qatar rail - corp.qr.com.qa rail... · qatar railways company (qatar rail) invites experienced...

50
Doc. No.: Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version. Qatar Rail Prequalification for Architectural Subcontracts Doha Metro Phase 1 03 rd August 2015

Upload: others

Post on 19-Jun-2020

21 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Doc. No.: Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Qatar Rail

Prequalification for Architectural Subcontracts

Doha Metro Phase 1

03rd August 2015

Page 2: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: i Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Table of contents

1 Purpose ................................................................................................................................ 1 1.1 Description of the Metro Network ....................................................................................................................... 2 1.1.1 Red Line North Underground .............................................................................................................................. 2 1.1.2 Red Line North Elevated and At Grade ............................................................................................................... 2 1.1.3 Red Line South Underground .............................................................................................................................. 2 1.1.4 Red Line South Elevated and At-Grade............................................................................................................... 2 1.1.5 Gold Line Underground ....................................................................................................................................... 2 1.1.6 Major Stations ...................................................................................................................................................... 2 1.1.7 Green Line Underground ..................................................................................................................................... 3 1.1.8 Green Line Elevated and At-Grade ...................................................................................................................... 3 1.2 Indicative number of Stations .............................................................................................................................. 3 1.3 Network Diagram ................................................................................................................................................. 5

2 Scope of Work ..................................................................................................................... 6 2.1 Scope of Architectural Finishes within each category or package ...................................................................... 6 2.2 Multidiscipline Work Package ..............................................................................................................................7 2.3 Interiors Package ...................................................................................................................................................7 2.3.1 Finishes to the internal public areas of the stations (below and above ground) ................................................7 2.3.2 The provision of facilities for the public, both inside and adjacent to the stations, ...........................................7 2.3.3 The provision of standardised building components across the program ......................................................... 8 2.4 Envelope, façade and related structure ............................................................................................................... 8 2.4.1 Underground Station- public entrance buildings ............................................................................................... 8 2.4.2 Elevated and at Grade Metro sections public entrance buildings ...................................................................... 8 2.4.3 Architectural elements of other minor building works ....................................................................................... 9 2.5 Hard and soft landscaping ................................................................................................................................... 9

3 The Contractor .................................................................................................................. 10 4 Prequalification - Criteria for consideration ....................................................................... 11 4.1 Introduction ......................................................................................................................................................... 11 4.2 Detailed information requirements .................................................................................................................... 11 4.2.1 Part 1 - Technical capability ................................................................................................................................ 11 4.2.2 Part 2 Capacity ..................................................................................................................................................... 14 4.2.3 Part 3 Financial Standing .................................................................................................................................... 15 4.2.4 Part 4 Other – Section. ........................................................................................................................................ 15

5 Documents ......................................................................................................................... 16 6 Examination of Documents ............................................................................................... 20 7 Prequalification Questionnaire (PQQ) ................................................................................ 21

List of Tables Table 1 Type & Number of Stations......................................................................................................... 3

Page 3: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: ii Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Table 2 Tunnels’ Sections Lengths and Types Summary ....................................................................... 4 Table 3 Turnover over the last 3 years .................................................................................................. 26 List of Figures

Figure 1 Metro Network – Phase 1 .......................................................................................................... 5

Page 4: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 1 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

1 Purpose

Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural Subcontracts for the Doha Metro Phase-1 civil contracts.

Qatar Rail is carrying out a centralised prequalification process for the Architectural works in order to source qualified subcontractors to carry out the following categories of subcontract work.

1. Multidiscipline – capable of doing all of the categories of Architectural works as listed below.

2. Interiors only.

3. Envelope and façade (including supporting structure, glazing and cladding).

4. Hard and soft Landscaping – including street furniture

This is being carried out in conjunction with the civil D&B contractors.

Qatar Rail and the D&B Contractors are seeking to pre-qualify experienced companies or joint ventures that possess the capability and expertise to successfully construct the Architectural elements of the Metro Systems.

This document provides applicant with relevant information on the scope of works, prequalification criteria, and the prequalification questionnaire which you need to complete and return to Qatar Rail Procurement department on 23rd August 2015 between the hours of 09:00 and 12:00 noon.

This Prequalification Questionnaire is for Interiors contractors, Envelope and Façade and Landscaping contractors and contractors capable of doing all elements. It is not intended for prequalifying vendors, suppliers, manufacturers.

Applicants must submit a separate completed prequalification questionnaire for each category they wish to be considered for.

Qatar Rail reserves the right to amend or cancel the prequalification process. Qatar Rail is not obliged to invite all or any applicants to tender for the works. Qatar Rail reserves its right to amend the scope of the Works described in this document prior to award of the contract.

All communications with Qatar Rail in relation to any clarifications relating to this Prequalification Questionnaire must be addressed to:

[email protected]

Page 5: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 2 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

1.1 Description of the Metro Network

Doha Metro Phase 1 is currently split into eight main Civil Design and Build Contracts which are summarized as follows:

1.1.1 Red Line North Underground

The Red Line North runs from Msheireb Station and northwards to Lusail Marina/The Pearl Station and beyond to the M11 transition.

1.1.2 Red Line North Elevated and At Grade

There are elevated and at-grade sections of the Red Line North between the M11 transition and Al Khor Stadium.

1.1.3 Red Line South Underground

The Red Line South runs from Msheireb station southwards through the M10/M11 Switchbox, to the M11 transition, and continues eastwards along M10 to NDIA station.

1.1.4 Red Line South Elevated and At-Grade

There are elevated and at-grade sections of the Red Line South between the M11 transition and Al Wakra South Station.

1.1.5 Gold Line Underground

The Gold Line runs from Airport City North Station westwards towards Al Sadd Stadium and beyond to the M20 transition. The Gold Line underground section also includes a section of the Blue Line which connects the Gold Line with the Red Line South from the M20/M40 switchbox and continues southwards to the M40/M104 switchbox. There is an elevated section from the M20 transition to Al Rayyan South.

1.1.6 Major Stations

Doha Metro Phase 1 contains two (2) major stations: Msheireb and Education City.

Msheireb Station

Msheireb Station, located in the centre of Doha city, is the hub of the metro network and is the major interchange station for Red Line North, Red Line South, Green Line and Gold Line.

Education City Station

The Education City Station provides interchange between the Green Line and the future high speed, long distance railway to Saudi Arabia and Bahrain.

Page 6: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 3 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

1.1.7 Green Line Underground

The Green Line starts from Msheireb Station and moves north and then west to the M32 transition.

1.1.8 Green Line Elevated and At-Grade

There is an elevated section of the Green line from the M32 transition to Al Rayyan Stadium Station.

Details of the D&B contractor’s delivering each section of the works can be found in section 2.1 later in this document.

1.2 Indicative number of Stations

Table 1 – Type & Number of Stations

Station Types

Red

Lin

e N

orth

U

nd

ergr

oun

d

Red

Lin

e S

outh

U

nd

ergr

oun

d

Gre

en L

ine

U

nd

ergr

oun

d

Maj

or S

tati

ons

Gol

d L

ine

Un

der

grou

nd

Red

Lin

e N

orth

E

leva

ted

/At

Gra

de

Red

Lin

e S

outh

E

leva

ted

/At

Gra

de

Gre

en L

ine

E

leva

ted

/At

Gra

de

Tot

als

Underground Stations I-Type unclassified 3 3

I-Type Silver 2 3 1 6

I-Type Gold 1 1 1 3 6

I-Type Platinum 1 2 1 2 6

I-Type Special 1 1

X-Type 1 1 1 1 4 Special-Lusail Marina-Pearl Interchange

1 1

Station Box only [ Al Khubaib ] 1 1

Special Station 2 2

Sub total 30

Elevated stations Type 8 1 1 2

Type 6/ Type 6 Event 1 1 2

Sub total 4

At Grade stations

Page 7: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 4 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Station Types

Red

Lin

e N

orth

U

nd

ergr

oun

d

Red

Lin

e S

outh

U

nd

ergr

oun

d

Gre

en L

ine

U

nd

ergr

oun

d

Maj

or S

tati

ons

Gol

d L

ine

Un

der

grou

nd

Red

Lin

e N

orth

E

leva

ted

/At

Gra

de

Red

Lin

e S

outh

E

leva

ted

/At

Gra

de

Gre

en L

ine

E

leva

ted

/At

Gra

de

Tot

als

Special 1 1

Type 1 1 1

Sub total 2

Grand total 7 5 6 2 10 2 3 1 36

Table 2 Tunnels’ Sections Lengths and Types Summary

Metro Phase I Underground Section (km)

Above Ground (km)

Red Line North Underground

13.11 km (Twin bored)

Red Line North Elevated and At Grade n/a

2.5km (Elevated), 2.0km (At Grade) & 2.2km Trough and Tunnel)

Red Line South Underground 16 km Twin Bored

Red Line South Elevated and At Grade 5.8km(EL),0.3km (AG)

& 1.6km (C&C tunnel)

Green Line Underground 17.44 km

Green Line elevated and At Grade

2.7km (elevated, 0.3km (At – Grade) and 0.2km (Ramp)

Gold Line underground 30km (twin bored)

Note - The metro network described above may be modified based on route, corridor availability and other factors.

Page 8: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 5 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

1.3 Network Diagram

Figure 1 Metro Network – Phase 1

Page 9: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 6 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

2 Scope of Work

The scope of works will include- Architectural Finishes including the design, fit out and branding of:

a) Underground stations - above ground public entrance structures to underground stations and adjacent ground level areas, including pedestrian footpaths which are not integral to a carriageway,

b) Elevated and at Grade stations - (within the limits of the station) including entrance structures, other above ground structures and adjacent ground level areas but excluding non–public areas already included in the contract.

in accordance with the requirements of the Corporate Architectural Design Manual.

Listed below is a summary of the Architectural scope of works in the provisional sums within the main D&B contracts.

The works are being packaged into the following categories. The applicants are encouraged to provide specific responses to match these categories of work, in order to allow Qatar Rail and the D&B contractors to adequately assess the applicants capability.

a) Multidiscipline – capable of doing all of the works in the below packages.

b) Interiors only.

c) Envelope, façade and related structure (including supporting structure, glazing and cladding) – including the provision of entrance Structures to Underground Stations and Elevated Station shelters and associated structural frame and envelope.

d) Hard and soft Landscaping – including street furniture

2.1 Scope of Architectural Finishes within each category or package A brief overview of the nature of the works within each package is provided below, in order to assist the applicant in deciding which category of works to submit a prequalification application. Please refer to the draft work packaging strategy in the appendix, which illustrates the approach being adopted by each Civil D&B contractor.

Page 10: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 7 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

2.2 Multidiscipline Work Package There are several packages across the network where the selected subcontractor will be required to carry out the full range of Architectural works including but not limited to.

1. Interiors.

2. Envelope, Façade and supporting Structure.

3. Hard and soft landscaping.

4. Fixtures Furnishing and Equipment.

2.3 Interiors Package

2.3.1 Finishes to the internal public areas of the stations (below and above ground)

The provision of finishes to the internal public areas of the underground stations as well as underpasses and over bridges associated with elevated and at grade stations - to include but not be limited to:

a) Floor finishes including movement and control joints;

b) Wall finishes including support systems;

c) Ceiling finishes including support systems;

d) Balustrades and handrails to stairs and openings; and

e) Decorative MEP and rail system components such as CCTV and PID housings, lighting booms and HVAC diffusers and louvers.

2.3.2 The provision of facilities for the public, both inside and adjacent to the stations,

This will include but not be limited to:

a) Way finding and informational signage;

b) Fixtures and fittings including items such as seats, bins, information points and fire cabinets;

c) Tactile guidance routes; and

d) Fit-out of customer service and public welfare facilities such as ticket offices, toilets, baby changing and waiting rooms.

Page 11: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 8 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

2.3.3 The provision of standardised building components across the

program

The scope will include the provision of building components which the Employer has decided shall be standardised program wide to include but not be limited to:

a) Door ironmongery including items such as lock sets, handles, closers, hinges, suited cylinders; and

b) Signage outside of the public areas including items such as door signage, escape signage, health and safety signage and rail information signage in areas such as the running tunnels, viaducts, plant rooms and staff areas; and

c) Furniture for use by staff in offices and customer service and welfare areas.

2.4 Envelope, façade and related structure This package will include provision of Entrance Structures to Underground Stations and elevated Station shelters, including the associated structural frame and envelope.

2.4.1 Underground Station- public entrance buildings

The scope will include the provision of public entrance buildings including pedestrian walkways which are integral to the public entrance structures.

This will include but not be limited to:

a) Above ground structural framework to support the external envelope; and

b) External building envelope including roof, curtain walling, glazing and public entry doors.

2.4.2 Elevated and at Grade Metro sections public entrance buildings

The scope will include the provision of signature roofs to station platforms and public entrance buildings to include but not be limited to:

a) Secondary framework (steel work) to support the external envelope; and

b) External building envelope including roof, curtain walling, glazing and entry doors.

The finishing of all above ground structures such as station buildings, public entrances, footbridges and auxiliary above ground facilities to include but not be limited to:

a) External building envelope including curtain walling and glazing; and

Page 12: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 9 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

b) Decorative external envelopes, including louvers, to buildings such as

escape stairs, vent shafts and skylights including associated support systems;

2.4.3 Architectural elements of other minor building works

The Provisional Sums for Architectural Finishes may be applied to any other minor building works not included in the Contract, as requested and approved in writing by the Engineer.

2.5 Hard and soft landscaping The scope will include:

a) Hard and Soft landscaping (including footpaths which are not integral to a carriageway) to ground level areas adjacent to stations and above ground public entrance structures. In a public Streetwork’s environment.

b) Street furniture including - outdoor lighting poles and fixtures for landscape and road lighting.

Page 13: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 10 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

3 The Contractor

The Employer for the Doha Metro Phase 1 project is Qatar Railways Company.

The various phases of the Metro are being delivered by several Joint Venture D&B contractors as follows. It is intended that following the prequalification and tender process, the successful Applicants will be engaged by the D&B contractors as listed below.

The address in Qatar Rail to which the Applicants prequalification submission should be submitted is shown in section 5 of this document.

Main Contract Name Joint Venture Contracting Consortia

Red Line North Underground

Salini Impregilo- SK Engineering & Construction Co. Ltd.- Galfar Al Misnad Engineering & Contracting W.L.L. JV

Red Line North Elevated and At-Grade

Rizzani De Eccher S.p.A.- Lotte Engineering and Construction- Redco International JV

Red Line South Underground

QDVC- GS Engineering & Construction Corp.- Al Darwish Engineering W.L.L. JV

Red Line South Elevated and At-Grade

FCC Construccion S.A- Archirodon, Construction Company S.A.- Yuksel Insaat A.S.- Petroserv Limited JV

Gold Line Underground

Aktor S.A.- Larsen & Tourbo Limited- Yapi Merkezi Insaat V.E.- SFTA- Al Jaber Eng., LLC JV

Major Stations Samsung C&T Corporation- Obrascon Huarte Lain S.A.- Qatar Building Company JV

Green Line Underground

Porr Bau GbmH – Saudi Binladin Group Company Ltd - Hamad Bin Khaled Contracting Co. WLL JV

Green Line Elevated and At-Grade

Saudi Binladin Group Company Ltd- PoRR Bau GmbH- Hamad Bin Khaled Contracting Co. WLL JV

Page 14: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 11 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

4 Prequalification - Criteria for consideration

4.1 Introduction

Applicants shall be companies capable of delivery of the scope of the Works described in section 2 for each specific category / package.

The Applicants prequalification response shall describe how they fulfil certain criteria that are detailed below.

Applicants are reminded that they must prepare a submitted a separate and specific Prequalification questionnaire for each category they wish to be considered for.

Given the size, complexity and array of disciplines involved in the successful delivery of the works, it is expected that sub-contractors may need to form either a joint venture (JV) or consortium in order to fulfil all of the criteria of the prequalification.

The principal evaluation criteria are:

a) Technical capability;

b) Capacity to undertake the work in the required time and quality; and

c) Financial robustness and size in relation to the anticipated size of the contract.

4.2 Detailed information requirements

4.2.1 Part 1 - Technical capability

A detailed submission will be required in response to section 6 Prequalification Questionnaire using the same format and numbering. In order to allow Qatar Rail and the D&B contractors to carry out an assessment of the suitability of the Applicants

A short summary of the information to be provided by the Applicant is listed below.

Responses should be tailored to the category of works that the applicant wishes to be considered for, in order that Qatar Rail can adequately assess the applicants experience and capability in the correct category.

Page 15: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 12 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

No Criteria Cross reference to PQQ

1

Structure and Organization of the Applicant and associated companies- including length of trading and a summary of how any joint venture arrangement would work in practice (exact details are to be provided in response to PQQ section C: Joint Venture)

Section E&F: Structure and Organization

2

Details of the experience of key personnel in the Applicant’s organisation, who would be working on this project if successful.

Section G: Resources, Personnel

3

Shop dwg and implementation design capability – evidence of the Applicants in house and / or design consultants/ subconsultant’s, technical capability to carry out detailed 3 D multidiscipline design co-ordination and production of construction drawings.

Section E: part 8, Structure and Organisation

4 Evidence of the Applicants capability to successfully operate in Qatar and the MENA.

Section J: Experience, Geographical

5

Previous experience of delivering projects of a similar scale and nature with a particular emphasis on relevant projects such as

a. Metro Railways, b. Petrochemical and Industrial, c. Airport, Hospitals, d. Civic Buildings, e. Shopping Mall projects

Section K: Relevant projects completed

6

Qatar Rail and the D&B contractors are particularly interested in prequalifying contractors who have experience in the following areas:

1. Multidiscipline – capable of doing all of the works in the below packages.

2. Interiors only

• Internal Architectural fit out including walls, ceilings, floors

Section K: Relevant projects completed

Please make specific reference to experience in the categories

Page 16: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 13 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

No Criteria Cross reference to PQQ

• Very High quality internal finishes with complex geometrical shapes and high insitu labour content

3. Envelope, façade and related structure (including supporting structure, glazing and cladding) – including the provision of entrance Structures to Underground Stations and Elevated Station shelters – structural frame and envelope. including fibre reinforced concrete and complex structures

4. Hard and soft Landscaping in a streetwork’s/ public roadworks environment in including earthworks, hard surfacing, planting, irrigation and street furniture. Some elements of Utility protection.

6.1

The Applicants ability to secure the services of sufficient numbers of skilled tradesmen, able to deliver high quality insitu applied; wall, ceiling and floor finishes in complex geometrical shapes and other specialist trades in the various subcontract categories.

Section H Resources Capacity Labour force, Subcontractors and fabrication

7

Evidence of well developed Quality assurance systems including defect rectification, commissioning and handover procedures.

Section M: Quality assurance

8

Health and Safety – evidence that an effective and robust Health and Safety system is in place in the Applicants organization and a Lost Time Injury Frequency Rates (LTIFR).

Section N: Health and Safety Policy

9 Evidence of compliance with mandatory requirements to protect the welfare of Migrant workers.

Section O: Environmental Policy and corporate social responsibility

10

Evidence of Accreditation of staff for QSAS and QGBC activities and experience on projects achieving these standards.

Section P: Training Licensing and accreditation

Page 17: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 14 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

No Criteria Cross reference to PQQ

11

Evidence of experience and training of staff in relation to activities concerned with Kahramma, QCDFSS, QSAS, GCBC and LEED Gold.

Section P: Training, Licencing and accreditation.

12 Proven ability to produce good quality Operation and Maintenance Manuals in a timely fashion.

Section Q: Operation and Maintenance requirements

4.2.2 Part 2 Capacity

No Criteria Cross reference to PQQ

1

Information to be provided on the exact nature of Joint Venture / consortia arrangements including confirmation of the lead and joint and several liability etc.

Section C: Joint Venture

2 Details of the Applicants sub-contracting proposals

Section H: section 3 Resources Capacity Labour force, Subcontractors and fabrication

3 Details of the availability of design and construction resources

Section H: Resources Capacity Labour force, Subcontractors and fabrication

4

Evidence as to whether the applicant has within its control sufficient plant, machinery, equipment and facilities to be able to deliver a large Architectural fit out and building and Structural projects of this nature.

Section I: Resources : Contractors Plant, Equipment and facilities

5

Evidence that the Applicant has sufficient available capacity to be able to perform the work in parallel with their other secured workload between 2015 and 2018

Section L: Capacity All projects in progress

6 Evidence of existing supply chain relationships in Qatar

Section H: Part 5, Resources Capacity Labour force, Subcontractors and fabrication

Indication of how much of the Section H: Part 1 e) Resources

Page 18: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 15 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

No Criteria Cross reference to PQQ 7 available workload on Doha Metro

phase 1 the applicant wishes to tender for in the event that they prequalify.

Capacity Labour force, Subcontractors and fabrication

4.2.3 Part 3 Financial Standing

The PQQ in section 7 specifies that published auditable financial statements should be provided.

No Criteria Cross reference

D1.1 Provision of 3 years audited published financial statements.

Section D: Financial Statement

D1.2

These are required in order to allow Qatar Rail and their D&B contractors to assess whether the applicant has sufficient financial standing/robustness (including liquidity and profitability) to be able to successfully deliver the requirements of the project.

Section D: Financial Statement

D3 Confirmed ability to be able to obtain a performance bond as required.

Section D: Financial Statement

D4 Confirmation evidence that valid insurances are in place.

Section D: Financial Statement

D5

Ability / confirmation that a Parent Company guarantee can be provided is required. The Parent Company Guarantee must be provided from the Ultimate parent Company.

Section D: Financial Statement

4.2.4 Part 4 Other – Section.

No Criteria Cross reference

D1 Information on the Applicants history of involvement in Litigation and Arbitration

Section R and S – Litigation and Arbitration History parts 1 and 2

Page 19: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 16 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

5 Documents

The Applicant shall submit its prequalification documents in two (2) hard copies and two (2) soft copies in PDF searchable format.

It is important that the Applicants prequalification response documents are structured strictly in accordance with the Prequalification Questionnaire numbering and format.

A page limit has been set at 300 pages and these must be adhered to, no smaller than 10 point fonts are to be used and single sides/sheet will count as one page.

Qatar Rail request that no advertising or promotional literature is submitted with the Applicants response. As this will not be opened or marked.

The date for submitting the prequalification documents is:

23rd August 2015 between the hours of 09:00 and 12:00 noon local Qatar time (GMT +03:00).

Delivery address:

Contracts & Procurement Department Qatar Railways Company Rail Tower, 14th Floor 231 Suhaim Bin Hamad Street (C-Ring Road) Al Sadd Area 38, P.O. Box: 29988 Doha, State of Qatar

With the following heading on the envelope and documents:

Doha Metro Phase 1 PREQUALIFICATION APPLICATION FOR Architectural Works Subcontracts

Page 20: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 17 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Application Covering Letter:

The application letter must be provided by the Applicant, co-signed by all entities that are members of the Applicant, and addressed to the Employer as follows:

To: Senior Contracts and Procurement Director Qatar Railways Company Contracts and Procurement Department P.O. Box 29988 Dear Sir, Re – Doha Metro Phase 1 - Architectural Prequalification submission We the undersigned, submit our application for prequalification to tender for the Doha Metro Phase 1 (insert name of category you wish to be considered for)

The submitted prequalification documents that constitute this application have been completed to the best of our knowledge and signed as instructed. We understand that the submission of the application and associated prequalification documents do not obligate you or the D&B contractor towards us nor to any party associated with or related to us. We also understand that the assessment of information presented will be at the sole discretion of the revenue. We further understand that you will treat the information provided in the prequalification documents as strictly confidential and will not make it available to any third party except to your appointed D&B Contractors and consultants. Furthermore, we understand that you will not be responsible for, nor pay any expense, which we may incur in the preparation and submission of the application and prequalification documents.

Each of the signatories below represents the authorised signatory of our company/JV/consortium members and each JV/consortium member confirms by this application and the associated prequalification documents, that it guarantees the truth and accuracy of all statements contained herein. Dated this................ day of..................

Page 21: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 18 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

1. Name of the Lead Entity:

Name of Authorised Signatory for Application: Signature

2. Name of Entity: Name of Authorised Signatory for Application: Signature

3. Name of Entity:

Name of Authorised Signatory for Application: Signature

In the capacity of:

[Provide in similar format the name and signature of authorised signatory for each additional entity that is part of the Applicant.]

End

The submitted prequalification documents shall be structured strictly in accordance with the Prequalification Questionnaire (PQQ) requirements as set out in section 6

The hard copy will be deemed to be the “original” submission of the application.

All documents shall be provided in the English language. Where information is provided in another language, it shall be accompanied by an English translation. This translation will govern and be used for interpreting the information.

Queries regarding the submission of prequalification documents shall be directed to [email protected] referenced Doha Metro Phase 1 Architectural subcontracts Prequalification.

Clarifications will be issued by email.

Page 22: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 19 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Qatar Rail and the D&B Contractor shall not be responsible for, nor reimburse, any expenses incurred by whomsoever in the preparation and submission of the prequalification documents or any clarification/further information which Qatar Rail may request for the proper assessment of the submitted prequalification documents.

Page 23: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 20 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

6 Examination of Documents

The Employer and D&B Contractors reserve the right not to examine documents that are received after the closing date and time as listed in Section 4.

Information provided by the Applicant in the submitted prequalification documents will be treated as strictly confidential.

The Employer reserves its right to request the Applicant to prepare and furnish any clarification considered necessary for the proper assessment of the submitted prequalification documents.

The Employer does not bind itself with any process subsequent to this prequalification, short listing, open tenders, communication with the Applicant, etc.

The Employer reserves its right to amend the scope of the Works described in this document prior to award of the subcontract by the D&B Contractor.

Page 24: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 21 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

7 Prequalification Questionnaire (PQQ)

A. Title Page B. Notes to Applicants C. Joint Venture /Consortium D. Financial Statement E. Structure and Organisation 1 F. Structure and Organisation 2 G. Resources: Personnel H. Resources: Capacity, Labour Force, Subcontractors and Fabrication I. Resources: Contractor’s Plant, Equipment and Facilities J. Experience: Geographical K. Experience: Relevant Projects Completed L. Experience: All Projects in Progress M. Quality Assurance System N. Health and Safety O. Environmental Policy and Corporate Social Responsibility P. Training Q. Operation and Maintenance R. Litigation and Arbitration History 1 S. Litigation and Arbitration History 2 T. Additional Information

Page 25: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 22 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

A. Title Page

Company Information

Name of the Applicant:

Address:

Telephone No (s):

Fax No (s):

Contact details of two key personnel:

Name: Telephone No: Mobile No: Email:

Name: Telephone No: Mobile No: Email:

Page 26: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 23 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

B. Note to Applicants

1. Please answer all questions and provide information as requested. 2. Supplementary pages may be photocopied or copied and inserted if

required. 3. Please retain a copy of your complete submission. 4. If a JV / consortium is proposed, all members are to respond to all

questions. 5. All financial data is to be given in Qatari Riyals. 6. Please address all queries regarding the submission of prequalification

documents via email to [email protected]. Clearly referenced ‘Doha Phase 1 Metro – Architectural Prequalification’

Standard Pages

A. Title Page B. Notes to Applicants C. Joint Venture /Consortium D. Financial Statement E. Structure and Organisation 1 F. Structure and Organisation 2 G. Resources: Personnel H. Resources: Capacity, Labour Force, Subcontractors and Fabrication I. Resources: Contractor’s Plant, Equipment and Facilities J. Experience: Geographical K. Experience: Relevant Projects Completed L. Experience: All Projects in Progress M. Quality Assurance System N. Health and Safety O. Environmental Policy and Corporate Social Responsibility P. Training Q. Operation and Maintenance R. Litigation and Arbitration History 1 S. Litigation and Arbitration History 2 T. Additional Information

Additional Pages

Please list below any additional pages attached to each standard page.

Page 27: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 24 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

C. Joint Venture / Consortium

If the Applicant is a JV / consortium for the Works, please give the following information, otherwise state “not applicable”

1. Names and addresses of JV / consortium partners.

2. Name of company leading the JV / consortium.

3. Name and address of bankers to the JV / consortium.

4. The indicative percentage of participation in the JV/consortium of each of its members.

5. A pre-bid agreement from each JV/consortium member confirming its intention to be part of the JV/consortium that will bid at a later stage in the process.

6. Please provide a short summary of any joint venture agreement would

work in practice.- with an explanation of how the Joint Venture arrangement would be led.

7. Confirmation that each member will be jointly and severally liable.

8. Confirmation of the intention that the JV/consortium, if successfully prequalified, will submit a tender for the Works.

9. Individual figures as contained within financial statements for all members of the JV/Consortium. This will be the basis for Qatar Rail assessment of financial robustness for the pre-qualification.

Page 28: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 25 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

10. It is recommended that if a JV Consortium is proposed that one member

is an established local (Qatari) company with experience in Architectural works or that one of the JV members has had significant experience working in similar projects in Qatar or the GCC.

11. Where the Applicant is proposing the use of a JV please

provide:

a) Name and address of bankers from whom references can be obtained if required.

b) Name(s) of insurers.

Page 29: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 26 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

D. Financial Statement

Table 3 Turnover over the last 3 years

Turnover for the last three years only based on auditable published financial statements

No Year N In QAR 2010 2011 2012 2013- *Others

(Specify) Total

1 Domestic

2 Overseas excl. Middle East

3 Middle East

4 Total

5

Turnover as published in Financial statements *

*Note – Please ensure that row 5 is reconcilable to row 4

The Applicant should also provide the following information:

1. Latest three year audited published financial accounts.

2. Bank guarantees issued and credit limits in the last three (3) years and status to date.

3. Name and address of bankers from whom references can be obtained if required.

4. Name(s) of insurers.

5. Written confirmation from Bond provider that a bond can be obtained in due course.

6. Details of current Employers Liability, Public Liability, Professional Indemnity.

7. Confirmation that the company provide a Parent Company Guarantee from the Ultimate Parent.

Page 30: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 27 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

8. Name all Parent Companies up to the Ultimate Parent and name all

daughter or related companies.

Page 31: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 28 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

E. Structure and Organisation 1

1. Name of Applicant.

2. Description of Applicant or members of Applicant for JV/consortium.

3. Names and addresses of associated companies intended to be involved in the Works, and whether parent/subsidiary/other.

4. If the Applicant (or members of Applicant for JV/consortium) is a subsidiary, what involvement, if any, will the parent company have in the Works?

5. Names and addresses of proposed sub consultant designers for the project (if any)

6. Design capability – Please provide evidence of the applicants in house and /or design consultants/sub consultants technical capability to carry out detailed 3D implementation design co-ordination and production of construction drawings and develop a BIM model.

Page 32: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 29 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

F. Structure and Organisation 2

1 Names and addresses of any associates the Applicant or members of Applicant for JV/consortium has/have in the country of the Works, knowledge of the local procedures of customs, immigration, etc.

2 Please indicate here or attach an organisation chart showing the

Applicant’s proposed project specific structure including the positions of Directors and key personnel, if relevant. An additional company organisation chart may also be attached

3 Copy of commercial registration and licenses issued by Qatar’s Ministry

of Business and Trade (Where Applicant / Applicant members are not registered in Qatar then registration and licenses from their relevant local governmental authorities shall be provided).

4. Provide details of the Applicants capability of working in a BIM

environment and the capability of any proposed subcontractors. Provide examples of projects, process, and software utilised.

Page 33: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 30 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

G. Resources: Personnel

1. Number of staff

- Technical - Administrative

2. Please list present Executive Directors

Name Present position

Years of experience with the company and/or in the industry

3. Please provide CV’s of 5 key members of staff who would be responsible for this project detailing their relevant experience – no more than 2 pages per CV.

Note:

If the Applicant is a JV then you need to provide items 1 & 2 above for each member of the JV. Item 3 above must include a minimum of 2 CVs from the JV leader and the rest may be provided by the other members of the JV.

Page 34: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 31 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

H. Resources: Capacity, Labour Force, Subcontractors and Manufacture/Fabrication

1. Design Capabilities

a) Number of design staff based in: In-house Sub-contractors

i. Qatar

ii. MENA

iii. Globally

b) Number of management staff

i. Qatar

ii. MENA

iii. Globally

2. Construction Capabilities

a) Number of construction operatives based in: In-house Sub-contractors

i. Qatar

ii. MENA

iii. Globally

b) Number of management staff

i. Qatar

ii. MENA

Page 35: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 32 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

iii. Globally

a) State the maximum number of packages that the applicants wishes or able to undertake.

b) State your preferred packages, if any, Stations) ranked 1st, 2nd, 3rd, 4th etc. see table in sections 1.2. – This should be category specific

NOTE: A package means one Station including any necessary above and below ground internal fit out, entrance structures, ancillary buildings and the landscaping within the curtilage of the Station

3. On the basis of the information provided herein provide a forecast indicate the likely source of the labour force required to undertake the Works in total and per discipline and type of personnel whether technical, commercial, or administration. Provide details of the source of the labour force.

4. Please provide information on the Applicants ability to secure the services of sufficient numbers of skilled tradesmen, able to deliver high quality insitu applied: wall, ceiling and floor finishes in complex geometrical shapes.

5. If it is foreseen that any part of the Works will be sub-contracted state the type of work to be undertaken by the subcontractor(s) and, if known, provide the name and address of the subcontractor(s) to be used.

6. Manufacture/fabrication/planting nursery facilities to be used for Architectural systems and landscaping.. List those in the control of any subsidiary companies where applicable.

The applicant is asked to confirm where these facilities are within their control or are still to be procured,

Summary:

Description:

Location:

Capacity:

Annual throughput:

Confirmation that facility is available for inspection in Q3/Q4 2015: Yes/No

Page 36: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 33 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

7. Details of employment of local and foreign companies/firms in existing

contracts in order to demonstrate that the applicant has an established local supply chain.

Page 37: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 34 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

I. Resources: Contracts Plant, Equipment and Facilities

1. On the basis of the information provided herein please provide a forecast equipment and facilities considered by the Applicant to be necessary for undertaking the Works.

2. Confirm whether this is already in the Applicant’s ownership or will be purchased, leased or hired for the Works.

3. Provide information on the age of the equipment and confirmation that it is less than 5 years old.

Page 38: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 35 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

J Experience: Geographical

1. List projects involving similar Architectural scope undertaken in

A. Qatar B. MENA C. Globally

Within the last 10 years. This should be limited to 5 projects per category

Page 39: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 36 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

K. Experience: Architectural Projects Completed

Please provide information about the Architectural projects the applicant has completed over the past ten (10) years using the criteria below. Answer all questions in the format below. Additional project images / data may be attached to support this.

In order to allow Qatar Rail to verify that the information provided is accurate, please supply extracts/ copies of pages from the actual contract documentation/ Letter of Award (LOA) relating to the referenced projects illustrating -

• Names of the parties

• Name of the contract/ project

• Value

• Date

• Signatories

1. Name, address and contact details of employer.

2. Your Contract/Subcontract Award Value.

3. Your Contract/Subcontract Final Account Value.

4. Award date.

5. Original Completion date at award.

6. Actual completion date on final completion and acceptance of works by the Employer.

7. Date of completion of all defaults and close out of your contract/subcontract.

8. State reasons if the final completion date exceeds the original completion date.

9. Was contract satisfactorily completed.

10. Were there any disputes, if yes state number and values and final resolution.

11. State all contract variations and values and why

12. Name, address and contact details of (consulting) engineer responsible for supervision.

Page 40: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 37 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

13. Names, addresses and contact details of Main Contractor/Joint venture

Partner/Consortium Member/Subcontractor.

14. Percentage of participation of company in the project.

15. Short description of project including location and type of works and intended purpose of the main works.

16. Please state if the projects referenced were constructed to QSAS , QGBC or LEED standards.

17. If the projects referenced used BIM please note and describe your involvement.

Page 41: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 38 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

L. Experience: All Projects in Progress – current workload

Provide information on all projects currently in progress and secured workload for the period 2015 to 2019. This should including projects where the Applicant has received a letter of intent, but a formal contract has not yet been awarded. Answer ALL questions in the format below. Additional project images/ data may be attached to support this.

In order to allow Qatar Rail to verify that the information provided is accurate, please supply extracts/ copies of pages from the actual contract documentation relating to the referenced projects illustrating -

• Names of the parties

• Name of the contract/ project

• Value

• Date

• Signatories

1. Name, address and contact details of the Employer.

2. Your Contract/Subcontract Award Value.

3. Your Contract/Subcontract Final Account Value.

4. Award date.

5. Original completion date at contract award.

6. Anticipated date for final completion and acceptance of works by the Employer.

7. Anticipated date of completion of all defects and close out of your contract/subcontract.

8. If the final anticipated completion date exceeds the original completion date, state reasons.

9. Were there any disputes, if yes state number and values and final resolution.

10. State all contract variations and values and reasons why.

Page 42: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 39 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

11. Name, address and contact details of (consulting) engineer responsible

for supervision.

12. Names, addresses and contact details of Main Contractor/Joint venture Partner/Consortium Member/Subcontractor.

13. Percentage of participation of company in the project.

14. Short description of project including location and type of works and intended purpose of the main works.

15. If the f this project was constructed to QSAS, QGBC or LEED standards please advised.

16. State if BIM was used on this project and what was your involvement.

Page 43: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 40 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

M. Quality Assurance System

The Applicant’s must comply with a Quality Management System Certified to ISO 9001, or have in place as necessary a quality system and have engaged Quality personnel so as to demonstrate an effective and robust Quality system that meets with the Quality requirements of the D&B Contractor. A copy of the applicants Quality Management document may be attached but should be separate.

1. Please describe the Applicant’s quality assurance system.

2. Please describe the Applicant’s design verification and validation process and procedures.

3. Please describe the Applicant’s proposed strategy for the completion of defects and outstanding works.

4. Please provide evidence of accreditation if achieved to the following international standards. If you are a JV then you must state the same for each JV member.

a. ISO 9001

b. ISO 14001

c. ISO 18001

Page 44: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 41 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

N. Health and Safety

The Applicant’s must comply with a Safety Management System Certified to OSHAS 18001, or have in place as necessary a safety system and have engaged safety personnel. In order to demonstrate an effective and robust safety system that meets with the safety requirements of the D&B Contractor, together with providing copies of past accident records.

A copy of the Applicants Health and Safety document may be attached

1. Please describe the Applicant’s health and safety plan. Qatar Rail and the D&B contractors request the applicant to provide information on how they can reduce H&S risks of working at height/falls, manual handling and risks of personnel and machinery collisions on these type of projects

2. Provide Lost Time Injury Frequency Rate (“LTIFR”) over the last three (3) years. If you are a JV then you must state the same for each JV member. Please provide details of any major LTI’s of fatalities that may have occurred in the last 5 years.

Page 45: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 42 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

O. Environmental Policy and Corporate Social Responsibility

Applicants company requirements

1. Migrant worker facilities – Please provide details of existing and planned migrant worker welfare and living accommodation specifying how the applicant is meeting the requirement of the following document:

“Welfare Standards for migrant workers – QF migrant workers initiative”

Please advise:

1. How future welfare accommodation will meet the required standards

2. Details of any worker accommodation and welfare audits carried out to date

3. How the applicant is working to ensure compliance with Qatari Labour law and section 12 of the welfare standards including any accommodation provided by subcontractors.

2. The Subcontractor/Sub-Consultant/Supplier must comply with an Environmental Management System Certified to ISO 14001, or have in place as necessary an effective management system, including engaging environmental personnel that meet with the requirements of the Main Contract’s:

1) Please describe the Applicant’s environmental policy.

2) Please provide details of how you consider energy use in the design and use of your product/service.

3) Please provide details of any programme for monitoring your current level of environmental performance.

4) Please provide details of environmental certification.

Page 46: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 43 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

P. Training Licencing and accreditation

1. The appointed contractor will be required to provide operational training for operatives of the completed Works, please name the location(s) where this would be carried out and the method of training.

2. Please provide four (4) examples from previous projects where

operational support and training has been provided by the Applicant, to a client/customer.

3. Industry Accreditations

a) Provide copies of ISO accreditations

b) Provide copies of other accreditations or evidence of training of

personnel relevant to activities connected with the following stakeholders:

• Kahramma • QCDFSS • QSAS • QGBC • LEED

Page 47: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 44 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

Q. Operation and Maintenance

1. The appointed contractor may be required to maintain the installation until final handover , please indicate in general terms the manner and methods by which this would be carried out.

2. Please provide details of the applicant’s capability to produce Operation and maintenance manuals in a timely and complete fashion.

i.e. Is this produced in house or subcontracted out to a third party.

3. Please provide a reference in this regard if possible.

Page 48: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 45 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

R. Litigation and Arbitration History 1

1. Please describe the Applicant’s (or members of Applicant for JV/consortium) history of litigation and/or arbitration from contracts executed or completed during the last six (6) years, and those currently under execution.

Page 49: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 46 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

S. Litigation and Arbitration History 2

1. Please describe for each year, the name of the employer, the main claims and counterclaims (if any) in the litigation or arbitration, the respective amounts claimed and counterclaimed (if any), the court or arbitral institution or arbitration rules concerned and amount awarded to and/or against the Applicant (or members of Applicant for JV/consortium), as appropriate.

Page 50: Qatar Rail - corp.qr.com.qa Rail... · Qatar Railways Company (Qatar Rail) invites experienced contractors (each an “Applicant”) to prequalify for the provision of Architectural

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Doc. No.: 47 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Project:

Applicant:

T. Additional Information

1. Please add further information which the Applicant considers to be relevant to the evaluation of its application for prequalification.

[If you wish to attach other documents, please list them below.]