    Punch Points Checklist of BTS siteSite Name-Mumbai Site ID-145MUM783

    Sr.no Particulars Status Remark

    Outdoor Unit

    1 Connection of outdoor jumper cables & GSM antenna ports

    should be properly tighten.2 Weather proofing of connection between outdoor jumper

    with antenna port should be properly done.

    3 Weather proofing should be done from bottom to top of

    antenna port and jumper connection.

    4 before installing GSM antenna,proper labelling of GSM

    antenna should be done.

    5 While pulling GSM antenna through ropway at resp.

    height,care should be taken that face of antenna(front)

    should be in opposite direction of tower.

    6 Connections of outdoor jumper cables & Feeder cables

    should be properly tighten.

    7 While removing outer insulation of Feeder cables,care

    should be taken that inner core of cables should not be

    damaged.

    8 While removing outer insulation of Feeder cables,care

    should be taken that direction of knife should be away from

    the body.

    9 Connectors of Feeder cables should be properly assembled.

    10 RF cable,connector & RF connector tool should be fromsame manufacturer.

    11 Weather proofing of connection between outdoor jumper

    with RF cables should be properly done.

    12 Weather proofing should be done from bottom to top of RF

    cables and jumper connection.

    13 While assembling earthing kits on each cables,care should

    be taken that all the earthing kits should be on same point

    of contact on all cables.

    14 All cu cables of earthing kits should be routed alongwith the

    respective RF cable in downward direction i.e. there should

    not be any loop.

    15 All cu lugs from earthing kits should be routed & grounded

    separately on EGB.

    16 Weather proofing of earthing kits should be done properly.

    17 While installing C-clamp on the tower body,care should be

    taken that paint should be removed from tower body where

    C-clamp is going to be installed.

  • 8/22/2019 Punch Point List-VIJAY

    2/22

    18 While bending the RF cables care should be taken that

    bending radius should be greater than 300mm.

    19 RF clamps should be assembled properly on cable tray.

    20 Routing of RF cables through Six-way clamp should be

    proper in such way that cables from 1st sector should be

    routed through top or bottom section of six-way clamp,2ndsector should be routed through middle section of six-way

    clamp,3rd sector should be routed through bottom or top

    section of six-way clamp.

    21 Cable tie should provided on eac h & every strip of cable

    tray.

    22 Cable tie should be cutted properly.

    23 Direction of knot of cable tie should be same for all.

    24 Tie should be provided in double cross with single cable tie

    only.

    25 While routing cables through Roxtec from outside to inside

    of shelter,care should be taken that it should take S-shaped

    structure to avoid any entrance of water.

    26 As for 4 rubber boot Roxtec,routing of cables should be

    proper such that cables from each sector should be inserted

    through separate rubber boot and through the holes which

    are horizontal to each other on separate rubber boot.

    27 All the remaining holes on the boots which are not used

    should be properly filled by weather proofing tape.

    28 The gap between Roxtec and shelter's wall should be

    properly filled by Silicon gel.

    Indoor

    29 We should wear ESD band while taking entry inside the

    shelter.

    Connection of Surge arrestors.

    30 Connection between Surge arrestor and feeder cable should

    be properly tighten.

    31 Connection between Surge arrestor and jumper cable

    should be properly tighten.

    32 Surge arrestors should be properly grounded to IGB.

    33 All the grounding connections of surge arrestors should be

    separately routed & grounded on IGB.

    34 Grounding connections of surge arrestors at the IGB should

    be properly tightened.

    35 lugs should be properly crimped by crimping tool at IGB

    end.

  • 8/22/2019 Punch Point List-VIJAY

    3/22

    36 While removing outer insulation of grounding cable at IGB

    end,care should be taken that inner core of cable should not

    be damaged.

    37 While removing outer insulation of grounding cable at IGB

    end,care should be taken that direction of knife should be

    away from the body.

    38 PVC tape should be properly wrapped around lugs and cableconnections at IGB end.

    39 There should not be any gap in between connection of cu

    lug and cables at IGB end.

    40 While routing cables from IGB to Surge arrestors there

    should not be any cross routing.

    41 Cable tie should provided on eac h & every strip of cable

    tray.

    42 Cable tie should be cutted properly.

    43 Direction of knot of cable tie should be same for all.

    44 Tie should be provided in double cross with single cable tie

    only.

    45 While routing cables on the cable tray,it should be routed in

    straight way.

    46 There should not be any vertical bending or loop.

    47 lugs should be properly crimped by crimping tool at Surge

    arrestor end.

    48 While removing outer insulation of grounding cable at Surge

    arrestor end,care should be taken that inner core of cable

    should not be damaged.

    49 While removing outer insulation of grounding cable at Surge

    arrestor end,care should be taken that direction of knifeshould be away from the body.

    50 PVC tape should be properly wrapped around lugs and cable

    connections at Surge arrestor end.

    51 There should not be any gap in between connection of cu

    lug and cables at Surge arrestor end.

    52 Connection between indoor jumper and BTS ports should

    be properly tightened.

    Installation of BTS-

    53 There should not be any continuity in between the fastner

    and BTS.

    54 BTS should be properly levelled.

    55 BTS should not be moved while applying any force from its

    original position.

    56 Fastners should be tight in random diagonal manner.

    57 BTS should be placed at accurate position as mentioned in

    floor plan.

    58 Bit of drill machine used to make a holes should be aligned

    with the centre of marked position.

  • 8/22/2019 Punch Point List-VIJAY

    4/22

    59 All the fastners should be tightened simaltaneously i.e. 2 to

    3 rounds of drive to each fastner simaltaneously.

    60 All the fastners should be properly tightened.

    Installation of TR-

    61 There should not be any continuity in between the fastner

    and TR.62 TR should be properly levelled.

    63 TR should not be moved while applying any force from its

    original position.

    64 Fastners should be tight in random diagonal manner.

    65 TR should be placed at accurate position as mentioned in

    floor plan.

    66 Bit of drill machine used to make a holes should be aligned

    with the centre of marked position.

    67 All the fastners should be tightened simaltaneously i.e. 2 to

    3 rounds of drive to each fastner simaltaneously.

    68 All the fastners should be properly tightened.

    Installation of B.B.&P.P. cabinet-

    69 There should not be any continuity in between the fastner

    and Cabinet.

    70 Cabinet should be properly levelled.

    71 Cabinet should not be moved while applying any force from

    its original position.

    72 Fastners should be tight in random diagonal manner.

    73 Cabinet should be placed at accurate position as mentioned

    in floor plan.74 Bit of drill machine used to make a holes should be aligned

    with the centre of marked position.

    75 All the fastners should be tightened simaltaneously i.e. 2 to

    3 rounds of drive to each fastner simaltaneously.

    76 All the fastners should be properly tightened.

    77 P.P. should be properly placed on the base above the B.B.

    Installation of DDF-

    78 All the screws should be properly tighten.

    79 DDF block should be properly aligned on the wall of shelter.

    80 Bit of drill machine used to make a holes should be aligned

    with the centre of marked position.

    Grounding connections of Equipments-

    Grounding connection of BTS-

    81 Grounding connections of BTS at the IGB should be properly

    tightened.

  • 8/22/2019 Punch Point List-VIJAY

    5/22

    82 lugs should be properly crimped by crimping tool at IGB

    end.

    83 While removing outer insulation of grounding cable at IGB

    end,care should be taken that inner core of cable should not

    be damaged.

    84 While removing outer insulation of grounding cable at IGB

    end,care should be taken that direction of knife should beaway from the body.

    85 PVC tape should be properly wrapped around lugs and cable

    connections at IGB end.

    86 There should not be any gap in between connection of cu

    lug and cables at IGB end.

    87 While routing cable from IGB to BTS there should not be any

    cross routing.

    88 Cable tie should be provided on eac h & every strip of cable

    tray.

    89 Cable tie should be cutted properly.

    90 Direction of knot of cable tie should be same for all.

    91 Tie should be provided in double cross with single cable tie

    only.

    92 While routing cables on the cable tray,it should be routed in

    straight way.

    93 There should not be any vertical bending or loop.

    94 lugs should be properly crimped by crimping tool at BTS

    end.

    95 While removing outer insulation of grounding cable at BTS

    end,care should be taken that inner core of cable should not

    be damaged.96 While removing outer insulation of grounding cable at BTS

    end,care should be taken that direction of knife should be

    away from the body.

    97 PVC tape should be properly wrapped around lugs and cable

    connections at BTS end.

    98 There should not be any gap in between connection of cu

    lug and cables at BTS end.

    Grounding connection of TR-

    99 Grounding connections of TR at the IGB should be properly

    tightened.

    100 lugs should be properly crimped by crimping tool at IGB

    end.

    101 While removing outer insulation of grounding cable at IGB

    end,care should be taken that inner core of cable should not

    be damaged.

    102 While removing outer insulation of grounding cable at IGB

    end,care should be taken that direction of knife should be

    away from the body.

  • 8/22/2019 Punch Point List-VIJAY

    6/22

    103 PVC tape should be properly wrapped around lugs and cable

    connections at IGB end.

    104 There should not be any gap in between connection of cu

    lug and cables at IGB end.

    105 While routing cable from IGB to TR there should not be any

    cross routing.

    106 Cable tie should be provided on eac h & every strip of cabletray.

    107 Cable tie should be cutted properly.

    108 Direction of knot of cable tie should be same for all.

    109 Tie should be provided in double cross with single cable tie

    only.

    110 While routing cables on the cable tray,it should be routed in

    straight way.

    111 There should not be any vertical bending or loop.

    112 lugs should be properly crimped by crimping tool at TR end.

    113 While removing outer insulation of grounding cable at TR

    end,care should be taken that inner core of cable should not

    be damaged.

    114 While removing outer insulation of grounding cable at TR

    end,care should be taken that direction of knife should be

    away from the body.

    115 PVC tape should be properly wrapped around lugs and cable

    connections at TR end.

    116 There should not be any gap in between connection of cu

    lug and cables at TR end.

    Grounding connection of B.B.-117 Grounding connections of B.B. at the IGB should be properly

    tightened.

    118 lugs should be properly crimped by crimping tool at IGB

    end.

    119 While removing outer insulation of grounding cable at IGB

    end,care should be taken that inner core of cable should not

    be damaged.

    120 While removing outer insulation of grounding cable at IGB

    end,care should be taken that direction of knife should be

    away from the body.

    121 PVC tape should be properly wrapped around lugs and cable

    connections at IGB end.

    122 There should not be any gap in between connection of cu

    lug and cables at IGB end.

    123 While routing cable from IGB to B.B. there should not be

    any cross routing.

    124 Cable tie should be provided on eac h & every strip of cable

    tray.

    125 Cable tie should be cutted properly.

  • 8/22/2019 Punch Point List-VIJAY

    7/22

    126 Direction of knot of cable tie should be same for all.

    127 Tie should be provided in double cross with single cable tie

    only.

    128 While routing cables on the cable tray,it should be routed in

    straight way.

    129 There should not be any vertical bending or loop.

    130 lugs should be properly crimped by crimping tool at B.B.end.

    131 While removing outer insulation of grounding cable at B.B.

    end,care should be taken that inner core of cable should not

    be damaged.

    132 While removing outer insulation of grounding cable at B.B.

    end,care should be taken that direction of knife should be

    away from the body.

    133 PVC tape should be properly wrapped around lugs and cable

    connections at B.B. end.

    134 There should not be any gap in between connection of cu

    lug and cables at B.B. end.

    Grounding connection of P.P.-

    135 Grounding connections of P.P. at the IGB should be properly

    tightened.

    136 lugs should be properly crimped by crimping tool at IGB

    end.

    137 While removing outer insulation of grounding cable at IGB

    end,care should be taken that inner core of cable should not

    be damaged.

    138 While removing outer insulation of grounding cable at IGB

    end,care should be taken that direction of knife should beaway from the body.

    139 PVC tape should be properly wrapped around lugs and cable

    connections at IGB end.

    140 There should not be any gap in between connection of cu

    lug and cables at IGB end.

    141 While routing cable from IGB to B.B. there should not be

    any cross routing.

    142 Cable tie should be provided on eac h & every strip of cable

    tray.

    143 Cable tie should be cutted properly.

    144 Direction of knot of cable tie should be same for all.

    145 Tie should be provided in double cross with single cable tie

    only.

    146 While routing cables on the cable tray,it should be routed in

    straight way.

    147 There should not be any vertical bending or loop.

    148 lugs should be properly crimped by crimping tool at P.P.

    end.

  • 8/22/2019 Punch Point List-VIJAY

    8/22

    149 While removing outer insulation of grounding cable at P.P.

    end,care should be taken that inner core of cable should not

    be damaged.

    150 While removing outer insulation of grounding cable at P.P.

    end,care should be taken that direction of knife should be

    away from the body.

    151 PVC tape should be properly wrapped around lugs and cableconnections at P.P. end.

    152 There should not be any gap in between connection of cu

    lug and cables at P.P. end.

    Grounding connection of DDF block-

    153 Grounding connections of DDF block at the IGB should be

    properly tightened.

    154 lugs should be properly crimped by crimping tool at IGB

    end.

    155 While removing outer insulation of grounding cable at IGB

    end,care should be taken that inner core of cable should not

    be damaged.

    156 While removing outer insulation of grounding cable at IGB

    end,care should be taken that direction of knife should be

    away from the body.

    157 PVC tape should be properly wrapped around lugs and cable

    connections at IGB end.

    158 There should not be any gap in between connection of cu

    lug and cables at IGB end.

    159 While routing cable from IGB to DDF block there should not

    be any cross routing.

    160 Cable tie should be provided on eac h & every strip of cabletray.

    161 Cable tie should be cutted properly.

    162 Direction of knot of cable tie should be same for all.

    163 Tie should be provided in double cross with single cable tie

    only.

    164 While routing cables on the cable tray,it should be routed in

    straight way.

    165 There should not be any vertical bending or loop.

    166 lugs should be properly crimped by crimping tool at DDF

    block end.

    167 While removing outer insulation of grounding cable at DDF

    block end,care should be taken that inner core of cable

    should not be damaged.

    168 While removing outer insulation of grounding cable at DDF

    block end,care should be taken that direction of knife

    should be away from the body.

    169 PVC tape should be properly wrapped around lugs and cable

    connections at DDF block end.

  • 8/22/2019 Punch Point List-VIJAY

    9/22

    170 There should not be any gap in between connection of cu

    lug and cables at DDF block end.

    DC connections from P.P.-

    DC connection between P.P. & PIU-

    171 lugs should be properly crimped by crimping tool at both

    ends.

    172 While removing outer insulation of grounding cable at bothends,care should be taken that inner core of cable should

    not be damaged.

    173 While removing outer insulation of grounding cable at both

    ends,care should be taken that direction of knife should be

    away from the body.

    174 PVC tape should be properly wrapped around lugs and cable

    connections at both ends.

    175 There should not be any gap in between connection of cu

    lug and cables at both ends.

    Connection of Busbar to B.B.-

    176 lugs should be properly crimped by crimping tool at both

    ends.

    177 While removing outer insulation of grounding cable at both

    ends,care should be taken that inner core of cable should

    not be damaged.

    178 While removing outer insulation of grounding cable at both

    ends,care should be taken that direction of knife should be

    away from the body.

    179 PVC tape should be properly wrapped around lugs and cable

    connections at both ends.

    180 There should not be any gap in between connection of culug and cables at both ends.

    181 Connections at the both ends should be properly tightened.

    Connection of fuse to B.B.-

    182 lugs should be properly crimped by crimping tool at both

    ends.

    183 While removing outer insulation of grounding cable at both

    ends,care should be taken that inner core of cable should

    not be damaged.

    184 While removing outer insulation of grounding cable at both

    ends,care should be taken that direction of knife should be

    away from the body.

    185 PVC tape should be properly wrapped around lugs and cable

    connections at both ends.

    186 There should not be any gap in between connection of cu

    lug and cables at both ends.

    187 Connections at the both ends should be properly tightened.

    DDF,P.P. alarm connections-

  • 8/22/2019 Punch Point List-VIJAY

    10/22

    188 At alarm panel,all pcm cables should be properly screwed.

    189 At DDF end, all pcm cables should be properly punched by

    krone tool.

    Connection to -ve of BTS-

    190 lugs should be properly crimped by crimping tool at both

    ends.191 While removing outer insulation of grounding cable at both

    ends,care should be taken that inner core of cable should

    not be damaged.

    192 While removing outer insulation of grounding cable at both

    ends,care should be taken that direction of knife should be

    away from the body.

    193 PVC tape should be properly wrapped around lugs and cable

    connections at both ends.

    194 There should not be any gap in between connection of cu

    lug and cables at both ends.

    195 Connections at the both ends should be properly tightened.

    Connection to +ve of BTS-

    196 lugs should be properly crimped by crimping tool at both

    ends.

    197 While removing outer insulation of grounding cable at both

    ends,care should be taken that inner core of cable should

    not be damaged.

    198 While removing outer insulation of grounding cable at both

    ends,care should be taken that direction of knife should be

    away from the body.199 PVC tape should be properly wrapped around lugs and cable

    connections at both ends.

    200 There should not be any gap in between connection of cu

    lug and cables at both ends.

    201 Connections at the both ends should be properly tightened.

    Power connections to DCDB-

    202 lugs should be properly crimped by crimping tool at both

    ends.

    203 While removing outer insulation of grounding cable at both

    ends,care should be taken that inner core of cable should

    not be damaged.

    204 While removing outer insulation of grounding cable at both

    ends,care should be taken that direction of knife should be

    away from the body.

    205 PVC tape should be properly wrapped around lugs and cable

    connections at both ends.

    206 There should not be any gap in between connection of cu

    lug and cables at both ends.

  • 8/22/2019 Punch Point List-VIJAY

    11/22

    SITE NAME:-KADI SITE ADDRESS:-PATIA

    SITE ID:-KD1234 OPERAYOR:-IDEA

    Punch Points Checklist of BTS site

    Sr.no Particulars Status Remark

    Outdoor Unit

    1 Connection of outdoor jumper cables & GSM antenna ports should

    be properly tighten.

    2 Weather proofing of connection between outdoor jumper with

    antenna port should be properly done.

    3 Weather proofing should be done from bottom to top of antenna

    port and jumper connection.

    4 before installing GSM antenna,proper labelling of GSM antenna

    should be done.

    5 While pulling GSM antenna through ropway at resp. height,care

    should be taken that face of antenna(front) should be in oppositedirection of tower.

    6 Connections of outdoor jumper cables & Feeder cables should be

    properly tighten.

    7 While removing outer insulation of Feeder cables,care should be

    taken that inner core of cables should not be damaged.

    8 While removing outer insulation of Feeder cables,care should be

    taken that direction of knife should be away from the body.

    9 Connectors of Feeder cables should be properly assembled.

    10 RF cable,connector & RF connector tool should be from same

    manufacturer.

    11 Weather proofing of connection between outdoor jumper with RF

    cables should be properly done.

    12 Weather proofing should be done from bottom to top of RF cables

    and jumper connection.

    13 While assembling earthing kits on each cables,care should be taken

    that all the earthing kits should be on same point of contact on allcables.

    14 All cu cables of earthing kits should be routed alongwith the

    respective RF cable in downward direction i.e. there should not be

    any loop.

    15 All cu lugs from earthing kits should be routed & grounded

    separately on EGB.

  • 8/22/2019 Punch Point List-VIJAY

    12/22

    16 Weather proofing of earthing kits should be done properly.

    17 While installing C-clamp on the tower body,care should be taken

    that paint should be removed from tower body where C-clamp is

    going to be installed.

    18 While bending the RF cables care should be taken that bending

    radius should be greater than 300mm.

    19 RF clamps should be assembled properly on cable tray.

    20 Routing of RF cables through Six-way clamp should be proper in

    such way that cables from 1st sector should be routed through top

    or bottom section of six-way clamp,2nd sector should be routed

    through middle section of six-way clamp,3rd sector should be

    routed through bottom or top section of six-way clamp.

    21 Cable tie should provided on each & every strip of cable tray.

    22 Cable tie should be cutted properly.

    23 Direction of knot of cable tie should be same for all.

    24 Tie should be provided in double cross with single cable tie only.

    25 While routing cables through Roxtec from outside to inside of

    shelter,care should be taken that it should take S-shaped structure

    to avoid any entrance of water.

    26 As for 4 rubber boot Roxtec,routing of cables should be proper such

    that cables from each sector should be inserted through separaterubber boot and through the holes which are horizontal to each

    other on separate rubber boot.

    27 All the remaining holes on the boots which are not used should be

    properly filled by weather proofing tape.

    28 The gap between Roxtec and shelter's wall should be properly filled

    by Silicon gel.

    Indoor

    29 We should wear ESD band while taking entry inside the shelter.

    Connection of Surge arrestors.

    30 Connection between Surge arrestor and feeder cable should be

    properly tighten.

    31 Connection between Surge arrestor and jumper cable should be

    properly tighten.

  • 8/22/2019 Punch Point List-VIJAY

    13/22

    32 Surge arrestors should be properly grounded to IGB.

    33 All the grounding connections of surge arrestors should be

    separately routed & grounded on IGB.

    34 Grounding connections of surge arrestors at the IGB should be

    properly tightened.

    35 lugs should be properly crimped by crimping tool at IGB end.

    36 While removing outer insulation of grounding cable at IGB end,care

    should be taken that inner core of cable should not be damaged.

    37 While removing outer insulation of grounding cable at IGB end,care

    should be taken that direction of knife should be away from the

    body.

    38 PVC tape should be properly wrapped around lugs and cable

    connections at IGB end.

    39 There should not be any gap in between connection of cu lug and

    cables at IGB end.

    40 While routing cables from IGB to Surge arrestors there should not

    be any cross routing.

    41 Cable tie should provided on each & every strip of cable tray.

    42 Cable tie should be cutted properly.

    43 Direction of knot of cable tie should be same for all.

    44 Tie should be provided in double cross with single cable tie only.

    45 While routing cables on the cable tray,it should be routed in

    straight way.

    46 There should not be any vertical bending or loop.

    47 lugs should be properly crimped by crimping tool at Surge arrestor

    end.

    48 While removing outer insulation of grounding cable at Surge

    arrestor end,care should be taken that inner core of cable should

    not be damaged.

    49 While removing outer insulation of grounding cable at Surge

    arrestor end,care should be taken that direction of knife should be

    away from the body.

    50 PVC tape should be properly wrapped around lugs and cable

    connections at Surge arrestor end.

  • 8/22/2019 Punch Point List-VIJAY

    14/22

    51 There should not be any gap in between connection of cu lug and

    cables at Surge arrestor end.

    52 Connection between indoor jumper and BTS ports should be

    properly tightened.

    Installation of BTS

    53 There should not be any continuity in between the fastner and BTS.

    54 BTS should be properly levelled.

    55 BTS should not be moved while applying any force from its original

    position.

    56 Fastners should be tight in random diagonal manner.

    57 BTS should be placed at accurate position as mentioned in floor

    plan.

    58 Bit of drill machine used to make a holes should be aligned with thecentre of marked position.

    59 All the fastners should be tightened simaltaneously i.e. 2 to 3

    rounds of drive to each fastner simaltaneously.

    60 All the fastners should be properly tightened.

    61 Grounding connections of BTS at the IGB should be properly

    tightened.

    62 lugs should be properly crimped by crimping tool at IGB end.

    63 While removing outer insulation of grounding cable at IGB end,care

    should be taken that inner core of cable should not be damaged.

    64 While removing outer insulation of grounding cable at IGB end,care

    should be taken that direction of knife should be away from the

    body.

    65 PVC tape should be properly wrapped around lugs and cable

    connections at IGB end.

    66 There should not be any gap in between connection of cu lug and

    cables at IGB end.

    67 While routing cable from IGB to BTS there should not be any cross

    routing.

    68 Cable tie should be provided on eac h & every strip of cable tray.

    69 Cable tie should be cutted properly.

    70 Direction of knot of cable tie should be same for all.

  • 8/22/2019 Punch Point List-VIJAY

    15/22

    71 Tie should be provided in double cross with single cable tie only.

    72 While routing cables on the cable tray,it should be routed in

    straight way.

    73 There should not be any vertical bending or loop.

    74 lugs should be properly crimped by crimping tool at BTS end.

    75 While removing outer insulation of grounding cable at BTS end,care

    should be taken that inner core of cable should not be damaged.

    76 While removing outer insulation of grounding cable at BTS end,care

    should be taken that direction of knife should be away from the

    body.

    77 PVC tape should be properly wrapped around lugs and cable

    connections at BTS end.

    78 There should not be any gap in between connection of cu lug andcables at BTS end.

    79 lugs should be properly crimped by crimping tool at +ve port of BTS

    and Busbar end.

    80 While removing outer insulation of grounding cable at +ve port of

    BTS and Busbar end,care should be taken that inner core of cable

    should not be damaged.

    81 While removing outer insulation of grounding cable at +ve port of

    BTS and Busbar end,care should be taken that direction of knife

    should be away from the body.

    82 PVC tape should be properly wrapped around lugs and cable

    connections at +ve port pf BTS and Busbar end.

    83 There should not be any gap in between connection of cu lug and

    cables at +ve port BTS and Busbar end.

    84 Connections at +ve port of BTS and Busbar end should be properly

    tightened.

    85 lugs should be properly crimped by crimping tool at -ve port of BTS

    and MCB's end.

    85 While removing outer insulation of grounding cable at -ve port of

    BTS and MCB's end,care should be taken that inner core of cable

    should not be damaged.

    86 While removing outer insulation of grounding cable at -ve port of

    BTS and MCB's end,care should be taken that direction of knife

    should be away from the body.

  • 8/22/2019 Punch Point List-VIJAY

    16/22

    87 PVC tape should be properly wrapped around lugs and cable

    connections at -ve port pf BTS and MCB's end.

    88 There should not be any gap in between connection of cu lug and

    cables at -ve port BTS and MCB's end.

    89 Connections at -ve port of BTS and MCB's end should be properly

    tightened.

    Installation of TR

    90 There should not be any continuity in between the fastner and TR.

    91 TR should be properly levelled.

    92 TR should not be moved while applying any force from its original

    position.

    93 Fastners should be tight in random diagonal manner.

    94 TR should be placed at accurate position as mentioned in floor plan.

    95 Bit of drill machine used to make a holes should be aligned with the

    centre of marked position.

    96 All the fastners should be tightened simaltaneously i.e. 2 to 3

    rounds of drive to each fastner simaltaneously.

    97 All the fastners should be properly tightened.

    98 Grounding connections of TR at the IGB should be properly

    tightened.

    99 lugs should be properly crimped by crimping tool at IGB end.

    100 While removing outer insulation of grounding cable at IGB end,care

    should be taken that inner core of cable should not be damaged.

    101 While removing outer insulation of grounding cable at IGB end,care

    should be taken that direction of knife should be away from the

    body.

    102 PVC tape should be properly wrapped around lugs and cable

    connections at IGB end.

    103 There should not be any gap in between connection of cu lug and

    cables at IGB end.

    104 While routing cable from IGB to TR there should not be any cross

    routing.

    105 Cable tie should be provided on eac h & every strip of cable tray.

    106 Cable tie should be cutted properly.

    107 Direction of knot of cable tie should be same for all.

  • 8/22/2019 Punch Point List-VIJAY

    17/22

    108 Tie should be provided in double cross with single cable tie only.

    109 While routing cables on the cable tray,it should be routed in

    straight way.

    110 There should not be any vertical bending or loop.

    111 lugs should be properly crimped by crimping tool at TR end.

    112 While removing outer insulation of grounding cable at TR end,care

    should be taken that inner core of cable should not be damaged.

    113 While removing outer insulation of grounding cable at TR end,care

    should be taken that direction of knife should be away from the

    body.

    114 PVC tape should be properly wrapped around lugs and cable

    connections at TR end.

    115 There should not be any gap in between connection of cu lug and

    cables at TR end.

    116 lugs should be properly crimped by crimping tool at +ve port of

    DCDB and Busbar end.

    117 While removing outer insulation of grounding cable at +ve port of

    DCDB and Busbar end,care should be taken that inner core of cable

    should not be damaged.

    118 While removing outer insulation of grounding cable at +ve port of

    DCDB and Busbar end,care should be taken that direction of knife

    should be away from the body.

    119 PVC tape should be properly wrapped around lugs and cable

    connections at +ve port of DCDB and Busbar end.

    120 There should not be any gap in between connection of cu lug and

    cables at +ve port of DCDB and Busbar end.

    121 lugs should be properly crimped by crimping tool at -ve port of

    DCDB and MCB's end.

    122 While removing outer insulation of grounding cable at -ve port of

    DCDB and MCB's end,care should be taken that inner core of cable

    should not be damaged.

    123 While removing outer insulation of grounding cable at -ve port of

    DCDB and MCB's end,care should be taken that direction of knife

    should be away from the body.

    124 PVC tape should be properly wrapped around lugs and cable

    connections at -ve port of DCDB and MCB's end.

  • 8/22/2019 Punch Point List-VIJAY

    18/22

    125 There should not be any gap in between connection of cu lug and

    cables at -ve port of DCDB and MCB's end.

    Installation of B.B.&P.P. cabinet

    126 There should not be any continuity in between the fastner and

    Cabinet.

    127 Cabinet should be properly levelled.

    128 Cabinet should not be moved while applying any force from its

    original position.

    129 Fastners should be tight in random diagonal manner.

    130 Cabinet should be placed at accurate position as mentioned in floor

    plan.

    131 Bit of drill machine used to make a holes should be aligned with the

    centre of marked position.

    132 All the fastners should be tightened simaltaneously i.e. 2 to 3

    rounds of drive to each fastner simaltaneously.

    133 All the fastners should be properly tightened.

    134 P.P. should be properly placed on the base above the B.B.

    135 Grounding connections of B.B. at the IGB should be properly

    tightened.

    136 lugs should be properly crimped by crimping tool at IGB end.

    137 While removing outer insulation of grounding cable at IGB end,care

    should be taken that inner core of cable should not be damaged.

    138 While removing outer insulation of grounding cable at IGB end,care

    should be taken that direction of knife should be away from the

    body.

    139 PVC tape should be properly wrapped around lugs and cable

    connections at IGB end.

    140 There should not be any gap in between connection of cu lug and

    cables at IGB end.

    141 While routing cable from IGB to B.B. there should not be any cross

    routing.

    142 Cable tie should be provided on eac h & every strip of cable tray.

    143 Cable tie should be cutted properly.

    144 Direction of knot of cable tie should be same for all.

  • 8/22/2019 Punch Point List-VIJAY

    19/22

    145 Tie should be provided in double cross with single cable tie only.

    146 While routing cables on the cable tray,it should be routed in

    straight way.

    147 There should not be any vertical bending or loop.

    148 lugs should be properly crimped by crimping tool at B.B. end.

    149 While removing outer insulation of grounding cable at B.B. end,care

    should be taken that inner core of cable should not be damaged.

    150 While removing outer insulation of grounding cable at B.B. end,care

    should be taken that direction of knife should be away from the

    body.

    151 PVC tape should be properly wrapped around lugs and cable

    connections at B.B. end.

    152 There should not be any gap in between connection of cu lug and

    cables at B.B. end.

    153 Grounding connections of P.P. at the IGB should be properly

    tightened.

    154 lugs should be properly crimped by crimping tool at IGB end.

    155 While removing outer insulation of grounding cable at IGB end,care

    should be taken that inner core of cable should not be damaged.

    156 While removing outer insulation of grounding cable at IGB end,care

    should be taken that direction of knife should be away from the

    body.

    157 PVC tape should be properly wrapped around lugs and cable

    connections at IGB end.

    158 There should not be any gap in between connection of cu lug and

    cables at IGB end.

    159 While routing cable from IGB to B.B. there should not be any cross

    routing.

    160 Cable tie should be provided on eac h & every strip of cable tray.

    161 Cable tie should be cutted properly.

    162 Direction of knot of cable tie should be same for all.

    163 Tie should be provided in double cross with single cable tie only.

  • 8/22/2019 Punch Point List-VIJAY

    20/22

    164 While routing cables on the cable tray,it should be routed in

    straight way.

    165 There should not be any vertical bending or loop.

    166 lugs should be properly crimped by crimping tool at P.P. end.

    167 While removing outer insulation of grounding cable at P.P. end,care

    should be taken that inner core of cable should not be damaged.

    168 While removing outer insulation of grounding cable at P.P. end,care

    should be taken that direction of knife should be away from the

    body.

    169 PVC tape should be properly wrapped around lugs and cable

    connections at P.P. end.

    170 There should not be any gap in between connection of cu lug and

    cables at P.P. end.

    171 lugs should be properly crimped by crimping tool at both P.P. and

    PIU ends.

    172 While removing outer insulation of grounding cable at P.P. and PIU

    ends,care should be taken that inner core of cable should not be

    damaged.

    173 While removing outer insulation of grounding cable at P.P. and PIU

    ends,care should be taken that direction of knife should be away

    from the body.

    174 PVC tape should be properly wrapped around lugs and cable

    connections at both P.P. and PIU ends.

    175 There should not be any gap in between connection of cu lug and

    cables at P.P. and PIU ends.

    176 lugs should be properly crimped by crimping tool at both B.B. and

    Busbar end.

    177 While removing outer insulation of grounding cable at both B.B.

    and Busbar end,care should be taken that inner core of cable

    should not be damaged.

    178 While removing outer insulation of grounding cable at both B.B.

    and Busbar end,care should be taken that direction of knife should

    be away from the body.

    179 PVC tape should be properly wrapped around lugs and cable

    connections at both B.B. and Busbar end.

    180 There should not be any gap in between connection of cu lug and

    cables at both B.B. and Busbar end.

  • 8/22/2019 Punch Point List-VIJAY

    21/22

    181 Connections at the both B.B. and Busbar end should be properly

    tightened.

    182 lugs should be properly crimped by crimping tool at both B.B. and

    Fuse end.

    183 While removing outer insulation of grounding cable at both B.B.

    and Fuse end,care should be taken that inner core of cable shouldnot be damaged.

    184 While removing outer insulation of grounding cable at both B.B.

    and Fuse end,care should be taken that direction of knife should be

    away from the body.

    185 PVC tape should be properly wrapped around lugs and cable

    connections at both B.B. and Fuse end.

    186 There should not be any gap in between connection of cu lug and

    cables at both B.B. and Fuse end.

    187 Connections at the both B.B. and Fuse end should be properlytightened.

    Installation of DDF

    188 All the screws should be properly tighten.

    189 DDF block should be properly aligned on the wall of shelter.

    190 Bit of drill machine used to make a holes should be aligned with the

    centre of marked position.

    191 Grounding connections of DDF block at the IGB should be properly

    tightened.

    192 lugs should be properly crimped by crimping tool at IGB end.

    193 While removing outer insulation of grounding cable at IGB end,care

    should be taken that inner core of cable should not be damaged.

    194 While removing outer insulation of grounding cable at IGB end,care

    should be taken that direction of knife should be away from the

    body.

    195 PVC tape should be properly wrapped around lugs and cable

    connections at IGB end.

    196 There should not be any gap in between connection of cu lug and

    cables at IGB end.

    197 While routing cable from IGB to DDF block there should not be any

    cross routing.

    198 Cable tie should be provided on each & every strip of cable tray.

  • 8/22/2019 Punch Point List-VIJAY

    22/22

    199 Cable tie should be cutted properly.

    200 Direction of knot of cable tie should be same for all.

    201 Tie should be provided in double cross with single cable tie only.

    202 While routing cables on the cable tray,it should be routed in

    straight way.

    203 There should not be any vertical bending or loop.

    204 lugs should be properly crimped by crimping tool at DDF block end.

    205 While removing outer insulation of grounding cable at DDF block

    end,care should be taken that inner core of cable should not be

    damaged.

    206 While removing outer insulation of grounding cable at DDF block

    end,care should be taken that direction of knife should be away

    from the body.

    207 PVC tape should be properly wrapped around lugs and cable

    connections at DDF block end.

    208 There should not be any gap in between connection of cu lug and

    cables at DDF block end.

    209 At alarm panel,all pcm cables should be properly screwed.

    210 At DDF end, all pcm cables should be properly punched by krone

    tool.