Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co - generation power 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh) Public Hearing Prepared by : Ascenso Enviro Pvt Ltd 1 1.1 Public Consultation Public hearing for proposed establishment of molasses / grain based distillery capacity : 120.0 KLD alongwith Co gen Power : 3.0 MW at village Hakimpur, Tehsil : Saidpur, Distt ; Ghazipur (Uttar Pradesh) was conducted on 30.01.2018 at 11: 00 AM within existing distillery premises. Details of the public hearing proceeding are appended herewith the final EIA / EMP reports : Public Hearing Proceedings Public hearing notice published in news papers “ Hindustan Times Lucknow, Dainik Jagran Varanasi & Hindustan Times Hindi, dated 28 th and 29 th December 2017 respectively. Photographs of Public Hearing . Action plan for the issues raised during public hearing. 1.2 Public hearing Proceeding Public Hearing proceeding (Hindi) along with the attendance sheet have been enclosed as Annexure V with this final Environmental Impact Assessment Report and Environmental Management Plan. Public hearing notice published in newspapers “ Hindustan Times Lucknow, Dainik Jagran Varanasi & Hindustan Times Hindi” , dated 28 th and 29 th December 2017 respectively

Upload: others

Post on 28-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 1

1.1 Public Consultation

Public hearing for proposed establishment of molasses / grain based distillery capacity : 120.0 KLD

alongwith Co gen Power : 3.0 MW at village Hakimpur, Tehsil : Saidpur, Distt ; Ghazipur (Uttar

Pradesh) was conducted on 30.01.2018 at 11: 00 AM within existing distillery premises.

Details of the public hearing proceeding are appended herewith the final EIA / EMP reports :

Public Hearing Proceedings

Public hearing notice published in news papers “ Hindustan Times Lucknow, Dainik Jagran

Varanasi & Hindustan Times Hindi” , dated 28th and 29th December 2017 respectively.

Photographs of Public Hearing .

Action plan for the issues raised during public hearing.

1.2 Public hearing Proceeding

Public Hearing proceeding (Hindi) along with the attendance sheet have been enclosed as

Annexure – V with this final Environmental Impact Assessment Report and Environmental

Management Plan.

Public hearing notice published in newspapers “ Hindustan Times Lucknow, Dainik Jagran

Varanasi & Hindustan Times Hindi” , dated 28th and 29th December 2017 respectively

Page 2: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 2

Fig : 1.1, Public notice in news papers for public hearing

Hindustan Times Lucknow

Published on 28th December

2017

Dainik Jagran, Varanasi

Published on 28th December

2017

Page 3: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 3

1.3 Photogrpahs of the Public Hearing

Page 4: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 4

Page 5: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 5

Page 6: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 6

Page 7: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 7

Fig : 7.2, Public hearing photographs

Page 8: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 8

1.4 Action plan for the issue raised during public hearing

S.No. Name of the Person Points Raised Reply to the issues / point raissed Action plan along with

budgetary allocation

1. Shri Visheshwar

Bind, Gram Pradhan

& Resident of Rampur

Banthara

Asked that “do will get

employment From new plant ?”

Mr Amit Jha (Unit Head) replied

that currently we have 30.0 KLD

distillery plant, after new

establishment of distillery plant

capacity of distillery will be 120.0

KLD, approx.: 04 times, employment

will be increased in the same

proportion.

Currently we have 100 labours in

bottling, after proposed establishment

labor requirement will be increased

four time. Local people will get

preference in unskilled employment.

Local people will get preference

in unskilled employment for

proposed 120.0 KLD (Molasses /

Grain ) alongwith 3.0 MW co gen

power.

We will conduct the skill

development for villagers and

they also get preference in

employment.

We have made the provision of

Rs 5.0 Lakhs / Year for skill

development programme.

2. Mr Ramsewak

Yadav, Gram Pradhan

- Devasiya

Expressed happiness to Additional

District Magistrate, the officials of

pollution Board, all the villagers

from nearby areas for coming and

attending the public hearing .

There is a huge demand to set up a

factory in many part, but here we are

The management expressed thanks. -

Page 9: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 9

getting this system ourselves. We

are happy if there are any flaws, then

it will be overcome in the future.

There will be pollution or any other

problem, so they are scientifically

removed.

Workers in our area will get

employment, staying in your family

will continue to take care of your

home, apart from this, people of our

area will also get the benefit of the

shop etc. We are happy for the

establishment of industry.

3. Shri Surendra Nath

Choubey, Resident :

Nandganj

1. The biggest problem here is that

people of our block are 99%

farmers .There are many

industries came here, gone, they

are not even expanded. The

farmers did not get benefit from

establishment of Distillery. Once

Chini Mills established in the

area, the farmers, workers and

businessman got their benefit. If

Environment Advisor asked to Shri

Chobe ji about the available land and

said that you have to inform about the

available land to the management. We

will do the plantation and

beautification on land.

On the availability of land, we

will beautify the land and

plantation will be done for the

same.

We have made the provision of

rupees 15 Lakhs rupees / year for

next 5 year.

Page 10: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 10

the industry established in the

area, then the farmers also get the

benefit.

2. There is illegal possession of the

surrounding land. Land

beautification and plantation

shall be done. Shri Choubey has

requested the Additional District

Magistrate to stop illegal

possession of land.

4. Shri Surendra Nath

Choubey, Resident :

Nandganj

It was conveyed by Mr Chaoubey

that district administration help is

required for land identification.

Environment Advisor asked that

those who have open land, tell the

management to beautify and do

plantation.

We have identified 8 ponds in which

the water of rain water will be

recharge, so that the water label will

come up.

With permissions from the

government, deepening ponds and

fencing will be done.

Chairperson (ADM sir) directed the

management for beautification of

We will deepen ponds upto 3

meters and clean up. Trees will

be planted and seats will be

installed for sitting.

We have made the provision of

rupees 15 Lakhs rupees / year for

next 5 year.

Page 11: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 11

pond and also asked Pradhan of

Rampur Banthara and Devasiya for

details of pond in written.

He also advise to opt the pond which

is out of populated area and in outer

area of village . You can go there for

walk in the morning and evening.

Environment Advisor added we will

deepen ponds upto 3 meters and clean

up. Trees will be planted and seats

will be installed for sitting.

5. Mr Faujdar Yadav Asked about what provision has

been made for Water pollution and

for prevention of water pollution ?

Environment Advisor replied that

waste water will concentrate in the

Multi Effect Evaporator, then

concentrate from MEE will be

incinerate in Boiler along with

bagasse. To prevent the air pollution

bag filters will be installed. No waste

water will be discharge from the

premises.

Latest technology based

concentration and incineration

systems are proposed installation

of the same will ensure that for

water pollution control.

(Rs 5625.0 Lakhs as capital cost

for Incineration boiler, MEE &

Bag filters)

6. Mr Ved Prakash

Pathak , Resident

Village – Naisare

He asked that what arrangement

has been made for Fly ash

generated from Industry?

Indsutry Management : Bagfilters

will be installed as Air Pollution

Control Equipment. Ash from APCS

To Control the air pollution Bag

filters of efficiency 99.9 % will

Page 12: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 12

will be used as manure as it contains

27 % potash.

be provided which will be

attached to 80.0 m stack.

Fly ash will be used as manure as

it contain 27 % Potash.

7. Mr OM Prakash

Pradhan, Vill :

Shriganj.

Give details about Air Pollution

Control ?

Environment Advisor replied that to

prevent Air pollution, higher

efficinency Bag filters will be

installed.

To Control the air pollution Bag

filters of efficiency 99.9 % will

be provided which will be

attached to 80.0 m stack.

(Rs 200.0 Lakhs as capital cost

for stack and Bag filters ).

8. Mr Avinash Kumar

Rai, resident :

Atarsuva

He told that once there was a Chini

Mill and Distillery, then chini has

been closed.

People have to go far away for

earning about (8000-10000). We are

happy to see the establishment of

Plant. Factory will do work for

people and you have to do work for

poor handicapped.

Environment Advisor said that we

will do work for Poor and

handicapped people according to the

Corporate social responsibility

(CSR). Plant Representative said that

cooler has been installed in Ghazipur

by the Factory and we have given 20-

20 blankets to the nearby gram

Pradhan to distribute.

Factory has distributed blankets to

some people directly. We will do

other work with the establishment of

plant. Factory has been organized eye

We have made the provision of

Rs 187.5 ( @ 1.5 % of Project

cost ) towards the Corporate

Environment Responsibility.

We will also made provision for

2 % of total profit in last three

year toward the Corporate Social

Responsibility (CSR).

Detailed CSR plan given in

Chapter – 8.

Page 13: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 13

operation camp for poor in the past.

We will organize the eye camp in

future and we will distribute tri cycle

to the disabled people.

Ram Sevak Gram Pradhan,

Devariya asked that factory was

organized camp and distributed

blankets to the people timely. Factory

does work on Street light

maintenance.

We want that hand pump should also

install by the factory. We welcome to

the expansion of plant.

9. Shri Ved Praksh

Panday, Gram

Nainsare

Asked that environment pollution is

a serious problem you have to

encourage to the farmers for

agroforestry.

Make trees available for planting

around the field.

Plant Representative said that Free

plant will be provided in the monsoon

season for plantation.

We will provide the plants for

plantation during the monsoon

season.

We have made te provision of Rs

100.0 Lakh for Plantation in next

five years.

10. Shri ShivMurat Bind,

Gram-Hakimpur

He asked that factory is in

Gramsbha- Hakimpur but Nandganj

is written everywhere. We want that

Hakimpur to be written everywhere.

Shri Amit Jhaa, unit head said that

we will try to change the name of

village in all document.

-

Page 14: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 14

11. Shri Avinash Rai He said that provide the school begs

and books to school children.

Shri Amit Jha said that said work

will be done by the Gram Pradhan.

Regional officer requested to all

people that anyone wants to ask any

question then can ask freely.

We have made the provision of

Rs 187.5 ( @ 1.5 % of Project

cost ) towards the Corporate

Environment Responsibility.

We will also made provision for

2 % of total profit in last three

year toward the Corporate Social

Responsibility (CSR).

Detailed CSR plan given in

Chapter – 8.

In the end Regional officer ask to the people about their opinion regarding to plant establishment and present crowd was agreeing with the

establishment of plant. Director sir was declared that the public hearing procedure is completed.

At the conclusion the local farmers and other person present during the public hearing was requested to vote for or against the setting up

of the proposed industry. The majority of the people raised this hand in agreement to the setting up of the industry.

Video recording is done of above public hearing, and CD is attached.

Page 15: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based) - 120.0 KLD (RS/ENA/AA) & Co -

Generation Power – 3.0 MW at village : Hakimpur, Nandganj, Tehsil: Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

MINUTES OF PUBLIC HEARING

Page 16: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 16

Page 17: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 17

Page 18: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 18

Page 19: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 19

Page 20: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 20

Page 21: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 21

Page 22: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 22

Page 23: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 23

Page 24: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 24

Page 25: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 25

Page 26: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 26

Page 27: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 27

Page 28: Public hearing notice published in news papers “ …environmentclearance.nic.in/writereaddata/Public Hearing...Bind, Gram Pradhan & Resident of Rampur Banthara Asked that “do will

Proposed establishment of new Distillery (Molasses /Grain Based )120.0 KLD (RS/ENA/AA) & co -

generation power – 3.0 MW at village : Hakimpur, Tehsil : Saidpur & Distt.: Ghazipur (Uttar Pradesh)

Public

Hearing

Prepared by : Ascenso Enviro Pvt Ltd 28