PUBLIC HEARING DOCUMENTS
1.1 PUBLIC CONSULTATION
Public consultation for this project was conducted on 27/01/2016 at 01:00 P.M. at
Earlier Middle School, Taroda, Sarvankheda, Kanpur Dehat which was presided over by
the Additional Distt. Magestrate (Admin) and attended by officers of UPPCB, Kanpur.
The public hearing was attended by nearby villages, NGO & other organizations.
Requisite publicity through local news papers/ media i.e. in Amar Ujala and Hindustan
Times Dated 27.12.2015 was given 30 days in advance of the date; as fixed for public
hearing through the Collector and State Pollution Control Board official in the matter.
The views and grievances of the attendees were listened. The project proponent has
given commitment to fulfil the environmental and social responsibility for development
of community of nearby villages. In this report, public hearing proceedings and minutes
of public hearing is included in the final EIA/EMP report and submitting to Expert
Appraisal Committee (EAC), MoEF, New Delhi for Environment Clearance.
Table 7-Error! No text of specified style in document.-1Public Hearing Compliance
with budgetary allocation
S.No. Issues raised by the
Public
RESPONSE/ COMMITMENT
OF PROJECT PROPONENTS REMARKS
1. Mr. Desh Deepak Yadav,
sherpura Taronda has
asked that the drain
(industrial) which is being
flowing through village
should be checked
Question was not related to
the Project Proponent.
UPPCB
official
assured that
appropriate
action will
be taken.
2. Mr. Ashwini Kumar,
member panchayat area
has asked that there is no
arrangement of water
discharge made by M/s K.
C. Kapoor. Animals
getting sick by consuming
Question was not related to
the Project Proponent.
UPPCB
official
assured that
appropriate
action will
be taken.
the water. There is no
arrangement of water
discharge.
3. Mr. Girish Babu Tiwari
has asked that
contaminated water of
M/s Agmotex fabrics
reaches up to village
through drain up to
agricultural field. It is
proposed to have some
other industries instead
of leather industry.
Question was not related to
the Project Proponent.
UPPCB
official
assured that
appropriate
action will
be taken.
4. Letter received from Mr.
Kamlesh Kumar of village
Taraunda said that “the
other factories installed
in the area disposes
waste water flow
towards Taraunda and
the pollution control
board does not give
satisfactory reply raised
by us”:
(a) The drain
should be RCC
and wide so that
the drain can be
easily cleaned.
(a) The issue does not relate
to the project proponent.
UPPCB
official
assured that
appropriate
action will
be taken.
(b) In response the
complaints
raised to
Pollution
Control board, a
lady officer has
said that this
project is big
and organized,
hence there will
not be any
water
discharge.
(c) He advised that
the leather
factory should
not be installed
and some other
project should
come up.
(b) The issue does not relate
to the project proponent.
(c) Proposed project by M/s
Leayan Global is being set
up with latest technologies
which include best
practices, highest level of
green technologies
accepted everywhere in
world. Project is proposed
to be a Zero Liquid
Discharge (ZLD) and ETP is
installed with three stage
RO system followed by
MEE and water shall be
reused in process itself and
other activities within the
premises. Therefore,
proposed project is not
going to impact
environment of the area
adversely. Project will have
positive impact due to
social and employment
benefits due to operation
of the project.
5 Letter received from Mr.
Anuj Kumar Singh S/o Sh.
Balveer Singh of village
Sherpur Taraunda, said
that the the resident of
village of Taraunda are
not in favour of
installation of Leather
tannery unit.
(a) Rania is an
industrial area.
The water flows
through our
village
Taraunda.
(a) Proposed unit is going to
follow best practices for
tanneries and will be a ZLD
unit due to a proper ETP
system which will be based
on Physico-chemical,
Biological treatment, RO &
MEE. There will be no flow
of waste to villages due to
operation of proposed
project. It will be ensured
that no water will be
discharged outside the
unit.
(b) The animals are
dying after
drinking
polluted water
in drains.
(c) The agricultural
fields are also
getting
destroyed due
to Polluted
water of drains.
Around 100
Bigha
Agricultural land
has also become
infertile due to
this. Land is not
fertile due to
which the
farmers are
having lots of
losses.
(d) Air pollution has
increase in our
area due to
(b) Proposed project will be
ZLD unit and shall cause no
pollution of water in the
area. Project proponent
shall provide provision of
water tank for drinking
purpose of animals; the
same has been added in
activities under CSR of the
unit.
(c) The complaint relates to
pollution caused by
existing units and their
operation. Proposed
project will be ZLD and
there will be no impact on
agricultural fields due to its
operation. Hence no
damage will be caused to
the environment.
(d) Proposed tannery unit will
have insignificant impact
on air environment as per
which people
are having
medical
problem like
asthma & lungs
problems.
(e) Leather industry
will increase air
pollution in our
village which
may inturn
increase the
medical
problem in the
village.
the results of dispersion
modelling (AERMOD) given
in EIA report wherein
modelling shows
insignificant impact due to
air pollution control
systems. Although the GLC
is negligible, it will have
minimum impact on
habitat. After installing
control measures
maximum incremental GLC
will be 1.85 g/m3 (PM). It
is 500 m away from
boundary of complex. It is
an open area. Stack of
Boiler will have multi
cyclone/Bag filter for
emission control.
(e) Proposed tannery unit will
have insignificant impact
on air environment as per
the results of dispersion
modelling (AERMOD) given
in EIA report. Stack of
Boiler will have multi
cyclone / Bag filter for
emission control which will
control emissions to a
maximum GLC incremental
impact 1.85 g/m3 (PM).
Hence, there will be no
impact on health of the
villagers. The detailed
dispersion report is
attached at Annexure-V of
EIA Report.
6 Letter received from 42
village residents of village
sherpur Taraunda,
Pargana & Teh. Akbarpur,
Janpat, Kanpur, Dehat. In
the letter, the villagers
requested that they are
resident of Vill. Sherpur
Taraunda and RSPL
named company is
planning to open leather
industry on the land of
their village. The villagers
have land just behind the
plot boundary of this
industry in which they
grow crop for livelihood/
earnings.
(a) “In case they
start this plant
then the
villagers will not
be able to reach
their
agricultural land
Alternate approach path shall
be provided to local people in
consultation with gram
panchayat & local stake
holders. Proposed project will
be a ZLD Unit wherein all waste
water generated will be re-
and their
residence will
be polluted and
it will be difficult
for children and
adult of the
village to live in
this
environment.
Therefore, we
request that no
such type of
industry should
come up this
area so that the
resident of
villages have
safe life”.
used by treatment in ETP which
uses Physio-chemical
Biological, RO, MEE
technologies. There shall be no
discharge of waste water from
the plant due to advanced
treatment proposed. Project
shall have insignificant impact
on air environment due to
installation of proper APCS on
sources, which has been
interpreted using AERMOD
software modelling and
maximum GLC has been
computed to 1.85 g/m3 (PM).
Proper acoustical enclosures
shall be put for noise control
within and outside the plant.
Project will bring in positive
social benefits in form of
employment; CSR etc. and
there will be no adversary to
life of villagers due to
operation of this project. The
details for CSR is given at
section no. 9.11 of EIA Report.
Proper medical facilities shall
be provided for the workers.
After that chairman summarized the meeting by assuring to the to consider all the facts raised
in the meeting shall be forwarded at competent level. The Public Hearing proceedings as
recorded by UPPCB have been given in Enclosure-3 of EIA report document.
1.1.1 PUBLIC HEARING PHOTOS