QCS Section 4 Part 2 General Requirements for Concrete Piles Page 1 2. GENERAL REQUIREMENTS FOR CONCRETE PILES ................................ 2 2.1 GENERAL ...................................................................................................... 2 2.1.1 Scope 2 2.1.2 References 2 2.2 MATERIALS ................................................................................................... 2 2.2.1 Cement 2 2.2.2 Aggregate 2 2.2.3 Water 3 2.2.4 Admixtures 3 2.2.5 Steel Reinforcement and Prestressing Steel 3 2.3 CONCRETE MIXES FOR PILING WORK...................................................... 3 2.3.1 General 3 2.3.2 Grade Designation 3 2.3.3 Designed Mix 3 2.3.4 Durability 4 2.3.5 Minimum Cement 4 2.4 PLACING CONCRETE .................................................................................. 4 2.4.1 General 4 2.4.2 Inspection 4 2.4.3 Cleanliness of Pile Bases 4 2.4.4 Workability of Concrete 4 2.4.5 Compaction 5 2.4.6 Placing Concrete in Dry Borings 5 2.4.7 Placing Concrete under Water or Drilling Fluid 5

Upload: rotsapnayrb

Post on 04-Oct-2015

9 views

Category:

Documents


2 download

DESCRIPTION

QCS 2007 0402

TRANSCRIPT

  • QCS Section 4 Part 2 General Requirements for Concrete Piles Page 1

    2. GENERAL REQUIREMENTS FOR CONCRETE PILES................................2

    2.1 GENERAL ......................................................................................................2

    2.1.1 Scope 22.1.2 References 2

    2.2 MATERIALS...................................................................................................2

    2.2.1 Cement 22.2.2 Aggregate 22.2.3 Water 32.2.4 Admixtures 32.2.5 Steel Reinforcement and Prestressing Steel 3

    2.3 CONCRETE MIXES FOR PILING WORK......................................................3

    2.3.1 General 32.3.2 Grade Designation 32.3.3 Designed Mix 32.3.4 Durability 42.3.5 Minimum Cement 4

    2.4 PLACING CONCRETE ..................................................................................4

    2.4.1 General 42.4.2 Inspection 42.4.3 Cleanliness of Pile Bases 42.4.4 Workability of Concrete 42.4.5 Compaction 52.4.6 Placing Concrete in Dry Borings 52.4.7 Placing Concrete under Water or Drilling Fluid 5

  • QCS Section 4 Part 2 General Requirements for Concrete Piles Page 2

    2. GENERAL REQUIREMENTS FOR CONCRETE PILES

    2.1 General

    2.1.1 Scope

    1 This part applies to cast in situ as well as precast concrete piles.

    2 Related Sections and Parts are as follows:

    This Section Part 1, General Requirements for Piling Works Part 3, Precast Reinforced and Prestressed Concrete Piles Part 4, Precast Reinforced Concrete Segmental Piles Part 5, Bored Cast-in-Place Piles Part 6, Bored Piles Constructed Using Continuous Flight Augers and Concrete or

    Grout Injection through Hollow Auger Stems Part 7, Driven Cast-In-Place Piles

    Section 5, Concrete.

    2.1.2 References

    1 The following Standards are referred to in this Part:

    BS 5075, Concrete admixtures BS 5328, Concrete BS 4027, Sulphate-resisting Portland cement BS 5573, Code of practice for safety precautions in the construction of large diameter

    boreholes for piling and other purposes.

    2.2 MATERIALS

    2.2.1 Cement

    1 Cement shall be ordinary Portland, sulphate-resisting Portland, Portland blast-furnacecement or rapid-hardening Portland cement unless otherwise specified or approved. Whensubmitting his piling method statement and programme to the Engineer, the Contractor shallalso submit for approval the type of cement, other than ordinary Portland cement, heproposes to use. High alumina cement shall not be used. For cement requirements seeSection 5, Part 3.

    2 The use of cement replacement materials will be permitted subject to the approval of theEngineer and provided that they can be shown to have beneficial effects on concreteimpermeability, heat generation during setting and general durability. The mix proportionsshall be subject to the approval of the Engineer. For requirement of cementitious additionsrefer to Section 5 Part 5.

    3 All cement and cement replacement materials shall be stored in separate containersaccording to type in waterproof stores or silos.

    2.2.2 Aggregate

    1 Aggregates shall consist of approved, naturally occurring or crushed sand and gravel. TheContractor shall inform the Engineer of the source of supply of the aggregates beforebeginning work and provide evidence regarding their properties and gradation. Foraggregates requirements refer to Section 5, Part 2.

  • QCS Section 4 Part 2 General Requirements for Concrete Piles Page 3

    2.2.3 Water

    1 If water for the Works is not available from a public supply, approval shall be obtainedregarding the source of water. For quality of water refer to Section 5, Part 4.

    2.2.4 Admixtures

    1 Admixtures complying with BS 5075 may be used, if approved, and shall be used as andwhen required by the Engineer. For use of admixtures refer to Section 5, Part 5.

    2.2.5 Steel Reinforcement and Prestressing Steel

    1 Steel reinforcement shall be stored in clean and dry conditions. It shall be clean, and freefrom loose rust and loose mill scale when installed in the Works. For requirements of steelreinforcement refer to Section 5, Part 11.

    2 The number of joints in longitudinal steel bars shall be kept to a minimum. Joints inreinforcement shall be such that the full strength of each bar is effective across the joint andshall be made so that there is no detrimental displacement of the reinforcement during theconstruction of the pile.

    3 For requirements of prestressing steel refer to Section 5, Part 18.

    2.3 CONCRETE MIXES FOR PILING WORK

    2.3.1 General

    1 For general requirements of concrete mixes, trial mixes, batching, mixing and transportationof fresh concrete and testing of hardened concrete refer to Section 5.

    2.3.2 Grade Designation

    1 Grades of concrete shall be denoted by the characteristic 28 day test cube strength in micropascals, or by grades, in accordance with BS 5328.

    2.3.3 Designed Mix

    1 The Contractor shall be responsible for selecting the mix proportions to achieve the requiredstrength and workability, but the Engineer will specify the minimum cement content and anyother properties required to ensure durability.

    2 Designed mixes shall be in accordance with grades 20, 25 or 30 (for cast-in-place piles) orgrades 40, 50 or 60 (for precast piles) of BS 5328. Other grades may be approved ifappropriate to the work. Complete information on the mix and sources of aggregate foreach grade of concrete and the water/cementitious material ratio and the proposed degreeof workability shall be approved before work commences.

    3 The free alkali content of the concrete mix shall be less than 3 kg per cubic metre ofconcrete and the alkali content shall be calculated from the formula A = Ca/100, where A isthe alkali content of the concrete (kg/m3), C is the maximum expected Portland cementcontent of the concrete (kg/m3 ) and a is the alkali content of Portland cement (%). Thelatter percentage is to be the declared monthly mean alkali content + 0.1 %.

    4 Where low-alkali, sulphate-resisting cement to BS 4027 is specified, the alkali content(equivalent sodium oxide) of the cement shall not exceed 0.6 % by weight.

    5 The Contractor shall submit the slump factor he proposes for approval before workcommences.

  • QCS Section 4 Part 2 General Requirements for Concrete Piles Page 4

    2.3.4 Durability

    1 For piles exposed to potentially aggressive ground or groundwater, approved measuresshall be taken to ensure durability. Reference should be made to Building ResearchEstablishment Digest 360 relating to sulphate attack coupled with the CIRIA SpecialPublication 31, Guide to Concrete Construction in the Gulf Region, to safeguard againstchloride attack.

    2.3.5 Minimum Cement

    1 The cement content in any mix for piling work shall be not less than 300 kg/m3. The cementcontent shall be not less than 380 kg/m3 where concrete is to be placed under water ordrilling mud by tremie nor less than 400 kg/m3 where the pile will be exposed to sea water.

    2.4 PLACING CONCRETE

    2.4.1 General

    1 The workability and method of placing and vibrating the concrete shall be such that acontinuous monolithic concrete shaft of the full cross-section is formed.

    2 The concrete shall be placed without such interruption as would produce a cold joint in thepile. The method of placing shall be approved.

    3 The Contractor shall take all precautions in the design of the mix and placing of the concreteto avoid arching of the concrete in a temporary casing. No soil, liquid or other foreignmatter which would adversely affect the performance of the pile shall be permitted tocontaminate the concrete.

    2.4.2 Inspection

    1 Each pile bore which does not contain standing water or drilling fluid shall be inspecteddirectly or indirectly before to concrete is placed in it. This inspection shall be carried outfrom the ground surface in the case of piles of less than 750 mm diameter. Torches orother approved means of lighting, measuring tapes, and a means of measuring verticalityshall be provided. For piles of 750 mm diameter or larger, equipment shall be provided bythe Contractor to enable his representatives and the Engineer to descend into the bore forthe purpose of inspection. Any method of descent and the equipment used shall complywith the requirements of BS 5573.

    2.4.3 Cleanliness of Pile Bases

    1 On completion of boring and where inspection of a dry pile bore indicates the necessity,loose, disturbed or softened soil shall be removed from the bore. Where pile bores containwater or drilling fluid, a cleaning process shall be employed before concrete is placed, or theconcrete shall be placed by tremie method. Large debris or accumulated sediment, or bothof them, shall be removed using appropriate approved methods, which shall be designed toclean while at the same time minimising ground disturbance below the pile bases. Water ordrilling fluid shall be maintained at such levels throughout and following the cleaningoperation that stability of the bore is preserved.

    2.4.4 Workability of Concrete

    1 Slump measured at the time of discharge into the pile bore shall be in accordance with thestandards shown in Table 2.1.

    2 The concrete shall be of the workability approved under Clause 2.3.3 when in its finalposition and shall remain sufficiently workable for all pile construction procedures to besafely completed.

  • QCS Section 4 Part 2 General Requirements for Concrete Piles Page 5

    2.4.5 Compaction

    1 Internal vibrators may be used to compact concrete, with the approval of the Engineerobtained in advance for each specific use.

    Table 2.1

    Standards for Concrete Slump

    Slump

    Piling mix Minimum Rangeworkability mm mm Typical conditions of use

    A 75 75-150 Placed into water-free unlined orpermanently lined bore of 600 mmdiameter or over, or where concreteis placed below temporary casing,and where reinforcement is widelyspaced leaving ample room for freemovement of concrete betweenbars.

    B 100 100-200 Where reinforcement is not spacedwidely, where concrete is placedwithin temporary casings, wherepile bore is water-free, and thediameter less than 600 mm

    C 150 150 or more Where concrete is to be placed bytremie under water or drilling mud,or by pumping

    2.4.6 Placing Concrete in Dry Borings

    1 Approved measures shall be taken to ensure that the structural strength of the concreteplaced in all piles is not impaired through grout loss, segregation or bleeding.

    2 Concrete shall be placed by elephant trunk, and the free fall shall not exceed 1.2 m.

    2.4.7 Placing Concrete under Water or Drilling Fluid

    1 Before placing concrete, measures shall be taken in accordance with Clause 2.4.3 to ensurethat there is no accumulation of silt or other material at the base of the boring, and theContractor shall ensure that heavily contaminated bentonite suspension, which could impairthe free flow of concrete from the tremie pipe, has not accumulated in the bottom of thehole.

    2 Concrete to be placed under water or drilling fluid shall be placed by tremie and shall not bedischarged freely into the water or drilling fluid. Pumping of concrete may be approvedwhere appropriate.

    3 A sample of the bentonite suspension shall be taken from the base of the boring using anapproved sampling device. If the specific gravity of the suspension exceeds 1.20 theplacing of concrete shall not proceed. In this event the Contractor shall modify or replacethe bentonite as approved to meet the specification.

    4 The concrete shall be a rich, coherent mix and highly workable, and cement content shall bein accordance with Clause 2.3.5.

  • QCS Section 4 Part 2 General Requirements for Concrete Piles Page 6

    5 The concrete shall be placed in such a manner that segregation does not occur.

    6 The hopper and pipe of the tremie shall be clean and watertight throughout. The pipe shallextend to the base of the bore and a sliding plug or barrier shall be placed in the pipe toprevent direct contact between the first charge of concrete in the tremie and the water ordrilling fluid. The pipe shall at all times penetrate the concrete which has previously beenplaced and shall be withdrawn at a rate such that there shall be a minimum concrete coverof 2 m over the end of the tremie pipe, until completion of concreting. A sufficient quantityof concrete shall be maintained within the pipe to ensure that the pressure from it exceedsthat from the water or drilling fluid. The internal diameter of the tremie pipe shall be not lessthan 150 mm, and the maximum sized aggregate shall be 20 mm. It shall be so designedthat external projections are minimised, allowing the tremie to pass within reinforcing cageswithout causing damage. The internal face of the pipe of the tremie shall be free fromprojections.

    END OF PART

    2. GENERAL REQUIREMENTS FOR CONCRETE PILES2.1 General2.1.1 Scope2.1.2 References2.2 MATERIALS2.2.1 Cement2.2.2 Aggregate2.2.3 Water2.2.4 Admixtures2.2.5 Steel Reinforcement and Prestressing Steel2.3 CONCRETE MIXES FOR PILING WORK2.3.1 General2.3.2 Grade Designation2.3.3 Designed Mix2.3.4 Durability2.3.5 Minimum Cement2.4 PLACING CONCRETE2.4.1 General2.4.2 Inspection2.4.3 Cleanliness of Pile Bases2.4.4 Workability of Concrete2.4.5 Compaction2.4.6 Placing Concrete in Dry Borings2.4.7 Placing Concrete under Water or Drilling Fluid