jun-11 23-Jun-11 2-Aug-11 10-Nov-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 17-Jan-12 13-Feb-12 28-Mar-12
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 4-Jun-11 28-Jun-11 2-Aug-11
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 29-Mar-2012 24-Apr-2012 16-May-12
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 7-Jun-11 28-Jun-11 2-Aug-11
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 7-Jun-11 28-Jun-11 2-Aug-11
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 7-Jun-11 28-Jun-11 2-Aug-11
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 18-Jun-2012 10-Jul-2012 23-Jul-2012
LKR 5.877 Ranjan Contractor N/ANCB 7.40 0.064347826 Post Review N/A
N/A -
24 NELSIP/NP/J/ChPS/W/05Mettaling & Tarring Ammakadai Road
2nd StageChavakachcheri PS
Chavakachcheri
PS
6.30 0.0435 Post Review N/A LKR15 NELSIP/NP/J/JAMC/W/15
Recosntruction of Hindu ladies lane,
Aththysoodi Veethy, Convent lane and
Gana Vairavar Front lane
Jaffna MC Jaffna MC
-
NCB
LKR N/A - NCB
5.40NCB
N/A6.30 0.0435 Post Review
13 NELSIP/NP/J/JAMC/W/13Reconstruction of Drainage at Convent
road & Mathiyas Veethy Jaffna MC Jaffna MC
14 NELSIP/NP/J/JAMC/W/14
Reconstruction of Suvamiar Veethy
Uppukulam Veethy with cross street &
Reclamation Road
Jaffna MC Jaffna MC
0.0374 Post Review N/A LKR N/A
Reconst. Of Ammakadai Veethyat
Chavakachcheri PS area
Reconst. Of Navalkuli West Koolarupitty
Road at Chavakachcheri PS area
Krishna
Contractors
N/A
Post Review
LKR 3.49 Turbo Group
Construction
Krishna
Contractors21
N/A
N/A
0.036434783NCB
Chavakachcheri
PS
Post Review
Post Review
Const. of Paththiniyar Thuravu Road Chavakachcheri UC
Reconst Ariyalai South East Manipuri
Veethy at Nallur PS areaNallur PS
NELSIP/NP/J/NaPS/W/02 Const. of Kerniyady Road Nallur PS
Nallur PS
Nallur PS
N/A
-
N/A
Chavakachcheri PSChavakachcheri
PS
0.065217391
NCBChavakachcheri PS
Prior Review
4.25
4.40
0.061826087
NCB
NCB
NCB
NCB
0.046434783
0.036
Chavakachcheri
UCNCB 7.50 NELSIP/NP/J/ChUC/W/03
Chavakachcheri
PSChavakachcheri PS
N/A
N/A
N/A
N/A
NELSIP/NP/J/NaPS/W/05(Na
PS-1)
16
17
19
NELSIP/NP/J/ChUC/W/03(Ch
UC-1)
NELSIP/NP/J/ChUC/W/04(Ch
UC-2)Chavakachcheri UC
Chavakachcheri
UC
Chavakachcheri
UC
NCB
NELSIP/NP/J/ChPS/W/06(Ch
PS-1)
NELSIP/NP/J/ChPS/W/07(Ch
PS-2)
NELSIP/NP/J/ChPS/W/08(Ch
PS-3)
Chavakachcheri UC
18
23
22
20
Reconst. Of Kalvayal Ramalingam Old
School Joint Road at Chavakachcheri UC
area
Reconst. Of Meesalai West Kerniyadi
Veethy at Chavakachcheri UC area
Reconst. Of Mirusuvil Hospital Front
Veethy at Chavakachcheri PS area
Post Review
LKR 2.98
LKR 3.32
LKR
Kamiska Civil
Engeeniring
Turbo Group
Construction
Selvam Engineers
Acme Construction
3.76
5.94
LKR 4.47
5.42
LKR 5.53
0.065478261
N/A
Turbo Group
Construction
Post Review
Post Review
N/A
Post Review
N/A
LKR
LKRN/A
N/A0.036956522
0.03826087
5.94
5.42
2.98
3.32
3.49
4.47
4.60
5.34
7.11
4.19
4.14
7.53 N/A
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 10.06.2011 1-Jul-11 2-Aug-11
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 10.06.2011 1-Jul-11 2-Aug-11
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 21-Feb-2012 16-Mar-2012 23-Apr-2012
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 21-Feb-2012 16-Mar-2012 20-Apr-2012
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 21-Feb-2012 16-Mar-2012 23-Apr-2012
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 21-Feb-2012 16-Mar-2012 23-Apr-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 7-Jun-11 29-Jun-11 1-Aug-11 31-Dec-11
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 7-Jun-11 29-Jun-11 1-Aug-11 31-Dec-11
Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12
Actual 6-Feb-2012 1-Mar-2012 21-Mar-12
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 8-Jun-11 29-Jun-11 2-Aug-11 1-Nov-11
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 8-Jun-11 29-Jun-11 2-Aug-11
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 8-Jun-11 29-Jun-11 2-Aug-11
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
LKR N/A - Mettaling & Tarring Kerudavil Amman
Kovil RoadPoint Pedro PS Point Pedro PS 0.07826087 Post Review N/A
1.85
Krishna
Contractors
1.85 34 NELSIP/NP/J/VdSWPS/W/03Reconst. Of Maththoni public market
Road
LKRPost Review N/A0.038608696
Vali South PS
Vali South PS
Vada South
West PS
Vali South PS
Post ReviewVada South
West PS
Point Pedro PS
NCB
NELSIP/NP/J/PPPS/W/05 Reconstruction of Poomagal road
NELSIP/NP/J/PPPS/W/04
NELSIP/NP/J/VSPS/W/13(VS
PS-1)
NELSIP/NP/J/PPPS/W/06)Reconstruction of Periyathevanaththai
Road
Reconst. Of Kampavaththai internal
Roads
Shiriraam
Construction
NELSIP/NP/J/VSPS/W/14(VS
PS-2)
Reconst of Uruththiravattai School
Veethy at Pointpedro PS area
Point Pedro PS
Point Pedro PS
Enthys
ConstructionN/A
N/A
NCB
Post Review
Vali South PS
Pointpedro PS
Vali South PS
NCB
Point Pedro PS
NCB
NCB 9.00
-
NCB
Vada South West PS
NCB
NCB
NCBVali South PS
NCB
Vali South PS
Vali South PS
Point Pedro PS
Vada South West PS
Pointpedro PS
Pointpedro PS
Point Pedro PS
Vada South West PS
Point Pedro PS
Point Pedro PS
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
NELSIP/NP/J/PPPS/W/09(PP
PS-1)
NELSIP/NP/J/VdSWPS/W/12(
VdSWPS-2)
NELSIP/NP/J/VdSWPS/W/11(
VdSWPS-1)
NELSIP/NP/J/PPPS/W/10(PP
PS-2)
NELSIP/NP/J/PPPS/W/03
NELSIP/NP/J/PPPS/W/07
NELSIP/NP/J/VSPS/W/15(VS
PS-3)
NELSIP/NP/J/VSPS/W/0438
30
36
27
31
33
35
32
28
Reconstruction of Kulanai Road at Vada
South West PS area
29
Reconstruction of Kudakkamparai
internal Road
Reconst. Of Kadakarampai Cemetry Road
at Vali South PS area
Reconst. Kali Kovil Veethy at Vali South
PS area
Reconst. Of Thikkam School Veethy at
Pointpedro PS area
37
25
26
Reconst.of Sabapathipillai Road
Reconstruction of Miththil Sembadu Road
at Vada South West PS area
Reconst. Of Malvam 3rd Cross Road at
Valisouth PS area
NCB
NCB
NCB
0.02
N/A 7.97
Post Review
Post Review
Post Review
Post Review N/A
Post Review
LKR
Post Review LKR
LKR
Post Review
N/A
Post Review
Post Review
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Global
Construction
Kavinsan
Construction
Global
Construction
Global
Construction
Jana Agency
Jana Civil Works
Sri Ram Civil
Engineering
Construction
1.91 Kavinsan
Construction
LKR 5.81
LKR
7.28
6.15
LKR
N/A
6.93
LKR
2.87 LKR
LKR
2.95
LKR 6.92
4.12
LKR
0.056434783
0.037391304
0.022173913
0.045130435
0.068521739
0.050869565
0.034956522
0.034956522
0.02973913
0.038173913
0.026086957
3.65
Jana Civil
Engineering
Construction
LKR 2.19
2.95
6.23
5.81
2.67
4.54
4.24
2.19
5.81
2.87
3.65
1.91
4.44
2.30
2.55
3.00
4.30
4.02
5.85
3.42
Pointpedro PS
5.19
4.39
7.88
4.02
6.49
NCBVada South
West PSPost Review N/A
KNS Construction
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 27-Apr-12 22-May-12 11-Jun-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 27-Apr-12 22-May-12 18-Jun-12
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 3-Jun-11 24-Jun-11 2-Aug-11
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 3-Jun-11 24-Jun-11 2-Aug-11
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 3-Jun-11 24-Jun-11 2-Aug-11
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 17-Jan-12 13-Feb-12 3-Apr-12
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 3-Jun-11 24-Jun-11 2-Aug-11
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 3-Jun-11 24-Jun-11 2-Aug-11
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 18-Feb-2012 14-Mar-2012 23-Apr-12
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 10-Jun-11 1-Jul-11 2-Aug-11 28-Aug-11
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 10-Jun-11 1-Jul-11 2-Aug-11 1-Nov-11
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 2-Feb-2012 28-Feb-2012 27-Mar-2012
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 2-Feb-2012 28-Feb-2012 26-Mar-2012
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 2-Feb-2012 28-Feb-2012 27-Mar-2012
0.0704 Post Review N/ANELSIP/NP/J/VSPS/W/06Mettaling & Tarring Nagathampiran
VeethyVali South PS Vali South PS NCB 9.90
Reconst. Of Kooththancheema Road Vali North PS Vali North PS NCB
Vali North PS Vali North PS
0.054173913 Post Review
Post Review 0.90
N/A 5.80 N/A
N/A N/A
2.48
Jupiters
Construction3.06
N/A
3.17
Vali West PS Vali West PS
Vali East PS
Reconst. Of Vanniyasingam Veethy at
Valieast PS area
N/A3.17
N/A
NCB
6.15
5.64
Sugantha civil
contractors8.53
Krishna
Contractors
4.92
Visvakaran(PVT)Li
mited
Seelan Brothers
Civil Engineering
Enthys
Construction
Post Review
6.95
Vali West PS
Reconst .of Thanipanaiyaddi Veethy at
Vali East PS area
Reconst. Of Ponnipulam Road
Reconst. Of vellijampathy Road
Reconst of Nochchiampathy Patchanthai
Veethyat Vali West PS area
Vali South PS
5.74
-
N/A
N/A
NCB
Vali North PS
Vali West PS
NCBVali East PS
Vali East PSVali East PS
NCB
Vali East PS
Vali South PS
Vali South PS
Vali South PS
Vali East PS
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
NELSIP/NP/J/VSPS/W/04
NELSIP/NP/J/VSPS/W/05
NELSIP/NP/J/VNPS/W/04
NELSIP/NP/J/VEPS/W/16(VE
PS-1)
NELSIP/NP/J/VEPS/W/17(VE
PS-2)
NELSIP/NP/J/VWPS/W03
NELSIP/NP/J/VWPS/W/19(V
WPS-2)
NELSIP/NP/J/VNPS/W/05
NELSIP/NP/J/VEPS/W/04
47
50
48
51
45
49
NELSIP/NP/J/VNPS/W/21(V
NPS-1)
NELSIP/NP/J/VNPS/W/22(V
NPS-2)
46
NELSIP/NP/J/VNPS/W/03
38
44
52
40
Reconst. Of Sellappa Maniyakaaran
Veethy
NELSIP/NP/J/VEPS/W/18(VE
PS-3)
NELSIP/NP/J/VWPS/W/19(V
WPS-1)
39
41
42
43
Reconst.of Sabapathipillai Road
Re-Construction of Pallasuddi Road
Reconst. Of old post office veethy
Reconst. Of Kopay Kiluvanai Veethy at
Vali East PS area
Reconst. Of Ponnaiya Veethy at Vali
North PS area
Reconst. Kuddiyapulam cemetry veethy at
Vali North PS area
Reconst. Chulipuram Periya Thampiran
Veethy at Vali West PS area
NCB
NCB
Vali North PS
Vali North PS
NCB
Vali North PS
Vali North PS
Vali East PS
Vali West PS
Vali East PS
Vali North PS
NCB
NCB
NCBVali West PS
NCB
NCB
NCB 0.037130435
5.48
N/A
N/A
N/A 7.97
N/A
LKR
LKR
7.40
N/A
Post Review
N/A
N/A
Post Review
Post Review
N/APost Review
Post Review
LKR
LKR
LKR
LKR
LKR
Post Review
Post Review
Post Review
N/A
N/A
Post Review
Post Review
Post Review
A Group
Construction
&Consults
LKR 3.06
Jupiters
Construction
Karthiga
Contractors
4.10
Seelan Brothers
Civil Engineering
LKR
6.10
6.00
LKR 5.86 Jupiters
Construction
A Group
Construction
&Consults
LKR
LKR0.031478261
0.056434783
0.051686957
0.052173913
0.042782609
0.058956522
0.063130435
0.085391304
0.031652174
0.049913043
0.076086957
0.060434783
LKR
LKR
N/A
LKR
Kamshikaas Civil
Engineering Works
N/A
6.78 Enthys
Construction
4.92
6.78
5.00
6.01
5.88
4.80
6.00
9.82
4.92
6.00
3.62
3.64
8.75
7.26
6.23
6.78
6.49
5.94
4.27
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 6-Jun-11 28-Jun-11 2-Aug-11 21-Mar-12
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 6-Jun-11 28-Jun-11 2-Aug-11 21-Mar-12
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 6-Jun-11 28-Jun-11 2-Aug-11 2-Nov-11
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 6-Jun-11 28-Jun-11 2-Aug-11 2-Nov-11
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 18-Jan-12 13-Feb-12 4-Apr-12
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 3-Jun-11 24-Jun-11 2-Aug-11
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 3-Jun-11 24-Jun-11 2-Aug-11
N/APost Review N/A LKR
N/A
Mettaling & Tarring Soda Company Rd Vali North PS Vali North PS NCB 5.10 0.044347826
7.80 0.067826087 Post Review N/A LKR
N/A
56 NELSIP/NP/J/VNPS/W/09 Mettaling & Tarring Thammalai Veethy Vali North PS Vali North PS NCB
0.086086957 Post Review N/A LKR
N/A
55 NELSIP/NP/J/VNPS/W/08 Mettaling & Tarring Kuruvalai veethy Vali North PS Vali North PS NCB
0.085217391 Post Review N/A LKRNELSIP/NP/J/VNPS/W/07Mettaling & Tarring Periya Kanakar
valavu RoadVali North PS Vali North PS NCB 9.80
Post Review N/A N/A53 NELSIP/NP/J/VNPS/W/06Mettaling & TarringKernipiddy veethy
(Periya Kinnaththady Veethy)Vali North PS Vali North PS NCB 6.40 0.055652174
N/A
N/ARatna Engineers &
Contractors
Ratna Engineers &
Contractors
N/A
3.98
5.50
2.84 Vali South West PS
0.030695652Vali South West
PS
Maya Engineering
KSB Construction N/A
N/A
Maya Engineering
N/A
N/A
N/A
N/A
LKR
Vali South West
PS
Vali South West PS
3.57
4.70
Vali South West PS
Reconst. Of Unthupalaikaddai Veethy Vali South West PS NCB
0.040869565
NCB
Velanai PS
Vali South West PS
Vali South West
PS
Velanai PS
Velanai PS NCB
Vali South West
PS
Vali South West
PS
NELSIP/NP/J/VSWPS/W/25(
VSWPS-3)
NELSIP/NP/J/VSWPS/W/26(
VSWPS-4)
60
61
57 NELSIP/NP/J/VNPS/W/10
NELSIP/NP/J/VLPS/W/28(VL
PS-2)
NELSIP/NP/J/VLPS/W/27(VL
PS-1)
62 NELSIP/NP/J/VSWPS/W/05
NELSIP/NP/J/VSWPS/W/24(
VSWPS-2)
54
59
NELSIP/NP/J/VSWPS/W/23(
VSWPS-1)58
Reconst. of Alankulan Lane at Vali
South West PS area
Reconst. Of Sinnappa Veethy at Vali
South West PS area
63
64
Reconst. Cemetry Veethy, Ilavalai at
Vali South West PS area
Reconst of Sangaththa Keri Veethy at
Velanai PS area
NCB
NCBReconst. Of Utchchiodai Veethi at Vali
South West PS area
Reconst. Of Rasaiya Veethy at Velanai
PS areaVelanai PS
NCB
NCB
3.34
4.41
LKR
Post Review
Post Review
Post Review
Post Review
Post Review
Post Review
Post Review
LKR
LKR
LKR
Ratna Engineers &
Contractors
4.54
Ratna Engineers &
Contractors
2.84
6.33
3.41
LKR0.042086957
0.056521739
0.052
0.056347826
0.027478261
N/A
N/A
LKR
LKR
N/A
N/A
N/A
3.57
3.41
3.34
4.41
9.90
4.84
6.50
5.98
3.16
6.48
3.53
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12
Actual 27-Feb-2012 23-Mar-2012 18-Apr-12
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 10-Jun-11 1-Jul-11 2-Aug-11
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 10-Jun-11 1-Jul-11 2-Aug-11
0.0509 Post Review N/A LKR66 NELSIP/NP/J/VLPS/W/04 Construction of Market Thuraiyoor Velanai PS Velanai PS NCB 5.85
0.086347826Velanai PS N/A
N/A
N/A
N/A
V.S.K BuildersLKR
LKR
V.S.K Builders
65 NELSIP/NP/J/VLPS/W/3) 9.70
Delft PS
N/ADelft PS
Velanai PSLingam Building
ConstructionNCB
Delft PS
Delft PS NCB
NCBNELSIP/NP/J/DELPS/W/30(D
ELPS-2)
NELSIP/NP/J/DELPS/W/29(D
ELPS-1)67
68
Reconst. Of South Sudalai Vigaravadi
Veethy at Delft PS area
Reconst. of Perunkulam veethy & Const.
of retaining wall
Reconst. Of St. Jagappar Kovil
Kalamunai Veethy at Delft PS area
2.43 Post Review
Post Review LKR
Post Review
0.023478261 N/A
3.21 N/A
0.27
2.00
1.65 0.031304348
2.70
3.60
9.93
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 10-Jun-11 1-Jul-11 2-Aug-11
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 7-Jun-11 28-Jun-11 2-Aug-11
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 2-Feb-12 28-Feb-12 19-Mar-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 2-Feb-2012 28-Feb-2012 19-Mar-12
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012
Actual 18-Jun-2012 10-Jul-2012 2-Aug-2012
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 8-Jun-11 30-Jun-11 2-Aug-11
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 8-Jun-11 30-Jun-11 2-Aug-11
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 17-Jan-12 13-Feb-12 29-Mar-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 17-Jan-12 13-Feb-12 11-Apr-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 17-Jan-12 13-Feb-12 29-Mar-12
Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 7-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 8-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 8-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
LKR N/ANCB 6.00 0.052173913 Post Review N/A80 NELSIP/NP/J/(KYPS//06Metalling &Tarring Naranthai
Utharappiddy RoadKayts PS Kayts PS
7.56 AMT Transport N/A8.32 0.1443 Post Review N/A LKR74 NELSIP/NP/J/KRPS/W/4Metalling &Tarring Kovalam
Maruthapuram 1st joing veethyKarainagar PS R/ACLG, Jaffna NCB
Post Review N/A LKR N/A81 NELSIP/NP/J/KYPS/W/07 Metalling &Tarring Koththikula veethy Kayts PS Kayts PS NCB 6.13 0.053304348
Post Review N/A LKR N/A82 NELSIP/NP/J/KYPS/W/08Metalling &Tarring Naranthanai Ganesha
school RdKayts PS Kayts PS NCB 7.85 0.06826087
LKR5.10 N/A0.044347826 Post Review70 NELSIP/NP/J/DELPS/W/04Construction of Children Park Delft
centreDelft PS Delft PS NCB
0.12 N/A7.75
LKR
LKR
78 NELSIP/NP/J/KYPS/W04 Reconst. Of Seddiyanthodda Road
8.40 0.073043478 Post Review N/A
Walker
Construction4.30 0.037391304 Post Review N/A
79 NELSIP/NP/J/KYPS/W/05) Reconst. Of Sooriyawathai Road Kayts PS
Kayts PS NCB
4.19 Maya Engineering4.50 0.039130435
4.70 3.50
Kayts PS NCB
8.48 Karthiga
Contractors4.60 0.04
N/A
2.40
72 NELSIP/NP/J/KRPS/W/02 Reconstruction of Sampalodai Road Karainagar PS LKRNCBKarainagar PS
Post Review N/A
2.75 N/ALKR
6.22 N/A
Karainagar PS NCB
NCB
Post Review
0.084347826 Post Review
Ratna Engineers &
Contractors
N/A
N/AN/A
LKR
2.82
73
NELSIP/NP/J/DELPS/W/31(D
ELPS-3)
Kavinsan
Construction
K.M.P. Association
Post Review N/A
N/A
Kayts PS
NELSIP/NP/J/KYPS/W/03 Reconst. Of Camp Road
N/A
Kayts PS
N/A
Ratna Engineers &
Contractors
NCB
N/A
77
Delft PS
Karainagar PS
Kayts PSKayts PS
Kayts PS
Delft PS
Karainagar PS
N/A
N/A
NELSIP/NP/J/KRPS/W/32(KR
PS-1)
NELSIP/NP/J/KYPS/W/33(K
YPS-1)
NELSIP/NP/J/KRPS//W/03
69
71
NELSIP/NP/J/KYPS/W/34(K
YPS-2)
75
76
Reconst. Of Melingimunai Main Road at
Kayts PS area
Reconst. Of Oori Murukan Kovil Veethy
at Karainagar PS area
Reconst. Of Murukan Kovil Kopalapiddi
Veethyat Delft PS area
Kayts PS
Karainagar PS
NCB
Reconstruction of Palaiyakandy Sivan
Kovil Road
Kayts PS
NCBReconst. Of Analaidivu Kadaiyadi Cross
Road at Kayts PS area
NCB Maya Engineering
3.72
N/A
Karthiga
Contractors
LKR
1.38
6.19
3.31
LKR
Post Review
LKR
Post Review
0.012521739 LKRN/A
2.82
1.05
6.10
3.05
4.14
9.70
3.55
1.44
0.036
0.030869565
0.073269565
Post Review
8.43
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 17-Jan-12 13-Feb-12 16-Mar-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 13-Feb-2012 8-Mar-2012 18-May-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 13-Feb-2012 8-Mar-2012 21-May-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12
Actual 13-Feb-12 8-Mar-2012 18-May-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12
Actual 5-Apr-12 2-May-12 15-Jul-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 5-Apr-12 2-May-12 22-Jun-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 5-Apr-12 2-May-12 22-Jun-12
Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 8-Dec-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 6-Dec-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 6-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 16-Jun-2012 9-Jul-2012 8-Aug-2012 8-Nov-2012
N/A
N/A20.40 0.177391304 Post Review N/A LKR93NELSIP/NP/J/ACLG/W/07(PP
UC)
Reconstruction of Aththiyady DC
Channel -Continuous WorkPoint Perdro UC R/ACLG, Jaffna NCB
LKR N/ANCB 14.20 0.1826 Post Review N/A91NELSIP/NP/J/ACLG/W/05
(KRPS)
Metalling &Tarring Paththar keniyady
Road & DrainageKarainagar PS R/ACLG, Jaffna
LKR N/ANCB 13.50 0.1391 Post Review N/A92NELSIP/NP/J/ACLG/W/06(K
RPS)
Metalling &Tarring Thoppukkadu
vairavar Kovil VeethyKarainagar PS R/ACLG, Jaffna
Post Review N/A LKR90NELSIP/NP/J/ACLG/W/04
(CHPS)
Mettaling & Tarring Mirusuvil Hospital
Front Road 2nd StageChavakachcheri PS R/ACLG, Jaffna NCB 17.55 0.152608696
Post Review N/A LKR
N/A12.80 Post Review
N/A95NELSIP/NP/J/ACLG/W/9
(KYPS)
Metalling &Tarring Puliyankoodal North
RoadKayts PS Kayts PS NCB 13.70 0.119130435
Post Review N/A15.40 0.133913043 LKR N/A
LKR
96NELSIP/NP/J/ACLG/W/10
(KYPS)
Metalling &Tarring Naranthai Sinnamadu
1st &2 nd Road & DrainageKayts PS Kayts PS NCB
94NELSIP/NP/J/ACLG/W/08(V
LPS)Metalling &Tarring Sudalai Veethy Velanai PS R/ACLG, Jaffna NCB 0.783 N/A
N/A
Sri Ram Civil
Engineering
Construction
1.55
6.31 0.054869565
LKR
Reconstruction of Karampakam
Vidaththatpalai RoadN/A
Post Review
Point Perdro UC
NELSIP/NP/J/ACLG/W/02
NELSIP/NP/J/PPUC/W/01
State Engeneering
Cooperation0.48 N/A
N/AKamsikas Civil
Engeniring Works
7.44
89
Reconstruction Manippuri joint Veethy
and Reconstruction Manippuri 8th
CrossVeethy
Nallur PS ACLG
Post Review N/A
6.89
86 NELSIP/NP/J/VVUC/W/03
Reconstruction of Retaining wall along
coastal Area from vady lane access to
mathavady area
Valvettithurai UCValvettithurai
UC
85 NELSIP/NP/J/VVUC/W/02
Reconstruction of Periakadakkarai Road,
Vellankarai cemetry Road, Veeramakali
Aman Kovil Road
Valvettithurai UCValvettithurai
UC
0.027652174
8.13
N/A
11.85
N/A
LKR
Post Review
Valvettithurai
UCNCB 3.18
NCB
NCB
10.05
ACLG
Point Perdro UC
Post Review
Post Review N/A LKR 5.36 Kamshikaas Civil
Engineering WorksN/A
87 NELSIP/NP/J/ACLG/W/01) Construction Athiyady DC Channel Point Perdro UC
84
Reconstruction of KKS Road 2nd
lane,Netkolu lane, Netkolu Varivar Kovil
front road ,
Valvettithurai UC
83
NCB 17.17
NCB
NCB
N/A
N/A
NELSIP/NP/J/VVUC/W/01
88 Chavakachcheri PS
ACLG
Const. of Retaining wall
NCB
0.17826087
0.149304348
13.12
Post Review
20.50
LKR
LKRN/A
Kumar Building
Consruction
18.81
3.75
15.15 LKRTurbo Group
Construction
10.77 N/ATurbo Group
Construction
0.087391304
0.059913043
LKR
2.59
-
Post Review N/A
0.114086957NELSIP/NP/J/ACLG/W/03
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 18-Jun-2012 10-Jul-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012
Actual
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012
Actual
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012
Actual
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012
Actual
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012
Actual
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012
Actual
Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 8-Jan-2013
Actual
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012
Actual
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 7-Jun-11 28-Jun-11 2-Aug-11 21-Jan-12
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 7-Jun-11 28-Jun-11 2-Aug-11 21-Jan-12
N/A26.20 0.2278 Post Review N/A LKR101NELSIP/NP/J/CLG/W/01(PPP
S)Construction of Market at manthikai Point Pedro PS CLG, Jaffna NCB
LKR N/ANCB 49.50 0.4304 Post Review N/A
N/A
105NELSIP/NP/J/CLG/W/05(VLP
S)
Construction of Modern Shoping
ComplexVelanai PS CLG, Jaffna
36.00 0.313043478 Post Review N/A LKR104NELSIP/NP/J/CLG/W/04(PPU
C)Reconstruction of Peruveddy Channel Point Perdro UC CLG, Jaffna NCB
LKR N/ANCB 42.75 0.3717 Post Review N/A
N/A
103NELSIP/NP/J/CLG/W/03(NA
PS)
Construction of Children indoor
games,Training centre & Cultural Hall Nallur PS CLG, Jaffna
50.76 0.4414 Post Review N/A LKR102NELSIP/NP/J/CLG/W/02(VV
UC)
Construction of vegetable Market with
Shopping ComplexValvettithurai UC CLG, Jaffna NCB
N/A18.00 0.1565 Post Review N/A LKR100NELSIP/NP/J/ACLG/W14(DE
LPS)Construction of Computer Trainig Center Delft PS R/ACLG, Jaffna NCB
N/A13.50 0.0913 Post Review N/A LKR99NELSIP/NP/J/ACLG/W/13(V
LPS)Construction of Market -Madathuveli Velanai PS R/ACLG, Jaffna NCB
N/A14.40 0.1565 Post Review N/A LKR
N/A
97NELSIP/NP/J/ACLG/W/11(V
SPS)
Mettaling & Tarring Kantharoodai
Cemetry Veethy Vali South PS R/ACLG, Jaffna NCB
0.1565 Post Review N/A LKR98NELSIP/NP/J/ACLG/W/12(PP
PS)Construction of Shopping complex Point Pedro PS R/ACLG, Jaffna 18.00NCB
Post Review N/A15.40 0.133913043 LKR N/A96NELSIP/NP/J/ACLG/W/10
(KYPS)
Metalling &Tarring Naranthai Sinnamadu
1st &2 nd Road & DrainageKayts PS Kayts PS NCB
Mannar PS
Mannar PS
N/A
Mannar PS N/A
N/A
NELSIP/NP/MN/MNPS/W/36
(MNPS-2)
NELSIP/NP/MN/MNPS/W/35
(MNPS-1)106
107
Cons of Bus Pip Line at 5th mile post
Erukalampitty at Mannar PS area
Repair of public well and cons of Water
tank at Uyilamkulamat Mannar PS area
Mannar PS NCB Post Review
1.32 0.011478261
0.85 0.007391304
NCB Post Review N/A 1.29 Ben Construction
LKRErukkalampitty
Community Center0.85
LKR
0.66
1.29
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 7-Jun-11 28-Jun-11 2-Aug-11
Planned ########## 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 5th July 2011 29-Jul-11 23-Aug-11 28-Oct-11
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 26-Jan-12 21-Feb-12 9-Apr-12
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 26-Jan-12 21-Feb-12 9-Apr-12
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
N/AN/A LKR113 NELSIP/NP/MN/MNPS/W/08Metalling & Tarring Pesalai Internal
RoadMannar PS Mannar PS NCB
N/A111 NELSIP/NP/MN/MNPS/W/06Metalling & Tarring Erukkalampitty
Internal RoadMannar PS Mannar PS NCB
N/A LKR N/A120 NELSIP/NP/MN/MNPS/W/15Construction of Erukkalampitty Cultural
hallMannar PS Mannar PS NCB
N/A4.200 0.036521739 Post Review N/A LKR119 NELSIP/NP/MN/MNPS/W/14Construction of Children park with play
ground UyilankulamMannar PS Mannar PS NCB
LKR118 NELSIP/NP/MN/MNPS/W/13Construction of Meat stall & Slaughter
house UyilankulamMannar PS Mannar PS NCB 3.700 0.032173913 Post Review
LKR N/A117 NELSIP/NP/MN/MNPS/W/12 Construction of Meat stall Talvuppadu Mannar PS Mannar PS 0.030434783
N/A116 NELSIP/NP/MN/MNPS/W/11 Construction of Beef stall Karaisal Mannar PS Mannar PS NCB
N/A115 NELSIP/NP/MN/MNPS/W/10Metalling & Tarring Thalaimannar
internal RoadMannar PS Mannar PS Post Review
N/A6.200 0.053913043 Post Review N/A114 NELSIP/NP/MN/MNPS/W/09Metalling & Tarring Periyakarisal
Sinnakarisal Road KaraisalMannar PS Mannar PS
0.008 Post Review N/A
Post Review
N/A
4.600 0.04
0.057391304
NCB
LKR
Post Review N/A LKR
0.046956522
LKR
LKR
NCB 3.500
LKR
N/A
NCB N/A
3.500 0.030434783
Construction of Market Building Mannar PS Mannar PS NCB
6.600
0.920
5.400
Post Review
Post Review
Mannar PS Mannar PS NCB 0.05226087 Post Review
Kasun Construction 1.08 N/A3.23
Ben Construction
ACLG
Mannar PSMannar PS
Mannar PS
N/A
N/A
N/A
NELSIP/NP/MN/MNPS/W/05
NELSIP/NP/MN/MNPS/W/37
(MNPS-3)
NELSIP/NP/MN/MNPS/W/07
109NELSIP/NP/MN/MNPS/W/38
(MNPS-4)
108
110
112
Reconst. Of Manthai Elupitty intenal
Road
Cons of measstall withslaughter house at
Mannar PS area
Cons of Market Building at Thalimannar
Station at Mannar PS area
0.015565217NCB Post Review
3.82
NCB 0.09730434811.19
1.79
6.01
0.033217391
N/A
Prior Review
N/A
Post Review N/A
10.40
LKR
1.51
LKR
LKR
5.31
Vigitha
Construction Works
MS Construction
0.99
6.50
4.15
N/A
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 29-Jun-2012 24-Jul-2012
Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12
Actual 3-Feb-12 28-Feb-12 9-Apr-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12
Actual 3-Feb-12 28-Feb-12 9-Apr-12
Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012
Actual 16-Jul-2012 9-Aug-2012
0.987 0.008582609 Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012
Actual 16-Jul-2012 9-Aug-2012
1.657 0.014408696 Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012
Actual 16-Jul-2012 9-Aug-2012
3.409 0.029643478 Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012
Actual 16-Jul-2012 9-Aug-2012
2.398 0.020852174 Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012
Actual 16-Jul-2012 9-Aug-2012
3.596 0.031269565 Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012
Actual 16-Jul-2012 9-Aug-2012
8.100 0.070434783 Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012
Actual 16-Jul-2012 9-Aug-2012
7.133 0.062026087 Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012
Actual 16-Jul-2012 9-Aug-2012
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 3-Feb-12 28-Feb-12 4-May-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
N/A LKR N/A120 NELSIP/NP/MN/MNPS/W/15Construction of Erukkalampitty Cultural
hallMannar PS Mannar PS NCB
0.032173913 N/APost ReviewReconst. Of Madukarai Road Nanattan PS Nanattan PS 3.20
N/APost Review LKRNCB 3.80
N/ANCB
N/A
0.033043478Nanattan PS
LKR3.70
Lanka Hardware
and Civil
Construction
8.100
Musali PS Post Review0.041565217Musali PS
9.16 Musali PS
Reconst.of Pericharkadu Road & Culvert
Construction of Market Building
Nanattan PS
NCB
3.500 0.030434783
Post Review
Post Review
NELSIP/NP/MN/MUPS/W/01Reconst. Of Arippu Pandaraveli Road &
CulvertMusali PS LKR 3.23 Kasun ConstructionN/A
Ben Construction3.49
LKR 4.33
N/A
N/A
N/A 1.50
-
1.70
Aheel Construction
NELSIP/NP/MN/NAPS/W/02
NELSIP/NP/MN/MUPS/W/03
NELSIP/NP/MN/NAPS/W/01
122
123
124
121
4.78
NCB 0.079652174 0.82
123 NELSIP/NP/MN/MUPS/W/04Construction of Small Town Ship at
Marichchikaddi (Shopping Complex)Musali PS Musali PS NCB N/A - 0.070434783 Post Review N/A LKR
124 NELSIP/NP/MN/MUPS/W/05Construction of Meat Stall at
ChilawathuraiMusali PS Musali PS NCB N/A - Post Review N/A LKR
125 NELSIP/NP/MN/MUPS/W/06Construction of Slaughter House at
VarivelyMusali PS Musali PS NCB N/A - Post Review N/A LKR
126 NELSIP/NP/MN/MUPS/W/07Construction of Children Park with
Playground at ChilawathuraiMusali PS Musali PS NCB N/A - Post Review N/A LKR
127 NELSIP/NP/MN/MUPS/W/08Construction of Children Park with
Playground at MarichchikaddiMusali PS Musali PS NCB N/A - Post Review N/A LKR
128 NELSIP/NP/MN/MUPS/W/09Construction of Children Park with
Playground at VeepankulamMusali PS Musali PS NCB N/A - Post Review N/A LKR
129 NELSIP/NP/MN/MUPS/W/10Metalling and Taring Koolankulam
Interanal Road Musali PS Musali PS NCB Post Review N/A LKR
130 NELSIP/NP/MN/MUPS/W/11Metalling and Taring Chilawathurai
Interanal Road Musali PS Musali PS NCB Post Review N/A LKR N/A -
N/A -
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 3-Feb-12 28-Feb-12 4-May-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 3-Feb-12 28-Feb-12 4-May-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 3-Feb-12 28-Feb-12 4-May-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 3-Feb-12 28-Feb-12 4-May-12
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual 19-Jul-2012 14-Aug-2012
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual 19-Jul-2012 14-Aug-2012
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 3-Feb-12 28-Feb-12 4-May-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 3-Feb-12 28-Feb-12 4-May-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-11
Actual 3-Feb-12 28-Feb-12 4-May-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-11
Actual 3-Feb-12 28-Feb-12 4-May-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 3-Feb-12 28-Feb-12 4-May-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12
Actual 3-Feb-12 28-Feb-12 23-Apr-12
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual 13-Jul-2012 7-Aug-2012
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual 13-Jul-2012 7-Aug-2012
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual 13-Jul-2012 7-Aug-2012
N/A - 0.057913043 Post Review N/A LKR
N/A -
139 NELSIP/NP/MN/MWPS/W09Metteling & Tarring Sinnapandivirichan
RoadManthai West PS
Manthai West
PSNCB 6.660
7.490 0.065130435 LKR138 NELSIP/NP/MN/MWPS/W08Construction of Public market Iranai
IllupaikulamManthai West PS
Manthai West
PSNCB
N/A -
N/A
137 NELSIP/NP/MN/MWPS/W07Metteling & Tarring Sinnavalayankaddu
internal RoadManthai West PS
Manthai West
PSNCB LKR
0.054956522 Post Review N/A LKR
N/A
130 NELSIP/NP/MN/NAPS/W/08Metteling & Tarring Valkaipettankandal
RoadNanattan PS Nanattan PS NCB 6.320
0.067652174 Post Review N/A LKR
N/A
129 NELSIP/NP/MN/NAPS/W/07Construction of Fish Market Vankalai
WestNanattan PS Nanattan PS NCB 7.780
0.067652174 Post Review N/A LKR128 NELSIP/NP/MN/NAPS/W/06Mettaling Tarring Vanchiyankulam
Village RoadNanattan PS Nanattan PS NCB 7.780
- N/A
N/A -
6.750 0.058695652 Post Review N/A
Post Review N/A
N/A -
N/A - Construction of Meet Stall with Slaughter
House Manthai West PS
Manthai West
PS
0.016869565 Y.A.Construction
NCB 1.94 0.016869565 Post Review
1.51 Post Review N/A
LKR 1.61 N/A
Construction of Meet Stall with Slaughter
House Manthai West PS
Manthai West
PS1.94
0.068086957 N/APost Review7.83
- N/A
134 NELSIP/NP/MN/MWPS/W/04 Construction of Market Building Manthai West PSManthai West
PSLKRNCB
Post Review
- LKR 7.37 Aheel Construction
7.04 S.M.S.Construction
Manthai West PS 0.0569565226.55 NCBManthai West
PS5.58 133
9.18 0.079826087 Post Review N/AReconst. Of Nedauankandal Sornapuri
Road
N/A
0.063478261 N/A
Construction of Market Building
Reconst. Of Kathalampiddy Road Manthai West PSManthai West
PS
Manthai West PSManthai West
PS
7.30 Post Review
LKR
N/A
5.94
Aheel Construction
N/A 2.16 7.10 0.06173913 Post Review N/A 7.28
Nochikulam Road Nanattan PS
127 NELSIP/NP/MN/NAPS/W/05 Reconstruction of Vankalai Central Road Nanattan PS
4.48 NCB
Nanattan PS
Post Review4.25
Post Review N/A
N/A 1.50
N/A
N/A
0.032173913
0.036956522
N/A
LKR
Post Review
Reconst. Of Achchamkulam Road &
CulvertNanattan PS Nanattan PS NCB
Reconst. Of Madukarai Road Nanattan PS Nanattan PS 3.20 N/ANCB LKR3.70
Lanka Hardware
and Civil
Construction
3.67 Matha Construction
Work
3.84
High Tech Creation
(Pvt)LTD
LKR Ben Construction
Aheel Construction
S.Y.Construction
LKR
LKR
LKR
1.70
Nanattan PS
NELSIP/NP/MN/NAPS/W/02
NELSIP/NP/MN/NAPS/W/04
NELSIP/NP/MN/MWPS/W/01
NELSIP/NP/MN/MWPS/W/05
NELSIP/NP/MN/MWPS/W/02
NELSIP/NP/MN/MWPS/W06
NELSIP/NP/MN/NAPS/W/03
NELSIP/NP/MN/MWPS/W/03
124
135
136
126
125
132
131
NCB
NCB
NCB
NCB
0.038956522 1.60
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual
Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12
Actual 26-Jan-12 21-Feb-12 24-Apr-12
Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12
Actual 26-Jan-12 21-Feb-12 24-Apr-12
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual 13-Jul-2012 7-Aug-2012
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Dec-2012
Actual 19-Jul-2012 14-Aug-2012
Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Dec-2012
Actual
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 8-Jun-11 29-Jun-11 2-Aug-11 10-Jan-12
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 8-Jun-11 29-Jun-11 2-Aug-11 10-Jan-12
Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11
Actual 8-Jun-11 29-Jun-11 2-Aug-11 29-Dec-11
Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12
Actual 3-Jan-12 28-Jan-12 2-Apr-12
Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12
Actual 3-Jan-12 28-Jan-12 2-Apr-12
N/AN/A LKR146 NELSIP/NP/MN/ACLG/W/03Construction of Cultural hall
ModdaikadaiNanattan PS
A,CLG,MANN
ARNCB 12.150 0.105652174 Post Review
LKR N/ANCB 11.660 0.101391304 Post Review N/A
N/A -
145 NELSIP/NP/MN/ACLG/W/02Construction of Murunkan Market 2nd.
StageNanattan PS
A,CLG,MANN
AR
0.039130435 Post Review N/A LKR
N/A
142 NELSIP/NP/MN/MWPS/W12 Children park with play ground
KakayankulamManthai West PS
Manthai West
PSNCB 4.500
N/A LKR141 NELSIP/NP/MN/ACLG/W/01Metalling & Tarring Sahayaveethi
Palakuli RoadManthai West PS
Manthai West
PSNCB 6.750 0.058695652 Post Review
LKR N/A - NCB 3.150 0.027391304 Post Review N/A140 NELSIP/NP/MN/MWPS/W10Construction of children park with play
ground AdampanManthai West PS
Manthai West
PS
N/ASanjeeve
Construction Works11.92
LKR
LKRMannar UC Mannar UC 14.03 Post Review0.122
2.70 N/A12.73 Sanjeeve
Construction WorksMannar UC Mannar UC
Vavuniya South Tamil
PS
Vavuniya South Tamil
PS
N/A
N/A
N/A
NELSIP/NP/VU/VSTPS/W/40
(VSTPS-2)
NELSIP/NP/VU/VSTPS/W/39
(VSTPS-1)
NELSIP/NP/MN/MNUC/W/01
NELSIP/NP/VU/VSTPS/W/41
(VSTPS-3)
NELSIP/NP/MN/MNUC/W/02
149
148
144
143
147
Moor Street Concrete Road
Katkulam 111 Roadat Vavuniya South
Tamil PS area
Vavuniya South Tamil
PS
Thalikulam School Roadat Vavuniya
South Tamil PS area
Labour office Concrete Road
Ukulan kulam Road at Vavuniya South
Tamil PS area
NCB
NCB
NCB
NCB
NCB
14.62 0.127130435 Post Review N/A
N/A
Keerthika
Construction
6.15 Ganam Builders
Vanaja
Construction
LKR 2.43 2.43
6.15
1.89
Post Review5.34 LKR
LKR
Vavuniya South
Tamil PSN/A
0.046434783
0.0264347833.04 Post Review
2.80 Vavuniya South
Tamil PSN/A
Post Review6.98 0.060695652
5.12
Vavuniya South
Tamil PSN/A
150 NELSIP/NP/VU/VSTPS/W/04Reconstruction of Matheenanagar School
Road
Vavuniya South Tamil
PS
Vavuniya South
Tamil PSNCB 4.42 0.038434783 Post Review N/A LKR 4.53
Yansika
ConstructionN/A 1.13
151 NELSIP/NP/VU/VSTPS/W/05Reconstruction of Pulitharitha
Puliyankulam Arfanagar Road
Vavuniya South Tamil
PS
Vavuniya South
Tamil PSNCB 6.10 0.053043478 Post Review N/A LKR 3.59 Jeya Construction N/A 1.13
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011
Actual 29-Jun-2012 24-Jul-2012
Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011
Actual 29-Jun-2012 24-Jul-2012
Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011
Actual 29-Jun-2012 24-Jul-2012
Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12
Actual 3-Feb-12 28-Feb-12 30-Apr-12
Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12
Actual 3-Jan-12 28-Jan-12 30-Apr-12
Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12
Actual 3-Jan-12 28-Jan-12 30-Apr-12
Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12
Actual 3-Jan-12 28-Jan-12 30-Apr-12
Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12
Actual 3-Jan-12 28-Jan-12 30-Apr-12
Planned 26-Jun-2012 19-Jul-2012 18-Aug-2012 18-Nov-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 26-Jun-2012 19-Jul-2012 18-Aug-2012 18-Nov-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12
155 NELSIP/NP/VU/VUC/W/01Reconstruction of Thachchankulam Main
RoadVavuniya UC
162 NELSIP/NP/VU/VSSPS/W/01
Mettaling & Tarring of
Mahakachchakoddiya - Etambaskoddalla
Road , Agbopura - Kokkeliya Road ,
Nedunkulam - Malayarparuthikulam
Road -
N/ANCB 4.800 0.04173913 Post Review N/A LKR
N/A
154 NELSIP/NP/VU/VSTPS/W/08Metalling & Tarring Salambaikkulam
Internal Road
Vavuniya South Tamil
PS
Vavuniya South
Tamil PS
153 NELSIP/NP/VU/VSTPS/W/07Metalling and Taring Poompugar
Kalmadu Road
Vavuniya South Tamil
PS
Vavuniya South
Tamil PSNCB N/A LKR9.700 0.084347826 Post Review
LKR152 NELSIP/NP/VU/VSTPS/W/06Metalling & Tarring Thonikal
Lakshabana Road
Vavuniya South Tamil
PS
Vavuniya South
Tamil PS8.90 0.077391304 Post Review N/A N/ANCB
Vavuniya UC NCB 6.76 0.058782609 Post Review N/A LKR 3.60 Keerthika
ConstructionN/A 1.14
156 NELSIP/NP/VU/VUC/W/02Reconstruction of Paddaikadu Road and
Construction of drainageVavuniya UC Vavuniya UC NCB 5.69 0.049478261 Post Review N/A LKR 4.96
Pasindu
Hettiarachchi
Construction
N/A 0.94
157 NELSIP/NP/VU/VUC/W/03Reconstruction of Thekawatte Internal
RoadVavuniya UC Vavuniya UC 1.14 NCB 4.60 0.04 Post Review N/A
Post Review
LKR 3.93 Keerthika
ConstructionN/A
158 NELSIP/NP/VU/VUC/W/04 Kurumankadu internal Road Vavuniya UC Vavuniya UC NCB 3.54 0.030782609 0.98
159 NELSIP/NP/VU/VUC/W/05 Thirunavatkulam Sivan Kovil Road Vavuniya UC Vavuniya UC NCB 4.95
N/A
Post Review LKR 4.45
N/ALKR 3.85 S.J.Civil
Constructions
Keerthika
Construction1.00 0.043043478 N/A
Vavuniya South
Singala PS
Vavuniya South
Singala PSNCB 6.92 0.060173913 Post Review N/A LKR 7.97
Asiri Construction
& Designed N/A 1.50
160 NELSIP/NP/VU/VUC/W/06Metalling&Tarring Paththiniyar
Mahilankulam 1st lane(Cemetry Road)Vavuniya UC Vavuniya UC NCB 2.850 0.024782609 Post Review N/A LKR
161 NELSIP/NP/VU/VUC/W/07Metalling&Tarring Paddaikadu Road
Through Veppankulam 7th lane Vavuniya UC Vavuniya UC NCB 13.427 0.116756522 Post Review N/A LKR N/A
N/A
N/A
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 3-Jan-12 28-Jan-12 10-May-12
Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12
Actual 3-Jan-12 28-Jan-12 10-May-12
Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12
Actual 3-Jan-12 28-Jan-12 2-May-12
Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011
Actual
Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011
Actual
Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011
Actual 29-Jun-2012 24-Jul-2012
Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011
Actual 29-Jun-2012 24-Jul-2012
Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12
Actual 3-Jan-12 28-Jan-12 9-Apr-12
Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12
Actual 3-Jan-12 28-Jan-12 9-Apr-12
Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011
Actual
N/A
N/A4.500 0.039130435 Post Review N/A LKR
N/A
171 NELSIP/NP/VU/VCKPS/W/03Reconstruction of Children Park & Play
ground at Sooduventhapulavu
Vengala Cheddikulam
PS
Vengala
Cheddikulam PSNCB
N/A
168 NELSIP/NP/VU/VSSPS/W/07Metalling & Tarring Puthuvillan kulam
main Road
Vavuniya South
Singala PS
Vavuniya South
Singala PSNCB
NELSIP/NP/VU/VSSPS/W/04Renovation of Market
Periyapuliyalankulam
Vavuniya South
Singala PS
162 NELSIP/NP/VU/VSSPS/W/01
Mettaling & Tarring of
Mahakachchakoddiya - Etambaskoddalla
Road , Agbopura - Kokkeliya Road ,
Nedunkulam - Malayarparuthikulam
Road -
Post Review
3.000 0.026086957 Post Review
LKR
N/A LKR
NCB 1.000 0.008695652
NCB 0.500 0.004347826 Post Review N/A
166 NELSIP/NP/VU/VSSPS/W/05Construction of Market
Mahakachchakodiya
Vavuniya South
Singala PS
Vavuniya South
Singala PSNCB
165Vavuniya South
Singala PS
LKR
N/ALKR
167 NELSIP/NP/VU/VSSPS/W/06Concrete Paving Galachiyambalawa
Pansala Road
Vavuniya South
Singala PS
Vavuniya South
Singala PS
1.000 0.008695652 Post Review N/A
Vavuniya South
Singala PS
Vavuniya South
Singala PSNCB 6.92 0.060173913 Post Review N/A LKR 7.97
Asiri Construction
& Designed N/A 1.50
163 NELSIP/NP/VU/VSSPS/W/02
Mettaling & Tarring of Maruthamadu
Vihara Road,Acre 60 Pansala
Road,Ullukulam Deewaragammanaya
Road -
Vavuniya South
Singala PS
Vavuniya South
Singala PSN/A - NCB 7.04 0.061217391 Post Review N/A
4.82 0.041913043 Post Review
LKR 6.89 Sanjeeve
Construction Works
164 NELSIP/NP/VU/VSSPS/W/03
Mettaling & Tarring of Err
apperiyakulam 2nd Cross
Road,Errapperiyakulam Railway Road,Sri
Ratnasara Mawatha -Ambalankoddalla
Vavuniya South
Singala PS
Vavuniya South
Singala PSNCB
NCB 0.19
N/A LKR 5.70 Thevan
Construction
N/A
LKR
N/A -
169 NELSIP/NP/VU/VCKPS/W/01 DBST of Muthaliyarkulam internal RoadVengala Cheddikulam
PS
Vengala
Cheddikulam PS
Vengala
Cheddikulam PSNCB
7.87 AR,Constructions(P
VT)LTDN/A9.21 0.080086957 Post Review N/A
Reconstruction of Veerapuram 1 st Lane
internal Road0.18 8.56 0.074434783 Post Review N/A LKR
Vengala Cheddikulam
PS7.14
AR,Constructions(P
VT)LTDN/A170 NELSIP/NP/VU/VCKPS/W/02
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011
Actual
Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12
Actual 3-Jan-2012 28-Jan-2012 8-Jun-12
Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12
Actual 3-Jan-2012 28-Jan-2012 9-Apr-12
Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Dec-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Dec-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Dec-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Dec-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Dec-2012
Actual
Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Dec-2012
Actual
Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-12
Actual 2-Feb-12 28-Feb-12 9-May-12
Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-11
Actual 2-Feb-12 28-Feb-12 9-May-12
Planned 13-Oct-11 3-Nov-11 1-Dec-11 30-Apr-12
N/A
N/A
N/A
0.03913 Post Review172 NELSIP/NP/VU/VCKPS/W/04 Pavatkulam Unit II Children ParkVengala Cheddikulam
PS
Vengala
Cheddikulam PSNCB N/A LKR N/A4.500
LKR N/A0.143478261NCB Post Review N/A
14.400 0.125217391 Post Review
16.500
N/A
178NELSIP/NP/VU/ACLG/W/06
(VCKPS)Sinnasippikulam Anaivilunthan Road
Vengala Cheddikulam
PSVU/ACLG
NELSIP/NP/VU/ACLG/W/05(VC
KPS)Construction of Kanthinagar Road
Vengala Cheddikulam
PSVU/ACLG NCB
15.600 LKR
LKR
N/A
VU/ACLG NCB 0.135652174 Post Review N/A
0.195652174 Post Review N/A LKR180NELSIP/NP/VU/ACLG/W/08
(VSSPS)
Construction of Guest House
Eratperiyakulam
Vavuniya South
Singala PSVU/ACLG NCB 22.500
175NELSIP/NP/VU/ACLG/W/03(V
NPS)
Metalling & Tarring Kanakarayankulam
Puthukulam RoadVavuniya North PS VU/ACLG NCB 12.600 0.109565217 Post Review
179NELSIP/NP/VU/ACLG/W/07(V
UC)
Construction of Market & Shopping
Complex at SinnaputhukulamVavuniya UC VU/ACLG
176NELSIP/NP/VU/ACLG/W/04(VC
KPS)
Metalling & Tarring Neriyakulam to
Sinnasippikulam Road
Vengala Cheddikulam
PS
177
LKR
NCB 21.600 0.187826087 Post Review N/A
N/A
LKR N/A
4.70 LKR 4.40 5.40 0.040869565
LKR 7.09 Shiriraam
ConstructionN/A
KNS Construction N/A
Post Review
Post Review
N/A
N/A
3.90
183 NELSIP/NP/KI/POPS/W/03
Construction of Market Complex -
Vegetable market, Fish market, Meat stall
& Toilet Pallikuda
Poonakary PS Poonakary PS NCB
Shiriraam
Construction
182 NELSIP/NP/KI/POPS/W/02Reconstruction of Pandiveddy
Pallawarayankaddu 2 nd Cross RoadPoonakary PS Poonakary PS NCB 5.60
N/A 1.10 NCB 8.31 0.07226087 Post Review N/A LKR 7.30 NELSIP/NP/KI/POPS/W/01 Reconstruction of Periyathampirai Road Poonakary PS Poonakary PS
0.048695652
173 NELSIP/NP/VU/ACLG/W/01
Construction of Nainamadhu
Karappakuththy Road ( Vavuniya
North)
Vavuniya North PS ACLG NCB 21.07 0.183226087 Post Review N/A LKR 22.10
A Group
Construction
&Consults
N/A 4.50
174 NELSIP/NP/VU/ACLG/W/02Reconstruction of DBST of Pavatkulam
Unit 6 to 4 Road
Vengala Cheddikulam
PSACLG NCB 11.65 0.101304348 Post Review N/A LKR 11.20
A Group
Construction
&Consults
N/A 2.20
181
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 2-Apr-2012 27-Apr-2012 7-Jun-12
Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-12
Actual 2-Feb-12 28-Feb-12 9-May-12
Planned 13-Oct-11 3-Nov-11 1-Dec-11 30-Apr-12
Actual 2-Apr-2012 27-Apr-2012 7-Jun-12
Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 8-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual
Planned 13-Oct-11 3-Nov-11 1-Dec-2011 1-Mar-12
Actual 16-Jan-12 9-Feb-12 23-Mar-2012
Planned 13-Oct-11 3-Nov-11 1-Dec-2011 1-Mar-12
Actual 16-Jan-12 9-Feb-12 28-Mar-2012
N/A0.0469 Post Review N/A LKR
N/A
190 NELSIP/NP/KI/POPS/W/11Reconstruction of alankerny Cemetary
road Poonakary PS Poonakary PS NCB 5..4
0.0235 Post Review N/A LKR
N/A
189 NELSIP/NP/KI/POPS/W/10 Construction of Park Poonakary PS Poonakary PS NCB 2.70
7.20 0.0626 Post Review N/A LKR188 NELSIP/NP/KI/POPS/W/09 Construction of Shoping Complex Poonakary PS Poonakary PS NCB
N/A0.0391 Post Review N/A LKR
N/A
187 NELSIP/NP/KI/POPS/W/07 Construction of Ayurvedic Hospital Poonakary PS NCB 4.10Poonakary PS
186 NELSIP/NP/KI/POPS/W/06 Construction of Valaippadu Market Poonakary PS Poonakary PS
N/A 1.20 NCB 5.66 0.049217391 Post Review N/A LKR 4.33 192 NELSIP/NP/KI/PAPS/W/02Reconstruction of Plopallai Allipallai
RoadPachchilappalli PS
Pachchilappalli
PS
0.04573913 Post Review N/A 1.10 Rushan
Construction
LKR
Leading Crusher
Works
LKR 3.91 N/A
LKR 4.45 N/A
N/A
191 NELSIP/NP/KI/PAPS/W/01Reconstruction of Plopallai East -
Mullayady RoadPachchilappalli PS
Pachchilappalli
PSNCB
NCB 4.90 0.0391
4.78 Krishna Civil
Engineering
Construction
Post Review
0.040956522 Post Review N/A - KNS Construction
4.70
N/A 1.17 NCB 7.71 0.067043478 Post Review N/A LKR
LKR 4.40 5.40
184 NELSIP/NP/KI/POPS/W/04Reconstruction of Nachchikuda
Kumulamunai roadPoonakary PS Poonakary PS
0.040869565 KNS Construction N/APost Review N/A183 NELSIP/NP/KI/POPS/W/03
Construction of Market Complex -
Vegetable market, Fish market, Meat stall
& Toilet Pallikuda
Poonakary PS Poonakary PS NCB
185 NELSIP/NP/KI/POPS/W/05
Construction of Market Complex -
Vegetable market, Fish market, Meat stall
& Toilet Kiranchchi
Poonakary PS Poonakary PS 4.71
5.26
NCB
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 13-Oct-11 3-Nov-11 1-Dec-2011 1-Mar-12
Actual 16-Jan-12 9-Feb-12 28-Mar-2012
Planned 13-Oct-11 3-Nov-11 1-Dec-2011 1-Mar-12
Actual 17-Jan-12 9-Feb-12 23-Mar-2012
Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 8-Nov-2012
Actual
Planned 18-Jun-2012 11-Jul-2012 10-Aug-2011 9-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 18-Jun-2012 11-Jul-2012 10-Aug-2011 9-Nov-2012
Actual 31-Jul-2012 24-Aug-2012
Planned 18-Jun-2012 11-Jul-2012 10-Aug-2011 9-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 18-Jun-2012 11-Jul-2012 10-Aug-2011 9-Nov-2012
Actual 2-Aug-2012 24-Aug-2012
Planned 18-Jun-2012 11-Jul-2012 10-Aug-2011 9-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
Planned 18-Jun-2012 11-Jul-2012 10-Aug-2011 9-Nov-2012
Actual 2-Aug-2012 24-Aug-2012
Planned 13-Oct-11 3-Nov-11 1-Dec-11 30-Apr-12
Actual 16-Jan-12 9-Feb-12 5-Apr-12 5-Jul-12
Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012
Actual 18-Jun-2012 10-Jul-2012
0.007 Post Review N/A LKR N/A
N/A
201 NELSIP/NP/KI/KAPS/W/07Reconstruction of Pannankandy
Cemetary and Well Karachchi PS Karachchi PS NCB 0.9
0.07826087 Post Review N/A LKR200 NELSIP/NP/KI/KAPS/W/06 Murasumoddai Cemetery road Karachchi PS Karachchi PS NCB
LKR
9.00
N/ANCB 1.80 0.015652174 Post Review N/A
N/A
199 NELSIP/NP/KI/KAPS/W/05Construction of Cemetary and Well at
KoorankadduKarachchi PS Karachchi PS
9.00 0.07826087 Post Review N/A LKR
N/A
198 NELSIP/NP/KI/KAPS/W/04Mettaling & Tarring of Kanagampikai
Kulam RoadKarachchi PS Karachchi PS NCB
4.50 0.039130435 Post Review N/A LKR
N/A
197 NELSIP/NP/KI/KAPS/W/03 Construction of Irrinaimadu Market Karachchi PS Karachchi PS NCB
9.90 0.086086957 Post Review N/A LKR
N/A
196 NELSIP/NP/KI/KAPS/W/02Mettaling & Tarring of Uruthirapuram
west 4th Cross roadKarachchi PS Karachchi PS NCB
8.55 0.074347826 Post Review N/A LKR195 NELSIP/NP/KI/PAPS/W/05 Construction of Play Ground at Palai Pachchilappalli PSPachchilappalli
PSNCB
N/A15.66 0.0822 Post Review N/A LKR203NELSIP/NP/KI/RACLG/W/02
((POPS)
Mettaling & Tarring of Murugan temple
Road Poonakary PS Poonakary PS NCB
Rushan
ConstructionN/A 1.30 0.052608696 Post Review N/ANCB LKR 4.64
NCB 6.14 0.053391304 Post Review
6.05
N/A193 NELSIP/NP/KI/PAPS/W/03 Reconstruction of Masar school Road Pachchilappalli PSPachchilappalli
PSN/A 4.00 LKR 4.66
Leading Crusher
Works
194 NELSIP/NP/KI/PAPS/W/04 Reconstruction of Mugavil Main Road Pachchilappalli PSPachchilappalli
PS
0.145217391NCB Post Review N/A Jana Agency N/A 2.30 LKR 14.45 202 NELSIP/NP/KI/ACLG/W/01Mettaling & Tarring of Kumarapuram
School roadKarachchi PS ACLG 16.70
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 13-Oct-2011 3-Nov-2011 1-Dec-11 1-Mar-12
Actual 23-Feb-2012 20-Mar-2012 8-May-12
Planned 13-Oct-2011 3-Nov-2011 1-Dec-11 1-Mar-12
Actual 23-Feb-2012 20-Mar-2012 8-May-12
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual
Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-12
Actual 23-Feb-2012 20-Mar-2012 24-May-12 5-Aug-12
Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-12
Actual 23-Feb-2012 20-Mar-2012 24-May-12 5-Aug-12
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012
Actual 18-Jul-2012 13-Aug-2012
LKR
LKR
LKR
N/A214 NELSIP/NP/MU/TUPS/W/05 Metalling & Tarring Ampalaperumal
village road Thunukkai PS Thunukkai PS NCB 8.10 0.070434783 Post Review
10.00 0.086956522 Post Review N/A212 NELSIP/NP/MU/TUPS/W/03
Metalling & Tarring Mallavi Iyankulam
road(mangainar rd -Continuation)
Therankandal
Thunukkai PS Thunukkai PS NCB
N/A - NCB 6.75 0.058695652 Post Review N/A
N/A -
209 NELSIP/NP/MU/PUPS/W/06 Muththaiyankaddu Mosque Internal Road Puthukkudiyiruppu PSPuthukkudiyirup
pu PS
6.75 0.058695652 Post Review N/A LKR208 NELSIP/NP/MU/PUPS/W/05Repair of Muththuiyankaddu Market
Circular RoadPuthukkudiyiruppu PS
Puthukkudiyirup
pu PSNCB
LKR N/A - NCB 2.70 0.023478261 Post Review N/A
N/A -
207 NELSIP/NP/MU/PUPS/W/04Reconstruction of slaughter House
Oddisuddan Puthukkudiyiruppu PS
Puthukkudiyirup
pu PS
9.00 0.07826087 Post Review N/A LKR206 NELSIP/NP/MU/PUPS/W/03Metalling & Tarring Thaddayamalai
Church RoadPuthukkudiyiruppu PS
Puthukkudiyirup
pu PSNCB
N/APost Review N/A LKR215 NELSIP/NP/MU/KTPS/W/01Metalling & Tarring Rizard
Road KanukernyKarathuraipattu PS
Karathuraipattu
PSNCB
N/A Metalling & TarringThirunagar school
front road Thunukkai PS 7.50 0.1065
6.75 0.0587
LKRPost Review N/A2.28 K.P.K Construction
K.P.K Construction N/A0.007304348 Post Review N/A
Post Review N/A
0.79
LKR
N/A
210 NELSIP/NP/MU/TUPS/W/01Construction of Market and Meatstall
Building IyankulamThunukkai PS Thunukkai PS NCB 2.64 0.022956522
Thunukkai PS
N/A
Reconstruction of Market Meat stall
Building MallaviThunukkai PS 0.84
Post Review0.064608696
Thunukkai PS NCB
213 NELSIP/NP/MU/TUPS/04
211 NELSIP/NP/MU/TUPS/W/02
NCB
LKR 6.46
LKR 7.45
N/A
Post Review
205 NELSIP/NP/MU/PUPS/W/02Reconstruction of Thachchadmpan
Periyapuliyankulam School RoadPuthukkudiyiruppu PS
Puthukkudiyirup
pu PSNCB 7.43
N/A204 NELSIP/NP/MU/PUPS/W/01Reconstruction of Mankulam Katkuvari
RoadPuthukkudiyiruppu PS
Puthukkudiyirup
pu PS0.069130435NCB 7.95 1.44
N/A 1.31
Sulaikha and Sons
Contractor
Sulaikha and Sons
Contractor
LKR
N/A
-
1.27
N/A
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012
Actual
Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-12
Actual 23-Feb-12 20/3/2012 3-May-12
Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-12
Actual 23-Feb-2012 20-Mar-2012 3-May-12
Planned 13-Oct-11 3-Nov-11 1-Dec-11 30-Apr-12
Actual 23-Feb-2012 20-Mar-2012 3-May-12 8-Sep-12
Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-12
Actual 23-Feb-2012 20-Mar-2012 3-May-12 8-Sep-12
Planned 13-Oct-11 3-Nov-11 1-Dec-11 30-Apr-12
LKR N/ANCB 5.00 0.043478261 Post Review N/A223 NELSIP/NP/MU/MEPS/W/2Contruction of Naddankandal Market and
Shoping Complex Manthai East PS Manthai East PS
LKR N/ANCB 4.50 0.039130435 Post Review N/A
N/A
222 NELSIP/NP/MU/KTPS/W/8HijraPuram Children Park with Play
GroundKarathuraipattu PS
Karathuraipattu
PS
4.50 0.039130435 Post Review N/A LKR221 NELSIP/NP/MU/KTPS/W/7Thaneerottru Children Park with Play
GroundKarathuraipattu PS
Karathuraipattu
PSNCB
LKR N/ANCB 3.15 0.027391304 Post Review N/A
N/A
220 NELSIP/NP/MU/KTPS/W/06 Neerawippitti East Road Mulliyawalai Karathuraipattu PSKarathuraipattu
PS
6.75 0.058695652 Post Review N/A LKR219 NELSIP/NP/MU/KTPS/W/05 Neerawippitti East Road Neerawippitti Karathuraipattu PSKarathuraipattu
PSNCB
LKR N/ANCB 6.75 0.058695652 Post Review N/A
N/A
218 NELSIP/NP/MU/KTPS/W/04 Hijra Puram internal Road Hijirapuram Karathuraipattu PSKarathuraipattu
PS
4.50 0.0391 Post Review N/A LKR
N/A
217 NELSIP/NP/MU/KTPS/W/03Construction of Children Park
Mullaithivu South Karathuraipattu PS
Karathuraipattu
PSNCB
0.0587 Post Review N/A LKR216 NELSIP/NP/MU/KTPS/W/02Metalling & Tarring Rani road
Mullaithivu West Karathuraipattu PS
Karathuraipattu
PSNCB 6.75
ACLG
11.07
0.117130435
N/A
N/A
N/A
Thunukkai PS
Bavithan
Contraction
K.P.K Construction
Subramaniyam
Coustruction
N/A LKR
11.03
11.93
N/A0.112434783 Post Review
0.10373913 10.70
Post Review N/A
KSB Construction
LKR 11.90
K.P.K Construction
226
227 NELSIP/NP/MU/ACLG/W/04
225 NELSIP/NP/MU/ACLG/W /02Renovation of Pradeshiya Sabha behind
Road
LKR
NELSIP/NP/MU/ACLG/W/03 Renovation of Yogapuram Centre Road Thunukkai PS ACLG
Construction of Mankainagar Mallavi
Main RoadNCB Post Review
NCB 13.47
N/A LKR 10.90 13.34 0.116 Post ReviewNCB
228 NELSIP/NP/MU/ACLG/W/05Renovation of Land No 317 to 350 Link
RoadManthai East PS ACLG NCB 12.93
ACLGManthai East PS
LKR
N/A -
N/A -
-
NCB 13.45 0.116956522 Post Review N/A224 NELSIP/NP/MU/ACLG/W/01 Renovation of Vettiyar veethy Karathuraipattu PS ACLG 1.60
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 2-Apr-2012 24-Apr-2012 2-Jun-12
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012
Actual
Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012
Actual 29-Jun-2012 24-Jul-2012
Planned 15-Jun-2012 15-Jul-2012 15-Aug-2012 15-Oct-2012
Actual 24-May-2012
Planned 15-Jun-2012 15-Jul-2012 15-Aug-2012 15-Oct-2012
Actual
N/A12.30 0.106956522 Post Review N/A LKR230NELSIP/NP/MU/MEPS/W/7-
MEPS
Metalling & Tarring Poovarankulam
coloni Link roadManthai East PS
R/ACLG,
MullaithivuNCB
N/A18.76 0.1271 Post Review N/A LKR236NELSIP/NP/MU/ACLG/W/13-
MEPS
Metalling & Tarring30 housing scheme
toParappukal roadManthai East PS
R/ACLG,
MullaithivuNCB
LKR N/ANCB 12.60 0.1096 Post Review N/A235NELSIP/NP/MU/ACLG/W/12-
TUPS
Reconstruction of Shops at Mallavi
marketThunukkai PS
R/ACLG,
Mullaithivu
LKR
11.07
N/ANCB 10.65 0.1 Post Review N/A
N/A
229NELSIP/NP/MU/ACLG/W/6-
TUPS
Metalling & Tarring Puthuveduvan health
center road Thunukkai PS
R/ACLG,
Mullaithivu
22.50 0.1957 Post Review N/A LKR234NELSIP/NP/MU/ACLG/W/09-
PUPS
Reconstruction of Public Market & Shops
MankulamPuthukkudiyiruppu PS
R/ACLG,
MullaithivuNCB
LKR N/ANCB 22.50 0.1957 Post Review N/A
N/A
233NELSIP/NP/MU/ACLG/W/08-
PUPS
Reconstruction of Public Market & Shops
OddisuddanPuthukkudiyiruppu PS
R/ACLG,
Mullaithivu
13.50 0.117391304 Post Review N/A LKR
N/A
232NELSIP/NP/MU/ACLG/W/07-
KTPSMurippu internal Road Murippu Karathuraipattu PS
R/ACLG,
MullaithivuNCB
0.117391304 Post Review N/A LKR231NELSIP/NP/MU/ACLG/W/06-
KTPS
Construction of Market & Shopping
Complex Stage I Mullaithivu TownKarathuraipattu PS
R/ACLG,
MullaithivuNCB 13.50
N/AN/A0.112434783 Post Review KSB ConstructionLKR228 NELSIP/NP/MU/ACLG/W/05Renovation of Land No 317 to 350 Link
RoadManthai East PS ACLG NCB 12.93
Post Review N/A LKR237 NELSIP/NP/PMU/W/01Extention of the CLG office Building For
Pura Neguma Office PMU,NP PMU,NP CC N/A 0.58
238 NELSIP/NP/PMU/W/02 Parttion of the CLG Office building PMU,NP PMU,NP
2.00 0.017391304
NS 1.50 0.013043478 Post Review N/A LKR N/A
2.2Themarachchiwest
MPCS
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 15-Jun-2012 15-Jul-2012 15-Aug-2012 15-Nov-2012
Actual
Planned 15-Jun-2012 15-Jul-2012 15-Aug-2012 15-Nov-2012
Actual
Planned 20-Jun-11 18-Jul-11 15-Aug-11 14-Nov-11
Actual 4-Jul-11 26-Jul-11 30-Sep-11 24-Jan-12
Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12
Actual 24-Oct-11 14-Nov-11 25-Jan-12 1-May-12
Planned 20-Jun-11 18-Jul-11 15-Aug-11 14-Nov-11
Actual 4-Jul-11 26-Jul-11 30-Sep-11 3-Jan-12
Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12
Actual 23-Sep-11 14-Oct-11 10-Jan-12 16-Mar-12
Planned 20-Jun-11 18-Jul-11 15-Aug-11 14-Nov-11
Actual 8-Jul-11 1-Aug-11 21-Dec-11 28-Mar-12
Planned 20-Jun-11 18-Jul-11 15-Aug-11 14-Nov-11
Actual 8-Jul-11 1-Aug-11 11-Nov-11 25-Feb-12
Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12
Actual 26-Sep-11 18-Oct-11 19-Jan-12 28-Mar-12
Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12
Actual 26-Sep-11 18-Oct-11 19-Jan-12 28-Mar-12
Planned 13-Mar-11 4-Apr-11 2-May-11 1-Jul-11
Actual 20-Apr-12 14-May-12
Planned 31-Aug-11 17-Nov-11
Actual 19-Aug-11 5-Dec-11
Planned 4-Nov-11 3-Jan-12
Actual 28-Nov-11 28-Feb-12
Planned 4-Nov-11 3-Jan-12
Actual 28-Nov-11 28-Feb-12
Planned 4-Nov-11 3-Jan-12LKR 1.27
Community Center,
JayanthipuraN/A - 253 EP/TR/KAPS/W/04
Improvements to Bridge structure at
Jeyanthipura 3rd cross Channel in
Kantale
Kantale PS Kantale PS CC 9.70 0.084347826 Post Review
252 EP/TR/KAPS/W/03Construction of bridge at seruvila across
the Peraru Channel KantaleKantale PS Kantale PS CC 1.12 0.00973913 Post Review
N/A LKR 7.44 CEB
N/A 1.26
251 EP/TR/KAPS/W/02 Supply of electricity to Wanela west Kantale PS Kantale PS DC
250 EP/TR/KAPS/W/01Constructoin of Bridge at 2460m of RB
Main channel, Batukachchiya in Kantale.Kantale PS Kantale PS CC 1.20 0.010434783 Post Review
4.10
249 EP/TR/TGPS/W/05 Blcok paving of Tsnami Gama Road Town & Gravets PSTown & Gravets
PSNCB 9.45 0.082173913
2.20
248 EP/TR/TGPS/W/04
Improvement of Thevanagar road at
Thevanagar, Puliyankulam in
Trincomalee
Town & Gravets PSTown & Gravets
PSNCB 9.45 0.082173913
Ragal Construction N/AN/A LKR 7.22
1.25
247 EP/TR/TGPS/W/03
Improvement of Jayasundara Mawatha
at Gemunupura, 5th mile
post,Sumethankarapura in Trincomalee.
Town & Gravets PSTown & Gravets
PSNCB 8.10 0.070434783
NCB 3.10 0.026956522 Post Review N/A
M.A.M. Fareed
ConstructionN/A 2.20
246
EP/TR/TGPS/W/02
Construction Of Market At Vellaimanal
TrincomaleeTown & Gravets PS
Town & Gravets
PS
2.30
245 EP/TR/TGPS/W/01
Construction Of Drainage From
Nithyapuri to Farm Road at third Mile,
Post Uppuveli In Trincomalee.
Town & Gravets PSTown & Gravets
PSNCB 5.50 0.047826087
2.14
244 EP/TR/KIUC/W/02
Construction of Concrete road with
Retaining wall at Ahudhanagar,
Addappana vayal Lagoon side in
Kinniya UC Kinniya UC NCB 9.11 0.079217391
2.30
243 EP/TR/ KIUC/W/ 01Construction of Fish Market at
Kandaladyoothu, Faizal Nagar, KinniyaKinniya UC Kinniya UC NCB 2.90 0.025217391
242 EP/TR/TRUC/W/02Improvement of Court road with side
drainage and culvert in TrincomaleeTrincomalee UC Trincomalee UC NCB 5.60 0.048695652 Post Review
241 EP/TR/TRUC/W/01Improvement of Customs Road in
TrincomaleeTrincomalee UC Trincomalee UC NCB
N/A N/A N/A
N/AN/A N/A N/A
N/A 7.30
LKR -
0.06426087 Post Review N/A N/A
1.04
Jana Jaya
Community
Center,Kanthale
LKR 1.26 Ekkamuthu
Community centerN/A N/A N/A
7.39
N/AN/A LKR
8.12 Ragal Construction N/ALKR
Post Review
Post Review N/A
2.51 SVMK
Construction
LKR
Post Review
N/ALKR
Post Review N/A
Post Review
N/A LKR 4.09
4.84 N/A LKR
Post Review
Sunrise
Constructon
8.02 EHJAS
ConstructionN/A
Farwees
ConstructionN/A
N/A
N/A LKR 2.16
N/A LKR 5.67 Sivashakthi
ConstructionN/A 3.70 6.20 0.053913043 Post Review
0.5239 NELSIP/NP/PMU/W/03Renovation of the Mannar R/ACLG
Office buildingDPMU,NP DPMU,NP NS
1.00 0.008695652
N/A LKR0.004347826 Post Review
Post Review N/A240 NELSIP/NP/PMU/W/04Renovation of the Trainning Hall at
R/ACLG Office JaffnaDPMU,NP DPMU,NP NCB LKR
N/A
N/A
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 20-Nov-11 20-Feb-12
Planned 4-Nov-11 3-Jan-12
Actual
Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12
Actual 26-Apr-12 14-May-12
Planned 24-Jun-11 21-Jul-11 18-Aug-11 17-Nov-11
Actual 13-Jul-11 4-Aug-11 15-Oct-11 14-Jan-12
Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12
Actual 21-Nov-11 12-Dec-11 21-Feb-12 31-Jul-12
Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12
Actual 21-Nov-11 12-Dec-11 21-Feb-12 5-Jul-12
Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12
Actual 3-Feb-12 24-Feb-12 16-May-12 15-Aug-12
Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12
Actual 1-May-12 21-May-12 25-Jul-12
Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12
Actual 1-May-12 21-May-12 25-Jul-12
Planned 24-Jun-11 21-Jul-11 18-Aug-11 17-Nov-11
Actual 11-Jul-11 2-Aug-11 4-Nov-11 14-Feb-12
Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12
Actual 28-Sep-11 20-Oct-11 11-Jan-12 25-Apr-12
Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12
Actual 3-Jan-12 3-Feb-12 17-Mar-12 23-Jun-12
Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12
Actual 4-Jul-11 26-Jul-11 29-Feb-12 31-Jul-12
Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12
Actual 30-Sep-11 24-Oct-11 14-Dec-11 21-Mar-12
Planned 24-Jun-11 21-Jul-11 18-Aug-11 17-Nov-11
Actual 13-Jul-11 4-Aug-11 30-Sep-11 6-Jan-12
Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12
Actual 29-Sep-11 21-Oct-11 28-Apr-12 31-Aug-12
Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12
Actual 29-Sep-11 21-Oct-11 28-Apr-12 31-Aug-12
Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12
Actual 29-Sep-11 21-Oct-11 28-Apr-12 31-Aug-12
Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12 7.04 0.061217391 2.10 271 EP/TR/KUPS/W/05
Mettaling & Tharring of Kumburupity
North Mariamman Kovil roadKuchaveli PS Kuchaveli PS NCB
Shalika And
ContructionN/APost Review 1.51 N/A LKR
5.03
1.80
270 EP/TR/KUPS/W/04Metaling & Tarring to Periyakulam
internal roadKuchchaveli PS Kuchchaveli PS NCB 5.88 0.051130435
3.99
269 EP/TR/KUPS/W/03Metaling & Tarring of Pulmoddai
Arafanagar roadKuchchaveli PS Kuchchaveli PS NCB 6.51 0.056608696
268 EP/TR/KUPS/W/02Metaling & Tarring of Thiriyai internal
roadKuchchaveli PS Kuchchaveli PS NCB 9.10 0.079130435
Shhira Agency
0.04173913 Post Review N/A 4.70 N/ALKR 4.73 Sulaika 7 Sons
Contractor
N/A 2.70
267 EP/TR/KUPS/W/01
Construction of Metaling & Tarring
Kanakula Road at Thiriyai GN Division
in Kuchchaveli Division
Kuchchaveli PS Kuchchaveli PS NCB 4.80
266 EP/TR/MOPS/W/02Construction of public Market Building,
at Mahadiulwewa Morawewa PS Morawewa PS NCB 3.69 0.032086957
RS Construction,
Kinniya
Post Review N/A 0.88 N/AM.S.Rasika
ConstructionLKR
1.60
265 EP/TR/MOPS/W/01Construction of block paving along school
road at MahadivulwewaMorawewa PS Morawewa PS NCB 3.69 0.032086957
5.40
264 EP/TR/GOPS/W/03
CONSTRUCTION OF CONCRETE
ROAD FOR THIRAPANE -
GALGADAWELLA ROAD
Gomarankadawela PS GOPS NCB 12.72 0.110608696
4.30
263 EP/TR/GOPS/W/02
Construction of Concrete Block paving
for Indikatuwewa Road in
Gomarankadawela.
Gomarankadawela PS GOPS NCB 8.82 0.076695652
0.040869565Munees
ConstructionN/APost Review N/A LKR 4.20
N/A
262 EP/TR/GOPS/W/01Ipprovement of Market Building in
GomarankadawelaGomarankadawela PS
Gomarankadawe
la PSNCB 4.70
8.78
261 EP/TR/SEPS/W/06Construction of bridge across Serunuwara
RajaelaSeruwilla Ps NCB 5.82 0.050608696 Post Review
Mack Civil
EngineeringN/A -
260 EP/TR/SEPS/W/05Block paving of Somapura
SamagimawathaSeruwilla Ps
Seruwilla Ps NCB
259 EP/TR/SEPS/W/04CONSTRUCTION OF SELVANAGAR
RDS ROADSeruvila PS Seruvila PS NCB 7.92 0.068869565 Post Review
-
258 EP/TR/SEPS/W/03Construction of Concreet block paving at
Serunuwara Siriduwa road Seruvila PS Seruvila PS NCB 5.68 -
N/A LKR 6.01 MAM Fareed
constructionN/A257 EP/TR/SEPS/W/02
Construction of Concrete block paving at
Dehiwatta Samagipura roadSeruvila PS Seruvila PS NCB 6.70 0.05826087 Post Review
256 EP/TR/SEPS/W/01Constrution of Market Stalls Building at
Seruwila Rajamaha Viharaya in Seruwila.Seruvila PS Seruvila PS NCB 6.50 4.13
0.047652174 Post Review N/A LKR N/A
0.016608696 Post Review N/A
255 EP/TR/VEPS/W/01Construction of drainage at
ValaiththoddamVerugal Ps Verugal Ps NCB 5.48
LKR 1.27 Community Center,
JayanthipuraN/A - 253 EP/TR/KAPS/W/04
Improvements to Bridge structure at
Jeyanthipura 3rd cross Channel in
Kantale
Kantale PS Kantale PS CC 9.70 0.084347826 Post Review
Post Review N/A Sahira Agency
5.66
6.40
N/A N/ALKRShak Agency
N/ALKR
N/AN/A LKR 8.00
Post Review
Post Review
Post Review
N/A LKR 8.02
N/A LKR 3.06
6.60
7.84 Uthpalana
ConstructionN/ALKR
Post Review
Post Review N/A
NAARS
ConstructionN/A
6.19 Ganditha Civil
Engenerring N/ALKR
0.049391304 Post Review N/A LKR
Ganditha Civil
Engenerring
N/A LKR 7.81
0.076347826 Post Review N/A 8.65 N/ALKR
5.44 Orient Construction N/A
4.70
Okra Construction
EngineeringN/A
LKR
N/A
0.056521739 Post Review N/A
LKR254 EP/TR/KAPS/W/05EXTENSION OF WATER SUPPLY
LINES AT KANTHALAY PERARUKantale PS Kantale PS DC 1.91
N/A N/A N/A
N/A N/A
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 2-Mar-12 23-Mar-12 25-Apr-12 24-Sep-12
Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12
Actual 2-Mar-12 23-Mar-12 25-Apr-12 24-Sep-12
Planned 24-Jun-11 21-Jul-11 18-Aug-11 17-Nov-11
Actual 11-Jul-11 2-Aug-11 14-Nov-11 15-Jan-12
Planned 24-Jun-11 21-Jul-11 18-Aug-11 17-Nov-11
Actual 8-Jul-11 1-Aug-11 25-Oct-11 27-Jan-02
Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12
Actual 22-Sep-11 14-Oct-11 10-Jan-12 13-Apr-12
Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12
Actual 22-Sep-11 14-Oct-11 10-Jan-12 13-Apr-12
Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12
Actual 9-Mar-12 30-Mar-12
Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12
Actual 9-Mar-12 30-Mar-12
Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12
Actual 9-Mar-12 30-Mar-12
Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12
Actual 28-Sep-11 19-Oct-11
Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12
Actual 28-Sep-11 19-Oct-11 11-Jan-12 25-Apr-12
Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12
Actual 9-Mar-12 30-Mar-12 28-May-12 22-Sep-12
Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12
Actual 9-Mar-12 30-Mar-12 28-May-12 22-Sep-12
Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12
Actual 9-Mar-12 30-Mar-12 28-May-12 22-Sep-12
Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12
Actual 9-Mar-12 30-Mar-12 28-May-12 22-Oct-12
Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12
Actual 31-Oct-11 21.Nov-11 9-Jan-12 24-Apr-12
Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12
Actual 14-Mar-12 4-Apr-12 12-Jun-12 11-Nov-12
Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12
Actual 14-Mar-12 4-Apr-12 12-Jun-12 11-Nov-12
Planned 16-Jun-11 12-Jul-11 11-Aug-11 10-Nov-11N/A 4.20 289 EP/TR/RACLG/W/01
Improvement of Thulasipuram Road in
TrincomaleeTrincomalee UC
RACLG
TrincomaleeNCB 11.40 0.099130435
Uthpalana
Construction
288 EP/TR/PAPS/W/03Consreting of Saiman Kade to Meeoya
Aniket roadPadavisripura ps NCB 9.82 0.085391304 Post Review N/A
NCB 9.90 0.086086957 Post Review N/A
N/APost Review 3.38
287 EP/TR/PAPS/W/02Concrete surfacing to Mahasen Mawatha
at ThissapuraPadavisripura ps
Padavisripura ps
0.92
286 EP/TR/PSPS/W/01Construction of side drainage at
Jayanthiwewa main roadPathavisiripura PS
Pathavisiripura
PSNCB 4.15 0.036086957
0.96
285 EP/TR/MUPS/W/06Mettaling & Tharring of Ilakkandai to
Patalipuram link roadMuthur Ps Muthur Ps NCB 5.29 0.046
284 EP/TR/MUPS/W/05Mettaling & Tarring of Pattithidal to
Manalchenai link roadMuthur Ps Muthur Ps NCB 6.20 0.053913043 Ilham construction
0.042434783 Post Review N/A 1.02 N/ALKR 5.12 Ilham construction
N/A 0.88
283 EP/TR/MUPS/W/04Mettalin & Tharring of Neithal Nagar to
Pala Nagar link roadMuthur Ps Muthur Ps NCB 4.88
282 EP/TR/MUPS/W/03Mettaling & Tharring of Allai Nagar west
to Ikbal Nagar link roadMuthur Ps Muthur Ps NCB 5.23 0.045478261 Ilham construction
5.88 0.051130435 Post Review N/A 1.80 N/ARS ConstructionLKR281 EP/TR/MUPS/W/02Construction of Market building at
Allainagar, ThopurMuttur PS Muttur PS NCB
9.61 0.083565217 N/APost Review
7.95 0.069130435
280 EP/TR/MUPS/W/01Metaling & Taring to Kattaiparichchan
north south link roadMuttur PS Muttur PS NCB
279 EP/TR/THPS/W/06Block paving of Galmetiyawa School
central roadThampalagamam Ps
Thampalagama
m PsNCB
N/APost Review N/A LKR278 EP/TR/THPS/W/05 Block paving of Muhamadiya Nagar road Thampalagamam PsThampalagama
m PsNCB 7.97 0.069304348
4.80
277 EP/TR/THPS/W/04Block paving of Thelungu nagar 01st
cross streetThampalagamam Ps
Thampalagama
m PsNCB 7.95 0.069130435
276 EP/TR/THPS/W/03
Construction of concrete Block paving of
Kobbekaduwa road in Thampalagamam
D.S Division
Thambalakamam PSThambalakama
m PSNCB 6.95 0.060434783
M2 Lanka
Engineering (Pvt)
Ltd
0.067391304 Post Review N/A 6.50 N/ALKR 6.51
M2 Lanka
Engineering (Pvt)
Ltd
N/A 7.13
275 EP/TR/THPS/W/02
Construction of Concrete Block paving of
Kuda road in Thampalagamam D.S
Division
Thambalakamam PSThambalakama
m PSNCB 7.75
274 EP/TR/THPS/W/01
Construction of Concrete Block Paving
for Mullipothanai Main Road At
Mullipothanai in Thampalakamam DS
Thambalakamam PS Thambalakama
m PS NCB 8.40 0.073043478
M.A.M. Fareed
Construction
4.70 0.040869565 Post Review N/A 4.70 N/AMunees
ConstructionLKR273 EP/TR/KIPS/W/01
Construction of Tarring at
Elumathuraiyady at Kurunchakerny in
Kinniya
Kinniya PS Kinniya PS NCB
6.11 0.053130435 N/A 2.65 Post Review
7.04 0.061217391 2.10
272 EP/TR/KUPS/W/06 Mettaling & Tharring of Jinna Palli road Kuchaveli PS Kuchaveli PS NCB
271 EP/TR/KUPS/W/05Mettaling & Tharring of Kumburupity
North Mariamman Kovil roadKuchaveli PS Kuchaveli PS NCB
LKR
N/A LKR 10.22 Post Review
N/A - LKR 9.30
9.10 Gowri Construction N/A -
N/A LKR 3.73
4.60
Sulaika ASC
N/A
Gamini
Construction
N/ALKR Ilham construction
N/AN/A LKR 4.80 Post Review
Post Review
Post Review
N/A LKR
N/A
Post Review N/A
LKR 4.40
4.98
N/A N/ALKR
N/ALKR
N/AN/A LKR 5.72 Post Review
Post Review
Post Review
N/A LKR 6.30
N/A
Post Review N/A
Sahira Agency
LKR 7.75
4.15
Sahira Agency 6.40 N/ALKR
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 17-Aug-11 8-Sep-11 29-Mar-12 28-Jul-12
Planned 16-Jun-11 12-Jul-11 11-Aug-11 10-Nov-11
Actual 18-Aug-11 8-Sep-11 30-Nov-11 1-Mar-12
Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12
Actual 12-Oct-11 3-Nov-11 28-Dec-11 2-Apr-12
Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12
Actual 12-Oct-11 3-Nov-11 2-Jan-12 8-Apr-12
Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12
Actual 1-Nov-11 22-Nov-11 11-Jan-12 25-Apr-12
Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12
Actual 1-Nov-11 22-Nov-11 29-Dec-11 5-Apr-12
Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12
Actual 1-Nov-11 22-Nov-11 12-Jan-12 31-Jul-12
Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12
Actual 12-Oct-11 3-Nov-11 7-Jan-12 10-Apr-12
Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12
Actual 1-Nov-11 22-Nov-11 23-Jan-12 30-Apr-12
Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12
Actual 1-Nov-11 22-Nov-11 10-Jan-12 23-May-12
Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12
Actual 27-Dec-11 17-Jan-12 2-Jul-12
Planned 24-Feb-12 16-Mar-12 18-Apr-12 18-Sep-12
Actual 24-Feb-12 16-Mar-12 7-May-12 6-Oct-12
Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12
Actual 22-Jun-12 13-Jul-12
Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12
Actual 24-Feb-12 16-Mar-12 25-May-12 22-Oct-12
Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12
Actual 24-Feb-12 16-Mar-12 21-May-12 13-Oct-12
Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12
Actual 9-Apr-12 30-Apr-12 14-May-12 6-Nov-12
Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12
Actual 9-Apr-12 30-Apr-12 6-Jul-12 6-Nov-12
Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12
Actual 24-Feb-12 16-Mar-12 22-May-12
Planned 24-Feb-12 19-Mar-12 27-May-12 27-Oct-12 - 307 EP/TR/RACLG/W/19
Block paving of Jinna Nagar to Alin
Nagar link roadMuttur PS RACLG NCB 10.47 0.091043478
NCB 13.77 0.11973913Adman
ContrcuctionN/APost Review N/A LKR
11.50 0.1 Post Review -
306 EP/TR/RACLG/W/18
Construction of Concrete Block paving of
97th to 98th link road Stage 1 in
Thampalagamam DS Division
Thampalagam PS RACLG
11.00 0.095652174 Post Review
305 EP/TR/RACLG/W/17Block paving of Ayliyadi Muslim Colani
RoadKinniya Ps RACLG NCB
Post Review N/A
304 EP/TR/RACLG/W/16Mettaling & Tarring of
Kachchakodhitheew Mahamaru road Kinniya Ps RACLG NCB
303 EP/TR/RACLG/W/15Mettaling & Tarring of Kuruinchakerny
Main roadKinniya Ps RACLG NCB 13.74 0.119478261
16.00 0.139130435 MM Building N/A 13.63 Post Review LKR
0.104869565 Post Review
302 EP/TR/RACLG/W/14 Concreting of Al-Irfa school road Kinniya UC RACLG NCB
N/A
301 EP/TR/RACLG/W/13 Improvement of Main street - stage 1 Trincomalee UC RACLG NCB 12.06
5.19
300 EP/TR/RACLG/W/12Improvement of court road- stage 2 with
drainage and 2 culverts Trincomalee UC RACLG NCB 24.08 0.209391304
13.23 0.115043478 Lankamachine
Leasers PVT LtdN/ALKR 17.68 299 EP/TR/RACLG/W/11
Improvements to Illangathurai main road
to Punnayadi ferry roadVerugal PS RACLG NCB
11.68 0.101565217 Post Review 3.00 N/A
21.64 0.188173913 -
298 EP/TR/RACLG/W/10Construction of pipe water supply scheme
at GemunupuraPathavisiripura PS RACLG NCB
297 EP/TR/RACLG/W/09METALING AND TARING AT AT
ATHABENTHIWEWAMorawewa PS RACLG NCB
0.094521739 Post Review N/A 3.54 9.61 SA Construction
and TradersN/A
N/A -
296 EP/TR/RACLG/W/08 Construction of public market at Sripura Pathavisiripura PS RACLG NCB 10.87
-
295 EP/TR/RACLG/W/07Construction of Block paving to
Kakkamunai west roadKinniya PS RACLG NCB 17.25 0.15
294 EP/TR/RACLG/W/06Concreating of Jayanthipura 20th barrier
roadKantale PS RACLG NCB 12.07 0.104956522 Post Review
20.00 0.173913043 Lucky Construction N/A 6.40 Post Review
13.23 0.115043478 3.60
293 EP/TR/RACLG/W/05Construction of Market building at new
bus stand in MuthurMuttur PS RACLG NCB
292 EP/TR/RACLG/W/04Improvements to Illangathurai main road
to Punnayadi ferry roadVerugal PS RACLG NCB
N/ALKR 11.58 6.10 291 /EP/TR/RACLG/W/03
Construction of Concrete Block Paving to
Kattaiyaru Seaside Road at
Malinthurai,Periyathumunai
Kinniya UC RACLG NCB 13.36 0.116173913Lanka Machine
Leasers(pvt)LTD
10.80 0.093913043 Post Review N/A 9.57
N/A 4.20
290 EP/TR/RACLG/W/02
Improvement of Illankaithurai Main Road
at Echchilampattru in Verugal
D.S.Division
Verugal PSRACLG
TrincomaleeNCB
289 EP/TR/RACLG/W/01Improvement of Thulasipuram Road in
TrincomaleeTrincomalee UC
RACLG
TrincomaleeNCB 11.40 0.099130435
Uthpalana
Construction
8.32 Adman
ContrcuctionN/ALKRPost Review N/A
10.94
9.42
N/A LKR 8.69
N/AN/A LKRMAM Fareed
construction
- LKR 10.90
Adman
ContrcuctionN/A -
A.R.Contruction N/A
N/A LKR
N/A
LKR 27.00
N/A
Udana Engineers
Ragal Construction
8.44
N/A
LKR
Post Review
N/A LKR 12.95
N/A
Post Review
LKR
N/A
Post Review
M2 Lanka
Engineering (Pvt)
Ltd
N/A
Post Review
N/A LKR 17.50
N/A LKR 12.91
10.31
M2 Lanka
Engineering (Pvt)
Ltd
N/ALKR
N/ALKRM2 lanka
Engineering Pvt Ltd
Post Review
N/A
N/A
10.00 Sisira Builders
11.54 Lanka Machine
leasersN/A
N/ALKR
Post Review
N/A LKR 10.22 Post Review
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 24-Feb-12 16-Mar-12 14-May-12 30-Sep-12
Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12
Actual 24-Feb-12 16-Mar-12 27-May-12 27-Sep-12
Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12
Actual 9-Apr-12 30-Apr-12 18-Jun-12 27-Oct-12
Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12
Actual 24-Feb-12 16-Mar-12 9-May-12 9-Oct-12
Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12
Actual 9-Apr-12 30-Apr-12 26-Jun-12 25-Nov-12
Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12
Actual 9-Apr-12 30-Apr-12 3-Jul-12 2-Dec-12
Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12
Actual 22-Jun-12 13-Jul-12
Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12
Actual 24-Feb-12 16-Mar-12 30-Nov-12
Pathavisiripura PS Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12
Actual 24-Feb-12 16-Mar-12 17-May-12 16-Oct-12
Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12
Actual 24-Feb-12 16-Mar-12 2-May-12 2-Oct-12
Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12
Actual 9-Apr-12 30-Apr-12 28-Apr-12 23-Oct-12
Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12
Actual 9-Apr-12 30-Apr-12 28-Apr-12 23-Oct-12
Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12
Actual 24-Feb-12 16-Mar-12 2-May-12 1-Oct-12
Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12
Actual 22-Jun-12 13-Jul-12
Planned 28-Dec-12 18-Jan-13 17-Feb-13 15-Oct-13
Actual
Planned 27-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12
Actual
Planned 22-May-11 3-Jun-11 24-Jun-11 5-Aug-11 1-Nov-11
Actual 7-Jun-11 29-Jun-11 21-Jul-11 19-Sep-11 19-Dec-11
Planned 05-Aug-11 26-Aug-11 23-Sep-11 22-Dec-11 7.25 8.76 0.076173913 Post Review Shana Const. N/AN/A LKR 7.15
7.76 0.067478261 Prior Review
324 EP/BT/KPPS/W/02Const. of Concrete surfacing to
Sunkankerny Kinnaiyady Link Road Koralaipattu PS Koralaipattu PS NCB
323 EP/BT/KPPS/W/01Construction of Concrete Surfacing to
Barathy road at Kiran West (900 m)Koralaipattu PS Koralaipattu PS NCB
N/A - 34.55 0.300434783 Post Review N/A LKR322 EP/PMU/W/09 Construction of Multippurpose Building Kanthale Ps (T) PMU NCB
N/A -
-
321 EP/PMU/W/08Construction of water supply scheem at
Gomarankadawala
Gomarankadawalla PS
(T)PMU NCB 28.90 0.251304348
320 EP/TR/RACLG/W/32 Improvement of Serunuwara market Seruwilla Ps RACLG NCB 8.20 0.071304348 Post Review
13.35 0.116086957 Vaman Enterprices N/A 3.20 Post Review
0.128086957 Post Review -
319 EP/TR/RACLG/W/31
Mettaling and Tarring to Illankaithurai
main road 2.0km at Vinayagapuram in
Verugal
Verugal PS RACLG NCB
NCB 22.31
318 EP/TR/RACLG/W/30Block paving of Nochchikulam central
roadMorawewa PS RACLG NCB 14.73
14.35 Nars Construction N/A -
317 EP/TR/RACLG/W/29Mettaling & Tharring of Ethabediwewa
road - Stage -2Morawewa PS RACLG
N/A -
316 EP/TR/RACLG/W/28 Construction of Public Market Morawewa PS RACLG NCB 17.54
-
315 EP/TR/RACLG/W/27Concreting to Lassana gama , Diulapitiya
Tempale roadRACLG NCB 10.17 0.088434783
-
314 EP/TR/RACLG/W/26Construction of Childran Park & Day
care center in Kanthalay.Kanthale Ps (T) RACLG NCB
NCB N/A LKR
11.50 0.100 Post Review -
313 EP/TR/RACLG/W/25 Construction of Cremotorium at Kanthale Kanthale Ps (T) RACLG
10.54 0.091652174 Post Review
312 EP/TR/RACLG/W/24 Block Paving of Mihindupura School road Town & Gravets PS RACLG NCB
21.57 0.187565217 Post Review
311 EP/TR/RACLG/W/23 Block paving of Linganagar Internal road Town & Gravets PS RACLG NCB
310 EP/TR/RACLG/W/22Construction of Drainage at Puliyankulam
UppuweliTown & Gravets PS RACLG NCB
0.156 Post Review N/A LKRSulaika 7 Sons
ContractorN/A -
N/A -
309 EP/TR/RACLG/W/21Mettaling & Tharring of Valautthu
Cematary roadKuchchaveli PS RACLG NCB 17.94
-
308 EP/TR/RACLG/W/20 Mettaling & Tharring of Salamiya street Kuchchaveli PS RACLG NCB 16.20 0.140869565
307 EP/TR/RACLG/W/19Block paving of Jinna Nagar to Alin
Nagar link roadMuttur PS RACLG NCB 10.47 0.091043478
6.60 Bemake Const.
LKR
Post Review
N/A 6.60 LKR
N/A LKR
N/A
11.92 Sulaika ASC
N/A
N/AN/A LKR
N/A LKR 11.49
N/A - 0.194 Post Review N/A LKR 18.05
LKR 8.59 Sulaiaka ASC
Sulaika ASC
LKR
Post Review N/A
0.152521739
Post Review N/A
Post Review N/A
LKR 14.08 M2Lanka
Engeeneing
10.10 Samasiri & Sons
ConstructionN/AN/A LKR
Post Review
Varnan Enterprises N/A - N/A LKR 12.60
MMM Contraction N/A - N/A LKR 19.40
9.96
LKR 13.64 Vaman Enterprices
8.32 Adman
ContrcuctionN/ALKR
Post Review N/A
Post Review N/A
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 23-Set-11 14-Oct-11 30-Dec-11 29-Mar-12
Planned 24-Fer-12 16-Mar-12 9-Apr-12 09-Jul-12
Actual 2-Mar-12 23-Mar-12
Planned 24-Fer-12 16-Mar-12 9-Apr-12 09-Jul-12
Actual 2-Mar-12 23-Mar-12 23-May-12
Planned 24-Fer-12 16-Mar-12 9-Apr-12 09-Jul-12
Actual 23-May-12 13-Jun-12
Planned 9-Apr-12 09-Jul-12
Actual 30-Apr-12 29-Jul-12
Planned N/A 9-Apr-12 09-Jul-12
Actual 30-Apr-12 29-Jul-12
Planned N/A 24-Fer-12 16-Mar-12 9-Apr-12 09-Jul-12
Actual 2-Mar-12 23-Mar-12 20-Jun-12 18-Sep-12
Planned 20-Jun-11 11-Jul-11 22-Aug-11 21-Nov-11
Actual 29-Jun-11 21-Jul-11 10-Oct-11 2-Jan-12
Planned 20-Jun-11 11-Jul-11 22-Aug-11 21-Nov-11
Actual 29-Jun-11 21-Jul-11 5-Oct-11 16-Jan-12
Planned N/A 27-Feb-12 19-Mar-12 2-Apr-12 2-Jul-12
Actual 5-Apr-12 21-May-12 24-May-12 10-Sep-12
Planned 27-Feb-12 19-Mar-12 2-Apr-12 2-Jul-12
Actual 3-May-12 24-May-12 26-Jul-12 24-Oct-12
Planned 2-Apr-12 2-Jul-12
Actual 29-May-12 28-Aug-12
Planned 16-Jun-11 14-Sep-11
Actual 25-Jul-11 24-Oct-11
Planned 08-Aug-11 29-Aug-11 26-Sep-11 25-Dec-11
Actual 21-Oct-11 11-Nov-11 05-Jan-12 20-Mar-12
Planned 2-Apr-12 2-Jul-12
Actual 27-Apr-12 25-Jul-12
Planned 2-Apr-12 2-Jul-12
Actual 10-May-12 25-Jul-12
Planned N/A 27-Feb-12 19-Mar-12 2-Apr-12 2-Jul-12
Actual 3-May-12 24-May-12 19-Jul-12 17-Oct-12
Post Review Planned 20-Jun-11 11-Jul-11 22-Aug-11 21-Nov-11
NCB LKR 7.68
Arunankal CC N/A
-
Kattankudi UC NCB 3.15 0.027391304 N/A
0.82
340 EP/BT/MS&EPPS/W/03Construction of concrete Surfacing to
New Post office Road at Kurumanvely.
Manmunai south &
Eruvil Pattu
Manmunai south
& Eruvil Pattu 9.79 0.085130435 Post Review
339 EP/BT/MS&EPPS/W/02Construction of Market Building at
Periyakallar
Manmunai south &
Eruvil Pattu
Manmunai south
& Eruvil Pattu CC 1.14 0.009913043 1.43
338 EP/BT/MS&EPPS/W/01Construction of Market Building at
Kottaikallar.
Manmunai south &
Eruvil Pattu
Manmunai south
& Eruvil Pattu CC N/A N/A
337 EP/BT/MSWPS/W/02Const. of Concrete surfacing
toKuluvinamadu to Thanthamalai Road
Manmunai South
West PS
Manmunai
South West PSNCB N/A 7.65
336 EP/BT/MSWPS/W/01Improvement to Public Market at
Kokkaddicholai
Manmunaipattu South
West PS
Manmunaipattu
South West PSCC 3.08 0.026782609 Post Review
CC LKR 0.99 Thuritham C.C
0.069130435 N/A -
335 EP/BT/EPPS/W/05Construction of Children park at
Kommathurai NorthEravurpattu PS Eravurpattu PS
0.072086957 1.40
334 EP/BT/EPPS/W/04Renovation of Market Building at
Vantharumoolai. Eravurpattu PS Eravurpattu PS NCB 7.95
5.87
333 EP/BT/EPPS/W/03Construction of concrete Surfacing to
School Road at Savukkady.Eravurpattu PS Eravurpattu PS NCB 8.29
7.38 0.064173913 N/A LKR 5.87 332 EP/BT/EPPS/W/02
Construction of concrete Slab Surfacing
to Vinayakar road at Kommathurai East
(750M)
Eravur Pattu PS Eravur Pattu PS NCB
8.38 0.072869565 Post Review 6.55 6.55 Brilliant
EngineeringN/AN/A
8.19 0.071217391 Post Review
331 EP/BT/EPPS/W/01
Construction of concrete slab surfacing to
Mariyamman kovil road at Kumaraveliyar
Village (850m)
Eravur Pattu PS Eravur Pattu PS NCB
330 EP/BT/KPPS/W/08Construction of concrete Surfacing to
Mohamathiya Road at Sammannodai.Koralaipattu PS Koralaipattu PS NCB
0.93 0.008086957 Post Review N/A N/A329 EP/BT/KPPS/W/07Construction of Children park at
PassikudahKoralaipattu PS Koralaipattu PS CC
N/A -
328 EP/BT/KPPS/W/06Construction of Drainage to Commaini
Road at ValachchenaiKoralaipattu PS Koralaipattu PS CC 1.17
6.40
327 EP/BT/KPPS/W/05 Renovation of public Market at Kiran Koralaipattu PS Koralaipattu PS NCB 8.28 0.072
326 EP/BT/KPPS/W/04Construction of concrete Surfscing Main
link Road at KiranKoralaipattu PS Koralaipattu PS NCB 8.20 0.071304348
7.25
325 EP/BT/KPPS/W/03
Construction of concrete Surfacting of
Hairath Umar Vaddavithanai Road at
Valachchenai
Koralaipattu PS Koralaipattu PS NCB 8.19 0.071217391
8.76 0.076173913 Post Review Shana Const. N/AN/A LKR 7.15 324 EP/BT/KPPS/W/02Const. of Concrete surfacing to
Sunkankerny Kinnaiyady Link Road Koralaipattu PS Koralaipattu PS NCB
341 EP/BT/KUC/W/O1Construction of Concrete drain at Sir
Razeek Fareed mawatha -(350 m )Kattankudi UC N/A - LKR
K.S.P Construction N/A
N/A
LKR
LKR 2.37 Kalmunthal CC 1.70
LKR
Post Review N/A N/A N/A
9.90 0.086086957 Post Review N/A
2.37 0.020608696 Post Review N/A
0.20
LKR 3.08 Aathavan C.C
7.65 K.S.P. Const
N/A
N/A 3.09
LKR
N/A N/A N/A
6.59 SMR ContructionPost Review N/A
0.77 N/A0.006695652 Post Review N/A N/A
Post Review LKR 6.57
N/A
Brilliant
EngineeringN/A
Post Review Sinthu Const.
LKR
Ms.Luxry Lanka
Civil ConstructionN/A - LKR 8.10
0.20
N/A 0.20
LKR 1.17 N/A0.010173913 Post Review N/A N/A
LKR 0.93 Thinvar CC
LKRPrior Review N/A
N/A
N/A LKR 8.18 Ranya Contruction
Ashraff CC
N/ALKR
Post Review
Post Review N/A
N/A
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 26-Apr-12 23-May-12
0.015652174 Planned 20-Jun-11 11-Jul-11 22-Aug-11 21-Nov-11
Actual 26-Mar-12 16-Apr-12 5-Jun-12 4-Sep-12
Planned 5-Mar-12 26-Mar-12 16-Apr-12 16-Jul-12
Actual
Planned 5-Mar-12 26-Mar-12 16-Apr-12 16-Jul-12
Actual
Planned 5-Mar-12 26-Mar-12 16-Apr-12 LKR 16-Jul-12
Actual
Planned 20-Jun-11 19-Sep-11
Actual 25-Jul-11 25-Oct-11
Planned 20-Jun-11 19-Sep-11
Actual 25-Jun-11 25-Oct-11
Planned 23-Fer-12 15-Mar-12 5-Apr-12 4-Jul-12
Actual 4-Apr-12 25-Apr-12 24-May-12 30-Aug-12
Planned 23-Fer-12 15-Mar-12 5-Apr-12 2-Jul-12
Actual 4-Apr-12 25-Apr-12 24-May-12 30-Aug-12
Planned 23-Fer-12 15-Mar-12 5-Apr-12 2-Jul-12
Actual 4-Apr-12 25-Apr-12 24-May-12 28-Aug-12
Planned 23-Fer-12 15-Mar-12 5-Apr-12 2-Jul-12
Actual 4-Apr-12 25-Apr-12 30-May-12 28-Aug-12
Planned 23-Fer-12 15-Mar-12 5-Apr-12 2-Jul-12
Actual 4-Apr-12 25-Apr-12 24-May-12 30-Aug-12
Planned 20-Jun-11 19-Sep-11
Actual 18-Jul-11 30-Oct-11
Planned 24-Fer-12 16-Mar-12 9-Apr-12 09-Jul-12
Actual 26-Mar-12 16-Apr-12 24-May-12 31-Aug-12
Planned 24-Fer-12 16-Mar-12 9-Apr-12 09-Jul-12
Actual 26-Mar-12 16-Apr-12 24-May-12 31-Aug-12
0.072434783 Planned 05-Aug-11 26-Aug-11 23-Sep-11 22-Dec-11
Actual 20-Oct-11 11-Nov-11 27-Dec-11 26-Mar-12
Planned 05-Aug-11 26-Aug-11 23-Sep-11 22-Dec-11
Actual 20-Oct-11 11-Nov-11 23-Dec-11 22-Mar-12
Planned 22-Feb-12 14-Mar-12 4-Apr-12 4-Jul-12
Actual 3-May-12 24-May-12 3-Jul-12 11-Oct-12
Planned 22-Feb-12 14-Mar-12 4-Apr-12 4-Jul-12359 EP/BT/MWPS/W/04
Construction of concrete Surfacing
Vaikal.Road at SalampakerniManmunai West PS
Manmunai West
PSNCB 6.91 0.060086957
LKR 4.50 V.J.Construction - N/A
5.50
358 EP/BT/MWPS/W/03Construction of Market building at
AythiyamalaiManmunai West PS
Manmunai West
PSNCB 5.14 0.044695652
357 EP/BT/MWPS/W/02Const. of Concrete surfacing to
Unnichchai Vaikkal RoadManmunai West PS
Manmunai West
PSNCB 6.65 0.057826087 Post Review
356 EP/BT/MWPS/W/01Const. of Concrete surfacing to
Nelluchchenai Mullamunai RoadManmunai West PS
Manmunai West
PSNCB 8.33 Post Review N/A
NCB 9.25 0.080434783 N/A 5.56 Post Review N/A
9.90 0.086086957 Post Review -
355 EP/BT/KPWPS/W/03
Construction of concrete Surfacting of Al
Ameen Road with rainage at
Kawathamunai.
Koralaipattu West PSKoralaipattu
West PS
354 EP/BT/KPWPS/W/O2
Construction of concrete Surfacing of
Araffa Nagar Amirali Road with
Drainage at Thiyavettavan.
Koralaipattu West PSKoralaipattu
West PSNCB
LKR 6.58 Iyapan Building
Construction
Koralaipattu
West PSCC 1.76 0.015304348 Post Review N/A
Manmunaipattu
PSNCB 8.88 0.077217391 Post Review N/A
351 EP/BT/MPPS/W/06Construction of concrete Surfacing of
Nvalady Road at Selvanagar.Manmunaipattu PS
Manmunaipattu
PSNCB -
N/A LKR N/A 3.60
N/A LKR 6.73 Iyapan Building
ConstructionNCB 9.27 0.080608696
350 EP/BT/MPPS/W/O5Construction of Concrete Surfacing of
kanthy Road at kirankulam.Manmunaipattu PS
Manmunaipattu
PSNCB
NCB LKR
7.28
N/A
349 EP/BT/MPPS/W/04
Construction of Concrete Surfacing of
Navaratnarajah Vithyalaya Road at
Arayampathy-East
Manmunaipattu PSManmunaipattu
PS
0.34 0.002956522
0.61
Post Review
348 EP/BT/MPPS/W/03Construction of Drainage to jothy lane at
Arayampathy-SouthManmunaipattu PS
Manmunaipattu
PS
Post Review N/A
Post Review347 EP/BT/MPPS/W/02Construction of Children Park at
Vannankulam in ArayampathyManmunaipattu PS
Manmunaipattu
PSCC
0.65 346 EP/BT/MPPS/W/01
Construction of Children Park at
Arayampathy Central GS Division (900
m)
Manmunaipattu PSManmunaipattu
PSCC N/A0.005652174
0.100347826 Post Review N/A - N/A
N/A
345 EP/BT/KUC/W/05Construction of 750m Side Drainage to
Sinna thona at Kattankudy. Kattankudi UC Kattankudi UC NCB 11.54
344 EP/BT/KUC/W/04Construction of 900m Side Drainage to
Karbala Road at KattankudyKattankudi UC Kattankudi UC NCB 12.72 0.110608696 Post Review
-
343 EP/BT/KUC/W/03Construction of 900m Side Drainage to
Nooraniya Cemetery Road at KattankudyKattankudi UC Kattankudi UC NCB 12.51 0.108782609
Kattankudi UC NCB 1.80 Post Review N/A 3.25
Kattankudi UC NCB 3.15 0.027391304 N/A
- Post Review N/A LKR 5.72
5.50 Rifthy Group N/A
Sadha Contruction N/A
N/A LKR
Post Review
Sadhu ConstLKR 6.70
N/A
N/A 6.70
LKR 9.16 C.H.Civil
Contruction
9.86 Alshan
ConstructionN/AN/A LKR
N/A 1.80 N/A N/A LKR353 EP/BT/KPWPS/W/O1Construction of Drainage at Manchcholai
VillageKoralaipattu West PS
N/A352 EP/BT/MPPS/W/07Construction concrete Surfacing of RDS
Road at Palamunai.Manmunaipattu PS 3.88
1.80
5.89 Sadha Contruction N/A
Bathuriya C.C
7.09 0.061652174 Post Review N/A
5.98 Arun Contruction
LKR
0.063304348 Post Review
N/A N/A
N/A
0.94
3.00
N/A
SMR Contruction5.13 0.044608696 Post Review N/A 4.10
LKR 0.61
LKR 0.34 Sri Murugan C.C
N/A
N/A 0.34
LKR
N/A Parithy C.C
N/A
Hilimiya
ContructionN/ALKR
Post Review N/AN/A LKR
341 EP/BT/KUC/W/O1Construction of Concrete drain at Sir
Razeek Fareed mawatha -(350 m )Kattankudi UC
342 EP/BT/KUC/W/02Construction of Concrete drain at Al -
Ameen cross road (200 m)Kattankudi UC
N/A - LKR
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 21-Mar-12 11-Apr-12 22-May-12 30-Aug-12
Planned 05-Aug-11 26-Aug-11 23-Sep-11 22-Dec-11
Actual 20-Oct-11 11-Nov-11 30-Mar-12 28-May-12
Planned 27-Sep-11 26-Dec-11
Actual 18-Nov-11 16-Feb-12
Planned 08-Aug-11 29-Aug-11 26-Sep-11 25-Dec-11
Actual 21-Oct-11 11-Nov-11 6/21/2012 19-Sep-12
Planned 08-Aug-11 29-Aug-11 26-Sep-11 25-Dec-11
Actual 21-Oct-11 11-Nov-11 6/26/2012 19-Sep-12
Planned 08-Aug-11 29-Aug-11 26-Sep-11 25-Dec-11
Actual 21-Oct-11 11-Nov-11 7/2/2012 1-Oct-12
Planned 28-Feb-12 20-Mar-12 10-Apr-12 9-Jul-12
Actual 29-Mar-12 19-Apr-12 2-Jul-12 01-Oct-12
Planned N/A 28-Feb-12 20-Mar-12 10-Apr-12 9-Jul-12
Actual 29-Mar-12 19-Apr-12 21-Jun-12 19-Sep-12
Planned 10-Apr-12 9-Jul-12
Actual 21-May-12 19-Sep-12
Planned 10-Apr-12 9-Jul-12
Actual 20-Jun-12 18-Sep-12
Planned 5-Mar-12 26-Mar-12 25-Apr-12 9-Jul-12
Actual 29-Mar-12 19-Apr-12 2-Jul-12 1-Oct-12
Planned 28-Feb-12 20-Mar-12 10-Apr-12 9-Jul-12
Actual
Planned 25-Jul-11 15-Aug-11 12-Sep-11 11-Dec-11
Actual 12-Oct-11 02-Nov-11 29-Nov-11 06-May-12
Planned 25-Jul-11 15-Aug-11 12-Sep-11 11-Dec-11
Actual 12-Oct-11 02-Nov-11 29-Nov-11 31-Jul-12
Planned 30-Jan-12 20-Feb-12 26-Mar-12 2-Jul-12
Actual 19-Mar-12 9-Apr-12 22-Jun-12 22-Sep-12
Planned 30-Jan-12 20-Feb-12 26-Mar-12 2-Jul-12
Actual 19-Mar-12 9-Apr-12 22-Jun-12 29-Sep-12
Planned 30-Jan-12 20-Feb-12 26-Mar-12 2-Jul-12
Actual 19-Mar-12 9-Apr-12 22-Jun-12 29-Sep-12
Planned 30-Jan-12 20-Feb-12 26-Mar-12 2-Jul-12
Actual
Planned 27-Jun-11 26-Sep-11LKR NWS & D N/A - 377 EP/BT/RACLG/W/01
Providing Community water supply
scheme to KanthinagarManmunai West PS
RACLG
BatticaloDC 15.00 0.130434783
376 EP/BT/MC/W/06Construction of IRUTHAYAPURAM
AREA DRAINAGEBatticaloa MC Batticaloa MC NCB 20.00 0.174
3.56 0.031 Post Review N/A LKR375 EP/BT/MC/W/05Construction of Metaling and Tarring at
Duch Bar Road Batticaloa MC Batticaloa MC NCB
374 EP/BT/MC/W/04Construction of Metaling and Tarring at
Munich Victoria Road & Cross Road Batticaloa MC Batticaloa MC NCB 12.15
LKR 4.86
Santhalingams
Building
Construction
N/A373 EP/BT/MC/W/03
Construction of Concrete, Metaling and
Tarring at Sethukkudah Vinayagar Road
& Cross Road
Batticaloa MC Batticaloa MC NCB 5.50 0.048
7.64
372 EP/BT/MC/W/02
Construction of Metaling and Tarring to
Iruthayapuram West Roads in
Iruthayapuram West GN Division,
Batticaloa MC Batticaloa MC NCB 14.00 10.00
N/A LKR 7.65 Murugesh works
and ConstructionN/A371 EP/BT/MC/W/01
Construction of Metaling and Tarring to
Murugan Kovil Road from
Palameenmadu to Thiraimadu, Batticaloa
Batticaloa MC Batticaloa MC NCB 8.95 0.077826087 Post Review
370 EP/BT/EUC/W/09Construction of Drainage Main street to
Lagoon Road at EravurEravur UC Eravur UC NCB 7.00 0.060869565
369 EP/BT/EUC/W/08Construction of concrete Surfacing of
Thaika Road at Eravur.Eravur UC Eravur UC NCB 10.04 0.087304348
Nazeeha
Hardware&Const.
1.59 0.013826087 Post Review N/A N/A N/A
Hara Ahara CC N/A 0.20
368 EP/BT/EUC/W/07 Construction of Children park at Eravur Eravur UC Eravur UC CC
367 EP/BT/EUC/W/06Construction of Bridge at Al Azhar
School Raod at EravurEravur UC Eravur UC CC 1.59 0.013826087 1.59
366 EP/BT/EUC/W/05Construction of concrete Surfacing of
Rifai palli odaviyar Road at EravurEravur UC Eravur UC NCB 8.97 0.078 1.50
N/A LKR 6.29 K.S.P.Construction 5.30 N/A365 EP/BT/EUC/W/04Construction of concrete Surfacing of
Veerapathirar Kovil Road at Eravur.Eravur UC Eravur UC NCB 7.21 0.062695652 Post Review
0.75
364 EP/BT/EUC/W/03Const. of Metaling and Tar
Athisayavinagar Road - Lucky RoadEravur UC Eravur UC NCB 5.96 -
Eravur UC NCB Post Review N/A LKR
Vinayakar C.C
ThampatawattaN/A
Eravur UC NCB 5.96 0.051826087 Post Review N/A 4.90
361 EP/BT/PPPS/W/02
Const. of Concrete surfacing to
Manikkappillayar Kovil Road at
Thampalawattai
Poraitivupattu PSPoraitivupattu
PSCC LKR 4.32
9.77 0.084956522 Post Review N/A 6.70 360 EP/BT/PPPS/W/01Const. of Concrete surfacing to Kampar
Road at Kovilporathivu WestPoraitivupattu PS
Poraitivupattu
PSNCB
359 EP/BT/MWPS/W/04Construction of concrete Surfacing
Vaikal.Road at SalampakerniManmunai West PS
Manmunai West
PSNCB 6.91 0.060086957
Prior Review N/A N/A N/A
LKR N/APost Review N/A
LKR
N/A
13.30 Sanjaya
ConstructionN/A
3.70 Sanjaya
Construction
0.12173913 Post Review N/A
0.106 Post Review N/A
Post Review N/A
LKR
N/A
11.89 Murugesh works
and ConstructionN/A
Post Review N/A LKR
N/A LKRPost Review 8.45
LKR 4.99 Hajimuli CC N/A -
LKR
Post Review
Post Review N/A N/A N/A
LKR 7.58 N/A
4.64 Ramanas
ContructionN/A
Nazeeha
Hardware&Const.
0.051826087 Post Review N/A LKR
6.90 K.S.P. Const
Nazeeha
Hardware&Const.N/ALKR
5.96 0.051826087 N/A
362 EP/BT/EUC/W/01Const. of Metaling and Tar to Palliyady
Road at EravurEravur UC
363 EP/BT/EUC/W/02Const. of Metaling and Tar Rural Court
Road at EravurEravur UC
4.32 N/A 4.00
1.04
0.037565217 Post Review N/A N/A
- Post Review N/A LKR
LKR 8.46 Krishnapila
ConstructionN/A
5.72 Sadha Contruction N/A
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual
Planned 03-Aug-11 24-Aug-11 21-Sep-11 20-Dec-11
Actual 30-Set-11 21-Oct-11 22-Dec-11 21-Mar-12
Planned 03-Aug-11 24-Aug-11 21-Sep-11 20-Dec-11
Actual 30-Set-11 21-Oct-11 04-Jan-12 3-Apr-12
Planned 03-Aug-11 24-Aug-11 21-Sep-11 20-Dec-11
Actual 30-Set-11 21-Oct-11 5-Jan-12 4-Apr-12
Planned 03-Aug-11 24-Aug-11 21-Sep-11 20-Dec-11
Actual 30-Set-11 21-Oct-11 27-Dec-11 26-Mar-12
Planned 03-Aug-11 24-Aug-11 21-Sep-11 20-Dec-11
Actual 30-Set-11 21-Oct-11 26-Dec-11 26-Mar-12
Planned 04-Sep-11 26-Sep-11 24-Oct-11 22-Jan-12
Actual 30-Set-11 21-Oct-11 4-Dec-11 3-Apr-12
Planned 04-Sep-11 26-Sep-11 24-Oct-11 22-Jan-12
Actual 18-Oct-11 08-Nov-11 05-Jan-12 4-Apr-12
Planned 04-Sep-11 26-Sep-11 24-Oct-11 22-Jan-12
Actual 18-Oct-11 08-Nov-11 26-Dec-11 26-Mar-12
Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12
Actual 9-Feb-12 1-Mar-12 8-May-12 7-Aug-12
Planned 29-Feb-12 21-Mar-12 11-Apr-12 10-Jul-12
Actual 27-Apr-12 18-May-12 31-May-12 29-Aug-12
Planned 29-Feb-12 21-Mar-12 11-Apr-12 N/A 10-Jul-12
Actual 21-Mar-12 11-Apr-12 20-May-12 20-Aug-12
Planned 1-Mar-12 22-Mar-12 16-Apr-12 16-Jul-12
Actual 30-Jul-12 20-Aug-12
Planned 29-Feb-12 21-Mar-12 11-Apr-12 N/A 10-Jul-12
Actual 15-Mar-12 5-Apr-12 18-May-12 27-Aug-12
Planned 29-Feb-12 21-Mar-12 11-Apr-12 10-Jul-12
Actual 15-Mar-12 5-Apr-12 18-May-12 27-Aug-12
Planned 29-Feb-12 21-Mar-12 11-Apr-12 N/A 10-Jul-12
Actual 15-Mar-12 5-Apr-12 18-May-12 27-Aug-12
Planned 5-Mar-12 26-Mar-12 16-Apr-12 16-Jul-12
Actual
Planned 1-Mar-12 22-Mar-12 16-Apr-12 16-Jul-12
Actual 27-Apr-12 18-May-12 24-May-12 23-Sep-12RACLG NCB 16.25 0.141304348 Post Review N/ALKR 15.39
-
393 EP/BT/RACLG/W/17
Construction of 1.8 km side Drainage to
Fisharish Coorporation Road at
kattankudy.
Porathivupattu PS RACLG LKR
0.102782609 11.28 Sanjaya
ContructionPost Review N/A LKR
0.160869565 -
392 EP/BT/RACLG/W/16Construction of concrete Surfacing of
Ampilanthurai Road at Navaladi
Manmunai South
West PSRACLG NCB 11.82
-
391 EP/BT/RACLG/W/15
Construction of concrete Surfacing of
Kadukkamunai Pandarively Road at
Pandariyavely.
Manmunai South
West PSRACLG NCB 18.50
390 EP/BT/RACLG/W/14
Construction of concrete Surfacing of
Arasadytheevu Santhirakanthan Road at
Arasadytheevu.
Manmunai South
West PSRACLG NCB 11.02 N/A
389 EP/BT/RACLG/W/13Construction of Children park at
Oddamavadi.Koralaipattu West PS RACLG NCB 21.19 0.18426087 Post Review
388 EP/BT/RACLG/W/12
Construction of concrete Surfacing of
Katpakerni Road at
Puthumandapaththady
RACLG NCB 14.17
N/A LKR 9.72 0.096086957
0.18
387 EP/BT/RACLG/W/11Construction of Market building at
VavunathivuManmunai West PS
RACLG NCB 11.05 Post Review
386 EP/BT/RACLG/W/10Concreting Mankadu Boundary Road at
Thethathiu
Manmunai south &
Eruvil Pattu RACLG NCB 16.05 0.139565217 N/A
385 EP/BT/RACLG/W/09Const. of Concrete surfacing to EHED
Housing Scheme Road at Thalankuda.Manmunaipattu PS RACLG NCB 27.54 0.239478261 Post Review
NCB LKR 22.78 Aramjee Group
M.R.T Group N/A 10.50
384 EP/BT/RACLG/W/08
Const. of Concrete surfacing to
Boundary Road with Const. of Drainage
at Oddamvady
Koralaipattu West PS RACLG
9.20
383 EP/BT/RACLG/W/07Const. of Concrete surfacing to Cemetery
Road at Eruvil
Manmunai south &
Eruvil Pattu RACLG NCB 12.23 10.58
382 EP/BT/RACLG/W/06Const. of Concrete surfacing to Girls
School Road to Mackamady Road Eravu UC RACLG NCB 10.92 0.094956522 N/A
381 EP/BT/RACLG/W/05Const. of Concrete surfacing to School
Road at AnaikaddiyavelyPoraitivupattu PS RACLG NCB 13.10 0.113913043 Post Review
LKR 11.64 Sinthu Const. N/A380 EP/BT/RACLG/W/04Const. of Concrete surfacing to Puthur
Road at RugamEravur Pattu PS RACLG NCB
11.15 Sinthu Const. N/A 11.00
N/A 9.70
379 EP/BT/RACLG/W/03Const. of Concrete surfacing to
Palayadithona to Santhively link RoadKoralaipattu PS RACLG NCB 11.79
378 EP/BT/RACLG/W/02
Const. of Concrete surfacing to
Nagathambiran kovil road at
Kokkadicholai
Manmunai South
West PSRACLG NCB 12.35 0.107391304 Post Review
LKR NWS & D N/A - 377 EP/BT/RACLG/W/01Providing Community water supply
scheme to KanthinagarManmunai West PS
RACLG
BatticaloDC 15.00 0.130434783
MRT Group
N/A21.35 0.185652174 Post Review N/ANCB
394 EP/BT/RACLG/W/18
Construction of cncrete Surfacing to
Manikkapillayar Kovil Road at
Thampalavatta.
N/APorathivupattu PS
Post Review N/A LKR 16.17 Sanjaya
ContructionN/A
LKR N/A
LKR 8,78 Ramanas
Contruction
N/A
0.095826087 Post Review
LKR0.123217391 Post Review N/A 15.54 Focus Marketting
and Engennering
N/A
2.30
Taj Building
Contruction
10.08 Jeeyago
ContructionPost Review N/A LKR
N/A LKR 17.68
22.10
M.R.T.Group N/A
N/A
17.68
LKR
LKR 9.73 Nazeeha
Hardware&Const.
29.29 0.254695652 Post Review N/A
Post Review
Post Review N/A
0.106347826
N/A
N/A
LKR 11.75
6.90
Sanjeev Const. N/A 11.70
LKR
LKR 9.77 Snajaya Const
13.81 0.120086957 Post Review N/A
Post Review
N/A
0.102521739
Prior Review N/A N/A N/A
N/A
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 1-Mar-12 22-Mar-12 16-Apr-12 16-Jul-12
Actual 15-Mar-12 20-Apr-12 11-Jun-12 10-Sep-12
Planned 1-Mar-12 22-Mar-12 16-Apr-12 16-Jul-12
Actual 24-May-12 12-Jun-12 18-Jun-12
Planned 1-Mar-12 22-Mar-12 16-Apr-12 16-Jul-12
Actual 15-Mar-12 5-Apr-12 18-May-12 14-Aug-12
Planned 08-Aug-11 29-Aug-11 26-Sep-11 25-Dec-11
Actual 02-Dec-11 23-Dec-11 06-Feb-12 6-Aug-12
Planned 6-Mar-12 27-Mar-12 17-Apr-12 15-Oct-12
Actual
Planned 17-Jun-11 9-Sep-11
Actual 29-Jun-11 1-Mar-12
Planned 17-Jun-11 9-Sep-11
Actual 29-Jun-11 1-Nov-12
Planned 17-Jun-11 9-Sep-11
Actual 29-Jun-11 1-Nov-11
Planned 17-Jun-11 9-Sep-11
Actual 29-Jun-11 1-Mar-12
Planned 17-Jun-11 9-Sep-11
Actual 29-Jun-11 1-Mar-12
Planned 17-Jun-11 9-Sep-11
Actual 29-Jun-11 1-Mar-12
Planned 17-Jun-11 9-Sep-11
Actual 29-Jun-11 31-Mar-12
Planned 17-Jun-11 9-Sep-11
Actual 15-Aug-11 25-May-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 10-May-12 31-May-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 10-May-12 31-May-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 10-May-12 31-May-12
Planned 17-Jun-11 1-Sep-11
Actual 18-Jul-11 1-Mar-12
Anver Ismail
Community CenterN/A
N/A
411 EP/AMP/NVPS/W/01Const.of Concrete Drainage at
Salambaikerny - 01Navithanveli PS Navithanveli PS CC
410 EP/AM/THPS/W/11Construction of concrete surfacing to
Pillayar kovil road Thampattai Thirukkovil PS Thirukkovil PS NCB 8.68 0.08 Post Review
409 EP/AM/THPS/W/10Construction of concrete surfacing to old
post office road at vinayagapuramThirukkovil PS Thirukkovil PS NCB 8.72 0.08 Post Review
408 EP/AM/THPS/W/09Construction of concrete surfacing to
Sarvodaya road at Thambiluvil -01Thirukkovil PS Thirukkovil PS NCB 8.72 0.08 Post Review
LKR 3.70 Navalar CC N/A 3.70 407 EP/AMP/THPS/W/08Costruction of Public Market at
Thambiluvil Thirukkovil PS Thirukkovil PS CC 3.70 0.032173913 Post Review
406 EP/AMP/THPS/W/07Supply of Electricity at Vinayagapuram
03,Rice mill RdThirukkovil PS Thirukkovil PS DC 0.50 0.004347826 Post Review
LKR 0.30 CEB N/A405 EP/AM/THPS/W/06Supply of Electricity at Thirukkovil 02,
04Thirukkovil PS Thirukkovil PS DC
N/A 1.00 LKR 1.00 CEB
1.00 0.008695652 Post Review N/A N/A N/A403 EP/AM/THPS/W/04
Supply of Electricity at East West –
Thambilivil - 01,Konamalai
veethy,Villiyampillai 1st cross rd
Thirukkovil PS Thirukkovil PS DC
LKR 0.50 CEB N/A
N/A 2.00
402 EP/AM/THPS/W/03Supply of Electricity at Vinayagapuram
03 PalakkudihThirukkovil PS Thirukkovil PS DC 0.50
Thirukkovil PS DC 2.00 0.017391304 Post Review N/A
N/A -
400 EP/AM/THPS/W/01
Supply of Electricity at East South –
Thambiluvil - 01,Iron ferry Rd,Valluvar
cross Rd
Thirukkovil PS Thirukkovil PS DC
41.73 0.362869565 Post Review N/A LKR
NCB 28.00 11.40
399 EP/PMU/W/07Construction of concrete Surfacing
Mankerney to Kirimichchai.RoadVakarai PS (B) PMU NCB
18.14 Ramanas
ContructionN/A -
398 EP/PMU/W/03Const. of Concrete surfacing at
Farmcolony to Kirimichchai Rd
Korrali pattu North
(B)PMU
RACLG NCB Post Review N/A LKR 23.08 0.200695652
2.40
RACLG NCB 11.43 0.099391304 Post Review
15.06 LKR 11.88 P.T.S.Brilliat N/A395 EP/BT/RACLG/W/19
Construction of concrete Surfacing to
Naripulthoddam Road at
Eluppadichchenai.
Eravurpattu P.S RACLG NCB
1.60 0.013913043 Post Review N/A N/A
LKR 7.98 N/A
1.60 N/A LKR 1.60
N/AN/A LKR 8.00
N/A LKR
0.50 CEB
N/A
N/A N/A
N/A N/A N/A
0.30
LKR 0.50
0.002608696 Post Review N/A N/A
N/AN/A
0.30 N/A
404 EP/AM/THPS/W/05Supply of Electricity at Vinayagapuram
04,visnu puram,sarvothaya veethyThirukkovil PS Thirukkovil PS DC Post Review N/A 1.00 0.008695652
N/A 1.00 LKR 1.00
N/A N/A
N/A
0.50 Post Review N/A N/A N/A
CEB
0.004347826
LKR 0.50 CEB 0.50 0.004347826 Post Review N/A
LKR401 EP/AM/THPS/W/02Supply of Electricity at Thandiyadi
Sengamam Gramam - 01Thirukkovil PS
N/A
2.00 CEBN/A
0.50 N/A N/A
29.56 N/A
N/ALKR
0.243478261 Post Review N/A LKR
N/A396 EP/BT/RACLG/W/20
Renovation of Market at Kirantion of
Market Building at
Armugaththankudiyiruppu.
Eravurpattu P.S
397 EP/BT/RACLG/W/21Construction of concrete Surfacing of
Division Boundary Road at Koddaikallar.
ManmunaiSouth
Eruvil Pattu P.S
-
0.130956522 Post Review N/A
10.67 Bobby Construction
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 17-Jun-11 1-Sep-11
Actual 18-Jul-11 1-Mar-12
Planned 17-Jun-11 1-Sep-11
Actual 18-Jul-11 1-Mar-12
Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12
Actual 12-Nov-11 5-Dec-11 20-Mar-12 1-Jul-12
Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12
Actual 12-Nov-11 5-Dec-11 20-Mar-12 1-Jul-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 8-Mar-12 29-Mar-12 11-Jun-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 8-Mar-12 29-Mar-12 11-Jun-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 8-Mar-12 29-Mar-12 11-Jul-12
Planned 14-Jun-11 1-Sep-11
Actual 3-Aug-11 1-Mar-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 10-May-12 31-May-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 10-May-12 31-May-12
Planned 6-Jun-11 28-Jun-11 1-Aug-11 1-Nov-11
Actual
Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12
Actual
Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12
Actual 13.Oct.11 03.Nov.11 23-Dec-11 5-May-12
Planned 18-Apr-12 17-Jul-12
Actual 9-May-12 9-Jul-12
Planned 18-Apr-12 17-Jul-12
Actual 9-May-12 9-Jul-12
Planned 18-Apr-12 17-Jul-12
Actual 10-Apr-12 9-Jul-12
Planned 18-Apr-12 17-Jul-12
Actual 9-May-12 9-Jul-12
Planned 18-Apr-12 17-Jul-12N/A 0.80 429 EP/AM/ADPS/W/08
Construction of Navaladi road concerete
Drainage at PalamunaiAddalaichchenai PS
Addalachchenai
PSDC 4.03 0.04 Post Review
Alimah CC N/A 0.50
Addalachchenai
PSDC 1.57 0.01 Post Review N/A
DC 2.54 0.02 Post Review LKR 2.54
DC 1.49 0.01 Post Review
427 EP/AM/ADPS/W/06Construction of concerete Drainage
Mohaideen road at AddalaichchenaiAddalaichchenai PS
Addalachchenai
PS
2.70 Kanthee CC N/A
426 EP/AM/ADPS/W/05Construction of Drainage at MPCS,
internal road AddalaichchenaiAddalaichchenai PS
Addalachchenai
PS
425 EP/AM/ADPS/W/04Construction of conceret Drainage at
APO internal road AddalaichchenaiAddalaichchenai PS
Addalachchenai
PSDC 2.70 LKR
424 EP/AM/ADPS/W/03Const.of concrete Surfacing to South
Eastern University Road at OluvilAddalaichchenai PS
Addalaichchenai
PSNCB 9.05 N/A 6.66
LKR N/A423 EP/AM/ADPS/W/02Const.of Market Building stage 2 at
AddalachchenaiAddalaichchenai PS
Addalaichchenai
PSNCB 7.49 0.065130435
N/A
422 EP/AM/ADPS/W/01Const.of Market building at
AddalchchenaiAddalachchenai PS
Addalachchenai
PSNCB 7.10
9.26 0.08 Post Review N/A LKR
9.22 0.08
421 EP/AM/DEPS/W/03Construction of Concrete Road at
ThuwaragalaDehiattakandiya PS
Dehiattakandiya
PSNCB
N/A 1.70
420 EP/AM/DEPS/W/02Construction of Concrete Road at
KadirapuraDehiattakandiya PS
Dehiattakandiya
PSNCB
-
419 EP/AM/DEPS/W/ 01Const.Of Weekly Faire Market at
Dehiyahakandy Dehiattakandiya PS
Dehiattakandiya
PSCC LKR
418 EP/AM/NVPS/W/08Construction of concrete road at 18 main
road Annamalai -03Navidanveli PS Navidanveli PS NCB 8.18 0.07 Post Review
417 EP/AM/NVPS/W/07Construction of concrete road at Co-
oporate road Navithanveli -02Navidanveli PS Navidanveli PS NCB 8.73 0.08 Post Review
NCB 8.34 0.07 Post Review N/A
Super Daina power N/A 2.30
416 EP/AM/NVPS/W/06Construction of concrete road at Al-
rahman road, Salambakkany Navidanveli PS Navidanveli PS
5.10
415 EP/AM/NVPS/W/05Construction of Concrete Surfacing to
Jummah Palli Road at Central Camp 1Navithanveli PS Navithanveli PS NCB 7.55 0.065652174
1.60
414 EP/AM/NVPS/W/04Const.of Concrete Surfacing to Alayadi
at Central Camp-5,6Navithanveli PS Navithanveli PS NCB 9.53 0.082869565
1.60 0.013913043 Post Review LKR 1.60 Sri murugan
Community Center
2.10 0.01826087 Post Review
413 EP/AM/NVPS/W/03Const.of Concrete Drainage of
Navidanveli - 02Navithanveli PS Navithanveli PS CC
412 EP/AM/NVPS/W/02Const.of Concrete Drainage at
Navidanveli - 01Navithanveli PS Navithanveli PS CC
LKR 4.03 AL Iqrahu CCN/A N/A N/A
LKRN/A N/A428 EP/AM/ADPS/W/07Construction of RDS road conceret
Drainage at AddalaichchenaiAddalaichchenai PS N/A 0.90
N/A N/A N/A
1.57 Alimah CC
N/AN/A N/A N/A
1.68
LKR 1.00
0.02 Post Review N/A N/A N/A
1.49 Kanthee CC
N/A
LKR 6.66 Hijra Construction,
Sammanthurai0.078695652 Post Review N/A
Post Review N/A
LKR
Post Review N/A LKR
0.06173913 Post Review N/A
LKR
N/A
N/A
1.70 Muwagammana
Community Center
6.58 Sivasangaraj
ConstructionN/A
1.70 0.014782609
Sanath Contractor
Post Review N/A N/A N/A
N/A - N/A LKR 6.55
Sanath Contractor N/A - LKR 6.38
Post Review N/A LKR 5.75
6.90 Post Review
1.70 Saththiyam
Community Center
N/AN/A LKR Hijra Construction,
N/A
N/A N/A
N/A N/A N/A
LKR 1.70 N/AN/A
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 10-Apr-12 9-Jul-12
Planned 18-Apr-12 17-Jul-12
Actual 9-May-12 9-Jul-12
Planned 6-Jun-11 28-Jun-11 1-Aug-11 1-Nov-11
Actual 27-Jun-11 19-Jul-11 24-Aug-11 1-Mar-12
Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12
Actual 13.Oct.11 03.Nov.11 28-Dec-11 1-Mar-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 8-Mar-12 29-Mar-12 17-May-12 16-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 8-Mar-12 29-Mar-12 17-May-12 16-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 8-Mar-12 29-Mar-12 17-May-12 16-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 8-Mar-12 29-Mar-12 17-May-12 16-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 8-Mar-12 29-Mar-12 17-May-12 16-Aug-12
Planned 6-Jun-11 28-Jun-11 1-Aug-11 1-Nov-11
Actual 27-Jun-11 19-Jul-11 8-Aug-11 1-Apr-12
Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12
Actual 13.Oct.11 03.Nov.11 17-Jan-12 1-May-12
Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12
Actual 13.Oct.11 03.Nov.11 17-Jan-12 1-May-12
Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12
Actual 13.Oct.11 03.Nov.11 17-Jan-12 1-May-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 16-Mar-12 9-Apr-12 14-May-12 26-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 16-Mar-12 9-Apr-12 14-May-12 26-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 16-Mar-12 9-Apr-12 14-May-12 20-Aug-12
Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12
Actual 12-Nov-11 5-Dec-11 26-Mar-12 30-Jun-12N/A 0.89
N/A 3.30
445 EP/AM/KTPS/W/01Const.of Tarring to Thesikar Therodum
Rd at KaraithivuKaraitivu PS Karaitivu PS NCB
444 EP/AM/NAPS/W/07Construction of Concrete surfacing to
Buruthagas Handiya Road Namaloya PS Namaloya PS NCB 6.80 0.06 Post Review
1.00
443 EP/AM/NAPS/W/06Construction of Concrete surfacingto
Paragakala 6th channal Road Namaloya PS Namaloya PS NCB N/A 1.12
N/A LKR 5.29 N/AJabha & Son
Construction
N/A 2.40
442 EP/AM/NAPS/W/05Construction of Concrete surfacing to
School Road at KarangawaNamaloya PS Namaloya PS NCB 6.80
N/A 5.34
441 EP/AM/NAPS/W/04Const.of Tarring to 288 Abayapura Rd at
ParagakellaNamal Oya PS Namal Oya PS NCB
0.065652174 Post Review N/A LKR 6.09
N/A 4.20
440 EP/AM/NAPS/W/03Const. of tarring to of A/41road at
Muwangala.Namal Oya PS Namal Oya PS NCB 7.55
439 EP/AM/NAPS/W/02Const.of Tarring to 1/31to1/41 to
Cemetary Rd at WawinnaNamal Oya PS Namal Oya PS NCB
LKR 1.12 N/A 1.00
N/A 2.02
438 EP/AM/NAPS/W/01 Construction of Drainage at Polwattha Namal Oya PS Namal Oya PS NCB 1.50
N/A 1.74
437 EP/AM/ALPS/W/07Construction of concrete surfacing to
Samurthi raod Alayadivembu Alayadivembu PS
Alayadivembu
PSNCB
436 EP/AM/ALPS/W/06Construction of concrete surfacing to
Potkollar road AkkaraiputtuAlayadivembu PS
Alayadivembu
PSNCB 8.75 0.08 Post Review
3.07
435 EP/AM/ALPS/W/05Construction of concrete surfacing to pre
school SinnapanagaduAlayadivembu PS
Alayadivembu
PSNCB N/A -
N/A LKR 9.71 N/AYogesh
Construction
N/A 2.45
434 EP/AM/ALPS/W/04Construction of concrete surfacing to
Kovil front road at Kolavil -01Alayadivembu PS
Alayadivembu
PSNCB 9.75
N/A 5.17
433 EP/AM/ALPS/W/03Construction of concrete surfacing to
Masilamani road AlayadivembuAlayadivembu PS
Alayadivembu
PSNCB
0.067304348 Post Review N/A LKR 5.84
N/A 4.70
432 EP/AM/ALPS/W/02Const.of Concrete Surfacing to -7/8
Common Rd at Akkaraipattu-8Alayadivembu PS
Alayadivembu
PSNCB 7.74
431 EP/AM/ALPS/W/01Const.of Concrete Road at
Vallapathukappu RoadAlayadivembu PS
Alayadivembu
PSNCB
N/A 2.61 Alinukus CC
N/A 0.80
430 EP/AM/ADPS/W/09Construction of conceret Drainage Mahir
Dr. Road at PalamunaiAddalaichchenai PS
Addalachchenai
PSDC 3.28
429 EP/AM/ADPS/W/08Construction of Navaladi road concerete
Drainage at PalamunaiAddalaichchenai PS
Addalachchenai
PSDC 4.03 0.04 Post Review
LKR 4.47 Super Dayana5.96 0.051826087 Post Review N/A
N/A World Ten Building
LKR 5.64 D.Team Holding
LKR 5.19
5.56 0.048347826 Post Review N/A
7.99 0.07 Post Review N/A
0.06 Post Review
N Sivarajaha
LKR 6.27 DMPR
Dissanayake
LKR 4.73 DMPR
Dissanayake
7.55 0.065652174 Post Review N/A
WM.Jayasingha0.013043478 Post Review N/A
LKR 6.00 Keerthi
Construction6.11 0.05 Post Review N/A
N/AM.M.Jalardeen
Refthi Group
LKR 8.84 N.LSarjhon Arenco
Pvt Ltd
LKR 8.70
9.79 0.09 Post Review N/A
8.89 0.08 Post Review N/A
0.08 Post Review
Brilliant
Construction
LKR 4.80 Santh Contractor
LKR 9.78 Santhraja and Son
Construction
6.50 0.056521739 Post Review N/A
LKR 3.28 0.03 Post Review N/A N/A
LKR 4.03 AL Iqrahu CCN/A N/A N/A
N/A
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 19-Mar-12 9-Apr-12 17-May-12 16-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 19-Mar-12 9-Apr-12 17-May-12 16-Aug-12
Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12
Actual 5-Nov-11 5-Dec-11 25-Feb-12 1-Apr-12
Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12
Actual 5-Nov-11 5-Dec-11 25-Feb-12 1-Jun-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 16-Mar-12 9-Apr-12 2-May-12 15-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 16-Mar-12 9-Apr-12 2-May-12 15-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 16-Mar-12 9-Apr-12 2-May-12 15-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 16-Mar-12 9-Apr-12 2-May-12 15-Aug-12
Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12
Actual 8-Mar-12 29-Mar-12 28-Apr-12 30-Jun-12
Planned 2-Mar-12 31-Jul-12
Actual 25-Jan-12 1-Jun-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 12-Mar-12 2-Apr-12 27-Apr-12 10-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 12-Mar-12 2-Apr-12 27-Apr-12 10-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 12-Mar-12 2-Apr-12 27-Apr-12 10-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 12-Mar-12 2-Apr-12 27-Apr-12 10-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 14-May-12 11-Sep-12
Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12
Actual 6-Mar-12 27-Mar-12 2-May-12 1-Jul-12
Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12
Actual 6-Mar-12 27-Mar-12 2-May-12 1-Jul-12 10.05 1.20 462 EP/AM/LAPS/W/02
Const.of Concrete Surface Road along
with Kantha Hintha Police Post RoadLahugala PS Lahugala PS NCB
LKR 7.44 BM Construction N/A 1.40
1.65
461 EP/AM/LAPS/W/01Const.of concrete surfacing road along
with South Panama RoadLahugala PS Lahugala PS NCB 11.68 0.101565217
N/A 3.00
460 EP/AM/AKPS/W/07Construction of Drainage along side of
Mosque road Akkaraipattu PS Akkaraipattu PS DC 4.42
7.56 0.07 Post Review N/A LKR
NCB 8.86 7.40
459 EP/AM/AKPS/W/06Construction of conceret Drainage at
pallikkudiuruppuAkkaraipattu PS Akkaraipattu PS NCB
9.43 Parshan Building
ConstructionN/A -
458 EP/AM/AKPS/W/05Construction of concrete surfacing to
paddiyadippitty school raodAkkaraipattu PS Akkaraipattu PS
Akkaraipattu PS NCB Post Review N/A LKR
N/A
Akkaraipattu PS NCB 8.44 0.07 Post Review N/A N/A8.34
455 EP/AM/AKPS/W/02Electricity Supply for Alimnagar,
IssanganicheemaiAkkaraipattu PS Akkaraipattu PS DC 2.77 LKR
12.18 0.105913043 Post Review N/A 1.90 N/A454 EP/AM/AKPS/W/01Const.of Concrete Surfacing to
Paddiyadipitty Sinnalebbe RoadAkkaraipattu PS Akkaraipattu PS NCB
8.78 0.08 Post Review N/A LKR453 EP/AM/POPS/W/06 Concre surfacing to Selvamani road Pottuvil PS Potthuvil PS NCB
1.90
452 EP/AM/POPS/W/05Construction of concrete Drainage at Al-
fathah roadPottuvil PS Potthuvil PS NCB LKR
1.70
451 EP/AM/POPS/W/04Construction of concrete surfacing to
MathuranchenaiPottuvil PS Potthuvil PS NCB 9.54 0.08
Post Review N/A LKR 8.94 KMST Lanka
3.10
450 EP/AM/POPS/W/03Construction of concrete surfacing to
Nazar road Pottuvil PS Potthuvil PS NCB 8.99 0.08
N/A 6.60
449 EP/AM/POPS/W/02Const.of Concrete Surfacing to Pansala
Rd at PottuvilPottuvil PS Pottuvil PS NCB
9.71 0.084434783 Post Review N/A LKR448 EP/AM/POPS/W/01Const.of Concrete Surfacing to Victor
watha Rd at PottuvilPottuvil PS Pottuvil PS NCB
447 EP/AM/KTPS/W/03Construction of concrete surfacing to
Vivehananda road at KaraitivuKaraitivu PS Karaitivu PS NCB N/A 1.03
LKR 9.07 N/A 1.47 446 EP/AM/KTPS/W/02 Construction of beach park at karaitivu Karaitivu PS Karaitivu PS NCB 9.00
BM Construction N/A0.087391304 Post Review N/A LKR
Post Review N/A
6.42
N/A
4.41
Leena Community
Center
Akkaraipattu
N/A0.04 Post Review N/A
7.52
0.08 Post Review N/A
LKR
8.71 Rifthy Group
Master
Construction
LKR
9.49 0.08
456 EP/AM/AKPS/W/03Construction of concrete surfacing to
Alim nagar mosque front road Akkaraipattu PS
457 EP/AM/AKPS/W/04Construction of concrete surfacing to
Pallikkudiuruppu Hakeem PC road Akkaraipattu PS
2.77
6.30
0.024086957 Post Review N/A N/A
AS Hardware
LKR 9.68 Super Dyna
LKR
N/A 2.77 CEB
8.78 R.Anandaraja
Construction
2.66
N/A 3.80
7.93 JR.Construction N/A 7.94 0.07 Post Review N/A
Post Review N/A LKR
N/A
9.54 Rifthy Group N/A
N/A7.36 0.064 Post Review N/A
Nibars
Construction
LKR
LKR 7.04 SV Construction
5.73 Nibars
Construction
7.55
9.38 0.08 Post Review N/A
PPS Construction0.08 Post Review N/A
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12
Actual 6-Mar-12 27-Mar-12 2-May-12 1-Jul-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 10-May-12 31-May-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 10-May-12 31-May-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 10-May-12 31-May-12 13-Jul-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 10-May-12 31-May-12 13-Jul-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 10-May-12 31-May-12 13-Jul-12
Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12
Actual 12-Nov-11 5-Dec-11 30-Mar-11 15-Aug-12
Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12
Actual 5-Mar-12 26-Mar-12 24-May-12
Planned 30-Jan-12 20-Feb-12 26-Mar-12 24-Jun-12
Actual
Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12
Actual 5-Mar-12 26-Mar-12
Planned 25-Jul-11 15-Aug-11 19-Sep-11 19-Dec-12
Actual 16-Jan-12 06-Feb-12 17-May-12 24-Aug-12
Planned 25-Jul-11 15-Aug-11 19-Sep-11 19-Dec-12
Actual 16-Jan-12 06-Feb-12 17-May-12 16-Aug-12
Planned 25-Jul-11 15-Aug-11 19-Sep-11 19-Dec-12
Actual 30-Mar-12 23-Apr-12 15-Jun-12 15-Sep-12
Planned 25-Jul-11 15-Aug-11 19-Sep-11 19-Dec-12
Actual 30-Mar-12 23-Apr-12 15-Jun-12 15-Sep-12
Planned 27-Feb-12 2-Apr-12 23-Apr-12 22-Jul-12
Actual 21-May-12 11-Jun-12
Planned 27-Feb-12 2-Apr-12 23-Apr-12 22-Jul-12
Actual 21-May-12 11-Jun-12
Planned 27-Feb-12 2-Apr-12 23-Apr-12 22-Jul-12
Actual 31-Mar-12 23-Apr-12
Planned 27-Feb-12 2-Apr-12 23-Apr-12 22-Jul-12480 EP/AM/KMC/W/09
Construction of concrete Road along
Market Road,Kalmunai Town.KalmunaiMC Kalmunai MC NCB N/A
N/A LKR N/A
N/A
479 EP/AM/KMC/W/08Construction of concrete Road French city
Housing Scheme Maruthamunai.KalmunaiMC Kalmunai MC NCB 6.00
N/A
478 EP/AM/KMC/W/07Construction of Children Park Stage -1
Sainthamaruthu.KalmunaiMC Kalmunai MC DC
0.07 Post Review N/A LKR
N/A -
477 EP/AM/KMC/W/06
Construction of concreteDrainage at north
& South of Nadarasa Vaikal Kalmunai
kudy.
KalmunaiMC Kalmunai MC NCB 8.00
476 EP/AM/KMC/W/04
Construction of concrete drainage at
Mosque Road and Thaika Road at
Kalmunai kudy
KalmunaiMC KalmunaiMC NCB
LKR 3.25 N/A 1.22
N/A 1.00
475 EP/AM/KMC/W/03Construction of concrete drainage at
Ameer Road , Islamabad KalmunaiMC KalmunaiMC DC 3.70
474 EP/AM/KMC/W/02Construction of concrete road along
Orabipasha Road , Sainthamaruthu KalmunaiMC KalmunaiMC NCB
0.072173913 Post Review N/A -
N/A
473 EP/AM/KMC/W/01
Construction of concrete road along
Thuravandiyamedu Road
,Chenaikkudiyiruppu
Kalmunai MC KalmunaiMC NCB 8.30
N/A
472 EP/AM/RACLG/W/25Improvement of Public Park at
Akkaripattu Akkarapattu MC RACLG NCB
14.56 N/A LKR
NCB N/A 3.10
471 EP/AM/AKMC/W/02 Improvement of Public Park Stage -II Akkaraipattu MCAkkaraipattu
MCNCB
7.31 N/A 1.46
470 EP/AM/AKMC/W/01 Construction of Public Park Akkarapattu MCAkkarapattu
MC
9.36 0.081391304 Post Review N/A LKR
4.00 N/A
469 EP/AM/AMUC/W/01
Construction of concrete Surfacing to
Despensary 20/9 Road at
Jayawardnapura ,Ampara
Amparai UC Amparai UC NCB
0.80 N/A
468 EP/AM/NIPS/W/03 Construction of Children Park Ninthavur PS Ninthavur PS NCB
467 EP/AM/NIPS/W/02 Construction of Vehicle Park Ninthavur PS Ninthavur PS NCB
NCB 4.30 0.04
8.10 0.07 Post Review
466 EP/AM/NIPS/W/01 Construction of Fish Market Ninthavur PS Ninthavur PS
465 EP/AM/UHPS/W/02 Construction Piyangala Nugalanda Bridge Uhana PS Uhana PS NCB
1.40
464 EP/AM/UHPS/W/01Construction of Concrete Road at
Mayathunna School RoadUhana PS Uhana PS NCB 7.93
0.101652174 Post Review N/A LKR N/A463 EP/AM/LAPS/W/03
Const.of Concrete Surface Road along
with North Panama Central Boundary
Road
Lahugala PS Lahugala PS NCB 11.69
LKR
3.70 0.03 Post Review N/A
8.00 0.07 Post Review N/A
0.05 Post Review
LKR 5.25 Renco Pvt Ltd
LKR
6.00 0.052173913 Post Review N/A
Akshan Engeenring 0.032173913 Post Review N/A
LKR 5.71 R.J Construction8.00 0.069565217 Post Review N/A
N/A
Sudushka Shopping
Complex
Construction s
LKR
LKR 5.37
17.50 0.152173913 Post Review N/A
23.08 0.200695652 Post Review N/A
0.13 Post Review
Yasoda
Construction
LKR 3.00 Sajith Construction
LKR 13.61 W.EARTH Movers
0.03 Post Review N/A
Post Review N/A0.01 LKR
N/A
0.65 Sakura
Construction
N/A
LKR
N/A LKR
Post Review N/A 3.36 Marsook
Construction
0.07 Post Review N/A LKR
7.44 BM Construction
N/A
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 31-Mar-12 23-Apr-12
Planned 27-Feb-12 2-Apr-12 23-Apr-12 22-Jul-12
Actual 31-Mar-12 23-Apr-12 15-Jun-12 15-Sep-12
Planned 27-Feb-12 2-Apr-12 23-Apr-12 22-Jul-12
Actual
Planned 6-Jun-11 28-Jun-11 1-Aug-11 1-Nov-11
Actual 10-Aug-11 2-Sep-11 12-Oct-11 5-Apr-12
Planned 20-May-11 30-Jun-11 21-Jul-11 1-Sep-11 1-Dec-11
Actual 18-Jul-11 10-Aug-11 2-Sep-11 12-Oct-11 1-Apr-12
Planned 6-Jun-11 28-Jun-11 1-Aug-11 1-Nov-11
Actual 10-Aug-11 1-Sep-11 12-Oct-11 1-Apr-12
Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 28.Sep.11 19.Oct.11 9-Dec-11 5-Apr-12
Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 28.Sep.11 19.Oct.11 9-Dec-11 5-Apr-12
Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 28.Sep.11 19.Oct.11 16-Mar-12 1-Jul-12
Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 28.Sep.11 19.Oct.11 23-Dec-11 1-Jul-12
Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 28.Sep.11 19.Oct.11 23-Dec-11 1-Jul-12
Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 28.Sep.11 19.Oct.11 9-Dec-11 1-Jul-12
Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 28.Sep.11 19.Oct.11 9-Dec-11 1-May-12
Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 28.Sep.11 19.Oct.11 9-Dec-11 5-Apr-12
Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 17.Oct.11 07.Nov.11 16-May-12 25-Jul-12
Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 28.Sep.11 19.Oct.11 9-Dec-11 1-Jun-12
RACLG Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 17.Oct.11 07.Nov.11 17-Jan-12 1-Jun-12
RACLG Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 29.Sep.11 20.Oct.11 9-Dec-11 5-Apr-12
Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-119.34 N/A 3.90 11.57 0.100608696 Post Review N/A LKR498 EP/AM/RACLG/W/16
Construction of Concrete Road at
Kehululla Kiriwana Pathiya Thalawa RACLG NCB
497 EP/AM/RACLG/W/15Const.of concrete Surfacing to
PuthuNagar cetral Road at MalwaththaSamanthurai PS NCB 10.62 N/A 4.29
LKR 14.52 N/A 10.00
7.13
496 EP/AM/RACLG/W/14
Const.of concrete Surfacing to
Kallarichchal 1st, 2nd eallai Road at
Sammanthrai
Samanthurai PS NCB 19.47 0.169304348 Post Review
495 EP/AM/RACLG/W/13Construction .of Concrete at 9 th
Avenue,AmparaAmpara UC RACLG NCB 14.12 0.122782609
15.08 0.131130435 Post Review N/A - 12.70 Nibras
ConstructionN/A
N/A 8.36
494 EP/AM/RACLG/W/12 Const of Cocrete Rd at Sugathagama Uhana PS RACLG NCB
493 EP/AM/RACLG/W/11
Construction of Concrete Surfacing to
Murugankovil Rd.
( Nanthwaner Pillayar Rd to
Karaithivu PS RACLG NCB 14.65 0.127391304sajath
Sainthamaruthu
0.091043478 Post Review N/A 5.25 PTS. Brilliant
Akkaraipattu
5.95 Post Review
492 EP/AM/RACLG/W/10Const.of Concrete Surfacing to-7/4
Kanakar Rd at Akkaraipattu-Alayadivembu PS RACLG NCB 10.47
NCB 14.98 0.13026087 Subodha Matara N/A
10.43 0.090695652 5.40
491 EP/AM/RACLG/W/09Const.of concrete Road at Poolawala
Dumanapura,MahaoyaMaha Oya PS RACLG
490 EP/AM/RACLG/W/08Const.of concrete Surfacing to
Ariyanayaham Road at ThirukkovilThirukovil PS RACLG NCB
0.090695652PTS. Brilliant
AkkaraipattuN/A 2.00
5.70
489 EP/AM/RACLG/W/07Const.of concrete Surfacing to
Vaddavidana Road at ThambiluvilThirukovil PS RACLG NCB 10.43
8.20
488 EP/AM/RACLG/W/06Const.of concrete Surfcing to Kappuganar
Road at Vinayahapuram,ThirukkovilThirukovil PS RACLG NCB 11.10 0.096521739
487 EP/AM/RACLG/W/05Const.of Tarring of road from
Hungamalagama to Namalgama Dehiattakandiya PS RACLG NCB 10.55 0.09173913
RJ Construction,
Karaithivu
8.20 8.02 RJ Construction,
KaraithivuN/ALKR486 EP/AM/RACLG/W/04
Const. of Tarring of road from
Henanigala North to Henanigala SouthDehiattakandiya PS RACLG NCB 10.55 0.09173913 Post Review
485 EP/AM/RACLG/W/03Con. Concrete Road Hagnewla
(Waththegamthalawa )in PaddiyathalawaPadiyathalawa PS
RACLG
AmparaNCB 10.60 0.092173913 Post Review
N/A 9.03
484 EP/AM/RACLG/W/02Const.of Concrete surface Road in Zain
pordiyar,Internal roadPottuvil PS
RACLG
AmparaNCB
6.00 0.05
RACLG
AmparaNCB 10.90 0.094782609
482 EP/AM/KMC/W/11Reconstruction of the Library building at
Chanaikudiruppu.KalmunaiMC Kalmunai MC NCB
N/A LKR 7.50 481 /EP/AM/KMC/W/10Construction of concrete Road along
Pillayar kovil Road,Pandiruppu.KalmunaiMC Kalmunai MC DC 3.70 0.03 Post Review
480 EP/AM/KMC/W/09Construction of concrete Road along
Market Road,Kalmunai Town.KalmunaiMC Kalmunai MC NCB N/A
Subodha Matara
LKR 4.29 D-Team
Sammanthurai0.092347826 Post Review N/A
Nibras
Construction
LKR 11.05 D-Team
Sammanthurai
N/A
LKR
Post Review N/A N/A
Post Review
N/A LKR 12.12
N/A LKR 11.79
7.80
N/ALKR
N/ALKR
Post Review N/A
LKR 8.00
9.10 Srifaya Enterprices
7.98 PTS. Brilliant
Akkaraipattu
Post Review N/A N/ALKR
Post Review
N/A LKR 8.02
N/A
Post Review N/A
N/A LKR 8.92 N/A
N/A
8.46 JR.Construction
Shifaya Enterprises
N/A 8.40 10.70 0.093043478 Prior Review LKR
8.92
LKR 9.03 A.R.Enterprises
Construction483 EP/AM/RACLG/W/01
Const.of Road at Nagaswewa
LihiniyagamaDehiattakandiya PS Post Review N/A
N/APost Review N/A LKR
Archana Geocery &
HardwareN/A
LKR8.00 0.07 Post Review N/A
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 29.Sep.11 20.Oct.11 9-Dec-11 1-Jul-12
Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 29.Sep.11 20.Oct.11 9-Dec-11 1-Aug-12
Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 29.Sep.11 20.Oct.11 16-Mar-12 1-Jul-12
Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 29.Sep.11 20.Oct.11 9-Dec-11 4-May-12
Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11
Actual 29.Sep.11 20.Oct.11 9-Dec-11 5-Apr-12
Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12
Actual 27-Jan-12 17-Feb-12 16-Mar-12 1-Jun-12
Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12
Actual 31-Jan-12 21-Feb-12 8-May-12 20-Aug-12
Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12
Actual 31-Jan-12 21-Feb-12 16-Mar-12 15-Jul-12
Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12
Actual 16-Feb-12 9-Mar-12 18-Apr-12 1-Jun-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 5-Apr-12 26-Apr-12 19-Jul-12 18-Oct-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 5-Apr-12 26-Apr-12 13-Jun-12 18-Oct-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 16-Mar-12 9-Apr-12 18-Apr-12 1-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 16-Mar-12 9-Apr-12 18-Apr-12 11-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 3-Apr-12 24-Apr-12 8-May-12 19-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 3-Apr-12 24-Apr-12 8-May-12 19-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 3-Apr-12 24-Apr-12 8-May-12 19-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 4-Apr-12 25-Apr-12 28-May-12 27-Sep-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 4-Apr-12 25-Apr-12 8-May-12 27-Sep-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12- N/A LKR 11.51 N/AAR Enterprices
N/A -
516 EP/AM/RACLG/W/34Construction of Concrete Road at
WewmedagamaDehiattakandiya PS RACLG NCB 11.52
N/A 1.67
515 EP/AM/RACLG/W/33Construction of Concrete Road at
ChanadanagamaDehiattakandiya PS RACLG NCB
0.10 Post Review N/A LKR 8.40
N/A -
514 EP/AM/RACLG/W/32Construction of Concrete Road at
MadagamaDehiattakandiya PS RACLG NCB 10.99
513 EP/AM/RACLG/W/31Construction of concrete surfacing to
Vilathalawa RoadMahaoya PS RACLG NCB
LKR 11.82 N/A -
N/A -
512 EP/AM/RACLG/W/30Construction of concrete surfacing to
Bogamayaya roadMahaoya PS RACLG NCB 15.83
N/A 9.33
511 EP/AM/RACLG/W/29Construction of Concrete Ruhunugama
Road at UhanaUhana PS RACLG NCB
510 EP/AM/RACLG/W/28Construction of Market Bulding at
IrakkamamIrakkamam PS RACLG NCB 13.09 0.11 Post Review
-
509 EP/AM/RACLG/W/27Construction of concrete surfacing road
and Drainage along Cemeteary roadIrakkamam PS RACLG NCB N/A 5.96
N/A LKR 14.97 N/AEllips Engineering
N/A -
508 EP/AM/RACLG/W/26Construction of concrete surfacing to
Vipulananda central college roadKaraithivu PS RACLG NCB 14.98
N/A 2.21
507 EP/AM/RACLG/W/25Construction of concrete surfacing to
Palayadippillayar kovil roadKaraithivu PS RACLG NCB
0.200695652 Post Review N/A LKR 12.88
N/A 5.60
506 EP/AM/RACLG/W/24Construction of Concrete Road &
Drainage to Ampara road at Udanga
1,Sammanthura
Sammanthura PS RACLG NCB 23.08
N/A 1.70
505 EP/AM/RACLG/W/23Const.of concrete road & Drainage &
Culvert to AD at road.Irakkamam PS RACLG NCB
504 EP/AM/RACLG/W/22Const.of Concrete road & Drainage &
Culvert to Varipathanchenai market roadIrakkamam PS RACLG NCB 21.02 0.182782609 Post Review
7.90
503 EP/AM/RACLG/W/21Const.of Drainag to Vaikkal Road at
PallikudiruppuAkkaraipattu PS RACLG NCB N/A 4.87
N/A LKR 8.06 N/A
8.70
502 EP/AM/RACLG/W/20Const.of Concrete Surfacing to Thirumal
Muha Rd to Barathi Rd at KaraithivuKaraithivu PS RACLG NCB 10.27 0.089304348
N/A 5.90
501 EP/AM/RACLG/W/19Construction of Concrete Surfacing to
Musthakeen Mosque Road at NinthaurNinthuar PS RACLG NCB N/A
Post Review N/A LKR 9.66 sajath
Sainthamaruthu
NCB N/A 1.68
500 EP/AM/RACLG/W/18Construction of Concrete Surface Beach
Internal Road at Ninthaur Ninthuar PS RACLG NCB
9.34 N/A 3.90
499 EP/AM/RACLG/W/17Construction of Concrete Road at
HagamwelaPathiya Thalawa RACLG
11.57 0.100608696 Post Review N/A LKR498 EP/AM/RACLG/W/16Construction of Concrete Road at
Kehululla Kiriwana Pathiya Thalawa RACLG NCB
13.80 0.12 Post Review N/A
0.10 Post Review
D-Team
Sammanthurai
LKR 12.39 LG Construction
LKR 10.42 AR Enterprices
15.17 0.13 Post Review N/A
LG Construction0.14 Post Review N/A
LKR 17.45 Sabash
Assosciation 20.46 0.18 Post Review N/A
N/A AS Hardware
LKR 18.70 AS Hardware
LKR 13.70
11.03 0.10 Post Review N/A
18.80 0.16 Post Review N/A
0.13 Post Review
Najeema
Constuction
LKR 13.31 Farzan
Construction
LKR 8.77 Amritha
Construction
23.59 0.205130435 Post Review N/A
AS HardwareN/A LKR 11.91
LKR 8.23 Ellipse Engineering 14.42 0.125391304 Post Review N/A
Post ReviewRJ Construction,
Karaithivu
LKR 8.91 sajath
Sainthamaruthu
13.45 0.116956522 Post Review N/A
10.74 0.093391304 Post Review N/A
11.66 0.101391304
Subodha Matara
LKR 10.91 Subodha Matara
LKR USD Date Currency Amount
( Million)
1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00
Pub
lish
cont
ract
aw
ard
notic
e
in U
ND
B &
Nat
iona
l
new
spap
ers
Exp
endi
ture
incu
rred
to
date
(Mill
ion)
Com
plet
ion
of c
ontr
act
Dea
dlin
e fo
r su
bmis
sion
of
bids
Prio
r/P
ost
Rev
iew
by
Ban
k**
Nam
e of
the
LA
Nam
e of
the
PE Estimated Cost (Million)
Ser
ial
No
.
Des
crip
tion
Met
hod
of P
rocu
rem
ent*
Pac
kag
e N
o.
*** Indicate extensions/modifications etc.
Nam
e of
Con
trac
tor/
Nat
iona
lity
Stage
Pub
lish
IFB
in N
atio
nal
new
spap
ers
and
UN
DB
Sub
mit
DB
D w
ith I
FB
for
Ban
k's
N/O
Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
Update as of : (date)
GPN # and Date Published:
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the
North and East Province )Credit #: 4728LK
Country/ Borrower:
Project Name:
Ministry of Economic Development Implementing Agency:
Signing of contract
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
Actual 4-Apr-12 25-Apr-12 28-May-12 27-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 20-Mar-12 10-Apr-12 23-May-12 27-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 18-Apr-12 9-May-12 16-Jul-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 18-Apr-12 9-May-12 16-Jul-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 18-Apr-12 9-May-12 16-Jul-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 4-Apr-12 25-Apr-12 8-May-12 7-Sep-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 10-May-12 31-May-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 5-Apr-12 26-Apr-12 28-May-12 27-Sep-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 16-Mar-12 9-Apr-12 8-May-12 22-Aug-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 20-Mar-12 10-Apr-12 28-May-12 27-Aug-12
Planned 6-Jun-11 28-Jun-11 1-Aug-11 1-Nov-11
Actual 10-Aug-11 2-Sep-11 19-Oct-11 1-Jul-12
Planned 6-Jun-11 28-Jun-11 1-Aug-11 1-Nov-11
Actual 10-Aug-11 2-Sep-11 19-Oct-11 1-Jun-12
Planned 22-Mar-12 16-Apr-12 16-May-12 14-Aug-12
Actual 4-Apr-12 25-Apr-12 28-Jun-12 27-Dec-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 4-Apr-12 25-Apr-12 28-Jun-12 27-Dec-12
Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12
Actual 4-Apr-12 25-Apr-12 27-May-12 26-Nov-12
Planned 28-Jun-11 24-Jul-11 7-Aug-11
Actual 11-May-11 3-Jun-11 29-Aug-11
N/A N/A
N/A
NS N/A
3.97 NCB
0.04 0.000347826 Post Review
19.86 AMM Welday
ConstructionPost Review
N/A
531 EP/PMU/W/04 Partition of NELSIP Cell in PMU PMU PMU
530 EP/PMU/W/06Construction of concrete road & Drainage
at Varipathanchenai , Valaikkalai Road Irakkamam PS (A) PMU (A)
NCB 27.60 0.24
SS Builders
25.35 N/A LKR
N/A -
0.22
529 EP/PMU/W/05Construction of weekly Market bulding at
HinguranaDamana PS (A) PMU (A)
N/A 11.90
528 EP/PMU/W/04improvement of Municipal Park at
AkkaraipattuAkkaripattu MC (A) PMU NCB 33.00
N/A 4.00
527 EP/PMU/W/02 Const.Of Tappalpola Wawa Udaha Road Maha Oya PS (A) PMU NCB
526 EP/PMU/W/01Const.Of Concrete Road From Piyangala
to Nugelanda Uhana PS (A) PMU NCB 15.60 0.135652174 Post Review
3.28
525 EP/AM/RACLG/W/43Construction of concrete surfacing road at
IndrasarapuraAmpara UC RACLG NCB N/A 2.30
LKR 16.40 N/ANibras
Construction
N/A
524 EP/AM/RACLG/W/42Construction of concrete surfacing to
Kudakalli roadPottuvil PS RACLG NCB 16.57
N/A
523 EP/AM/RACLG/W/41
Construction of Main Drainage along
Suvaniyar Arappattai to Verreamunai
boundary road
Sammanthurai PS RACLG NCB
0.15 Post Review N/A LKR
N/A 7.28
522 EP/AM/RACLG/W/40 Construction of Public Market Padiyathalawa PS RACLG NCB 17.26
521 EP/AM/RACLG/W/39Construction of Palamunai Tsunami
Housing scheme concerete road Addalachennai PS RACLG NCB
LKR 11.71 N/A
N/A
520 EP/AM/RACLG/W/38Construction of concrete Surfacing to
Vellaskaddu RoadNinthavur PS RACLG NCB 11.79
N/A
519 EP/AM/RACLG/W/37Construction of concrete Surfacing Al-
Mina roadNinthavur PS RACLG NCB
518 EP/AM/RACLG/W/36Construction of concrete surfacing to
Girls school roadNinthavur PS RACLG NCB 14.92 0.13 Post Review
-
517 EP/AM/RACLG/W/35Construction of concrete surfacing road at
NavagamburaAmpara UC RACLG NCB N/A 2.90
N/A LKR 11.51 N/AAR Enterprices516 EP/AM/RACLG/W/34Construction of Concrete Road at
WewmedagamaDehiattakandiya PS RACLG NCB 11.52
0.03 LKR 0.03
LKR 22.50
AMM Welding
Works Shop and
Industries
N/A - Post Review N/A
AMM Welding
Works Shop and
Industries
0.287 Post Review N/A LKR 33.89
LKR 13.47 LG Construction 17.60 0.153043478 Post Review N/A
N/A LG Construction
LKR 11.50 LG Construction
LKR 12.93
19.34 0.17 Post Review N/A
13.97 0.12 Post Review N/A
0.14 Post Review
LKR 11.91 JR.Construction
LKR 14.19 ELH Group
11.91 0.10 Post Review N/A
Azeez Constrution0.10 Post Review N/A
LKR 10.09 Adambawa and
Sons 10.20 0.09 Post Review N/A
N/ARJ Construction,
Karaithivu
LKR 14.70 LG Construction
LKR 14.91
20.16 0.18 Post Review N/A
0.10 Post Review
21
IFB
IFB
IFB
IFB
IFB
IFB
100%
80%
100%
100%
July
Sta
tus/
Rem
arks
***
100%
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
100%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
IFB
IFB
IFB
0%
100%
100%
100%
45%
100%
100%
100%
95%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
TEC
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
20%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
TEC
100%
100%
100%
60%
100%
20%
100%
100%
100%
50%
100%
100%
100%
100%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
TEC
TEC
TEC
TEC
100%
100%
80%
100%
TEC
100%
100%
100%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
P
60%
70%
20%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
TEC
0%
TEC
TEC
P
65%
100%
95%
100%
75%
100%
50%
100%
100%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
TEC
IFB
TEC
TEC
TEC
IFB
IFB
35%
5%
50%
95%
5%
25%
60%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
P
P
P
P
P
P
P
IFB
P
IFB
100%
100%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
TEC
TEC
TEC
TEC
TEC
TEC
TEC
TEC
100%
90%
90%
TEC
60%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
TEC
60%
60%
50%
40%
IFB
IFB
IFB
IFB
IFB
IFB
IFB
IFB
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
IFB
IFB
IFB
IFB
IFB
p
80%
80%
70%
60%
60%
60%
60%
50%
50%
50%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
P
IFB
P
IFB
P
100%
100%
50%
60%
100%
75%
75%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
TEC
TEC
TEC
90%
15%
95%
70%
50%
70%
TEC
TEC
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
TEC
P
TEC
P
P
70%
75%
50%
50%
60%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
P
IFB
IFB
IFB
P
IFB
P
25%
95%
60%
25%
40%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
P
P
P
TEC
TEC
85%
65%
60%
30%
25%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
IFB
TEC
TEC
TEC
IFB
P
IFB
TEC
75%
90%
90%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
TEC
TEC
P
P
P
P
IFB
TEC
70%
30%
25%
90%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
P
P
P
P
P
P
P
P
10%
70%
50%
50%
20%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
TEC
TEC
P
TEC
P
P
P
P
10%
75%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
25%
25%
100%
TEC
75%
75%
75%
75%
50%
100%
75%
100%
100%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
25%
50%
50%
50%
100%
100%
25%
50%
75%
100%
0%
0%
15%
15%
25%
100%
TEC
100%
P
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
25%
15%
15%
100%
25%
25%
25%
25%
75%
TEC
TEC
TEC
TEC
100%
100%
100%
100%
25%
25%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
25%
25%
15%
15%
15%
25%
TEC
0%
25%
50%
25%
50%
50%
15%
75%
35%
25%
100%
25%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
100%
100%
P
P
TEC
25%
25%
15%
15%
25%
0%
TEC
15%
15%
15%
15%
25%
25%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
100%
100%
100%
100%
10%
10%
10%
100%
100%
20%
TEC
100%
TEC
100%
0%
TEC
100%
25%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
0%
75%
100%
100%
75%
75%
50%
25%
100%
100%
P
P
P
50%
25%
100%
25%
50%
TEC
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
P
P
10%
0%
10%
100%
100%
P
25%
0%
25%
25%
25%
25%
75%
75%
25%
100%
25%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
25%
25%
25%
IFB
25%
0%
25%
100%
100%
100%
100%
100%
100%
100%
100%
P
P
25%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
100%
TEC
TEC
TEC
100%
100%
100%
100%
100%
P
25%
25%
100%
100%
100%
10%
10%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
20%
75%
100%
75%
100%
P
P
TEC
TEC
100%
0%
15%
15%
75%
100%
100%
100%
30%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
75%
10%
10%
10%
100%
90%
90%
100%
50%
50%
50%
75%
50%
100%
100%
100%
20%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
0%
0%
0%
0%
50%
75%
15%
20%
50%
90%
100%
50%
50%
100%
100%
50%
90%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
TEC
TEC
TEC
TEC
25%
75%
25%
25%
TEC
P
0%
25%
0%
0%
0%
TEC
0%
TEC
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
50%
90%
100%
100%
25%
100%
100%
75%
75%
75%
75%
100%
100%
100%
100%
100%
10%
TEC
P
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
0%
10%
10%
0%
0%
25%
75%
50%
0%
0%
75%
75%
50%
75%
100%
100%
90%
15%
50%
21
July
Sta
tus/
Rem
arks
***
*** Indicate extensions/modifications etc.
5th April 2010
31th July 2012
* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract
PROCUREMENT PLAN FOR WORKS
Government of Sri Lanka
Credit #: 4728LK
Ministry of Economic Development
** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22
100%
25%
0%
25%
100%
75%
90%
20%
0%
TEC
75%
0%
0%
0%
50%
0%