Q1 MARKET UPDATE 2019 9 May 2019 Results for the quarter ended 31 March 2019

Upload: others

Post on 05-Jun-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

Q1 MARKET UPDATE

2 0 1 9

9 May 2019

Results for the quarter ended 31 March 2019

Page 2: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

Certain statements contained in this document, other than statements of historical fact, including, without limitation, those concerning the economicoutlook for the gold mining industry, expectations regarding gold prices, production, total cash costs, all-in sustaining costs, all-in costs, cost savings andother operating results, productivity improvements, growth prospects and outlook of AngloGold Ashanti’s operations, individually or in the aggregate,including the achievement of project milestones, commencement and completion of commercial operations of certain of AngloGold Ashanti’s explorationand production projects and the completion of acquisitions, dispositions or joint venture transactions, AngloGold Ashanti’s liquidity and capital resourcesand capital expenditures and the outcome and consequence of any potential or pending litigation or regulatory proceedings or environmental health andsafety issues, are forward-looking statements regarding AngloGold Ashanti’s operations, economic performance and financial condition. These forward-looking statements or forecasts involve known and unknown risks, uncertainties and other factors that may cause AngloGold Ashanti’s actual results,performance or achievements to differ materially from the anticipated results, performance or achievements expressed or implied in these forward-lookingstatements. Although AngloGold Ashanti believes that the expectations reflected in such forward-looking statements and forecasts are reasonable, noassurance can be given that such expectations will prove to have been correct. Accordingly, results could differ materially from those set out in theforward-looking statements as a result of, among other factors, changes in economic, social and political and market conditions, the success of businessand operating initiatives, changes in the regulatory environment and other government actions, including environmental approvals, fluctuations in goldprices and exchange rates, the outcome of pending or future litigation proceedings, and business and operational risk management. For a discussion ofsuch risk factors, refer to AngloGold Ashanti’s annual report on Form 20-F for the year ended 31 December 2018, which has been filed with the UnitedStates Securities and Exchange Commission (SEC). These factors are not necessarily all of the important factors that could cause AngloGold Ashanti’sactual results to differ materially from those expressed in any forward-looking statements. Other unknown or unpredictable factors could also havematerial adverse effects on future results. Consequently, readers are cautioned not to place undue reliance on forward-looking statements. AngloGoldAshanti undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances afterthe date hereof or to reflect the occurrence of unanticipated events, except to the extent required by applicable law. All subsequent written or oralforward-looking statements attributable to AngloGold Ashanti or any person acting on its behalf are qualified by the cautionary statements herein.

The financial information in this document has not been reviewed or reported on by the Company’s external auditors.

Non-GAAP financial measuresThis communication may contain certain “Non-GAAP” financial measures. AngloGold Ashanti utilises certain Non-GAAP performance measures andratios in managing its business. Non-GAAP financial measures should be viewed in addition to, and not as an alternative for, the reported operatingresults or cash flow from operations or any other measures of performance prepared in accordance with IFRS. In addition, the presentation of thesemeasures may not be comparable to similarly titled measures other companies may use.

DISCLAIMER

2

Page 3: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

POSITIONED TO CREATE VALUE THROUGH THE CYCLE

3

Decisive action on operations; balance sheet flexibility remains a priority

Consistent delivery; improving cost management, focus on enhancing margins

Towards zero harm, excellence in environmental stewardship, community development

AngloGold Ashanti’s core strategic focus is to generate sustainable cash flow improvements and shareholder returns by focusing on five key areas, namely:

These focus areas drive our plans for inward investment, to deliver better quality production aimed at increasing margins, extending mine lives and shaping the portfolio in the longer term.

Ongoing portfolio improvements through investment and rationalisation

Maintaining optionality to deliver value-adding growth over the long term

Page 4: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

TARGETING ZERO HARMLONG-TERM SAFETY IMPROVEMENTS CONTINUE

4

Working towards zero harm,excellence in environmentalstewardship and communitydevelopment• Fatalities down 100% & AIFR down 46%

since 2012

• 358-consecutive fatality-free days in Q1

• Injury rates improved 34% y-o-y

• Integrated safety strategy bearing fruits

AIFR per million hours worked

4

5

6

7

8

2012

2013

2014

2015

2016

2017

2018

Q1

2019

-46%

Fatalities

0

4

8

12

16

2020

12

2013

2014

2015

2016

2017

2018

Q1

2019

Reportable environmental incidents

0

4

8

12

16

20

2012

2013

2014

2015

2016

2017

2018

Q1

2019

-100%

-100%

Constituent of the FTSE All World Index

Page 5: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

Q1 2019 PERFORMANCE

5

Production 165koz

AISC $967/oz

EBITDA $74m

Production 338koz

AISC $969/oz

EBITDA $149m

Production 91koz

AISC $1,197/oz

EBITDA $19m

Production 158koz

AISC $919/oz

EBITDA $87m

Operations Projects Asset sales being considered Greenfields exploration

*World Gold Council standard**Group EBITDA includes -$22m relating to corporate or other.

• Production, costs and capital remain on track to meet annual guidance

• Q1 production of 752,000oz; solid performance from Geita, Iduapriem, Tropicana and Kibali

• AISC* improve 2% y-o-y to $1,009/oz; Total cash costs improve 5% to $791/oz

• South Africa assets see early wins in safety from new shift arrangements

• Tropicana’s strong exploration results lead to approval of Boston Shaker underground project

• Process to review ownership of the remaining assets in South Africa announced

22%

45%

12% 21%

Production split

Americas Continental Africa South Africa Australia

Page 6: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

MARGIN IMPROVEMENT

6

700

900

1,100

1,300

2013 2014 2015 2016 2017 2018 Q1 2019

All-in Sustaining Costs vs. Gold Price$/oz

AISC* Avg Gold Price*World Gold Council standard

REINVESTMENT

CONTINUOUS IMPROVEMENT RESTRUCTURING

14%margin

19%margin

21%margin

21%margin

16%margin 23%

margin

22%margin

Page 7: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

Q1 PRODUCTION PERFORMANCE

7

Q1 Production from retained opskoz

South Africa107

South Africa91

Australia161 Australia

158

Continental Africa314

Continental Africa338

Americas191

Americas165

Q1 2018 Q1 2019

773 752 Am

eric

as • Lower grades at CdS due to model changes, geotechnical issues

• Heavy rains, regulator stoppages following Brumadinhodisaster

• Lower tonnages at Serra Grande

Con

tinen

tal

Afr

ica • Strong quarter at Kibali +21%, Iduapriem +12%, Geita +11%

• Siguiri impacted by ramp-up of the new combination plant• Geita mill shutdown completed on schedule

Aus

tral

ia • Tropicana - higher mill throughput, feed-grades and recovery• Boston Shaker underground development approved• Sunrise Dam mill throughput lower • Costs benefited from lower capital and favourable currency

Sout

h A

fric

a • Solid performance despite power-related challenges, inclement weather, and seismicity

• New shift arrangements yield better safety, efficiencies related to blasting and development rates

Page 8: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

Q1 COST PERFORMANCE

8

Q1 2019 HighlightsGroup AISC* improves 2% y-o-y to $1,009/oz

• Continental Africa: TCC of $819/oz, AISC at $969/oz; Benefited from strong operating performance at Iduapriem (higher grades from Teberebie cuts 1 and 3, and lower strip ratio), at Geita (higher feed grade ore from Nyankanga block 5 and Star & Comet cut 2 underground)

• South Africa: AISC improved 8% y-on-y to $1,197/oz; Benefited from improved operating efficiencies and weaker exchange rate, offset by lower gold output and inflation; Cost reduction initiatives, focused on both on- and off-mine cost structures, are continuing

• Australia: Improved TCC of $687/oz, AISC of $919/oz; Benefited from lower sustaining capex and favourable exchange rate movements; Sunrise Dam with focus now on stabilising the downstream circuits to maximise gold recovery and reduce costs

• Americas: TCC at $719/oz, AISC at $967/oz; Impacted by cost escalations across the region and lower by-product contributions, partly offset by favourable exchange rates

*World Gold Council standardTCC: Total Cash Cost

704

823

729

1,162

1,132

1,101

1,000

1,304

787

924

1,051

1,198

1,060

Kibali

CVSA

Tropicana

Siguiri

Geita

Serra Grande

AGA Mineração

Mponeng

Iduapriem

Sadiola

SA Surface Ops

Morila

Sunrise Dam

AISC* by mine$/oz

Q1 2019 Q1 2018

Q1/

19 $

1,00

9/oz

vs

. Q

1/18

$1,

028/

oz

Assets considered for sale

Page 9: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

OBUASI PROJECT UPDATE AND MILESTONES

9

• Project is on schedule and on budget

• Two phase development• 2000tpd – end 2019• 4000tpd – end 2020

• Design and procurement are in progress

• Demolition of redundant plant is close to completion

• Refurbishment for Phase 1 commenced

• Mining contractor mobilised

• First development blast took place successfully in early February

• Capex spend lower in Q1 than planned due to later commitments, but will be caught up in Q2

• First gold remains on track for end of 2019

Page 10: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

STRONG EXPLORATION START IN 2019

10

Quebradona

184,660 meters were drilled during the quarter Focused on mineral resource to ore reserve conversion

and creation of new mineral resources

Generative exploration drilling programs were active in Australia and the United States with 13,720 meters by air core, roto-sonic, reverse circulation and diamond

drilling across the projects

No Current ExplorationGenerative ExplorationMine Site Exploration

Page 11: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

COMPARISON OF KEY METRICS

11

Q1 2019 Q1 2018Variance

Q1 2019 vs.Q1 2018

Production from operations (kozs) 752 824 (9%)

Production from retained operations (kozs) 752 773 (3%)

Gold price received ($/oz) 1,297 1,323 (2%)

Total cash costs ($/oz) 791 834 (5%)

Corporate & marketing costs ($m)(1) 20 18 11%

Exploration & evaluation costs ($m) 25 21 19%

All-in sustaining costs(2) ($/oz) 1,009 1,028 (2%)

All-in costs(2) ($/oz) 1,108 1,107 -

Adjusted EBITDA ($m) 307 383 (20%)

Cash inflow from operating activities ($m) 67 117 (43%)

Free cash outflow ($m) (109) (70) (56%)

Capital expenditure ($m) 141 169 (17%)(1) Includes administration and other expenses(2) World Gold Council standard, excludes stockpiles written off(3) Retained operations exclude closed and sold operations

Page 12: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

COST PERFORMANCE

12

500

600

700

800

900

834 (69) 40 805 28 (39) 24 (3) (22) 31 (31) (2) 791

Mar-18 Exch-ange

Inflation Total Volume Grade By-products

Royalty Stockpile& Gip

Effic-iency

Acq/disposal

Other Mar-19

Total Cash cost Q1 2019 vs. Q1 2018 $/oz

*World Gold Council standard

900

950

1,000

1,050

1,028 (43) 15 22 6 5 (24) 1,009

Mar-18 Totalcashcosts

Finance leasepayment

Sustaining

Rehab-ilitation

Corporatecosts

Sustainingexplor-ation

Totalsustaining

capex

Mar-19

AISC* Q1 2019 vs Q1 2018$/oz

Page 13: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

BALANCE SHEET STRATEGY TO ENFORCE CAPITAL DISCIPLINE

13

The pursuit of an even healthier balance sheet will guide sound capital decision-making and investment strategies

Undrawn facilities* at 31 March 2019

R4.555bnZAR Facilities

US$1,429m**USD RCFs

US$262mCash

Net Debt $m

1000

2000

3000

4000

2012 2013 2014 2015 2016 2017 2018 2019 Q1

-43%

Self-funded development of Tropicana, Kibali

Last-12-months Net debt to Adjusted EBITDA ratio

0

1

2

3

4

2013 2014 2015 2016 2017 2018 2019 Q1

1.27X

Net Debt to Adjusted EBITDA

*Total calculated with ZAR facility at R14.4985/$(excluding DMTNP), and AUD facility at 0.7095 to A$

** US$1.4bn RCF includes a capped facility of AU$500m

c.$2.0bn

Covenant 3.5X

1.0X New Target

through the cycle

Page 14: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

FULL YEAR GUIDANCE

14

2019 FY Guidance Commentary

Gold production (000 oz) 3,250 – 3,450 Production will be back weighted, with a stronger second half expected for Geita, Siguri and Brazil

All-in sustaining costs* ($/oz) 935 - 995 First-quarter costs to be impacted by anticipated lower production.

Currency and commodity assumptions: ZAR14.00/$; $0.75/A$; BRL3.65/$; $40.00/ARS; Brent $74/blTotal cash costs ($/oz) 730 – 780

Corporate costs ($m) 75 - 85

Expensed expl./study costs ($m) 130 - 140 Including equity-accounted joint ventures

Total capex ($m) 910 - 990

Sustaining capex ($m) 520 - 560

Non-sustaining capex ($m) 390 - 430 Expenditure related to Obuasi, Siguiri, Tropicana, Mponeng and Quebradona

FULL YEAR GUIDANCE

*World Gold Council standard**Income Statement

Both production and cost estimates assume neither operational, labour or power disruptions or other interruptions, norfurther changes to asset portfolio and/or operating mines and have not been reviewed by our external auditors. Otherunknown or unpredictable factors could also have material adverse effects on our future results and no assurance can begiven that any expectations expressed by AngloGold Ashanti will prove to have been correct. Accordingly, actual resultscould differ from guidance and any deviation may be significant. Please refer to the Risk Factors section in AngloGoldAshanti’s annual report on Form 20-F for the year ended 31 December 2018, filed with the United States Securities andExchange Commission (SEC).

Depreciation and amortisation ($m)Incl. in equity accounted earnings ($m)

680160

Interest and finance costs** ($m)Other operating expenses ($m)

13085

SENSITIVITIES (based on $1,200/oz gold price and the same assumptions used for guidance)

AISC ($/oz)

Cash from operating activities before taxes for remaining nine months of 2019 ($m)

10% change in the oil price 6 16 10% change in local currency 58 117 5% change in the gold price 2 151 50koz change in production 14 56

Page 15: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

OWNERSHIP REVIEW OF SOUTH AFRICAN ASSETS

15

Driven by disciplined capital allocation• Restructuring has created a focused, cash generative

South African portfolio

• Mponeng underground mine and long-life surface unit

• Mponeng requires additional investment in the medium term to extend life beyond eight years

• Life extension option competes for scarce capital with other, higher-return projects in our portfolio

• Thorough review process at an early stage and may not result in change to ownership

• Priority to ensure review is conducted with appropriate thoroughness to ensure best outcome for all stakeholders

Under the right ownership, these assets offer a compelling longer-term value proposition

Page 16: Q1 MARKET UPDATE - The Vault Q1 PRODUCTION PERFORMANCE 7 Q1 Production from retained ops koz South Africa 107 South Africa 91 Australia 161 Australia 158 Continental Africa 314 Continental

ANGLOGOLD ASHANTI IS A PREMIER GOLD INVESTMENT

16

Track record of disciplined

capital allocation and

project delivery

Focus on advancing

strong pipeline of options

Minimizing Risk and

improving Shareholder

returns

Clear and predictable strategic approach

2019 Priorities• Continued focus on sustainability

• Complete sale processes

• Optimise margins and capital

• Advance Obuasi for first production year-end 2019

• Ongoing Stakeholder Engagement

• Advance Colombia up value curve